Page 1: Marine risk topic heavy lift cargo 2013

Corporate customers

Risk TopicHeavy Lift and Project Cargo

Luis VitirittiZRE Marine and Fleet [email protected]+55 11 99945-2376

Sept 2013

Page 2: Marine risk topic heavy lift cargo 2013

Size, weight and CoG matters

2

Page 3: Marine risk topic heavy lift cargo 2013

Total Project Cargo Risk

3

Cargo

Infra

Process

People

• Cargo design• Characteristics• Needs

• Equipment's • Means of transportation• Route / Soil / weather / tides

Low

Moderate

High

• Quality• Control• Review• Risk

management• Manager• Training• People skill• Commitment

??

What is the Risk?

Page 4: Marine risk topic heavy lift cargo 2013

General recommendations

• Request basic information related to cargo specially for the critical items

• Request to customer and/or broker the schedule and project agenda

• Customer should be prepared – Plan for the Project• Request assistance for Risk Engineer support, specially for

calculation - lift, stability and transport• CoG – Center of Gravity information is the main topic for heavy

lift cargoes– Lifting, Lashing, Dunage and Protection

• The critical points should be well prepared, such as:– Loading, unloading, lifting, transport in camber surfaces

• Route, parking and soil surfaces should be analyzed prior voyage or parking

• An engineer should review all equipment and means of transportation

Page 5: Marine risk topic heavy lift cargo 2013

Basic info from Project Cargo Specially for critical items

• Length X width X height of overall cargo• Weight per piece of cargo• Value and quantity of cargo• Dispatcher and where should be loaded• End destination and where should be discharged (site destination)• When / Agenda• Total volume (m3) / weight (ton) and heaviest piece• Lifting points and transport saddles• Foundations on which the load has to be set• Packaging and CoG (center of gravity)• Infra structure of the job site• Quay heights, strength, tidal differences and levels in relation to

top quay

5

Page 6: Marine risk topic heavy lift cargo 2013

Topics to take care

• Wind forces and speed• Route path, bridges, land scape, hills, friction forces, etc• Weather reports (heavy rain, rain, flood, etc)• Tides and heights• NATHAZ and Earthquake history

6

Page 7: Marine risk topic heavy lift cargo 2013

Another important cares

7

Page 8: Marine risk topic heavy lift cargo 2013

Plan your projectWhy we make a planning schedule?

8

• To create an overview of the work we plan to execute• By placing all tasks in a row, we can identify which tasks can

be execute in parallel to each other to save valuable time• Watch out the project and prepare for weather circumstances

and force majeure• Most accidents happens due to human error • Divide workforce in teams and skills• Help for cost reduction and prepare• To track and help memory• Simple method to inform

Page 9: Marine risk topic heavy lift cargo 2013

Recs to avoid accidents

9

• Be alert and think well about actions. Avoid sudden movements

• When lift loads be aware which load will be suspended in the crane. The correct weight is therefore essential.

• Ask yourself again and again which forces will act on the load due to certain actions.

• Be aware of the consequences of an accident and always work safely

• Always use your proper PPE equipment (Personal protective equipment)

• Do not a work in heights without a proper protection• Make your risk analysis• Stays within a vertical plane• Watch our for the right position• Before a fob make a toolbox meeting

Page 10: Marine risk topic heavy lift cargo 2013

Wind and water forces

10

Page 11: Marine risk topic heavy lift cargo 2013

Different cargo = different solution

11

Page 12: Marine risk topic heavy lift cargo 2013

Conclusion

12

• We need to analyze each project and think about risk prior going further

• Use the Marine Grading methodology to discuss with customers and brokers prior accepting Project Cargo shipments and policies

• There are a lot of engineering solutions for different size and types of Project Cargo

• Project Cargo is an opportunity to learn about customer profile and risk appetite

• Project Cargo is also a Cross Sell opportunity for other LOBs such as construction and property

• Following customer in the whole process of Project Cargo makes customer feel secure

Page 13: Marine risk topic heavy lift cargo 2013

13

References

• A special thanks to Mr. Richard Krabberdam from www.heavyliftspecialists.com who teach and share a lot of knowledge about Project Cargo and Break Bulk

http://www.heavyliftspecialist.com/

05-06 Sept 2013

Page 14: Marine risk topic heavy lift cargo 2013

Video and info experience

• http://www.heavyliftspecialist.com/video-picture-gallery/• http://www.faymonville.com/home.aspx?id=549• http://egytrans.com/• http://www.alatasbiglift.com/gallery/• http://www.fwpl.in/site/default.htm• http://www.jumbomaritime.nl/site/en/news/mediagallery

14

Many Thanks!