Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

12

Transcript of Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Page 1: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.
Page 2: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Unload-n-lock Committee

Maria Campos

Emmanuela Neba

Gabriella Fragoso

CIS 1020-126 Fall 2011

Page 3: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

For

President BioteauSalt Lake Community College

Page 4: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Proposal

• We would like funding to provide students and professors with their own personal lockers in each building. To keep their belongings such as; Books, Files, Lunch, Important Papers, and Projects.

Page 5: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Benefits

• Students will be able to keep books and important things at school.

• Easier for students to be prepared for class. • Less of a strain on students backs and

shoulders.

Page 6: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Lockers

Buildings # in Buildings Cost of each locker Total Cost

AD Building 192 $ 23.00 $ 4,416.00

AT Building 58 $ 23.00 $ 1,334.00

ATC Building 56 $ 23.00 $ 1,288.00

Buisness Building 116 $ 23.00 $ 2,668.00

CDL Building 28 $ 23.00 $ 644.00

CT Building 76 $ 23.00 $ 1,748.00

LAC Building 300 $ 23.00 $ 6,900.00

Science Building 192 $ 23.00 $ 4,416.00

Student Center 200 $ 23.00 $ 4,600.00

TB Building 240 $ 23.00 $ 5,520.00

Page 7: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Graph

Ad Building

AT Building

ATC Building

Business

Building

CDL Build

ing

CT Building

LAC Build

ing

Science

Building

Student C

enter

TB Building

10

100

1000

10000

19258 56 116

2876

300192 200 240

44161334 1288 2668

6441748

69004416 4600 5520

Lockers

# In buildings Cost in each

Am

ount

Page 8: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Total CostBuildings Total Cost

CDL Building $ 644.00

ATC Building $ 1,288.00

AT Building $ 1,334.00

CT Building $ 1,748.00

Buisness Building $ 2,668.00

AD Building $ 4,416.00

Science Building $ 4,416.00

Student Center $ 4,600.00

TB Building $ 5,520.00

LAC Building $ 6,900.00

Page 9: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Graph

CDL Building

ATC Building

AT Building

CT Building

Buisness Building

AD Building

Science Building

Student Center

TB Building

LAC Building

$- $2,000.00 $4,000.00 $6,000.00 $8,000.00

Total Cost

Total Cost

Total Cost For each Building

Build

ings

Page 10: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Result

The total cost for lockers $33,534.00

Page 11: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

Lighter loads is such a relief!

Page 12: Maria Campos Emmanuela Neba Gabriella Fragoso CIS 1020-126 Fall 2011.

I hope you consider funding the Unload-n-Lock Committee because it will help students.

Thank you