Transcript of March 2011 Project Update
![Page 1: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/1.jpg)
Project Update
April 11th , 2011
![Page 2: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/2.jpg)
Roadway Projects
![Page 3: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/3.jpg)
• Opened both Northbound lanes 2/22 • Street lighting conflict with CenterPoint
power lines scheduled for completion by the end of April
• Work continues on the project to complete outstanding items
Cullen Parkway
![Page 4: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/4.jpg)
Cullen Parkway
![Page 5: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/5.jpg)
Phase II – Mary’s Creek Bypass to SH35
• Opened to 4 lanes on 4/6 • Completed landscape and irrigation
installation; conducted substantial completion inspection with TxDOT
• Completed major sidewalk and brick paver installation
• Continued traffic signal installation network
Dixie Farm Road
![Page 6: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/6.jpg)
![Page 7: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/7.jpg)
• One lane closure between SH 35 and Veterans allowing only westbound traffic
• Brush cleared between Veterans and BNSF railroad tracks
• Began installing 10x4 RCB east of Veterans • Conflicts were identified with the relocation
of three CenterPoint Energy power poles and a resolution has been initiated.
• Utility relocation continues
Walnut Reconstruction
![Page 8: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/8.jpg)
Construction Phase III – Morgan to Harkey and CR 89
• Contractor completed paving at the remediation areas east of FM 1128
• CenterPoint installed 2nd arm for Southfork streetlights; working on plan for Magnolia streetlights
• Initiated ditch re-grading, base and asphalt work on east side of FM 1128
• Late April/Early May opening
Magnolia Road
![Page 9: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/9.jpg)
![Page 10: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/10.jpg)
• Green Armor installation is scheduled to be
complete by mid-April • Final walk-through scheduled for the end of
April
Town Ditch Phase III
![Page 11: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/11.jpg)
![Page 12: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/12.jpg)
• Orange Street has been closed to westbound traffic between SH 35 and Mykawa to begin the installation of utilities and grading
• Began installation of inlets • Continued coordination with the utility
companies • AT&T has many conflicts that are affecting
the project
Orange Street
![Page 13: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/13.jpg)
• Returned plan review of 100% plans with
drainage updates to the engineer for revisions • Traffic counts and noise measurements
completed for Noise Impact Analysis; Engineer working on draft report submission
• ROW acquisition underway – 61 of 65 parcels acquired, 4 in condemnation (May 16th)
Bailey Road (Veterans to FM1128)
![Page 14: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/14.jpg)
• Irrigation and landscaping ongoing; working with HOA for upgrades
• Final clean-up in progress
McHard Road (Country Place to Cullen)
![Page 15: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/15.jpg)
McHard Road (Soundwall Construction)
• CenterPoint installed new transmission lines
along north side of McHard in order to de-energize and remove lines on the south side.
• North side wall placement complete with the exception of Sound Fighter gate installation
• Majority of south side mow strip, column, and panel placement complete
![Page 16: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/16.jpg)
![Page 17: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/17.jpg)
• Two lanes of paving Flea Market to Walmart • Working with TxDOT to address local
business concerns • USACE issued permit for low water crossing
on Hickory Slough • All utilities have been relocated along SH35
with the exception of the contaminated soil area & water line on bridge
SH35 – BW8 to FM518
![Page 18: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/18.jpg)
![Page 19: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/19.jpg)
• Utility relocates and coordination ongoing • Initiated slip form from Kirby to Clear
Creek Bridge • Bridge deck at Clear Creek Bridge poured • Storm Sewer Completed
FM 2234 Widening
![Page 20: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/20.jpg)
![Page 21: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/21.jpg)
• Cabinet box, controller and signal heads delivered to contractor site
• Bollards installed and painted • CenterPoint pole adjustments and tree
clearing scheduled for completion this month
Interim Traffic Signal Installation – Mykawa Road at Brookside Road
![Page 22: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/22.jpg)
![Page 23: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/23.jpg)
Drainage Projects
![Page 24: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/24.jpg)
Detention Pond • Pond B excavation complete; Pilot channel
installation in progress • Excavation of diversion channel from Pond A to
CR 143 complete • Hauling activities and fill placement at designated
fill sites continued • City staff finalized pump configuration • Waiting for engineer to complete plan revisions
for pump station
Cowart Creek Diversion
![Page 25: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/25.jpg)
![Page 26: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/26.jpg)
Diversion Ditch • Conoco Phillips issued NTP • CR100 closure thru next week • Veterans closure late April – 4-6 weeks • Awaiting re-submittal of 90% N/S Ditch
plans
Cowart Creek Diversion
![Page 27: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/27.jpg)
Facility Projects
![Page 28: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/28.jpg)
• Completed below slab utilities, water, sewer,
electrical, and data • 95% complete on Site Utilities, including internal
drainage, electrical and phone and prep’d for installation of fiber optic to PSB
• Poured slab with cut outs for tilt wall panels • Reviewing Building access control options and costs
Hillhouse Road Service Center
![Page 29: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/29.jpg)
![Page 30: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/30.jpg)
• Continuing work on Interview Room Recording System – New cameras & mics were installed in two rooms for a
three week test period – Audio, video, and playback of new equipments meets
needs – Contractor directed to install this setup in all interview
rooms • Performed Final Acceptance Walkthrough on
March 21st . The contractor is working to complete additional items
Public Safety Building
![Page 31: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/31.jpg)
• Held final walk-through • Continued working through warranty items,
Fire Marshal’s issues, and Architectural Barrier issues resolved
• All furniture has arrived • Intercom system was installed
Fire Station #5
![Page 32: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/32.jpg)
![Page 33: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/33.jpg)
• Underground utilities complete • Began erection of pre-engineered building • Driveways and 50% of parking/paving has
been poured
Fire Station #6
![Page 34: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/34.jpg)
• HGAC grant application has been submitted • Staff has reviewed 60% design plans and
specs • Working to advertise the project once the
HGAC grant is approved
Pearland Gateway – Project Stars
![Page 35: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/35.jpg)
Parks
![Page 36: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/36.jpg)
• Revised plans received from architect. Held pre-development meeting with Planning to clarify permitting issues with shade structures
• Plans submitted for review through development department and CIP review processes
Trail Connectivity
![Page 37: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/37.jpg)
• Held progress meeting to review park amenities, type and cost of fields, and brought project in line with current budget and cost estimates
• Met with BDD4 to review pond function, H&H model, access, and property acquisition, and identified need for Interlocal Agreement
• CR403 Extension per SPA with MUD#16 • Set up coordination meeting with MUD #16
Engineer and developer
Sports Complex at Max Road
![Page 38: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/38.jpg)
Utility Projects
![Page 39: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/39.jpg)
30” Waterline Interconnect
• The sub-contractor has drilled the piers on the North side of Clear Creek for the aerial crossing
• The 30” waterline has been pressure tested from McHard to the Alice Street Water Plant
• Completed installation of 20” distribution waterline from Alice Street Water Plant along McHard to Old Alvin Rd.
• Fuqua line and meter station underway • CoH 72” line scheduled for completion in July 2011
City of Houston Interconnect
![Page 40: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/40.jpg)
20” waterline with Gate Valve at Alice Street Water Plant
![Page 41: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/41.jpg)
City of Houston Interconnect
Alice Street Water Plant • Industrial TX continued working on the pump
building and chemical facility • Preload completed the construction of the interior
of the ground storage tank • Upon completion of the 30” waterline, Preload
will test the ground storage tank • Poured the slab for the turbine facility
![Page 42: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/42.jpg)
![Page 43: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/43.jpg)
South SH 35 Interim Lift Station at Industrial Drive
• Plans were revised. Request for proposal submitted to the contractor
• Proposal received from contractor and is currently under review
• Revisions will result in a deductive Change Order
![Page 44: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/44.jpg)
• Revised Design Services proposal to remove filter lift station & filter evaluation from design effort after filter evaluation letter report was completed
• Negotiated revised design contract • Prepared contract for presentation to
Council for award
Longwood WWTP Rehabilitation
![Page 45: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/45.jpg)
• Plant personnel are cleaning out the old storage basin to be reconstructed as the new thickener, for surveyor work on topographic plant site
• Met with geotech engineer and structural engineer on site to discuss bridge design issues
• Structural design of bridge and thickener equipment is underway
Barry Rose WWTP Rehabilitation
![Page 46: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/46.jpg)
• Negotiated design contract • Engineer prepared revised proposal • Presenting agreement and proposal to Council for
consideration
Hatfield Basin Trunk Sewer
![Page 47: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/47.jpg)
• Held project kick-off meeting • PER phase underway
Twin Creek Regional Lift Station
![Page 48: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/48.jpg)
Far Northwest Wastewater Treatment Plant Improvements
• Staff received and reviewed proposal for
equipment repairs and upgrades from decanter manufacturer
• Scheduling to meet with UV system manufacturer
![Page 49: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/49.jpg)
Old Alvin 20” Waterline
• Contract for PER services awarded at Council • Held Kick-off meeting
![Page 50: March 2011 Project Update](https://reader034.fdocuments.in/reader034/viewer/2022042719/568bf06a1a28ab89338f9047/html5/thumbnails/50.jpg)
Project Update
Questions/Comments
April 11th , 2011