MANUFACTURING PLANNING & CONTROL SYSTEM

40
MANUFACTURING PLANNING & MANUFACTURING PLANNING & CONTROL SYSTEM CONTROL SYSTEM Make the right goods at the right time at top qual and do so as economically as possible.

description

MANUFACTURING PLANNING & CONTROL SYSTEM. Make the right goods at the right time at top quality and do so as economically as possible. Manufacturing Planning and Control (MPC). Production planning Implementation and Control Inventory Management. - PowerPoint PPT Presentation

Transcript of MANUFACTURING PLANNING & CONTROL SYSTEM

Page 1: MANUFACTURING PLANNING & CONTROL SYSTEM

MANUFACTURING PLANNING MANUFACTURING PLANNING & CONTROL SYSTEM& CONTROL SYSTEM

Make the right goods at the right time at top qualityand do so as economically as possible.

Page 2: MANUFACTURING PLANNING & CONTROL SYSTEM

Manufacturing Planning and Manufacturing Planning and Control (MPC)Control (MPC)

1. Production planning

2. Implementation and Control

3. Inventory Management

Manufacturing Planning and Control is responsible for the planning and control of the flow of material through the manufacturing processThe primary activities carried out are as follows:

Page 3: MANUFACTURING PLANNING & CONTROL SYSTEM

A good planning systemA good planning system

• What are we going to make ?

• What does it take to make it ?

• What do we have ?

• What do we need ?

Page 4: MANUFACTURING PLANNING & CONTROL SYSTEM

PRIORITY(Demand)

Capacity(Resources)

PRIORITY-CAPACITY RELATIONSHIP

Priority relates to what product are needed, how many are needed, and when they are needed.

Capasity is the capability of manufacturing to produce goods and services.Eventally it depends on the resources of the company : the machinery, labor, and financial resource , and the availability of material from suppliers.

Page 5: MANUFACTURING PLANNING & CONTROL SYSTEM

MPCMPC

• 5 Mayor level :

- Strategic business plan

- Production Plan

- Master Production Schedule

- Material Requirements Plan

- Purchasing and Production Activity Control

Page 6: MANUFACTURING PLANNING & CONTROL SYSTEM

STRATEGICBUSSINESS

PLAN

ProductionPlan

Financial Plan

MarketingPlant

EngineeringPlan

Page 7: MANUFACTURING PLANNING & CONTROL SYSTEM

Strategic businessplan

Production plan

Master prod schedule

Material req plan

Prod activity cont.& puchasing

Planning

implementation

Master Plan

ManufacturingPlanning and Control system

Page 8: MANUFACTURING PLANNING & CONTROL SYSTEM

PRODUCTION PLANPRODUCTION PLAN

• Quantity of each product group that must be produced in each period

• Desired Inventory levels

• Resources of equipment, labor, and material needed in each period

• Availability of the resources needed

Page 9: MANUFACTURING PLANNING & CONTROL SYSTEM

Master Production ScheduleMaster Production Schedule

• Plan for the production of individual end items.

• Level of detail for the MPS is higher than for the production plan

Page 10: MANUFACTURING PLANNING & CONTROL SYSTEM

Material Requirements PlanMaterial Requirements Plan

• Plan for Production and Purchase of the components used in making the items in the master production schedule.

• The levels of detail is high

Page 11: MANUFACTURING PLANNING & CONTROL SYSTEM

Purchasing and Production Activity Purchasing and Production Activity ControlControl

• Represent the implementation and control phase of the production planning and control system.

• Purchasing is responsible for establishing and controlling the flow of raw materials into factory.

• Production and Activity Control is responsible for planning and controlling the flow of work through the factory.

Page 12: MANUFACTURING PLANNING & CONTROL SYSTEM

Capacity ManagementCapacity Management

• At each level in the manufacturing planning and control system, the priority plan must be tested against the available resources and capacity of the manufacturing system.

Page 13: MANUFACTURING PLANNING & CONTROL SYSTEM

MPS

RRP

I/O Cont.

Ops. Seq

CRP

RCCP

ManajemenPermintaan

STRAG BIS

Perencanaan.Produksi

MRP

PAC

Perencanaan Prioritas

Perencanaan Kapasitas

Purchasing

RRP = Resource Requirement PlanningRCCP = Rough-Cut Capacity PlanningCRT = Capacity Requirement Planning

Page 14: MANUFACTURING PLANNING & CONTROL SYSTEM

MRP II System

Business Planning

Marketing Planning

Production Planning

Master ProductionScheduling

Material RequirementPlanning

Production Activity Control- Order release- Operation scheduling- Dispatching- Expediting- Production reporting

Performance Measurement

Purchasing- Vendor selection- Order placement- Vendor scheduling- Order follow-up

Demand Management - Forecasting - Distribution Requirement Planning - Order Entry

Final AssemblyScheduling

Resource Planning

Rough-Cut CapacityPlanning

Capacity RequirementPlanning

Operation Management Execution

Top

Management

Planning

Operation

Management

Planning

Page 15: MANUFACTURING PLANNING & CONTROL SYSTEM

MANUFACTURING RESOURCE MANUFACTURING RESOURCE PLANNING ( MRP II )PLANNING ( MRP II )

• MRP II provides coordination between marketing and production, marketing, finance, and production agree on a total workable plan expressed in the production plan.

• Fully integrated planning and control system.

Page 16: MANUFACTURING PLANNING & CONTROL SYSTEM

ENTERPRISE RESOURCE ENTERPRISE RESOURCE PLANNING ( ERP )PLANNING ( ERP )

• ERP is similar to the MRP II system except it dose not dwell on manufacturing. The whole enterprise is teken into account.

• APICS : An accounting oriented information system for identifying and palnning the enterprise – wide resources needed to make, ship, and account for customer orders.

Page 17: MANUFACTURING PLANNING & CONTROL SYSTEM

Demand ManagementDemand Management

Four mayor activities :

• Forecasting.

• Order Processing.

• Making delivery promises.

• Interfacing between manufacturing planning & control and the marketplace.

Page 18: MANUFACTURING PLANNING & CONTROL SYSTEM

Forecasting Forecasting

Forecasting adalah sebuah prediksi mengenai apa yang akan terjadi di masa yang akan datang.

Tiga Kategori Forecasting :

• Qualitative

• Extrinsic

• Intrinsic

Page 19: MANUFACTURING PLANNING & CONTROL SYSTEM

Qualitative techniquesQualitative techniques

• Projections based on judgement, intuition and informed opinions.

• By their nature, they are subjective.

Page 20: MANUFACTURING PLANNING & CONTROL SYSTEM

Extrinsic TechniquesExtrinsic Techniques

• Projection based on external indicators which relate to the demand for company’s products.

• Example : sales of automobile tires are proportional to gasoline comsumption.

Page 21: MANUFACTURING PLANNING & CONTROL SYSTEM

Intrinsic TechniquesIntrinsic TechniquesA 12-month demand historyA 12-month demand history

Month Demand Month Demand

January 92 July 84

February 83 August 81

March 66 September 75

Aprill 74 October 63

May 75 November 91

June 84 December 84

Page 22: MANUFACTURING PLANNING & CONTROL SYSTEM

Intrinsic TechniquesIntrinsic Techniques

Based on single month :

• Demand this month will be the same as last month 84

• Demand this month wil be the same as demand the same month last year 92

Page 23: MANUFACTURING PLANNING & CONTROL SYSTEM

Intrinsic TechniquesIntrinsic Techniques

• Avarage demand : 79

• Moving avarages, exp 3-month moving average,

• Forecast January (63+91+84)/3 = 79

• Suppose that January demand turned out to be 90 instead of 79,

• Forecast February (91+84+90)/3 = 88

Page 24: MANUFACTURING PLANNING & CONTROL SYSTEM

Rata-rata Bergerak Rata-rata Bergerak TertimbangTertimbang

• Misal untuk bulan Oktober (90), September (110) dan Agustus (130); diberi bobot tertimbang masing-masing 3, 2, 1 maka ramalan pada bulan Nopember adalah :

• (3(90) + 2(110) + 1(130) )/ (3 + 2 + 1) = 103.3

Page 25: MANUFACTURING PLANNING & CONTROL SYSTEM

Intrinsic TechniquesIntrinsic TechniquesExponensial SmoothingExponensial Smoothing

Perioda Bulan Pesanan Ramalan α = 0.1

Ramalan α = 0.3

1 Januari 120 --- ---

2 Februari 90 120.0 120.0

3 Maret 100 117.0 111.0

4 April 75 115.3 107.7

5 Mei 110 111.3 97.9

6 Juni 50 111.2 101.5

7 Juli 75 105.1 86.1

8 Agustus 130 102.1 82.8

9 September 110 104.9 97.0

10 Oktober 90 105.4 100.9

11 November -- 103.9 97.6

Page 26: MANUFACTURING PLANNING & CONTROL SYSTEM

Penghalusan EksponensialPenghalusan Eksponensial

• Permintaan bulan Februari D2 = 90

• Ramalan bulan Februari F2 = 120• F3 = α D2 + (1-α) F2

= (0.1) (90) + (0.9) (120)

= 117

• F4 = α D3 + (1-α) F3

= (0.1) (100) + (0.9) (117)

= 115.3

Exponensial Smoothing

Page 27: MANUFACTURING PLANNING & CONTROL SYSTEM

Seasional IndexSeasional Index

Seasional sales history

Year Quarter

1 2 3 4 Total

1 122 108 81 90 401

2 130 100 73 96 399

3 132 98 71 99 400

Average 128 102 75 95 400

Page 28: MANUFACTURING PLANNING & CONTROL SYSTEM

Seasional IndexSeasional Index

• Seasional Index = (period avg demand) / (avg demand for all periods)

• SI = 128 / 100 = 1.28 untuk kwartal-1

• SI = 102 / 100 = 1.02 untuk kwartal-2

• SI = 75 / 100 = 0.75 untuk kwartal-3

• SI = 95 / 100 = 0.95 untuk kwartal-4

• The company forecast an annual demand next year of 420 units

Page 29: MANUFACTURING PLANNING & CONTROL SYSTEM

Seasional IndexSeasional Index

• Forecast average quarterly demand

= 420 / 4 = 105 units

Expected first-quarter demand

= 1.28 x 105 = 134.4 units

Expected second-quarter demand

= 1.02 x 105 = 107.1 units

Page 30: MANUFACTURING PLANNING & CONTROL SYSTEM

STRATEGI PERENCANAAN STRATEGI PERENCANAAN PRODUKPRODUK

• LEVEL METHOD

• CHASE STRATEGY

• HYBRID / COMPROMISE

• SUBCONTRACTOR

Page 31: MANUFACTURING PLANNING & CONTROL SYSTEM

0

2

4

6

8

10

1 2 3 4 5 6 7 8 9 10 11 12

Series1

Page 32: MANUFACTURING PLANNING & CONTROL SYSTEM

0

2

4

6

8

10

1 2 3 4 5 6 7 8 9 10 11 12

Series1

CHASE

Page 33: MANUFACTURING PLANNING & CONTROL SYSTEM

0

2

4

6

8

10

1 2 3 4 5 6 7 8 9 10 11 12

Series1

Series2

LEVELING PRODUCTION

Page 34: MANUFACTURING PLANNING & CONTROL SYSTEM

0

2

4

6

8

10

1 2 3 4 5 6 7 8 9 10 11 12

Series1

Series2

HYBRID / COMPROMISE

Page 35: MANUFACTURING PLANNING & CONTROL SYSTEM

Permintaan Produksi Inventori

PERIODA 0 1 2 3 4 5 6 7 8 9 10 11 12

PERMINTAAN TOTAL   5 5 5 15 25 35 35 35 35 25 15 5

INVENTORY 30                        

Page 36: MANUFACTURING PLANNING & CONTROL SYSTEM

DESKRIPSI0 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

1. Permintaan Total 5 5 5 15 25 35 35 35 35 25 15 5 2402. Rencana Produksi (LP) 20 20 20 20 20 20 20 20 20 20 20 20 2403. Inventori (LP) 30 45 60 75 80 75 60 45 30 15 10 15 30 5404. Rencana Produksi (CS) 5 5 5 15 25 35 35 35 35 25 15 5 2405. Inventori (CS) 30 30 30 30 30 30 30 30 30 30 30 30 30 3606. Rencana Produksi (Com) 0 0 0 0 40 40 40 40 40 40 0 0 2407. Inventori (Com) 30 25 20 15 0 15 20 25 30 35 50 35 30 300

DESKRIPSI0 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

1. Permintaan Total 10 10 10 20 20 20 30 30 30 70 55 352. Rencana Produksi (LP)3. Inventori (LP) 04. Rencana Produksi (CS)5. Inventori (CS) 06. Rencana Produksi (Com)7. Inventori (Com) 0

PERIODA WAKTU ( BULAN)

PERIODA WAKTU ( BULAN)

Permintaan Produksi Inventori

Page 37: MANUFACTURING PLANNING & CONTROL SYSTEM

Total CostTotal Cost

• If the cost of carrying inventory is $5 per case per periode based on ending inventory, what is the total of carrying inventory

• If the cost changing production level is $20, What is the total cost of the plan

Page 38: MANUFACTURING PLANNING & CONTROL SYSTEM

PROBLEMPROBLEM

• A Company wants to produce 10,000 units of an item over teh nest three months at a level rate. The first month has 20 working days, the second, 21 working days, and the third, 12 working days because of an annual shutdown. On the average, how much should the company produce each day to level production?

Page 39: MANUFACTURING PLANNING & CONTROL SYSTEM

PROBLEMPROBLEM

• Amalgamated Fish Sinkers makes a product group of fresh fish sinkers and wants to develop a production plan for them. The expected opening inventory is 100 cases, and they want to reduce that to 80 cases by the end of the planning period. The number of working days is the same for each period. There are no back orders. The expected demand for the fish sinkers per period is as follows: 110, 120, 130. 120, 120.

• a. How much should be produced each period?• b. What is the ending inventory for each period?• c. If teh cost of carrying inventory is $5 per case per

period based on ending inventory, what is the total cost of carrying inventory?

• d. What will be the total cost of the plan?

Page 40: MANUFACTURING PLANNING & CONTROL SYSTEM