Jul. 21, 2010 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-30513 USER INFORMATION: GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORM4ATION: TO: GERLACH*ROSE M 07/21/2010 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material. TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 07/09/2010 ADD MANUAL TABLE OF CONTENTS DATE: 07/20/2010 CATEGORY: DOCUMENTS TYPE: TRM2 4D0

Transcript of MANUAL HARD COPY DISTRIBUTION · 2012. 12. 3. · manual hard copy distribution document...

  • Jul. 21, 2010

    Page 1 of 2

    MANUAL HARD COPY DISTRIBUTION

    DOCUMENT TRANSMITTAL 2010-30513

    USER INFORMATION:

    GERLACH*ROSE M EMPL#:028401 CA#: 0363

    Address: NUCSA2

    Phone#: 254-3194

    TRANSMITTAL INFORM4ATION:

    TO: GERLACH*ROSE M 07/21/2010

    LOCATION: USNRC

    FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

    THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED

    TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON

    THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE

    UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS

    FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF

    ERRORS.

    ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no

    TOC will be issued with the updated material.

    TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2

    REMOVE MANUAL TABLE OF CONTENTS DATE: 07/09/2010

    ADD MANUAL TABLE OF CONTENTS DATE: 07/20/2010

    CATEGORY: DOCUMENTS TYPE: TRM2

    4D0

  • Jul. 21, 2010

    Page 2 of 2

    ID: TEXT 3.4.6

    ADD: REV: 0

    CATEGORY: DOCUMENTS

    ID: TEXT B3.4.6

    ADD: REV: 0

    CATEGORY: DOCUMENTS

    ID: TEXT LOES

    REMOVE: REV:61

    TYPE: TRM2

    TYPE: TRM2

    ADD: REV: 62

    CATEGORY:

    ID: TEXT

    REMOVE:

    DOCUMENTS

    TOC

    REV:17

    TYPE: TRM2

    ADD: REV: 18

    ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR

    ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN

    ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE

    COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL

    USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN

    YOUR NIMS INBOX.

  • SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    Table Of ContentsIssue Date: 0

    Procedure Name

    TEXT LOES

    Title: LIST OF EF]

    7/20/2010'

    Rev

    62

    FECTIVE SECTIONS

    Issue Date

    07/20/2010

    Change ID Change Number

    TEXT TOC

    Title:

    18 07/20/2010

    TABLE OF CONTENTS

    TEXT 1.1 0 11/19/2002

    Title: USE AND APPLICATION DEFINITIONS

    TEXT 2.1 1 02/04/2005

    Title: PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS

    TEXT 2.2 9 02/12/2010

    Title: PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE

    TEXT 3.0 4 05/23/2008

    Title: APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY.

    TEXT 3.1.1 1 .11/09/2007

    Title: REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD

    INJECTION (ATWS-ARI) INSTRUMENTATION

    TEXT 3.1.2 0 11/19/2002

    Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT

    TEXT 3.1.3 4 05/14/2009

    Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION

    TEXT 3.1.4 0 11/19/2002

    Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND

    CHECK VALVE

    TEXT 3.2.1 8 05/14/2009

    Title: CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

    LDCN 4712

    Page 2. of 15 Report Date: 07/20/10

    Page 1 of .15 Report Date: 07/20/10

  • SSES MANUAL.

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT 3.3. 1

    Title: INSTRUMENTATION

    TEXT 3.3.2

    Title: INSTRUMENTATION

    TEXT 3.3.3

    Title: INSTRUMENTATION

    TEXT 3.3.4

    Title: INSTRUMENTATION

    TEXT 3.3.5

    Title: INSTRUMENTATION

    TEXT 3.3.6

    Title: INSTRUMENTATION

    TEXT 3.3.7

    Title: INSTRUMENTATION

    TEXT 3.3.8

    Title: INSTRUMENTATION

    TEXT 3.3.9

    Title: INSTRUMENTATION

    TEXT 3.3.10

    Title: INSTRUMENTATION

    TEXT 3.3.11

    Title: INSTRUMENTATION

    TEXT 3.3.12

    0 11/19/2002

    RADIATION MONITORING INSTRUMENTATION

    2 11/09/2007

    SEISMIC MONITORING INSTRUMENTATION

    2 11/09/2007

    METEOROLOGICAL MONITORING INSTRUMENTATION

    6 07/09/2010

    TRM POST-ACCIDENT MONITORING INSTRUMENTATION

    0 11/19/2002

    THIS PAGE INTENTIONALLY LEFT BLANK

    2 10/19/2005

    TRM ISOLATION ACTUATION INSTRUMENTATION

    1 11/09/2007

    MAIN TURBINE OVERSPEED PROTECTION SYSTEM

    1 10/22/2003

    TRM RPS INSTRUMENTATION

    3 05/14/2009

    LPRM UPSCALE ALARM INSTRUMENTATION

    1 12/14/2004

    REACTOR RECIRCULATION PUMP MG SET STOPS

    .1 10/22/2003

    MVP ISOLATION INSTRUMENTATION

    0 04/16/2009

    0

    Title: WATER MONITORING INSTRUMENTATION

    Page2. of 15. Report Date: 07/20/10

    Page 2 , of 15 Report Date: 07/20/10

  • SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT 3.4.1

    Title: REACTOR

    TEXT 3.4.2

    Title: REACTOR

    TEXT 3.4.3

    Title: REACTOR

    TEXT 3.4.4

    Title: REACTOR

    TEXT 3.4.5

    Title: REACTOR

    TEXT 3.4.6

    Title: REACTOR

    TEXT 3.5.1

    1 04/26/2006

    COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY

    1 04/16/2009

    COOLANT SYSTEM STRUCTURAL INTEGRITY

    1 11/09/2007

    COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)

    2 05/14/2009

    COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT

    1 04/26/2006

    COOLANT SYSTEM REACTOR VESSEL MATERIALS

    0 07/20/2010

    RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION

    1 02/04/2005

    Title: ECCS AND RCIC ADS MANUAL INHIBIT

    TEXT 3.5.2 1 11/09/2007

    Title: ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION

    TEXT 3.5.3 0 11/19/2002

    Title: ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS

    TEXT 3.6.1 0 11/19/2002

    Title: CONTAINMENT VENTING OR PURGING

    TEXT 3. 6.2 0 11/19/2002

    Title: CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION

    TEXT 3.6.3 0 11/19/2002

    Title: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION

    Page 3 of 15 ReportýDate: 07/20/10

  • SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT 3.6.4 0 11/19/2002

    Title: CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES'

    TEXT 3. 7.1

    Title: PLANT

    TEXT 3. 7.2

    Title: PLANT

    TEXT 3.7.3.1

    Title: PLANT

    TEXT 3.7.3.2

    Title: PLANT

    TEXT 3.7.3.3

    Title: PLANT

    0 11/19/2002

    SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN

    0 11/19/2002

    SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL

    2 04/16/2009

    SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM

    3 04/16/2009

    SYSTEMS SPRAY AND SPRINKLER SYSTEMS

    3 04/16/2009

    SYSTEMS C02 SYSTEMS

    2 04/16/2009

    SYSTEMS HALON SYSTEMS

    TEXT 3.7.3.4

    Title: PLANT

    TEXT 3.7.3.5

    Title: PLANT

    TEXT 3.7.3.6

    Title: PLANT

    TEXT 3.7.3.7

    Title: PLANT

    TEXT 3.7.3.8

    Title: PLANT

    TEXT 3.7.4

    Title: PLANT

    2 04/16/2009

    SYSTEMS FIRE HOSE STATIONS

    2 04/16/2009

    SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES

    1 04/26/2006

    SYSTEMS. FIRE RATED ASSEMBLIES

    8 01/20/2010

    SYSTEMS FIRE DETECTION INSTRUMENTATION

    1 04/26/2006

    SYSTEMS SOLID RADWASTE SYSTEM--

    Page 4 of 15 Report Date: 07/20/10

    Page 4 of 15 Report Date: 07/20/10

  • SSES MANUAL

    . Manual Name: TRM2Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT -2

    TEXT 3.7.5.1 0 11/19/2002

    Title: PLANT SYSTEMS MAIN CONDENSER-OFFGAS HYDROGEN MONITOR

    TEXT 3.7.5.2 0 11/19/2002

    Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE

    TEXT 3.7.5.3 1 .04/26/2006

    Title: PLANT SYSTEMS LIQUID HOLDUP TANKS

    TEXT 3.7.6 2 06/27/2008

    Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION

    TEXT 3.7.7 2 09/05/2008

    Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION'9O MONITORING INSTRUMENTATIONTEXT 3.7.8 6 .06/21/2007

    Title: PLANT SYSTEMS SNUBBERS

    TEXT 3.7.9 1 08/28/2006

    Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC

    TEXT 3.7.10 1 12/14/2004

    Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

    TEXT 3.7.11 1 10/02/2009

    Title: PLANT SYSTEMS

    TEXT 3.8.1 2 02/04/2005

    Title: ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT'

    PROTECTIVE DEVICES

    TEXT 3.8.2.1 2 11/09/2007

    Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD. PROTECTION -

    CONTINUOUS

    9 TEXT 3.8.2.2 2 12/14/2004Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

    AUTOMATIC

    Page 5 of 15. Report Date: 07/20/10

  • SSES; MANUAl

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT 3.8.3

    Title: ELECTRICAL

    TEXT 3.8.4

    Title: ELECTRICAL

    TEXT 3.8.5

    Title: ELECTRICAL

    TEXT 3.8.6

    Title: ELECTRICAL

    TEXT 3.8.7

    1 04/05/2010

    POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES

    1 02/04/2005

    POWER 24 VDC ELECTRICAL.SUBSYSTEM

    0 11/19/2002

    POWER DEGRADED VOLTAGE PROTECTION

    0 11/19/2002

    POWER EMERGENCY SWITCHGEAR ROOM COOLING

    2 10/22/2009

    Title: BATTERY MAINTENANCE AND MONITORING PROGRAM

    TEXT 3.9.1 0 .11/19/2002

    Title: REFUELING OPERATIONS DECAY TIME

    TEXT 3.9.2 0 11/19/2002

    Title: REFUELING OPERATIONS COMMUNICATIONS

    TEXT 3.9.3 0 11/19/2002

    Title: REFUELING OPERATIONS REFUELING PLATFORM.

    TEXT 3.10.1 1 04/26/2006

    Title: MISCELLANEOUS SEALED SOURCE CONTAMINATION

    TEXT 3.10.2 1 04/09/2007

    Title: MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION,-

    TEXT 3.10.3 2 06/15/2010

    Title: MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

    TEXT 3.11.1.1 1 04/26/2006

    Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION

    Pae'of1 eor ae 0/01

    Page6 of 1__5 Report Date: 07/20/10

  • SSES', MANUIAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT 3.11.1.2

    Title: RADIOACTIVE

    TEXT 3.11.1.3

    Title: RADIOACTIVE

    TEXT 3.11.1.4

    Title: RADIOACTIVE

    TEXT 3.11.1.5

    Title: RADIOACTIVE

    TEXT 3.11.2.1

    Title: RADIOACTIVE

    TEXT 3'.11.2.2

    Title: RADIOACTIVE

    TEXT 3.11.2.3

    Title: RADIOACTIVE

    FORM

    TEXT 3.11.2.4

    Title: RADIOACTIVE

    TEXT 3.11.2.5

    Title: RADIOACTIVE

    TEXT 3.11.2.6

    Title: RADIOACTIVE

    TEXT 3.11.3

    Title: RADIOACTIVE

    TEXT 3.11.4.1

    Title: RADIOACTIVE

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    1 04/26/2006

    LIQUIDtEFFLUENTS DOSE

    1 04/26/2006

    LIQUID WASTE TREATMENT SYSTEM

    1 12/14/2004

    LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION

    2 05/02/2007

    RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION

    3 04/26/2006

    DOSERATEý

    1 04/26/2006

    DOSE - NOBLE GASES

    1 04/26/2006

    DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE

    0 11/19/2002

    GASEOUS RADWASTE TREATMENT SYSTEM

    3 11/14/2006

    VENTILATION EXHAUST TREATMENT SYSTEM,

    4 09/16/2009

    RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION

    1 04/26/2006

    TOTAL- DOSE'

    3 04/26/2006

    MONITORING PROGRAM

    Page 2 of 15 Report Date: 07/20/10

    Page 7 of .15 Report Date: 07/20/10

  • SSES MANTUAIL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT 3.11.4.2 2 04/26/2006

    Title: RADIOACTIVE EFFLUENTS LAND USE CENSUS

    TEXT 3.11.4.3 1 04/26/2006

    Title: RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM

    TEXT 3.12.1 0 11/19/2002

    Title: LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL

    TEXT 3.12.2 4 04/17/2008

    Title: LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS

    TEXT 3.12.3 0 11/19/2002

    Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS

    TEXT 4.1

    Title:

    TEXT 4.2

    Title:

    TEXT 4.3

    Title:

    TEXT 4.4

    Title:

    TEXT 4.5

    Title:

    TEXT 4.6

    Title:

    TEXT 4.7

    Title:

    ADMINISTRATIVE

    ADMINISTRATIVE

    ADMINISTRATIVE

    ADMINISTRATIVE

    ADMINISTRATIVE

    ADMINISTRATIVE

    ADMINISTRATIVE

    0 09/27/2003

    CONTROLS ORGANIZATION

    0 09/27/2003

    CONTROLS REPORTABLE EVENT ACTION

    0 09/27/2003 ,

    CONTROLS SAFETY LIMIT VIOLATION

    1 12/18/2008

    CONTROLS PROCEDURES & PROGRAMS

    0 09/27/2003

    CONTROLS REPORTING REQUIREMENTS

    0 09/27/2003

    CONTROLS RADIATION PROTECTION PROGRAM

    0 09/27/2003

    CONTROLS TRAINING.

    Page .~ of 25. Report Date: 07/20/10

    Page8 of 15 Report Date: 07/20/10

  • SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT B3.0 4 05/23/2008

    Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY

    TEXT B3.1.1 1 11/09/2007

    Title: REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE

    ROD INJECTION (ATWS-ARI) INSTRUMENTATION

    TEXT B3.1.2 0 11/19/2002

    Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT

    TEXT B3.1.3 3 04/10/2007

    Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION

    TEXT B3.1.4 0 11/19/2002

    Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION

    AND CHECK VALVE

    TEXT B3.2.1 0 11/19/2002

    Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

    TEXT B3.3.1

    Title: INSTRUMENTATION

    TEXT B3.3.2

    Title: INSTRUMENTATION

    TEXT B3.3.3

    Title: INSTRUMENTATION

    TEXT B3.3.4

    Title: INSTRUMENTATION

    TEXT B3.3.5

    Title: INSTRUMENTATION

    TEXT B3.3.6

    Title: INSTRUMENTATION

    0 11/19/2002

    BASES RADIATION MONITORING INSTRUMENTATION

    1 11/09/2007

    BASES SEISMIC.MONITORING INSTRUMENTATION

    2 11/09/2007

    BASES METEOROLOGICAL MONITORING INSTRUMENTATION

    4 07/09/2010

    BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION

    2 11/09/2007

    BASES THIS;PAGE INTENTIONALLY LEFT BLANK

    3 10/1.9/2005

    BASES TRM ISOLATION ACTUATION INSTRUMENTATION

    Page ~ of 15 Report Date: 07/20/10

    Page9 of 15 Report Date: 07/20/10

  • SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT B3.3.7

    Title: INSTRUMENTATION

    TEXT B3.3.8

    Title: INSTRUMENTATION

    TEXT B3.3.9

    Title: INSTRUMENTATION

    TEXT B3.3.10

    Title: INSTRUMENTATION

    TEXT B3.3.11

    Title: INSTRUMENTATION

    1 11/09/2007

    BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM

    1 10/22/2003

    BASES TRMRPS INSTRUMENTATION

    3 05/14/2009

    BASES LPRM UPSCALE ALARM INSTRUMENTATION

    1 12/18/2008

    BASES REACTOR RECIRCULATION PUMP MG

    1 10/22/2003

    BASES MVP ISOLATION INSTRUMENTATION

    SET STOPS

    TEXT B3.3.12 0 04/16/2009

    Title: WATER MONITORING INSTRUMENTATION

    TEXT B3.4.1

    Title: REACTOR

    TEXT B3.4.2

    Title: REACTOR

    TEXT B3.4.3

    Title: REACTOR

    TEXT B3.4.4

    Title: REACTOR

    TEXT B3.4.5

    Title: REACTOR

    TEXT B3.4.6

    0 11/19/2002

    COOLANT SYSTEM.BASES REACTOR COOLANT SYSTEM CHEMISTRY

    1 04/16/2009

    COOLANT SYSTEM BASES STRUCTURAL INTEGRITY

    1 11/09/2007

    COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR

    0 11/19/2002

    COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW ANDROD'LINE LIMIT

    0 11/19/2002

    COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS

    0 07/20/2010

    Title: REACTOR RECIRCULATION SINGLE LOOP-OPERATION SLO FLOW RATE RESTRICTION W

    Page i~~~~~Q. ~ of1ReotDt:0//0Page 10 of 15 Report Date:-07/20/10

  • SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT B3.5.1 0 11/19/2002

    Title: ECCS AND RCIC BASES ADS MANUAL INHIBIT

    TEXT B3.5.2 1 11/09/2007

    Title: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION

    TEXT B3.5.3 1 11/09/2ý007

    Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS

    TEXT B3.6.1 0 11/19/2002

    Title: CONTAINMENT BASES VENTING OR PURGING

    TEXT B3.6.2 0 11/i9/2002

    Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION

    INDICATION

    TEXT B3.6.3 1 04/19/2-007

    Title: CONTAINMENT BASES SUPPRESSION POOL ALARM'INSTRUMENTATION

    TEXT B3.6.4 1 12/14/2004

    Title: CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES

    TEXT B3.7.1 0 .11/19/2002

    Title: PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

    TEXT B3.7.2 0 11/19/2002

    Title: PLANT SYSTEMS BASES ULTIMATE HEAT-SINK (UHS) GROUND WATER LEVEL

    TEXT B3.7.3.1 3 06/15/2010

    Title: PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM'

    TEXT B3.7.3.2 2 04/26/2006

    Title: PLANT SYSTEMSBASES SPRAY -AND SPRINKLER SYSTEMS

    TEXT B3.7.3.3 0 11/19/2002

    Title: PLANT. SYSTEMS BASES C02 SYSTEMS

    Page 11 of 15 , Report Date: 07/20/10

  • SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT B3.7.3.4

    Title: PLANT

    TEXT B3.7.3.5

    Title: PLANT

    TEXT B3.7.3.6

    Title: PLANT

    TEXT B3.7.3.7

    Title: PLANT

    TEXT B3.7.3.8

    Title: PLANT

    TEXT B3.7.4

    Title: PLANT

    TEXT B3.7.5.1

    Title: PLANT

    TEXT B3.7.5.2

    Title: PLANT

    TEXT B3.7.5.3

    Title: PLANT

    TEXT B3.7.6

    Title: PLANT

    TEXT B3.7.7

    Title: PLANT

    1* 04/26/2006

    SYSTEMS BASES HALON SYSTEMS

    1 04/26/2006

    SYSTEMS BASES FIRE HOSE STATIONS

    1 04/26/2006

    SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES

    SYSTEMS BASES

    SYSTEMS BASES

    SYSTEMS BASES

    SYSTEMS BASES

    SYSTEMS BASES

    SYSTEMS BASES

    SYSTEMS BASES

    SYSTEMS BASES

    0 11/19/2002

    FIRE RATED ASSEMBLIES

    1 01/12/2004

    FIRE DETECTION INSTRUMENTATION

    0 11/19/2002

    SOLID RADWASTE SYSTEM

    0 11/19/2002

    MAIN CONDENSER OFFGAS HYDROGEN MONITOR

    0 11/19/2002

    MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE

    0 11/19/2002

    LIQUID HOLDUP TANKS

    2 06/27/2008

    ESSW-PUMPHOUSE.VENTILATION

    2 -01/31/2008

    MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMICtRADIATION

    MONITORING INSTRUMENTATION

    TEXT B3.7.8 3 06/21/2007

    Title: PLANT SYSTEMS BASES SNUBBERS

    Page 2~2~ of 15 Report Date: 07/20/10

    Page 12 of 15 Report Date: 07/20/10

  • SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT B3.7.9 1 12/14/2004

    Title: PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC

    TEXT B3.7.10 1 12/14/2004

    Title: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS

    TEXT B3.7.11 2 04/14/2010

    Title: STRUCTURAL INTEGRITY

    TEXT B3.8.1 2 03/10/2010

    Title: ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT

    PROTECTIVE DEVICES

    TEXT B3.8.2.1

    Title: ELECTRICAL

    CONTINUOUS

    TEXT B3.8.2.2

    Title: ELECTRICAL

    AUTOMATIC

    TEXT B3.8.3

    Title: ELECTRICAL

    0 11/19/2002

    POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD

    1 09/17/2004

    POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD

    PROTECTION -

    PROTECTION -

    0 11/19/2002

    POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES

    TEXT B3.8.4 0 11/19/2002

    Title: ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM

    TEXT B3.8.5 0 11/19/2002

    Title: ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION

    TEXT B3.8.6 1 02/04/2005

    Title: ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING

    TEXT B3.8.7 1 06/15/2009

    Title: BATTERY MAINTENANCE AND MONITORING PROGRAM•

    TEXT B3.9.1 0 11/19/2002

    Title: REFUELING OPERATIONS BASES DECAY TIME

    Page 13. of 15 Report Date: 07/20/10

    Page 13 of 15 Report Date: 07/20/10

  • .SSES MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT B3.9.2 0 11/19/2002

    Title: REFUELING OPERATIONS BASES COMMUNICATIONS

    TEXT B3.9.3 0 11/19/2002

    Title: REFUELING OPERATIONS BASES REFUELING PLATFORM-

    TEXT B3.10.1 0 11/19/2002

    Title: MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION

    TEXT B3.10.2 1 04/10/2007

    Title: MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION

    TEXT B3.10.3 0 11/19/2002

    Title: MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

    TEXT B3.11.1.1

    Title: RADIOACTIVE

    TEXT B3.11.1.2

    Title: RADIOACTIVE

    TEXT B3.11.1.3

    Title: RADIOACTIVE

    TEXT B3.11.1.4

    Title: RADIOACTIVE

    EFFLUENTS

    EFFLUENTS

    EFFLUENTS

    ..EFFLUENTS

    0 11/19/2002

    BASES LIQUID EFFLUENTS CONCENTRATION

    0 11/19/2002

    BASES LIQUID EFFLUENTS DOSE

    0 11/19/2002

    BASES LIQUID WASTE TREATMENT SYSTEM

    0 11/19/2002

    BASESLIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION

    TEXT B3.11.1.5

    Title: RADIOACTIVE EFFLUENTS

    0 '11/19/2002

    BASES RADIOACTIVE LIQUID PROCESS MONITORING,

    INSTRUMENTATION

    TEXT B3.11.2.1 1 12/14/2004

    Title: RADIOACTIVE EFFLUENTS BASES DOSE RATE

    TEXT B3.11.2.2

    Title: RADIOACTIVE EFFLUENTS

    0 11/19/2002

    BASES DOSE - NOBLE GASES

    Page 24 of 15 Report Date: .07/20/10

    Page 14 . of 15 Report Date:.07/20/10

  • SSES -MANUAL

    Manual Name: TRM2

    Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2

    TEXT B3.11.2.3

    Title: RADIOACTIVE EFFLUENTS

    PARTICULATES FORM

    0 11/19/2002

    BASES DOSE -'IODINE, TRITIUM, AND RADIONUCLIDES IN

    TEXT B3.11.2.4 0 11/19/2002

    Title: RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM

    TEXT B3.11.2.5 4 11/14/2006

    Title: RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM

    TEXT B3.11.2.6

    Title: RADIOACTIVE 'EFFLUENTS

    INSTRUMENTATION

    1 01/27/2004

    BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING

    TEXT B3.11.3 0 11/19/2002

    Title: RADIOACTIVE EFFLUENTS BASES TOTAL DOSE

    TEXT B3.11.4.1 3 07/09/2010

    Title: RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM

    TEXT B3.11.4.2 0 11/19/2002

    Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS

    TEXT B3.11.4.3 0 11/19/2002

    Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM

    TEXT B3.12.1 1 10/04/2007

    Title: LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL

    TEXT B3.12.2

    Title: LOADS CONTROL PROGRAM

    TEXT B3.12.3

    Title: LOADS CONTROL PROGRAM

    0 11/19/2002

    BASES HEAVY LOADS REQUIREMENTS

    0 11/19/2002

    BASES-LIGHT LOADS REQUIREMENTS

    Page I~ of 15 Report Date: 07/20/10

    Page 15 of .15 Report Date: 07/20/10

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

    SECTION TITLE PAGE

    1.0 USE AND APPLICATION ............................................................................ 1.0-11.1 D efinitions ..................................................................................... T R M /1.0-2

    2.0 PLANT PROGRAMS ................................................................................... 2.0-12 .1 P lant P rogram s ...................................................................................... 2 .0-12.2 Instrument Trip Setpoint Table ..................................................... TRM/2.0-5

    3.0 APPLICABILITY ................................................................................. TRM/3.0-13.0 (TRO) - TR for Operation (TRO) Applicability ............................... TRM/3.0-13.0 (TRS) - TR Surveillance (TRS) Applicability .................................. TRM/3.0-3

    3.1 REACTIVITY CONTROL SYSTEMS .................................................. TRM/3.1-13.1.1 Alternate Rod Injection ................................................................. TRM/3.1-13.1.2 CRD Housing Support ........................................................................... 3.1-43.1.3 Control Rod Block Instrumentation ........................................................ 3.1-53.1.4 Control Rod Scram Accumulators Instrumentation and

    C heck V alve ................................................................................. T R M /3.1-9

    3.2 CORE OPERATING LIMITS REPORT ........................................................ 3.2-13.2.1 Core Operating Limits Report ................................................................ 3.2-1

    3.3 INSTRUMENTATION ......................................................................... TRM/3.3-13.3.1 Radiation Monitoring Instrumentation ........................................... TRM/3.3-13.3.2 Seismic Monitoring Instrumentation ................ : ............................. TRM/3.3-43.3.3 Meteorological Monitoring Instrumentation ................................... TRM/3.3-73.3.4 TRM Post-Accident Monitoring Instrumentation ............................ TRM/3.3-93.3.5 Section Not Used .......................................................................... TRM/3.3-123.3.6 TRM Containment Isolation Instrumentation ................................. TRM/3.3-133.3.7 Turbine Overspeed Protection System ......................................... TRM/3.3-173.3.8 Section Not Used ......................................................................... TRM/3.3-193.3.9 OPRM Instrumentation ................................................................. TRM/3.3-213.3.10 Reactor Recirculation Pump MG Set Electrical and

    Mechanical Stops ......................................................................... TRM/3.3-223.3.11 MVP Isolation Instrumentation ..................... ... TRM/3.3-243.3.12 Water Monitoring Instrumentation ............................................... TRM/3.3-26

    3.4 REACTOR COOLANT SYSTEM .......................................................... TRM/3.4-13.4.1 Reactor Coolant System Chemistry ...................................................... 3.4-13.4 .2 N ot U sed ......................................................................................... T R M /3.4-63.4.3 High/Low Pressure Interface Leakage Monitors .................................... 3.4-93.4.4 Reactor Recirculation Flow and Rod Line Limit ............................ TRM/3.4-123.4.5 Reactor Vessel Material Surveillances Program ........................... TRM/3.4-133.4.6 Reactor Recirculation Single Loop Operation (SLO)

    Flow Rate Restriction .................................................................... TRM/3.4-14

    SUSQUEHANNA-UNIT2 TRM I TOC-1 EFFECTIVE DATE 07/15/2010

    SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

    SECTION TITLE PAGE

    3.5 EMERGENCY CORE COOLING AND RCIC ...................................... TRM/3.5-13.5.1 ADS Manual Inhibit ....................................................................... TRM/3.5-13.5.2 ECCS and RCIC System Monitoring Instrumentation ............................ 3.5-33.5.3 Long Term Nitrogen Supply to ADS ...................................................... 3.5-6

    3.6 C O N TA IN M E N T .......................................................................................... 3.6-13.6.1 VENTING or PURGING ......................................................................... 3.6-13.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position

    In d ica tio n ............................................................................................... 3 .6 -33.6.3 Suppression Pool Alarm Instrumentation ............................................... 3.6-43.6.4 Primary Containment Closed System Boundaries ........................ TRM/3.6-7

    3.7 PLANT SYSTEMS .............................................................................. TRM/3.7-13.7.1 Emergency Service Water System (Shutdown) ............................ TRM/3.7-13.7.2 Ultimate Heat Sink and Ground Water Level ......................................... 3.7-33.7.3.1 Fire Suppression Water Supply System ....................................... TRM/3.7-43.7.3.2 Spray and Sprinkler Systems ....................................................... TRM/3.7-83.7.3.3 C02 systems ................................................................................ TRM/3.7-123.7.3.4 Halon Systems ............................................................................. TRM/3.7-163.7.3.5 Fire Hose Stations ........................................................................ TRM/3.7-183.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................. TRM/3.7-223.7.3.7 Fire Rated Assemblies .................................................................. TRM/3.7-243.7.3.8 Fire Detection Instrumentation ...................................................... TRM/3.7-263.7.4 Solid Radwaste System ................................................................ TRM/3.7-343.7.5.1 Main Condenser Offgas Hydrogen Monitor ........................................... 3.7-373.7.5.2 Main Condenser Explosive Gas Mixture ....................................... TRM/3.7-383.7.5.3 Liquid Holdup Tanks ..................................................................... TRM/3.7-393.7.6 ESSW Pumphouse Ventilation .............................................................. 3.7-403.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation

    Monitoring Instrumentation ........................................................... TRM/3.7-413.7.8 S nubbers ...................................................................................... T R M /3.7-433.7.9 Control Structure HVAC ................................................................ TRM/3.7-493.7.10 Spent Fuel Storage Pools (SFSPs) .............................................. TRM/3.7-513.7.11 Structural Integrity ......................................................................... TRM/3.7-54

    3.8 ELECTRICAL POWER ....................................................................... TRM/3.8-13.8.1 Primary Containment Penetration Conductor Overcurrent

    Protective Devices ........................................................................ TRM/3.8-13.8.2.1 Motor Operated Valves Thermal Overload Protection -

    C ontinuous ................................................................................... T R M /3.8-53.8.2.2 Motor Operated Valves Thermal Overload Protection -

    A utom atic ................................................................................... T R M /3.8-113.8.3 Diesel Generator (DG) Maintenance Activities ............................. TRM/3.8-13

    . SUSQUEHANNA - UNIT 2 TRM /TOC-2 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

    SECTION TITLE PAGE

    3.8.4 24VDC Electrical Power Subsystem ......... ...................... TRM/3.8-153.8.5 Degraded Voltage Protection ............................................. : ........ TRM/3.8-213.8.6 Emergency Switchgear Room Cooling .................................................. 3.8-243.8.7 Battery Monitoring and Maintenance Program .............................. TRM/3.8-26

    3.9 REFUELING OPERATIONS ........................................................................ 3.9-13 .9 .1 D e ca y T im e ................... , ....................................................................... 3 .9-13.9 .2 C om m unications ................................................................................... 3.9-23.9 .3 R efueling P latform ................................................................................. 3.9-3

    3.10 MISCELLANEOUS ............................................................................. TRM/3.10-13.10.1 Sealed Source Contamination ...................................................... TRM/3.10-13.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation .......................... 3.10-43.10.3 Independent Spent Fuel Storage Installation (ISFSI) .................... TRM/3.10-73.10.4 Section Not Used .......................................................................... TRM/3.10-8

    3.11 RADIOACTIVE EFFLUENTS .............................................................. TRM/3.11-13.11.1 Liquid Effluents ............................................................................ T R M /3.11-13.11.1.1 Liquid Effluents Concentration ...................................................... TRM/3.11-13.11.1.2 Liquid Effluents Dose ................................................................... TRM/3.11-43.11.1.3 Liquid Waste Treatment System ................................................... TRM/3.11-63.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ............................ 3.11-83.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ............... TRM/3.11-133.11.2 Gaseous Effluents ........................................................................ TRM/3.11-173.11.2 .1 D ose R ate ..................................................................................... T R M /3.11-173.11.2.2 Dose - Noble Gases ..................................................................... TRM/3.11-203.11.2.3 Dose - Iodine, Tritium, and Radionuclides in

    Particulate Form ........................................................................... T R M /3.11-213.11.2.4 Gaseous Radwaste Treatment System ........................................ TRM/3.11-223.11.2.5 Ventilation Exhaust Treatment System ......................................... TRM/3.11-233.11.2.6 Radioactive Gaseous Effluent Monitoring

    Instrum entation ............................................................................. T R M /3.11-253.11.3 Total D ose .................................................................................... T R M /3.11-333.11.4 Radiological Environmental Monitoring ......................................... TRM/3.11-353.11.4.1 Monitoring Program ...................................................................... TRM/3.11-353.11.4.2 Land Use Census .......................................................................... TRM/3.11-453.11.4.3 Interlaboratory Comparison Program ............................................ TRM/3. 11-47

    3.12 LOADS CONTROL PROGRAM .......................................................... TRM/3.12-13.12.1 Crane Travel - Spent Fuel Storage Pool ...................................... TRM/3.12-13.12.2 Heavy Loads Requirements ......................................................... TRM/3.12.33.12.3 Light Loads Requirements ............................................................ TRM/3.12-5

    SUSQUEHANNA-UNIT2 TRM / TOC-3 EFFECTIVE DATE 07/15/2010

    SUSQUEHANNA - UNIT 2 TRM /TOC-3 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

    SECTION TITLE PAGE

    4.0 ADMINISTRATIVE CONTROLS ............................. 4.0-14 .1 O rg a n ization .......................................................................................... 4 .0-14.2 Reportable Event Action ........................................................................ 4.0-24 .3 S afety Lim it V iolation ............................................................................. 4 .0-34.4 Procedures and Programs ..................................................................... 4.0-44.5 Reporting Requirements ........................................................................ 4.0-54.6 Radiation Protection Program ................................................................ 4.0-74 .7 T ra in in g .................................................................................................. 4 .0 -8

    SUSQUEHANNA-UNIT2 TRM/TOC-4 EFFECTIVE DATE 07/15/2010

    SUSQUEHANNA - UNIT 2 TRM /TOC-4 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

    SECTION TITLE PAGE

    B 3.0 (TRO) - TR for Operation (TRO) Applicability ...................................... B 3.0-1B 3.0 (TRS).- TR Surveillance (TRS) Applicability......................................... B 3.0-9

    B 3.1.1 Alternate Rod Injection ................................................................ TRM/B 3.1-1B 3.1.2 CRD Housing Support .............. ... .............. B 3.1-4B 3.1.3 Control Rod Block Instrumentation .............................................. TRM/B 3.1-5B 3.1.4 Control Rod Scram Accumulators Instrumentation

    and C heck Valve ......................................................................... TR M /B 3.1-8

    B 3.2.1 Core Operating Limits Report (COLR) ...................... B 3.2-1

    B 3.3.1 Radiation Monitoring Instrumentation .......................................... TRM/B 3.3-1B 3.3.2 Seismic Monitoring Instrumentation ............................................. TRM/B 3.3-2B 3.3.3 Meteorological Monitoring Instrumentation .................................. TRM/B 3.3-3B 3.3.4 TRM Post-Accident Monitoring Instrumentation ........................... TRM/B 3.3-4B 3.3.5 Section Not Used ......................................................................... TRM/B 3.3-9B 3.3.6 TRM Containment Isolation Instrumentation ........................................ B 3.3-10B 3.3.7 Turbine Overspeed Protection System ........................................ TRM/B 3.3-14B 3.3.8 Section Not Used ......................................................................... TRM/B 3.3-15B 3.3.9 OPRM Instrumentation ................................................................ TRM/B 3.3-18B 3.3.10 Reactor Recirculation Pump MG Set Electrical and

    M echanical Stops ........................................................................ TR M /B 3.3-20B 3.3.11 MVP Isolation Instrumentation .................................................... TRM/B 3.3-22B 3.3.12 Water Monitoring Instrumentation ................................................ TRM/B 3.3-24

    B 3.4.1 Reactor Coolant System Chemistry ..................................................... B 3.4-1B 3.4.2 N ot U sed ...................................................................................... T R M /B 3.4-2B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ........................... TRM/B 3.4-5B 3.4.5 Reactor Vessel Material Surveillances Program .................................. B 3.4-6B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)

    Flow Rate Restriction .................................................................... TRM/B3.4-7

    B 3.5.1 ADS Manual Inhibit ............................................................ B 3.5-1B 3.5.2 ECCS and RCIC System Monitoring Instrumentation .................. TRM/B 3.5-3B 3.5.3 Long Term Nitrogen Supply to ADS .................................................... B 3.5-4

    B 3.6.1 VENTING or PURGING ............................................................... TRM/B 3.6-1B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position

    In d ica tio n ............................................................................................. B 3 .6 -3B 3.6.3 Suppression Pool Alarm Instrumentation ............................................. B 3.6-4B 3.6.4 Primary Containment Closed System Boundaries ....................... TRM/B 3.6-6

    B 3.7.1 Emergency Service Water System (Shutdown) ................................... B 3.7-1B 3.7.2 Ultimate Heat Sink and Ground Water Level ....................................... B 3.7-2B 3.7.3.1 Fire Suppression Water Supply System ...................................... TRM/B 3.7-3

    SUSQUEHANNA - UNIT 2 TRM / TOC-5 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

    SECTION TITLE PAGE

    B 3.7.3.2 Spray and Sprinkler Systems ...................................................... TRM/B 3.7-5B 3.7.3.3 C02 Systems .............................................................................. TRM/B 3.7-7B 3.7.3.4 Halon Systems ............................................................................ TRM/B 3.7-8B 3.7.3.5 Fire Hose Stations ....................................................................... TRM/B 3.7-10B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................ TRM/B 3.7-11B 3.7.3.7 Fire Rated Assemblies ................................................................. TRM/B 3.7-12B 3.7.3.8 Fire Detection Instrumentation ..................................................... TRM/B 3.7-14B 3.7.4 Solid Radwaste System ............................................................... TRM/B 3.7-15B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ......................................... B 3.7-17B 3.7.5.2 Main Condenser Explosive Gas Mixture .............................................. B 3.7-19B 3.7.5.3 Liquid Holdup Tanks ............................................................................ B 3.7-20B 3.7.6 ESSW Pumphouse Ventilation .................................................... TRM/B 3.7-21B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation

    Monitoring Instrumentation .......................................................... TRM/B 3.7-22B 3.7.8 S nubbers ..................................................................................... T R M /B 3.7-24B 3.7.9 Control Structure HVAC ............................................................... TRM/B 3.7-31B 3.7.10 Spent Fuel Storage Pools ............................................................ TRM/B 3.7-33B 3.7.11 Structural Integrity ........................................................................ TRM/B 3.7-36

    B 3.8.1 Primary Containment Penetration Conductor OvercurrentProtective Devices ....................................................................... TRM/B 3.8-1

    B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -C ontinuous .................................................................................. T R M /B 3.8-3

    B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -A utom atic ..................................................................................... T R M /B 3.8-4

    B 3.8.3 Diesel Generator (DG) Maintanence Activities ............................ TRM/B 3.8-5B 3.8.4 24VDC Electrical Power Subsystem ............................................. TRM/B 3.8-6B 3.8.5 Degraded Voltage Protection ...................................................... TRM/B 3.8-16B 3.8.6 Emergency Switchgear Room Cooling ........................................ TRM/B 3.8-17B 3.8.7 Battery Monitoring and Maintenance Program ............................. TRM/B 3.8-18

    B .3.9 .1 D ecay T im e ......................................................................................... B 3.9-1B 3.9.2 C om m unications .................................................................................. B 3.9-2B 3.9.3 Refueling Platform ............................................................................... B 3.9-3

    B 3.10.1 Sealed Source Contamination ............................................................. B 3.10-1B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ........................ B 3.10-2B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ................... TRM/B 3.10-4B 3.10.4 Section Not Used ......................................................................... TRM/B 3.10-6

    B 3.11.1.1 Liquid Effluents Concentration ............................................................. B 3.11-1B 3.11.1.2 Liquid Effluents Dose .......................................................................... B 3.11-4B 3.11.1.3 Liquid Waste Treatment System ......................................................... B 3.11-6B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ........................... B 3.11-7B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .............. TRM/B 3.11-10

    SUSQUEHANNA - UNIT 2 TRM /TOC-6 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATIONTABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

    PPL Rev. 18

    SECTION

    B 3.11.2.1B 3.11.2.2B 3.11.2.3

    B 3.11.2.4B 3.11.2.5B 3.11.2.6

    B 3.11.3B 3.11.4.1B 3.11.4.2B 3.11.4.3

    B 3.12B.3.12.1B.3.12.2B.3.12.3

    TITLE PAGE

    Dose Rate .................................................................................... TRM/B 3.11-12Dose - Noble Gases ............................................................................ B 3.11-16Dose - Iodine, Tritium, and Radionuclides inParticulate Form .................................................................................. B 3.11-18Gaseous Radwaste Treatment System ....................................... TRM/B 3.11-20Ventilation Exhaust Treatment System ........................................ TRM/B 3.11-21Radioactive Gaseous Effluent MonitoringInstrumentation ............................................................................ TRM/B 3.11-24Total Dose ........................................................................................... B 3.11-26Monitoring Program ..................................................................... TRM/B 3.11-28Land Use Census ................................................................................ B 3.11-34Interlaboratory Comparison Program ........................................... TRM/B 3.11-36

    LOADS CONTROL PROGRAM ................................................... TRM/B 3.12-1Crane Travel - Spent Fuel Storage Pool ..................................... TRM/B 3.12-1Heavy Loads Requirements ........................................................ TRM/B 3.12-2Light Loads Requirements ........................................................... TRM/B 3.12-3

    TRM2 Text TOC7/8/2010

    SUSQUEHANNA - UNIT 2 TRM /TOC-7 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title

    TOC

    1.0

    TABLE OF CONTENTS

    USE AND APPLICATIONPage TRM / 1.0-1Page TRM / 1.0-2Page TRM / 1.0-3

    2.0

    3.0

    PLANT PROGRAMSPage 2.0-1Pages TRM / 2.0-2 and TRM 2.0-3Page TRM / 2.0-4Page TRM / 2.0-5Page TRM / 2.0-6Page TRM / 2.0-7Page TRM / 2.0-8Page TRM / 2.0-9Page TRM / 2.0-10Page TRM /2.0-11Page TRM / 2.0-12Pages TRM / 2.0-13 and TRM /2.0-14Page TRM / 2.0-15

    APPLICABILITYPages TRM / 3.0-1 and TRM / 3.0-2Page TRM / 3.0-3Page TRM / 3.0-4

    REACTIVITY CONTROL SYSTEMSPage TRM / 3.1-1Pages TRM / 3.1-2 through TRM / 3.1-5Page TRM / 3.1-6Page TRM / 3.1-7Page TRM / 3.1-8Pages TRM / 3.1-9 and TRM / 3.1-9aPage TRM / 3.1-10

    CORE OPERATING LIMITS REPORTPage TRM / 3.2-1Pages TRM / 3.2-2 through TRM / 3.2-54

    INSTRUMENTATIONPages TRM / 3.3-1 through TRM / 3.3-3Pages TRM / 3.3-4 and TRM / 3.3-5Page 3.3-6Page TRM 3.3-7Page 3.3-8

    Effective Date

    07/15/2010

    08/31/199810/04/200208/31/1998

    08/31/199801/28/200506/25/200204/12/199904/15/200905/15/200804/15/200911/15/200402/02/201011/15/200404/15/200911/15/200411/15/2005

    3.1

    04/14/200803/15/200211/30/2005

    10/31/200708/31/199803/27/200704/15/200903/27/200702/18/199902/18/1999

    08/31/199804/17/2009

    07/16/199910/31/200708/31/199810/31/200708/31/1998

    3.2

    3.3

    SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 07/15/2010

    SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title

    3.4

    Pages TRM / 3.3-9 and TRM / 3.3-9aPage TRM / 3.3-10Pages TRM / 3.3-11 and TRM / 3.3-11 aPage TRM / 3.3-12Page TRM / 3.3-13Page TRM / 3.3-14Page TRM / 3.3-15Page TRM / 3.3-16Page TRM / 3.3-17Page TRM / 3.3-18Pages TRM / 3.3-19 and TRM / 3.3-20Page TRM / 3.3-21Page TRM / 3.3-21aPages TRM /3.3-21b through TRM / 3.3-21dPage TRM / 3.3-22Pages TRM / 3.3-23 and TRM / 3.3-24Page TRM / 3.3-25Pages TRM / 3.3-26 and TRM / 3.3-27

    REACTOR COOLANT SYSTEMPage TRM / 3.4-1Pages 3.4-2 through 3.4-5Pages TRM / 3.4-6 through TRM / 3.4-8Page 3.4-9Page 3.4-10Page 3.4-11Page TRM / 3.4-12Page TRM / 3.4-13Page TRM / 3.4-14

    EMERGENCY CORE COOLING AND RCICPage TRM / 3.5-1Pages 3.5-2 and 3.5-3Page TRM / 3.5-4Pages 3.5-5 through 3.5-7

    CONTAINMENTPages 3.6-1 through 3.6-4Page TRM / 3.6-5Page 3.6-6Pages TRM / 3.6-7 through TRM / 3.6-9

    Effective Date

    06/30/201010/31/200706/30/201003/30/200109/13/200512/14/199810/22/200306/27/200106/14/200210/31/200710/22/200304/15/200911/15/200403/27/200712/03/200405/16/200310/22/200304/07/2009

    03/31/200610/23/199804/01/200908/31/199810/31/200708/31/199804/17/200903/31/200607/15/2010

    01/28/200508/31/199810/31/200708/31/1998

    3.5

    3.608/31/199801/07/200208/31/199812/31/2002

    SUSQUEHANNA- UNIT 2 TRM / LOES-2 EFFECTIVE DATE

    07/15/2010SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title Effective Date

    3.7 PLANT SYSTEMSPages TRM / 3.7-1 and TRM / 3.7-2Page 3.7-3Page TRM / 3.7-4Page TRM / 3.7-5Pages TRM / 3.7-6 through TRM / 3.7-8Pages TRM / 3.7-9 and TRM / 3.7-10Page TRM / 3.7-11Page TRM / 3.7-12Page TRM / 3.7-13Page TRM / 3.7-14Pages TRM / 3.7-15 and TRM / 3.7-16Page TRM / 3.7-17Page TRM / 3.7-18Page TRM / 3.7-19Pages TRM / 3.7-20 through TRM / 3.7-22Page TRM / 3.7-23Page TRM / 3.7-24Pages TRM / 3.7-25 and TRM / 3.7-26Page TRM / 3.7-27Page TRM / 3.7-28Page TRM / 3.7-29Page TRM / 3.7-30Page TRM / 3.7-31Page TRM / 3.7-32Page TRM / 3.7-33Page TRM / 3.7-34Pages TRM / 3.7-35 and TRM / 3.7-36Pages 3.7-37 through 3.7-38Page TRM / 3.7-39Page TRM / 3.7-40Page TRM / 3.7-40aPage TRM / 3.7-41Page TRM / 3.7-42Pages TRM / 3.7-43 through TRM / 3.7-45Page TRM / 3.7-46Page TRM / 3.7-47Page TRM / 3.7-48Page TRM / 3.7-49Page TRM / 3.7-50Page TRM / 3.7-51Page TRM / 3.7-52Page TRM / 3.7-53Page TRM / 3.7-54Page TRM / 3.7-55Page TRM / 3.7-56

    07/29/199908/31/199803/31/200604/07/200908/02/199904/07/200901/21/200008/02/199904/07/200908/09/200508/02/199904/07/200908/02/199904/07/200908/02/199904/07/200903/31/200608/02/199910/31/200711/29/200601/13/201011/30/200511/16/200101/09/200410/05/200203/31/200602/01/199908/31/199803/31/200602/14/200506/20/200809/04/200808/31/199810/05/200606/07/200710/05/200606/07/200703/09/200108/16/200612/03/200404/15/200307/29/199904/01/200909/25/200904/01/2009

    SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE

    07/15/2010SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title Effective Date

    3.8 ELECTRICAL POWERPage TRM / 3.8-1Pages TRM / 3.8-2 and TRM / 3.8-3Page TRM / 3.8-4Pages TRM / 3.8-5 and TRM / 3.8-6Pages TRM / 3.8-7 through TRM / 3.8-10Page TRM / 3.8-11Page TRM / 3.8-12Page TRM / 3.8-13Page TRM / 3.8-14Page TRM / 3.8-15Pages TRM / 3.8-16 and TRM / 3.8-17Page 3.8-18Page TRM / 3.8-19Page TRM / 3.8-20Pages TRM / 3.8-21 through TRM / 3.8-23Pages 3.8-24 and 3.8-25Page TRM / 3.8-26Page TRM / 3.8-27Page TRM / 3.8-28Page TRM / 3.8-29

    04/02/200201/28/200501/31/200504/02/200210/31/200708/10/200412/03/200403/25/201008/31/199801/28/200504/02/200202/01/199904/02/200202/01/199906/06/199908/31/199805/28/200911/29/200605/28/200910/20/2009

    08/31/1998

    03/31/200608/30/199803/27/200706/10/2010

    3.9 REFUELING OPERATIONSPages 3.9-1 through 3.9-3

    3.10 MISCELLANEOUSPage TRM / 3.10-1Pages 3.10-2 through 3.10-4Pages TRM / 3.10-5 and TRM / 3.10-6Page TRM / 3.10-7

    3.11 RADIOACTIVE EFFLUENTSPage TRM / 3.11-1Pages 3.11-2 through 3.11-3Page TRM / 3.11-4Page 3.11-5Page TRM / 3.11-6Pages 3.11-7 through 3.11-9Page TRM / 3.11-10Pages 3.11-11 and 3.11-12Page TRM /3.11-13Page TRM /3.11-14Pages 3.11-15 and 3.11-16Page TRM / 3.11-17

    03/31/200608/31/199803/31/200608/31/199803/31/200608/31/199812/03/200408/31/199804/12/200712/03/100409/01/199803/31/2006

    SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 07/15/2010

    SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title Effective Date

    Page 3.11-18Page TRM / 3.11-19Pages TRM / 3.11-20 and TRM / 3.11-21Page TRM / 3.11-22Page TRM / 3.11-23Page TRM / 3.11-24Page TRM / 3.11-25Pages TRM / 3.11-26 and TRM / 3.11-27Page TRM / 3.11-28Page TRM / 3.11-29Pages TRM 3.11-30 through TRM / 3.11-32Page TRM / 3.11-33Page 3.11-34Page TRM / 3.11-35Pages TRM / 3.11-36 through TRM / 3.11-39Pages 3.11-40 through 3.11-44Page TRM / 3.11-45Page 3.11-46Page TRM / 3.11-47

    LOADS CONTROL PROGRAMPages TRM / 3.12-1 through TRM / 3.12-3Page TRM / 3.12-4Page TRM / 3.12-5

    ADMINISTRATIVE CONTROLSPages TRM / 4.0-1 through TRM / 4.0-3Page TRM / 4.0-4Pages TRM / 4.0-5 through TRM / 4.0-8

    08/31/199808/15/200503/31/200604/02/200211/14/200605/13/200504/12/200701/21/200409/08/200912/03/200401/21/200403/31/200608/31/199803/31/200611/30/200508/31/199803/31/200608/31/199803/31/2006

    02/05/199903/14/200802/05/1999

    08/31/199812/11/200808/31/1998

    3.12

    4.0

    SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 07/15/2010

    SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title Effective Date

    B 3.0 APPLICABILITY BASESPages TRM / B 3.0-1 through TRM / B 3.0-3Page TRM / B 3.0-4Page TRM / B 3.0-5Page TRM / B 3.0-6Page TRM / B 3.0-7Pages TRM / B 3.0-8 through TRM / B 3.0-10Pages TRM / B 3.0-11 and TRM / B 3.0-12Pages TRM / B 3.0-13 and TRM / B 3.0-14Page TRM / B 3.0-15

    B 3.1

    B 3.2

    B 3.3

    REACTIVITY CONTROL SYSTEMS BASESPage TRM / B 3.1-1Pages TRM / B 3.1-2 and TRM / B 3.1-3Page B 3.1-4Pages TRM / B 3.1-5 through TRM / B 3.1-7Page TRM / B 3.1-8

    CORE OPERATING LIMITS BASESPage B 3.2-1

    INSTRUMENTATION BASESPage TRM / B 3.3-1Pages TRM / B 3.3-2 and TRM / B-3.3-2aPages TRM / B 3.3-3 and TRM / B 3.3-3aPage TRM / B 3.3-4Page TRM / B 3.3-5Page TRM / B 3.3-6Page TRM / B 3.3-7Page TRM / B 3.3-8Page TRM / B 3.3-9Page B 3.3-10Pages TRM / B 3.3-11 and TRM / B 3.3-12Page TRM / B 3.3-13Page TRM / B 3.3-14Page TRM / B 3.3-14aPage TRM / B 3.3-14bPages TRM / B 3.3-15 through TRM / B 3.3-17Pages TRM / B 3.3-18 and TRM / B 3.3-19Pages TRM / B 3.3-19a and TRM / B 3.3-19bPage TRM / B 3.3-19cPages TRM / B 3.3-19d and TRM/ B 3.3-19ePage TRM / B 3.3-20Page TRM / B 3.3-21Page TRM / B 3.3-22Page TRM / B 3.3-23Pages TRM / B 3.3-24 and TRM / B 3.3-25

    08/31/199801/10/200704/14/200808/31/199804/12/200708/31/199803/15/200211/30/200503/15/2002

    07/13/199910/31/200708/31/199803/27/200702/18/1999

    08/31/1998

    04/07/200010/31/200710/31/200706/30/201005/30/200606/30/201010/31/200706/30/201010/31/200708/31/199809/13/200512/03/200406/25/200210/31/200706/14/200210/22/200303/27/200703/27/200704/17/200903/27/200712/11/200805/16/200310/22/200305/16/200304/07/2009

    SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title

    B 3.4

    B 3.5

    B 3.6

    REACTOR COOLANT SYSTEM BASESPage TRM / B 3.4-1Pages TRM / B 3.4-2 and TRM / B3.4-3Pages TRM / B 3.4-4 and TRM / B 3.4-4aPage TRM / B 3.4-5Page B 3.4-6Page TRM / B 3.4-7

    ECCS AND RCIC BASESPages B 3.5-1 and B 3.5-2Pages TRM / B 3.5-3 and TRM / B 3.5-3aPage B 3.5-4Page TRM / B 3.5-5

    CONTAINMENT BASESPage TRM / B 3.6-1Page TRM/ B 3.6-2Page B 3.6-3Page TRM / B 3.6-4Page TRM / B 3.6-5Page TRM / B 3.6-6Pages TRM / B 3.6-7 through TRM / B 3.6-11

    PLANT SYSTEMS BASESPages B 3.7-1 and B 3.7-2Page TRM / B 3.7-3Page TRM / B 3.7-3aPage TRM / B 3.7-4Page TRM / B 3.7-5Pages TRM / B 3.7-6 and TRM / B 3.7-6aPages TRM / B 3.7-7 and TRM / B 3.7-7aPage TRM / B 3.7-8Page TRM / B 3.7-9Page TRM / B 3.7-10Pages TRM / B 3.7-1Oa through TRM / B 3.7-1 laPages TRM / B 3.7-12 through TRM / B 3.7-14Pages TRM / B 3.7-14a and TRM / B 3.7-14bPages TRM / B 3.7-15 and TRM / B 3.7-16Pages B 3.7-17 through B 3.7-20Page TRM / B 3.7-21Page TRM / B 3.7-21aPages TRM / B 3.7-22 and TRM / B 3.7-23Pages TRM / B 3.7-24 through TRM / B 3.7-29

    Effective Date

    08/31/199804/01/200910/31/200710/15/199908/31/199807/15/2010

    08/31/199810/31/200708/31/199810/31/2007

    07/26/200102/01/199908/31/199803/29/200704/04/200712/03/200412/31/2002

    08/31/199806/10/201012/27/200703/31/200608/02/199903/31/200608/02/199908/02/199903/31/200608/02/199903/31/200608/02/199901/09/200402/01/199908/31/199802/14/200506/20/200801/30/200810/05/2006

    B 3.7

    SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title Effective Date

    B 3.8

    B.3.9

    Page TRM / B 3.7-30Pages TRM / B 3.7-30a and TRM / B 3.7-30bPage TRM / B 3.7-32Page TRM / B 3.7-33Page TRM / B 3.7-34Page TRM / B 3.7-35Pages TRM / B 3.7-36 and TRM / B 3.7-37Page TRM / B 3.7-38Page TRM / B 3.7-39Page TRM / B 3.7-40

    ELECTRICAL POWER BASESPage TRM / B 3.8-1Pages TRM / B 3.8-2 and TRM / B 3.8-2Page TRM / B 3.8-2aPage TRM / B 3.8-3Page TRM / B 3.8-3aPage TRM / B 3.8-4Page TRM / B 3.8-4aPage TRM / B 3.8-5Pages TRM / B 3.8-6 through TRM / B 3.8-16Page TRM / B 3.8-17Pages TRM / B 3.8-18 through TRM / B 3.8-20Pages TRM / B 3.8-21 through TRM / B 3.8-24

    REFUELING OPERATIONS BASESPages B 3.9-1 and B 3.9-2Pages B 3.9-3 through B 3.9-7

    06/07/200710/05/200603/09/200104/15/200312/03/200407/05/200004/01/200909/25/200904/01/200904/08/2010

    04/02/200201/28/200503/01/201004/02/200204/02/200204/02/200208/10/200408/31/199804/02/200201/28/200511/29/200605/28/2009

    08/31/199810/23/1998

    08/31/199803/27/200708/23/1999

    08/31/199802/01/199904/07/200002/01/199912/03/200402/01/199908/31/199804/02/200204/02/2002

    B 3.10 MISCELLANEOUS BASESPage B 3.10-1Pages TRM / B 3.10-2 and TRM / B 3.10-3Pages TRM / B 3.10-4 and TRM / B 3.10-5

    B 3.11 RADIOACTIVE EFFLUENTS BASESPages B 3.11-1 through B 3.11-9Page TRM / B 3.11-10Pages TRM/B 3.11-11 and TRM/B 3.11-11 aPages TRM/B 3.11-12 and TRM/B 3.11-13Page TRM /B 3.11-14Page TRM/ B 3.11-15Pages B 3.11-16 through B 3.11-19Page TRM/ B 3.11-20Page TRM / B 3.11-20a

    SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 07/15/2010

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

    Section Title

    Page TRM / B 3.11-21Pages TRM / B 3.11-22 and TRM / B 3.11-23Page TRM / B 3.11-23aPages TRM / B 3.11-24 and TRM / B 3.11-25Pages B 3.11-26 through B 3.11-27Pages TRM / B 3.11-28 and TRM / B 3.11-29Page TRM / B 3.11-30Pages TRM / B 3.11-31 and TRM / B 3.11-32Page TRM / B 3.11-33Pages TRM / B 3.11-34 and TRM / B 3.11-35Page TRM / B 3.11-36

    Effective Date

    05/13/200511/14/200605/13/200501/21/200408/31/199811/30/200506/30/201008/31/199806/30/201008/31/199802/12/1999

    B.3.12 LOADS CONTROL PROGRAM BASESPage TRM / B 3.12-1Pages TRM / B 3.12-2 and TRM / B 3.12-3

    09/19/200702/05/1999

    TRM2 text LOES .doc7/8/10

    SUSQUEHANNA- UNIT 2 TRM / LOES-9 EFFECTIVE DATE 07/15/2010

    SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 07/15/2010

  • PPL Rev. 0Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction

    3.4.6

    3.4 Reactor Coolant System (RCS)

    3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction

    TRO 3.4.6 In single loop operation, establish operating Reactor Recirculation loop FlowRate to less than or equal to 53.0 Mlbm/hr

    APPLICABILITY: MODES 1 and 2

    ACTIONS

    CONDITION REQUIRED ACTION COMPLETION TIME

    A. Requirements of the TRO A.1 Restore reactor recirculation 2 hoursnot met flow rate to within limits

    B. Requirements of B.1 Place Reactor Mode Switch in Immediately

    Condition A not met Shutdown

    AND

    B.2 Restore reactor recirculation Immediatelyloop flow rate to within limits

    TECHNICAL REQUIREMENT SURVEILLANCE

    SURVEILLANCE FREQUENCY

    TRS 3.4.6.1 Verify the operating loop flow rate is less than or Once every four hoursequal to 53.0 Mlbm/hr.

    SUSQUEHANNA UNIT 2 TRM / 3.4-14 EFFECTIVE DATE 07/15/2010

  • PPL Rev. 0Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction

    B 3.4.6

    B 3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction

    BASES

    TRO TRO 3.4.6 requires that the operating loop flow rate be maintained lessthan or equal to 53.0 MIbm/hr during single loop operation. Note that theparameter of concern is the 3 minute average recirculation system loopflow (e.g., PICSY point NJF02B and NJF03B) not core flow. This restrictionavoids excessive vibration of jet pump components. Fatigue usage can beaccumulated when loop flow rates are above 54 MIbm/hr if large gaps arepresent. The single loop operation limits for either loop are set at 53Mlbm/hr to provide margin to the limit of 54 MIbm/hr. Excessive vibrationcan lead to cracking of the jet pump riser brace welds. The limitationcontained in this TRO will provide nuclear safety assurance in that jet pumpintegrity will be maintained and thus the FSAR Chapter 15 analysisassumption of maintaining 2/3 core height will be met. Additionally, thesemeasures will assure asset preservation and avoid lengthy repairs due topotential riser brace cracking. The required action to place the reactormode switch in shutdown will assure the flow rate is established withinlimits. The time frame of 2 hours is required to avoid excessive vibrationsthat occur at higher loop flow rates and the subsequent impact on jet pumpriser brace.

    APPLICABILITY This Requirement is applicable whenever in reactor recirculation singleloop operation in Modes 1 and 2.

    ACTIONS The Actions assure excessive jet pump vibration can not occur when insingle loop operation.

    TRS The required surveillance assures that the maximum loop flow rate is notexceeded.

    REFERENCES 1. FSAR Section 15.6

    SUSQUEHANNA - UNIT 2 TRM / B 3.4-7 EFFECTIVE DATE 07/15/2010