MAPS 3 Trail ImprovementsPhase 3, Project 3
Lake Stanley Draper TrailProject Number: M3‐T003B
FINAL PLANSTRIAD DESIGN GROUP
November, 2017
![Page 2: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/2.jpg)
Phase 3, Project 3 Section Overview
Total Alignment Length: 4.52 miles Alignment begins 1500’ south of I‐240 on Midwest Boulevard Draper Trail will connect to existing Tinker‐Draper Trail Major Intersections :
Midwest Boulevard Douglas Boulevard Post Road Westminster Road S.E. 104th Street
Trail is a minimum of 25 feet from Midwest Boulevard and Stanley Draper Drive with the exception of the creek crossings.
Creek crossings require extension of existing drainage structures and guardrail along the roadway where guardrail has not been installed.
![Page 3: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/3.jpg)
Phase 3, Project 3 Construction Cost Overview
Construction Budget: $3,415,000 Construction Cost Estimate: $3,290,000
![Page 4: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/4.jpg)
Stanley Draper Dr.
I‐240
Midwest B
oulevard
Midwest Blvd. to Stanley Draper Dr.
![Page 5: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/5.jpg)
Stanley Draper Dr.
I‐240
Midwest B
oulevard
Midwest Blvd. to Stanley Draper Dr.
![Page 6: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/6.jpg)
Stanley Draper Dr.
I‐240
Midwest B
oulevard
Midwest Blvd. to Stanley Draper Dr.
Extend 4’ x 4’ RCB 28 feet and install 400 feet of guardrail
![Page 7: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/7.jpg)
Stanley Draper Dr.
I‐240
Midwest B
oulevard
Midwest Blvd. to Stanley Draper Dr.
Connection to Tinker‐Draper Trail
TRAIL LOCATION
![Page 8: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/8.jpg)
I‐240
Stanley Draper Drive
Doug
las B
lvd.
Lake Stanley Draper
Midwest B
oulevard
Midwest Blvd. to Douglas Blvd. along Stanley Draper Dr.
![Page 9: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/9.jpg)
I‐240
Stanley Draper Drive
Doug
las B
lvd.
Lake Stanley Draper
Midwest B
oulevard
Midwest Blvd. to Douglas Blvd. along Stanley Draper Dr.
Extend existing 60’ RCP 14 feet.
Existing guardrail in place.
![Page 10: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/10.jpg)
I‐240
Stanley Draper Drive
Doug
las B
lvd.
Lake Stanley Draper
Midwest B
oulevard
Midwest Blvd. to Douglas Blvd. along Stanley Draper Dr.
Extend existing 72” RCP 40 L.F.
Trail Greater than 25 feet from road, new
guardrail is not required.
![Page 11: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/11.jpg)
I‐240
Stanley Draper Drive
Doug
las B
lvd.
Lake Stanley Draper
Midwest B
oulevard
Midwest Blvd. to Douglas Blvd. along Stanley Draper Dr.
View from Trail to Lake
![Page 12: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/12.jpg)
I‐240
Stanley Draper Drive
Doug
las B
lvd.
Lake Stanley Draper
Midwest B
oulevard
Midwest Blvd. to Douglas Blvd. along Stanley Draper Dr.
TRAIL LOCATION
![Page 13: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/13.jpg)
I‐240
Stanley Draper Drive
Doug
las B
lvd.
Lake Stanley Draper
Midwest B
oulevard
Midwest Blvd. to Douglas Blvd. along Stanley Draper Dr.
Extend 4 – 72” RCP 20 feet. Existing guardrail in place.
![Page 14: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/14.jpg)
SE 89th Street
S. Post R
oad
Stanley Draper Drive
Doug
las B
lvd.
Douglas Blvd to Post Rd.
![Page 15: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/15.jpg)
Post Rd. along Stanley Draper Dr. to SW 104th. St.
SW 104th. St.
S. Post R
oad
![Page 16: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/16.jpg)
Post Rd. along Stanley Draper Dr. to SW 104th. St.
SW 104th. St.
S. Post R
oad
![Page 17: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/17.jpg)
Post Rd. along Stanley Draper Dr. to SW 104th. St.
SW 104th. St.
S. Post R
oad
TRAIL LOCATION
![Page 18: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/18.jpg)
Phase 3, Project 3 Construction Cost Overview
November 2017: MAPS Board Meeting for recommendation to City Council to advertise for bids
November 8, 2017: Advertise for Bids November 29, 2017 – Receive Bids December 20, 2017 – Recommendation to Subcommittee December 21, 2017 – Recommendation to Citizens Advisory Board
January 2, 2018 – Award of Construction Contract by City Council
January 3, 2018 – Notice to Proceed for Construction August 2018 – Construction Complete
![Page 19: MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley ...€¦ · MAPS 3 Trail Improvements Phase 3, Project 3 Lake Stanley Draper Trail Project Number: M3‐T003B FINAL PLANS](https://reader030.fdocuments.in/reader030/viewer/2022040611/5ed504b7ad38025d974e463e/html5/thumbnails/19.jpg)