Jul. 21, 2010
Page 1 of 2
MANUAL HARD COPY DISTRIBUTION
DOCUMENT TRANSMITTAL 2010-30513
USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363
Address: NUCSA2
Phone#: 254-3194
TRANSMITTAL INFORM4ATION:
TO: GERLACH*ROSE M 07/21/2010
LOCATION: USNRC
FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED
TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON
THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE
UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS
FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF
ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no
TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2
REMOVE MANUAL TABLE OF CONTENTS DATE: 07/09/2010
ADD MANUAL TABLE OF CONTENTS DATE: 07/20/2010
CATEGORY: DOCUMENTS TYPE: TRM2
4D0
-
Jul. 21, 2010
Page 2 of 2
ID: TEXT 3.4.6
ADD: REV: 0
CATEGORY: DOCUMENTS
ID: TEXT B3.4.6
ADD: REV: 0
CATEGORY: DOCUMENTS
ID: TEXT LOES
REMOVE: REV:61
TYPE: TRM2
TYPE: TRM2
ADD: REV: 62
CATEGORY:
ID: TEXT
REMOVE:
DOCUMENTS
TOC
REV:17
TYPE: TRM2
ADD: REV: 18
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR
ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN
ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE
COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL
USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN
YOUR NIMS INBOX.
-
SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
Table Of ContentsIssue Date: 0
Procedure Name
TEXT LOES
Title: LIST OF EF]
7/20/2010'
Rev
62
FECTIVE SECTIONS
Issue Date
07/20/2010
Change ID Change Number
TEXT TOC
Title:
18 07/20/2010
TABLE OF CONTENTS
TEXT 1.1 0 11/19/2002
Title: USE AND APPLICATION DEFINITIONS
TEXT 2.1 1 02/04/2005
Title: PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS
TEXT 2.2 9 02/12/2010
Title: PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE
TEXT 3.0 4 05/23/2008
Title: APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY.
TEXT 3.1.1 1 .11/09/2007
Title: REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD
INJECTION (ATWS-ARI) INSTRUMENTATION
TEXT 3.1.2 0 11/19/2002
Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT
TEXT 3.1.3 4 05/14/2009
Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION
TEXT 3.1.4 0 11/19/2002
Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND
CHECK VALVE
TEXT 3.2.1 8 05/14/2009
Title: CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712
Page 2. of 15 Report Date: 07/20/10
Page 1 of .15 Report Date: 07/20/10
-
SSES MANUAL.
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT 3.3. 1
Title: INSTRUMENTATION
TEXT 3.3.2
Title: INSTRUMENTATION
TEXT 3.3.3
Title: INSTRUMENTATION
TEXT 3.3.4
Title: INSTRUMENTATION
TEXT 3.3.5
Title: INSTRUMENTATION
TEXT 3.3.6
Title: INSTRUMENTATION
TEXT 3.3.7
Title: INSTRUMENTATION
TEXT 3.3.8
Title: INSTRUMENTATION
TEXT 3.3.9
Title: INSTRUMENTATION
TEXT 3.3.10
Title: INSTRUMENTATION
TEXT 3.3.11
Title: INSTRUMENTATION
TEXT 3.3.12
0 11/19/2002
RADIATION MONITORING INSTRUMENTATION
2 11/09/2007
SEISMIC MONITORING INSTRUMENTATION
2 11/09/2007
METEOROLOGICAL MONITORING INSTRUMENTATION
6 07/09/2010
TRM POST-ACCIDENT MONITORING INSTRUMENTATION
0 11/19/2002
THIS PAGE INTENTIONALLY LEFT BLANK
2 10/19/2005
TRM ISOLATION ACTUATION INSTRUMENTATION
1 11/09/2007
MAIN TURBINE OVERSPEED PROTECTION SYSTEM
1 10/22/2003
TRM RPS INSTRUMENTATION
3 05/14/2009
LPRM UPSCALE ALARM INSTRUMENTATION
1 12/14/2004
REACTOR RECIRCULATION PUMP MG SET STOPS
.1 10/22/2003
MVP ISOLATION INSTRUMENTATION
0 04/16/2009
0
Title: WATER MONITORING INSTRUMENTATION
Page2. of 15. Report Date: 07/20/10
Page 2 , of 15 Report Date: 07/20/10
-
SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT 3.4.1
Title: REACTOR
TEXT 3.4.2
Title: REACTOR
TEXT 3.4.3
Title: REACTOR
TEXT 3.4.4
Title: REACTOR
TEXT 3.4.5
Title: REACTOR
TEXT 3.4.6
Title: REACTOR
TEXT 3.5.1
1 04/26/2006
COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY
1 04/16/2009
COOLANT SYSTEM STRUCTURAL INTEGRITY
1 11/09/2007
COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
2 05/14/2009
COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT
1 04/26/2006
COOLANT SYSTEM REACTOR VESSEL MATERIALS
0 07/20/2010
RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION
1 02/04/2005
Title: ECCS AND RCIC ADS MANUAL INHIBIT
TEXT 3.5.2 1 11/09/2007
Title: ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION
TEXT 3.5.3 0 11/19/2002
Title: ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS
TEXT 3.6.1 0 11/19/2002
Title: CONTAINMENT VENTING OR PURGING
TEXT 3. 6.2 0 11/19/2002
Title: CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION
TEXT 3.6.3 0 11/19/2002
Title: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION
Page 3 of 15 ReportýDate: 07/20/10
-
SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT 3.6.4 0 11/19/2002
Title: CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES'
TEXT 3. 7.1
Title: PLANT
TEXT 3. 7.2
Title: PLANT
TEXT 3.7.3.1
Title: PLANT
TEXT 3.7.3.2
Title: PLANT
TEXT 3.7.3.3
Title: PLANT
0 11/19/2002
SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN
0 11/19/2002
SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL
2 04/16/2009
SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM
3 04/16/2009
SYSTEMS SPRAY AND SPRINKLER SYSTEMS
3 04/16/2009
SYSTEMS C02 SYSTEMS
2 04/16/2009
SYSTEMS HALON SYSTEMS
TEXT 3.7.3.4
Title: PLANT
TEXT 3.7.3.5
Title: PLANT
TEXT 3.7.3.6
Title: PLANT
TEXT 3.7.3.7
Title: PLANT
TEXT 3.7.3.8
Title: PLANT
TEXT 3.7.4
Title: PLANT
2 04/16/2009
SYSTEMS FIRE HOSE STATIONS
2 04/16/2009
SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
1 04/26/2006
SYSTEMS. FIRE RATED ASSEMBLIES
8 01/20/2010
SYSTEMS FIRE DETECTION INSTRUMENTATION
1 04/26/2006
SYSTEMS SOLID RADWASTE SYSTEM--
Page 4 of 15 Report Date: 07/20/10
Page 4 of 15 Report Date: 07/20/10
-
SSES MANUAL
. Manual Name: TRM2Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT -2
TEXT 3.7.5.1 0 11/19/2002
Title: PLANT SYSTEMS MAIN CONDENSER-OFFGAS HYDROGEN MONITOR
TEXT 3.7.5.2 0 11/19/2002
Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE
TEXT 3.7.5.3 1 .04/26/2006
Title: PLANT SYSTEMS LIQUID HOLDUP TANKS
TEXT 3.7.6 2 06/27/2008
Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION
TEXT 3.7.7 2 09/05/2008
Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION'9O MONITORING INSTRUMENTATIONTEXT 3.7.8 6 .06/21/2007
Title: PLANT SYSTEMS SNUBBERS
TEXT 3.7.9 1 08/28/2006
Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC
TEXT 3.7.10 1 12/14/2004
Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1 10/02/2009
Title: PLANT SYSTEMS
TEXT 3.8.1 2 02/04/2005
Title: ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT'
PROTECTIVE DEVICES
TEXT 3.8.2.1 2 11/09/2007
Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD. PROTECTION -
CONTINUOUS
9 TEXT 3.8.2.2 2 12/14/2004Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC
Page 5 of 15. Report Date: 07/20/10
-
SSES; MANUAl
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT 3.8.3
Title: ELECTRICAL
TEXT 3.8.4
Title: ELECTRICAL
TEXT 3.8.5
Title: ELECTRICAL
TEXT 3.8.6
Title: ELECTRICAL
TEXT 3.8.7
1 04/05/2010
POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES
1 02/04/2005
POWER 24 VDC ELECTRICAL.SUBSYSTEM
0 11/19/2002
POWER DEGRADED VOLTAGE PROTECTION
0 11/19/2002
POWER EMERGENCY SWITCHGEAR ROOM COOLING
2 10/22/2009
Title: BATTERY MAINTENANCE AND MONITORING PROGRAM
TEXT 3.9.1 0 .11/19/2002
Title: REFUELING OPERATIONS DECAY TIME
TEXT 3.9.2 0 11/19/2002
Title: REFUELING OPERATIONS COMMUNICATIONS
TEXT 3.9.3 0 11/19/2002
Title: REFUELING OPERATIONS REFUELING PLATFORM.
TEXT 3.10.1 1 04/26/2006
Title: MISCELLANEOUS SEALED SOURCE CONTAMINATION
TEXT 3.10.2 1 04/09/2007
Title: MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION,-
TEXT 3.10.3 2 06/15/2010
Title: MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1 04/26/2006
Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION
Pae'of1 eor ae 0/01
Page6 of 1__5 Report Date: 07/20/10
-
SSES', MANUIAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT 3.11.1.2
Title: RADIOACTIVE
TEXT 3.11.1.3
Title: RADIOACTIVE
TEXT 3.11.1.4
Title: RADIOACTIVE
TEXT 3.11.1.5
Title: RADIOACTIVE
TEXT 3.11.2.1
Title: RADIOACTIVE
TEXT 3'.11.2.2
Title: RADIOACTIVE
TEXT 3.11.2.3
Title: RADIOACTIVE
FORM
TEXT 3.11.2.4
Title: RADIOACTIVE
TEXT 3.11.2.5
Title: RADIOACTIVE
TEXT 3.11.2.6
Title: RADIOACTIVE
TEXT 3.11.3
Title: RADIOACTIVE
TEXT 3.11.4.1
Title: RADIOACTIVE
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
EFFLUENTS
1 04/26/2006
LIQUIDtEFFLUENTS DOSE
1 04/26/2006
LIQUID WASTE TREATMENT SYSTEM
1 12/14/2004
LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION
2 05/02/2007
RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
3 04/26/2006
DOSERATEý
1 04/26/2006
DOSE - NOBLE GASES
1 04/26/2006
DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE
0 11/19/2002
GASEOUS RADWASTE TREATMENT SYSTEM
3 11/14/2006
VENTILATION EXHAUST TREATMENT SYSTEM,
4 09/16/2009
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION
1 04/26/2006
TOTAL- DOSE'
3 04/26/2006
MONITORING PROGRAM
Page 2 of 15 Report Date: 07/20/10
Page 7 of .15 Report Date: 07/20/10
-
SSES MANTUAIL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT 3.11.4.2 2 04/26/2006
Title: RADIOACTIVE EFFLUENTS LAND USE CENSUS
TEXT 3.11.4.3 1 04/26/2006
Title: RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM
TEXT 3.12.1 0 11/19/2002
Title: LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL
TEXT 3.12.2 4 04/17/2008
Title: LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS
TEXT 3.12.3 0 11/19/2002
Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS
TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
ADMINISTRATIVE
ADMINISTRATIVE
ADMINISTRATIVE
ADMINISTRATIVE
ADMINISTRATIVE
ADMINISTRATIVE
ADMINISTRATIVE
0 09/27/2003
CONTROLS ORGANIZATION
0 09/27/2003
CONTROLS REPORTABLE EVENT ACTION
0 09/27/2003 ,
CONTROLS SAFETY LIMIT VIOLATION
1 12/18/2008
CONTROLS PROCEDURES & PROGRAMS
0 09/27/2003
CONTROLS REPORTING REQUIREMENTS
0 09/27/2003
CONTROLS RADIATION PROTECTION PROGRAM
0 09/27/2003
CONTROLS TRAINING.
Page .~ of 25. Report Date: 07/20/10
Page8 of 15 Report Date: 07/20/10
-
SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT B3.0 4 05/23/2008
Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY
TEXT B3.1.1 1 11/09/2007
Title: REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE
ROD INJECTION (ATWS-ARI) INSTRUMENTATION
TEXT B3.1.2 0 11/19/2002
Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT
TEXT B3.1.3 3 04/10/2007
Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION
TEXT B3.1.4 0 11/19/2002
Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION
AND CHECK VALVE
TEXT B3.2.1 0 11/19/2002
Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1
Title: INSTRUMENTATION
TEXT B3.3.2
Title: INSTRUMENTATION
TEXT B3.3.3
Title: INSTRUMENTATION
TEXT B3.3.4
Title: INSTRUMENTATION
TEXT B3.3.5
Title: INSTRUMENTATION
TEXT B3.3.6
Title: INSTRUMENTATION
0 11/19/2002
BASES RADIATION MONITORING INSTRUMENTATION
1 11/09/2007
BASES SEISMIC.MONITORING INSTRUMENTATION
2 11/09/2007
BASES METEOROLOGICAL MONITORING INSTRUMENTATION
4 07/09/2010
BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION
2 11/09/2007
BASES THIS;PAGE INTENTIONALLY LEFT BLANK
3 10/1.9/2005
BASES TRM ISOLATION ACTUATION INSTRUMENTATION
Page ~ of 15 Report Date: 07/20/10
Page9 of 15 Report Date: 07/20/10
-
SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT B3.3.7
Title: INSTRUMENTATION
TEXT B3.3.8
Title: INSTRUMENTATION
TEXT B3.3.9
Title: INSTRUMENTATION
TEXT B3.3.10
Title: INSTRUMENTATION
TEXT B3.3.11
Title: INSTRUMENTATION
1 11/09/2007
BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM
1 10/22/2003
BASES TRMRPS INSTRUMENTATION
3 05/14/2009
BASES LPRM UPSCALE ALARM INSTRUMENTATION
1 12/18/2008
BASES REACTOR RECIRCULATION PUMP MG
1 10/22/2003
BASES MVP ISOLATION INSTRUMENTATION
SET STOPS
TEXT B3.3.12 0 04/16/2009
Title: WATER MONITORING INSTRUMENTATION
TEXT B3.4.1
Title: REACTOR
TEXT B3.4.2
Title: REACTOR
TEXT B3.4.3
Title: REACTOR
TEXT B3.4.4
Title: REACTOR
TEXT B3.4.5
Title: REACTOR
TEXT B3.4.6
0 11/19/2002
COOLANT SYSTEM.BASES REACTOR COOLANT SYSTEM CHEMISTRY
1 04/16/2009
COOLANT SYSTEM BASES STRUCTURAL INTEGRITY
1 11/09/2007
COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR
0 11/19/2002
COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW ANDROD'LINE LIMIT
0 11/19/2002
COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS
0 07/20/2010
Title: REACTOR RECIRCULATION SINGLE LOOP-OPERATION SLO FLOW RATE RESTRICTION W
Page i~~~~~Q. ~ of1ReotDt:0//0Page 10 of 15 Report Date:-07/20/10
-
SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT B3.5.1 0 11/19/2002
Title: ECCS AND RCIC BASES ADS MANUAL INHIBIT
TEXT B3.5.2 1 11/09/2007
Title: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION
TEXT B3.5.3 1 11/09/2ý007
Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS
TEXT B3.6.1 0 11/19/2002
Title: CONTAINMENT BASES VENTING OR PURGING
TEXT B3.6.2 0 11/i9/2002
Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION
INDICATION
TEXT B3.6.3 1 04/19/2-007
Title: CONTAINMENT BASES SUPPRESSION POOL ALARM'INSTRUMENTATION
TEXT B3.6.4 1 12/14/2004
Title: CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES
TEXT B3.7.1 0 .11/19/2002
Title: PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title: PLANT SYSTEMS BASES ULTIMATE HEAT-SINK (UHS) GROUND WATER LEVEL
TEXT B3.7.3.1 3 06/15/2010
Title: PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM'
TEXT B3.7.3.2 2 04/26/2006
Title: PLANT SYSTEMSBASES SPRAY -AND SPRINKLER SYSTEMS
TEXT B3.7.3.3 0 11/19/2002
Title: PLANT. SYSTEMS BASES C02 SYSTEMS
Page 11 of 15 , Report Date: 07/20/10
-
SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT B3.7.3.4
Title: PLANT
TEXT B3.7.3.5
Title: PLANT
TEXT B3.7.3.6
Title: PLANT
TEXT B3.7.3.7
Title: PLANT
TEXT B3.7.3.8
Title: PLANT
TEXT B3.7.4
Title: PLANT
TEXT B3.7.5.1
Title: PLANT
TEXT B3.7.5.2
Title: PLANT
TEXT B3.7.5.3
Title: PLANT
TEXT B3.7.6
Title: PLANT
TEXT B3.7.7
Title: PLANT
1* 04/26/2006
SYSTEMS BASES HALON SYSTEMS
1 04/26/2006
SYSTEMS BASES FIRE HOSE STATIONS
1 04/26/2006
SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
SYSTEMS BASES
SYSTEMS BASES
SYSTEMS BASES
SYSTEMS BASES
SYSTEMS BASES
SYSTEMS BASES
SYSTEMS BASES
SYSTEMS BASES
0 11/19/2002
FIRE RATED ASSEMBLIES
1 01/12/2004
FIRE DETECTION INSTRUMENTATION
0 11/19/2002
SOLID RADWASTE SYSTEM
0 11/19/2002
MAIN CONDENSER OFFGAS HYDROGEN MONITOR
0 11/19/2002
MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE
0 11/19/2002
LIQUID HOLDUP TANKS
2 06/27/2008
ESSW-PUMPHOUSE.VENTILATION
2 -01/31/2008
MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMICtRADIATION
MONITORING INSTRUMENTATION
TEXT B3.7.8 3 06/21/2007
Title: PLANT SYSTEMS BASES SNUBBERS
Page 2~2~ of 15 Report Date: 07/20/10
Page 12 of 15 Report Date: 07/20/10
-
SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT B3.7.9 1 12/14/2004
Title: PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC
TEXT B3.7.10 1 12/14/2004
Title: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS
TEXT B3.7.11 2 04/14/2010
Title: STRUCTURAL INTEGRITY
TEXT B3.8.1 2 03/10/2010
Title: ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT
PROTECTIVE DEVICES
TEXT B3.8.2.1
Title: ELECTRICAL
CONTINUOUS
TEXT B3.8.2.2
Title: ELECTRICAL
AUTOMATIC
TEXT B3.8.3
Title: ELECTRICAL
0 11/19/2002
POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD
1 09/17/2004
POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD
PROTECTION -
PROTECTION -
0 11/19/2002
POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES
TEXT B3.8.4 0 11/19/2002
Title: ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM
TEXT B3.8.5 0 11/19/2002
Title: ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION
TEXT B3.8.6 1 02/04/2005
Title: ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING
TEXT B3.8.7 1 06/15/2009
Title: BATTERY MAINTENANCE AND MONITORING PROGRAM•
TEXT B3.9.1 0 11/19/2002
Title: REFUELING OPERATIONS BASES DECAY TIME
Page 13. of 15 Report Date: 07/20/10
Page 13 of 15 Report Date: 07/20/10
-
.SSES MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT B3.9.2 0 11/19/2002
Title: REFUELING OPERATIONS BASES COMMUNICATIONS
TEXT B3.9.3 0 11/19/2002
Title: REFUELING OPERATIONS BASES REFUELING PLATFORM-
TEXT B3.10.1 0 11/19/2002
Title: MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION
TEXT B3.10.2 1 04/10/2007
Title: MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
TEXT B3.10.3 0 11/19/2002
Title: MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1
Title: RADIOACTIVE
TEXT B3.11.1.2
Title: RADIOACTIVE
TEXT B3.11.1.3
Title: RADIOACTIVE
TEXT B3.11.1.4
Title: RADIOACTIVE
EFFLUENTS
EFFLUENTS
EFFLUENTS
..EFFLUENTS
0 11/19/2002
BASES LIQUID EFFLUENTS CONCENTRATION
0 11/19/2002
BASES LIQUID EFFLUENTS DOSE
0 11/19/2002
BASES LIQUID WASTE TREATMENT SYSTEM
0 11/19/2002
BASESLIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION
TEXT B3.11.1.5
Title: RADIOACTIVE EFFLUENTS
0 '11/19/2002
BASES RADIOACTIVE LIQUID PROCESS MONITORING,
INSTRUMENTATION
TEXT B3.11.2.1 1 12/14/2004
Title: RADIOACTIVE EFFLUENTS BASES DOSE RATE
TEXT B3.11.2.2
Title: RADIOACTIVE EFFLUENTS
0 11/19/2002
BASES DOSE - NOBLE GASES
Page 24 of 15 Report Date: .07/20/10
Page 14 . of 15 Report Date:.07/20/10
-
SSES -MANUAL
Manual Name: TRM2
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2
TEXT B3.11.2.3
Title: RADIOACTIVE EFFLUENTS
PARTICULATES FORM
0 11/19/2002
BASES DOSE -'IODINE, TRITIUM, AND RADIONUCLIDES IN
TEXT B3.11.2.4 0 11/19/2002
Title: RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM
TEXT B3.11.2.5 4 11/14/2006
Title: RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM
TEXT B3.11.2.6
Title: RADIOACTIVE 'EFFLUENTS
INSTRUMENTATION
1 01/27/2004
BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING
TEXT B3.11.3 0 11/19/2002
Title: RADIOACTIVE EFFLUENTS BASES TOTAL DOSE
TEXT B3.11.4.1 3 07/09/2010
Title: RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM
TEXT B3.11.4.2 0 11/19/2002
Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS
TEXT B3.11.4.3 0 11/19/2002
Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM
TEXT B3.12.1 1 10/04/2007
Title: LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL
TEXT B3.12.2
Title: LOADS CONTROL PROGRAM
TEXT B3.12.3
Title: LOADS CONTROL PROGRAM
0 11/19/2002
BASES HEAVY LOADS REQUIREMENTS
0 11/19/2002
BASES-LIGHT LOADS REQUIREMENTS
Page I~ of 15 Report Date: 07/20/10
Page 15 of .15 Report Date: 07/20/10
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE
1.0 USE AND APPLICATION ............................................................................ 1.0-11.1 D efinitions ..................................................................................... T R M /1.0-2
2.0 PLANT PROGRAMS ................................................................................... 2.0-12 .1 P lant P rogram s ...................................................................................... 2 .0-12.2 Instrument Trip Setpoint Table ..................................................... TRM/2.0-5
3.0 APPLICABILITY ................................................................................. TRM/3.0-13.0 (TRO) - TR for Operation (TRO) Applicability ............................... TRM/3.0-13.0 (TRS) - TR Surveillance (TRS) Applicability .................................. TRM/3.0-3
3.1 REACTIVITY CONTROL SYSTEMS .................................................. TRM/3.1-13.1.1 Alternate Rod Injection ................................................................. TRM/3.1-13.1.2 CRD Housing Support ........................................................................... 3.1-43.1.3 Control Rod Block Instrumentation ........................................................ 3.1-53.1.4 Control Rod Scram Accumulators Instrumentation and
C heck V alve ................................................................................. T R M /3.1-9
3.2 CORE OPERATING LIMITS REPORT ........................................................ 3.2-13.2.1 Core Operating Limits Report ................................................................ 3.2-1
3.3 INSTRUMENTATION ......................................................................... TRM/3.3-13.3.1 Radiation Monitoring Instrumentation ........................................... TRM/3.3-13.3.2 Seismic Monitoring Instrumentation ................ : ............................. TRM/3.3-43.3.3 Meteorological Monitoring Instrumentation ................................... TRM/3.3-73.3.4 TRM Post-Accident Monitoring Instrumentation ............................ TRM/3.3-93.3.5 Section Not Used .......................................................................... TRM/3.3-123.3.6 TRM Containment Isolation Instrumentation ................................. TRM/3.3-133.3.7 Turbine Overspeed Protection System ......................................... TRM/3.3-173.3.8 Section Not Used ......................................................................... TRM/3.3-193.3.9 OPRM Instrumentation ................................................................. TRM/3.3-213.3.10 Reactor Recirculation Pump MG Set Electrical and
Mechanical Stops ......................................................................... TRM/3.3-223.3.11 MVP Isolation Instrumentation ..................... ... TRM/3.3-243.3.12 Water Monitoring Instrumentation ............................................... TRM/3.3-26
3.4 REACTOR COOLANT SYSTEM .......................................................... TRM/3.4-13.4.1 Reactor Coolant System Chemistry ...................................................... 3.4-13.4 .2 N ot U sed ......................................................................................... T R M /3.4-63.4.3 High/Low Pressure Interface Leakage Monitors .................................... 3.4-93.4.4 Reactor Recirculation Flow and Rod Line Limit ............................ TRM/3.4-123.4.5 Reactor Vessel Material Surveillances Program ........................... TRM/3.4-133.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction .................................................................... TRM/3.4-14
SUSQUEHANNA-UNIT2 TRM I TOC-1 EFFECTIVE DATE 07/15/2010
SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE
3.5 EMERGENCY CORE COOLING AND RCIC ...................................... TRM/3.5-13.5.1 ADS Manual Inhibit ....................................................................... TRM/3.5-13.5.2 ECCS and RCIC System Monitoring Instrumentation ............................ 3.5-33.5.3 Long Term Nitrogen Supply to ADS ...................................................... 3.5-6
3.6 C O N TA IN M E N T .......................................................................................... 3.6-13.6.1 VENTING or PURGING ......................................................................... 3.6-13.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position
In d ica tio n ............................................................................................... 3 .6 -33.6.3 Suppression Pool Alarm Instrumentation ............................................... 3.6-43.6.4 Primary Containment Closed System Boundaries ........................ TRM/3.6-7
3.7 PLANT SYSTEMS .............................................................................. TRM/3.7-13.7.1 Emergency Service Water System (Shutdown) ............................ TRM/3.7-13.7.2 Ultimate Heat Sink and Ground Water Level ......................................... 3.7-33.7.3.1 Fire Suppression Water Supply System ....................................... TRM/3.7-43.7.3.2 Spray and Sprinkler Systems ....................................................... TRM/3.7-83.7.3.3 C02 systems ................................................................................ TRM/3.7-123.7.3.4 Halon Systems ............................................................................. TRM/3.7-163.7.3.5 Fire Hose Stations ........................................................................ TRM/3.7-183.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................. TRM/3.7-223.7.3.7 Fire Rated Assemblies .................................................................. TRM/3.7-243.7.3.8 Fire Detection Instrumentation ...................................................... TRM/3.7-263.7.4 Solid Radwaste System ................................................................ TRM/3.7-343.7.5.1 Main Condenser Offgas Hydrogen Monitor ........................................... 3.7-373.7.5.2 Main Condenser Explosive Gas Mixture ....................................... TRM/3.7-383.7.5.3 Liquid Holdup Tanks ..................................................................... TRM/3.7-393.7.6 ESSW Pumphouse Ventilation .............................................................. 3.7-403.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation
Monitoring Instrumentation ........................................................... TRM/3.7-413.7.8 S nubbers ...................................................................................... T R M /3.7-433.7.9 Control Structure HVAC ................................................................ TRM/3.7-493.7.10 Spent Fuel Storage Pools (SFSPs) .............................................. TRM/3.7-513.7.11 Structural Integrity ......................................................................... TRM/3.7-54
3.8 ELECTRICAL POWER ....................................................................... TRM/3.8-13.8.1 Primary Containment Penetration Conductor Overcurrent
Protective Devices ........................................................................ TRM/3.8-13.8.2.1 Motor Operated Valves Thermal Overload Protection -
C ontinuous ................................................................................... T R M /3.8-53.8.2.2 Motor Operated Valves Thermal Overload Protection -
A utom atic ................................................................................... T R M /3.8-113.8.3 Diesel Generator (DG) Maintenance Activities ............................. TRM/3.8-13
. SUSQUEHANNA - UNIT 2 TRM /TOC-2 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE
3.8.4 24VDC Electrical Power Subsystem ......... ...................... TRM/3.8-153.8.5 Degraded Voltage Protection ............................................. : ........ TRM/3.8-213.8.6 Emergency Switchgear Room Cooling .................................................. 3.8-243.8.7 Battery Monitoring and Maintenance Program .............................. TRM/3.8-26
3.9 REFUELING OPERATIONS ........................................................................ 3.9-13 .9 .1 D e ca y T im e ................... , ....................................................................... 3 .9-13.9 .2 C om m unications ................................................................................... 3.9-23.9 .3 R efueling P latform ................................................................................. 3.9-3
3.10 MISCELLANEOUS ............................................................................. TRM/3.10-13.10.1 Sealed Source Contamination ...................................................... TRM/3.10-13.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation .......................... 3.10-43.10.3 Independent Spent Fuel Storage Installation (ISFSI) .................... TRM/3.10-73.10.4 Section Not Used .......................................................................... TRM/3.10-8
3.11 RADIOACTIVE EFFLUENTS .............................................................. TRM/3.11-13.11.1 Liquid Effluents ............................................................................ T R M /3.11-13.11.1.1 Liquid Effluents Concentration ...................................................... TRM/3.11-13.11.1.2 Liquid Effluents Dose ................................................................... TRM/3.11-43.11.1.3 Liquid Waste Treatment System ................................................... TRM/3.11-63.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ............................ 3.11-83.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ............... TRM/3.11-133.11.2 Gaseous Effluents ........................................................................ TRM/3.11-173.11.2 .1 D ose R ate ..................................................................................... T R M /3.11-173.11.2.2 Dose - Noble Gases ..................................................................... TRM/3.11-203.11.2.3 Dose - Iodine, Tritium, and Radionuclides in
Particulate Form ........................................................................... T R M /3.11-213.11.2.4 Gaseous Radwaste Treatment System ........................................ TRM/3.11-223.11.2.5 Ventilation Exhaust Treatment System ......................................... TRM/3.11-233.11.2.6 Radioactive Gaseous Effluent Monitoring
Instrum entation ............................................................................. T R M /3.11-253.11.3 Total D ose .................................................................................... T R M /3.11-333.11.4 Radiological Environmental Monitoring ......................................... TRM/3.11-353.11.4.1 Monitoring Program ...................................................................... TRM/3.11-353.11.4.2 Land Use Census .......................................................................... TRM/3.11-453.11.4.3 Interlaboratory Comparison Program ............................................ TRM/3. 11-47
3.12 LOADS CONTROL PROGRAM .......................................................... TRM/3.12-13.12.1 Crane Travel - Spent Fuel Storage Pool ...................................... TRM/3.12-13.12.2 Heavy Loads Requirements ......................................................... TRM/3.12.33.12.3 Light Loads Requirements ............................................................ TRM/3.12-5
SUSQUEHANNA-UNIT2 TRM / TOC-3 EFFECTIVE DATE 07/15/2010
SUSQUEHANNA - UNIT 2 TRM /TOC-3 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE
4.0 ADMINISTRATIVE CONTROLS ............................. 4.0-14 .1 O rg a n ization .......................................................................................... 4 .0-14.2 Reportable Event Action ........................................................................ 4.0-24 .3 S afety Lim it V iolation ............................................................................. 4 .0-34.4 Procedures and Programs ..................................................................... 4.0-44.5 Reporting Requirements ........................................................................ 4.0-54.6 Radiation Protection Program ................................................................ 4.0-74 .7 T ra in in g .................................................................................................. 4 .0 -8
SUSQUEHANNA-UNIT2 TRM/TOC-4 EFFECTIVE DATE 07/15/2010
SUSQUEHANNA - UNIT 2 TRM /TOC-4 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE
B 3.0 (TRO) - TR for Operation (TRO) Applicability ...................................... B 3.0-1B 3.0 (TRS).- TR Surveillance (TRS) Applicability......................................... B 3.0-9
B 3.1.1 Alternate Rod Injection ................................................................ TRM/B 3.1-1B 3.1.2 CRD Housing Support .............. ... .............. B 3.1-4B 3.1.3 Control Rod Block Instrumentation .............................................. TRM/B 3.1-5B 3.1.4 Control Rod Scram Accumulators Instrumentation
and C heck Valve ......................................................................... TR M /B 3.1-8
B 3.2.1 Core Operating Limits Report (COLR) ...................... B 3.2-1
B 3.3.1 Radiation Monitoring Instrumentation .......................................... TRM/B 3.3-1B 3.3.2 Seismic Monitoring Instrumentation ............................................. TRM/B 3.3-2B 3.3.3 Meteorological Monitoring Instrumentation .................................. TRM/B 3.3-3B 3.3.4 TRM Post-Accident Monitoring Instrumentation ........................... TRM/B 3.3-4B 3.3.5 Section Not Used ......................................................................... TRM/B 3.3-9B 3.3.6 TRM Containment Isolation Instrumentation ........................................ B 3.3-10B 3.3.7 Turbine Overspeed Protection System ........................................ TRM/B 3.3-14B 3.3.8 Section Not Used ......................................................................... TRM/B 3.3-15B 3.3.9 OPRM Instrumentation ................................................................ TRM/B 3.3-18B 3.3.10 Reactor Recirculation Pump MG Set Electrical and
M echanical Stops ........................................................................ TR M /B 3.3-20B 3.3.11 MVP Isolation Instrumentation .................................................... TRM/B 3.3-22B 3.3.12 Water Monitoring Instrumentation ................................................ TRM/B 3.3-24
B 3.4.1 Reactor Coolant System Chemistry ..................................................... B 3.4-1B 3.4.2 N ot U sed ...................................................................................... T R M /B 3.4-2B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ........................... TRM/B 3.4-5B 3.4.5 Reactor Vessel Material Surveillances Program .................................. B 3.4-6B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction .................................................................... TRM/B3.4-7
B 3.5.1 ADS Manual Inhibit ............................................................ B 3.5-1B 3.5.2 ECCS and RCIC System Monitoring Instrumentation .................. TRM/B 3.5-3B 3.5.3 Long Term Nitrogen Supply to ADS .................................................... B 3.5-4
B 3.6.1 VENTING or PURGING ............................................................... TRM/B 3.6-1B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position
In d ica tio n ............................................................................................. B 3 .6 -3B 3.6.3 Suppression Pool Alarm Instrumentation ............................................. B 3.6-4B 3.6.4 Primary Containment Closed System Boundaries ....................... TRM/B 3.6-6
B 3.7.1 Emergency Service Water System (Shutdown) ................................... B 3.7-1B 3.7.2 Ultimate Heat Sink and Ground Water Level ....................................... B 3.7-2B 3.7.3.1 Fire Suppression Water Supply System ...................................... TRM/B 3.7-3
SUSQUEHANNA - UNIT 2 TRM / TOC-5 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE
B 3.7.3.2 Spray and Sprinkler Systems ...................................................... TRM/B 3.7-5B 3.7.3.3 C02 Systems .............................................................................. TRM/B 3.7-7B 3.7.3.4 Halon Systems ............................................................................ TRM/B 3.7-8B 3.7.3.5 Fire Hose Stations ....................................................................... TRM/B 3.7-10B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................ TRM/B 3.7-11B 3.7.3.7 Fire Rated Assemblies ................................................................. TRM/B 3.7-12B 3.7.3.8 Fire Detection Instrumentation ..................................................... TRM/B 3.7-14B 3.7.4 Solid Radwaste System ............................................................... TRM/B 3.7-15B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ......................................... B 3.7-17B 3.7.5.2 Main Condenser Explosive Gas Mixture .............................................. B 3.7-19B 3.7.5.3 Liquid Holdup Tanks ............................................................................ B 3.7-20B 3.7.6 ESSW Pumphouse Ventilation .................................................... TRM/B 3.7-21B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation
Monitoring Instrumentation .......................................................... TRM/B 3.7-22B 3.7.8 S nubbers ..................................................................................... T R M /B 3.7-24B 3.7.9 Control Structure HVAC ............................................................... TRM/B 3.7-31B 3.7.10 Spent Fuel Storage Pools ............................................................ TRM/B 3.7-33B 3.7.11 Structural Integrity ........................................................................ TRM/B 3.7-36
B 3.8.1 Primary Containment Penetration Conductor OvercurrentProtective Devices ....................................................................... TRM/B 3.8-1
B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -C ontinuous .................................................................................. T R M /B 3.8-3
B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -A utom atic ..................................................................................... T R M /B 3.8-4
B 3.8.3 Diesel Generator (DG) Maintanence Activities ............................ TRM/B 3.8-5B 3.8.4 24VDC Electrical Power Subsystem ............................................. TRM/B 3.8-6B 3.8.5 Degraded Voltage Protection ...................................................... TRM/B 3.8-16B 3.8.6 Emergency Switchgear Room Cooling ........................................ TRM/B 3.8-17B 3.8.7 Battery Monitoring and Maintenance Program ............................. TRM/B 3.8-18
B .3.9 .1 D ecay T im e ......................................................................................... B 3.9-1B 3.9.2 C om m unications .................................................................................. B 3.9-2B 3.9.3 Refueling Platform ............................................................................... B 3.9-3
B 3.10.1 Sealed Source Contamination ............................................................. B 3.10-1B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ........................ B 3.10-2B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ................... TRM/B 3.10-4B 3.10.4 Section Not Used ......................................................................... TRM/B 3.10-6
B 3.11.1.1 Liquid Effluents Concentration ............................................................. B 3.11-1B 3.11.1.2 Liquid Effluents Dose .......................................................................... B 3.11-4B 3.11.1.3 Liquid Waste Treatment System ......................................................... B 3.11-6B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ........................... B 3.11-7B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .............. TRM/B 3.11-10
SUSQUEHANNA - UNIT 2 TRM /TOC-6 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATIONTABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 18
SECTION
B 3.11.2.1B 3.11.2.2B 3.11.2.3
B 3.11.2.4B 3.11.2.5B 3.11.2.6
B 3.11.3B 3.11.4.1B 3.11.4.2B 3.11.4.3
B 3.12B.3.12.1B.3.12.2B.3.12.3
TITLE PAGE
Dose Rate .................................................................................... TRM/B 3.11-12Dose - Noble Gases ............................................................................ B 3.11-16Dose - Iodine, Tritium, and Radionuclides inParticulate Form .................................................................................. B 3.11-18Gaseous Radwaste Treatment System ....................................... TRM/B 3.11-20Ventilation Exhaust Treatment System ........................................ TRM/B 3.11-21Radioactive Gaseous Effluent MonitoringInstrumentation ............................................................................ TRM/B 3.11-24Total Dose ........................................................................................... B 3.11-26Monitoring Program ..................................................................... TRM/B 3.11-28Land Use Census ................................................................................ B 3.11-34Interlaboratory Comparison Program ........................................... TRM/B 3.11-36
LOADS CONTROL PROGRAM ................................................... TRM/B 3.12-1Crane Travel - Spent Fuel Storage Pool ..................................... TRM/B 3.12-1Heavy Loads Requirements ........................................................ TRM/B 3.12-2Light Loads Requirements ........................................................... TRM/B 3.12-3
TRM2 Text TOC7/8/2010
SUSQUEHANNA - UNIT 2 TRM /TOC-7 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title
TOC
1.0
TABLE OF CONTENTS
USE AND APPLICATIONPage TRM / 1.0-1Page TRM / 1.0-2Page TRM / 1.0-3
2.0
3.0
PLANT PROGRAMSPage 2.0-1Pages TRM / 2.0-2 and TRM 2.0-3Page TRM / 2.0-4Page TRM / 2.0-5Page TRM / 2.0-6Page TRM / 2.0-7Page TRM / 2.0-8Page TRM / 2.0-9Page TRM / 2.0-10Page TRM /2.0-11Page TRM / 2.0-12Pages TRM / 2.0-13 and TRM /2.0-14Page TRM / 2.0-15
APPLICABILITYPages TRM / 3.0-1 and TRM / 3.0-2Page TRM / 3.0-3Page TRM / 3.0-4
REACTIVITY CONTROL SYSTEMSPage TRM / 3.1-1Pages TRM / 3.1-2 through TRM / 3.1-5Page TRM / 3.1-6Page TRM / 3.1-7Page TRM / 3.1-8Pages TRM / 3.1-9 and TRM / 3.1-9aPage TRM / 3.1-10
CORE OPERATING LIMITS REPORTPage TRM / 3.2-1Pages TRM / 3.2-2 through TRM / 3.2-54
INSTRUMENTATIONPages TRM / 3.3-1 through TRM / 3.3-3Pages TRM / 3.3-4 and TRM / 3.3-5Page 3.3-6Page TRM 3.3-7Page 3.3-8
Effective Date
07/15/2010
08/31/199810/04/200208/31/1998
08/31/199801/28/200506/25/200204/12/199904/15/200905/15/200804/15/200911/15/200402/02/201011/15/200404/15/200911/15/200411/15/2005
3.1
04/14/200803/15/200211/30/2005
10/31/200708/31/199803/27/200704/15/200903/27/200702/18/199902/18/1999
08/31/199804/17/2009
07/16/199910/31/200708/31/199810/31/200708/31/1998
3.2
3.3
SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 07/15/2010
SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title
3.4
Pages TRM / 3.3-9 and TRM / 3.3-9aPage TRM / 3.3-10Pages TRM / 3.3-11 and TRM / 3.3-11 aPage TRM / 3.3-12Page TRM / 3.3-13Page TRM / 3.3-14Page TRM / 3.3-15Page TRM / 3.3-16Page TRM / 3.3-17Page TRM / 3.3-18Pages TRM / 3.3-19 and TRM / 3.3-20Page TRM / 3.3-21Page TRM / 3.3-21aPages TRM /3.3-21b through TRM / 3.3-21dPage TRM / 3.3-22Pages TRM / 3.3-23 and TRM / 3.3-24Page TRM / 3.3-25Pages TRM / 3.3-26 and TRM / 3.3-27
REACTOR COOLANT SYSTEMPage TRM / 3.4-1Pages 3.4-2 through 3.4-5Pages TRM / 3.4-6 through TRM / 3.4-8Page 3.4-9Page 3.4-10Page 3.4-11Page TRM / 3.4-12Page TRM / 3.4-13Page TRM / 3.4-14
EMERGENCY CORE COOLING AND RCICPage TRM / 3.5-1Pages 3.5-2 and 3.5-3Page TRM / 3.5-4Pages 3.5-5 through 3.5-7
CONTAINMENTPages 3.6-1 through 3.6-4Page TRM / 3.6-5Page 3.6-6Pages TRM / 3.6-7 through TRM / 3.6-9
Effective Date
06/30/201010/31/200706/30/201003/30/200109/13/200512/14/199810/22/200306/27/200106/14/200210/31/200710/22/200304/15/200911/15/200403/27/200712/03/200405/16/200310/22/200304/07/2009
03/31/200610/23/199804/01/200908/31/199810/31/200708/31/199804/17/200903/31/200607/15/2010
01/28/200508/31/199810/31/200708/31/1998
3.5
3.608/31/199801/07/200208/31/199812/31/2002
SUSQUEHANNA- UNIT 2 TRM / LOES-2 EFFECTIVE DATE
07/15/2010SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date
3.7 PLANT SYSTEMSPages TRM / 3.7-1 and TRM / 3.7-2Page 3.7-3Page TRM / 3.7-4Page TRM / 3.7-5Pages TRM / 3.7-6 through TRM / 3.7-8Pages TRM / 3.7-9 and TRM / 3.7-10Page TRM / 3.7-11Page TRM / 3.7-12Page TRM / 3.7-13Page TRM / 3.7-14Pages TRM / 3.7-15 and TRM / 3.7-16Page TRM / 3.7-17Page TRM / 3.7-18Page TRM / 3.7-19Pages TRM / 3.7-20 through TRM / 3.7-22Page TRM / 3.7-23Page TRM / 3.7-24Pages TRM / 3.7-25 and TRM / 3.7-26Page TRM / 3.7-27Page TRM / 3.7-28Page TRM / 3.7-29Page TRM / 3.7-30Page TRM / 3.7-31Page TRM / 3.7-32Page TRM / 3.7-33Page TRM / 3.7-34Pages TRM / 3.7-35 and TRM / 3.7-36Pages 3.7-37 through 3.7-38Page TRM / 3.7-39Page TRM / 3.7-40Page TRM / 3.7-40aPage TRM / 3.7-41Page TRM / 3.7-42Pages TRM / 3.7-43 through TRM / 3.7-45Page TRM / 3.7-46Page TRM / 3.7-47Page TRM / 3.7-48Page TRM / 3.7-49Page TRM / 3.7-50Page TRM / 3.7-51Page TRM / 3.7-52Page TRM / 3.7-53Page TRM / 3.7-54Page TRM / 3.7-55Page TRM / 3.7-56
07/29/199908/31/199803/31/200604/07/200908/02/199904/07/200901/21/200008/02/199904/07/200908/09/200508/02/199904/07/200908/02/199904/07/200908/02/199904/07/200903/31/200608/02/199910/31/200711/29/200601/13/201011/30/200511/16/200101/09/200410/05/200203/31/200602/01/199908/31/199803/31/200602/14/200506/20/200809/04/200808/31/199810/05/200606/07/200710/05/200606/07/200703/09/200108/16/200612/03/200404/15/200307/29/199904/01/200909/25/200904/01/2009
SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE
07/15/2010SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date
3.8 ELECTRICAL POWERPage TRM / 3.8-1Pages TRM / 3.8-2 and TRM / 3.8-3Page TRM / 3.8-4Pages TRM / 3.8-5 and TRM / 3.8-6Pages TRM / 3.8-7 through TRM / 3.8-10Page TRM / 3.8-11Page TRM / 3.8-12Page TRM / 3.8-13Page TRM / 3.8-14Page TRM / 3.8-15Pages TRM / 3.8-16 and TRM / 3.8-17Page 3.8-18Page TRM / 3.8-19Page TRM / 3.8-20Pages TRM / 3.8-21 through TRM / 3.8-23Pages 3.8-24 and 3.8-25Page TRM / 3.8-26Page TRM / 3.8-27Page TRM / 3.8-28Page TRM / 3.8-29
04/02/200201/28/200501/31/200504/02/200210/31/200708/10/200412/03/200403/25/201008/31/199801/28/200504/02/200202/01/199904/02/200202/01/199906/06/199908/31/199805/28/200911/29/200605/28/200910/20/2009
08/31/1998
03/31/200608/30/199803/27/200706/10/2010
3.9 REFUELING OPERATIONSPages 3.9-1 through 3.9-3
3.10 MISCELLANEOUSPage TRM / 3.10-1Pages 3.10-2 through 3.10-4Pages TRM / 3.10-5 and TRM / 3.10-6Page TRM / 3.10-7
3.11 RADIOACTIVE EFFLUENTSPage TRM / 3.11-1Pages 3.11-2 through 3.11-3Page TRM / 3.11-4Page 3.11-5Page TRM / 3.11-6Pages 3.11-7 through 3.11-9Page TRM / 3.11-10Pages 3.11-11 and 3.11-12Page TRM /3.11-13Page TRM /3.11-14Pages 3.11-15 and 3.11-16Page TRM / 3.11-17
03/31/200608/31/199803/31/200608/31/199803/31/200608/31/199812/03/200408/31/199804/12/200712/03/100409/01/199803/31/2006
SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 07/15/2010
SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date
Page 3.11-18Page TRM / 3.11-19Pages TRM / 3.11-20 and TRM / 3.11-21Page TRM / 3.11-22Page TRM / 3.11-23Page TRM / 3.11-24Page TRM / 3.11-25Pages TRM / 3.11-26 and TRM / 3.11-27Page TRM / 3.11-28Page TRM / 3.11-29Pages TRM 3.11-30 through TRM / 3.11-32Page TRM / 3.11-33Page 3.11-34Page TRM / 3.11-35Pages TRM / 3.11-36 through TRM / 3.11-39Pages 3.11-40 through 3.11-44Page TRM / 3.11-45Page 3.11-46Page TRM / 3.11-47
LOADS CONTROL PROGRAMPages TRM / 3.12-1 through TRM / 3.12-3Page TRM / 3.12-4Page TRM / 3.12-5
ADMINISTRATIVE CONTROLSPages TRM / 4.0-1 through TRM / 4.0-3Page TRM / 4.0-4Pages TRM / 4.0-5 through TRM / 4.0-8
08/31/199808/15/200503/31/200604/02/200211/14/200605/13/200504/12/200701/21/200409/08/200912/03/200401/21/200403/31/200608/31/199803/31/200611/30/200508/31/199803/31/200608/31/199803/31/2006
02/05/199903/14/200802/05/1999
08/31/199812/11/200808/31/1998
3.12
4.0
SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 07/15/2010
SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date
B 3.0 APPLICABILITY BASESPages TRM / B 3.0-1 through TRM / B 3.0-3Page TRM / B 3.0-4Page TRM / B 3.0-5Page TRM / B 3.0-6Page TRM / B 3.0-7Pages TRM / B 3.0-8 through TRM / B 3.0-10Pages TRM / B 3.0-11 and TRM / B 3.0-12Pages TRM / B 3.0-13 and TRM / B 3.0-14Page TRM / B 3.0-15
B 3.1
B 3.2
B 3.3
REACTIVITY CONTROL SYSTEMS BASESPage TRM / B 3.1-1Pages TRM / B 3.1-2 and TRM / B 3.1-3Page B 3.1-4Pages TRM / B 3.1-5 through TRM / B 3.1-7Page TRM / B 3.1-8
CORE OPERATING LIMITS BASESPage B 3.2-1
INSTRUMENTATION BASESPage TRM / B 3.3-1Pages TRM / B 3.3-2 and TRM / B-3.3-2aPages TRM / B 3.3-3 and TRM / B 3.3-3aPage TRM / B 3.3-4Page TRM / B 3.3-5Page TRM / B 3.3-6Page TRM / B 3.3-7Page TRM / B 3.3-8Page TRM / B 3.3-9Page B 3.3-10Pages TRM / B 3.3-11 and TRM / B 3.3-12Page TRM / B 3.3-13Page TRM / B 3.3-14Page TRM / B 3.3-14aPage TRM / B 3.3-14bPages TRM / B 3.3-15 through TRM / B 3.3-17Pages TRM / B 3.3-18 and TRM / B 3.3-19Pages TRM / B 3.3-19a and TRM / B 3.3-19bPage TRM / B 3.3-19cPages TRM / B 3.3-19d and TRM/ B 3.3-19ePage TRM / B 3.3-20Page TRM / B 3.3-21Page TRM / B 3.3-22Page TRM / B 3.3-23Pages TRM / B 3.3-24 and TRM / B 3.3-25
08/31/199801/10/200704/14/200808/31/199804/12/200708/31/199803/15/200211/30/200503/15/2002
07/13/199910/31/200708/31/199803/27/200702/18/1999
08/31/1998
04/07/200010/31/200710/31/200706/30/201005/30/200606/30/201010/31/200706/30/201010/31/200708/31/199809/13/200512/03/200406/25/200210/31/200706/14/200210/22/200303/27/200703/27/200704/17/200903/27/200712/11/200805/16/200310/22/200305/16/200304/07/2009
SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title
B 3.4
B 3.5
B 3.6
REACTOR COOLANT SYSTEM BASESPage TRM / B 3.4-1Pages TRM / B 3.4-2 and TRM / B3.4-3Pages TRM / B 3.4-4 and TRM / B 3.4-4aPage TRM / B 3.4-5Page B 3.4-6Page TRM / B 3.4-7
ECCS AND RCIC BASESPages B 3.5-1 and B 3.5-2Pages TRM / B 3.5-3 and TRM / B 3.5-3aPage B 3.5-4Page TRM / B 3.5-5
CONTAINMENT BASESPage TRM / B 3.6-1Page TRM/ B 3.6-2Page B 3.6-3Page TRM / B 3.6-4Page TRM / B 3.6-5Page TRM / B 3.6-6Pages TRM / B 3.6-7 through TRM / B 3.6-11
PLANT SYSTEMS BASESPages B 3.7-1 and B 3.7-2Page TRM / B 3.7-3Page TRM / B 3.7-3aPage TRM / B 3.7-4Page TRM / B 3.7-5Pages TRM / B 3.7-6 and TRM / B 3.7-6aPages TRM / B 3.7-7 and TRM / B 3.7-7aPage TRM / B 3.7-8Page TRM / B 3.7-9Page TRM / B 3.7-10Pages TRM / B 3.7-1Oa through TRM / B 3.7-1 laPages TRM / B 3.7-12 through TRM / B 3.7-14Pages TRM / B 3.7-14a and TRM / B 3.7-14bPages TRM / B 3.7-15 and TRM / B 3.7-16Pages B 3.7-17 through B 3.7-20Page TRM / B 3.7-21Page TRM / B 3.7-21aPages TRM / B 3.7-22 and TRM / B 3.7-23Pages TRM / B 3.7-24 through TRM / B 3.7-29
Effective Date
08/31/199804/01/200910/31/200710/15/199908/31/199807/15/2010
08/31/199810/31/200708/31/199810/31/2007
07/26/200102/01/199908/31/199803/29/200704/04/200712/03/200412/31/2002
08/31/199806/10/201012/27/200703/31/200608/02/199903/31/200608/02/199908/02/199903/31/200608/02/199903/31/200608/02/199901/09/200402/01/199908/31/199802/14/200506/20/200801/30/200810/05/2006
B 3.7
SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date
B 3.8
B.3.9
Page TRM / B 3.7-30Pages TRM / B 3.7-30a and TRM / B 3.7-30bPage TRM / B 3.7-32Page TRM / B 3.7-33Page TRM / B 3.7-34Page TRM / B 3.7-35Pages TRM / B 3.7-36 and TRM / B 3.7-37Page TRM / B 3.7-38Page TRM / B 3.7-39Page TRM / B 3.7-40
ELECTRICAL POWER BASESPage TRM / B 3.8-1Pages TRM / B 3.8-2 and TRM / B 3.8-2Page TRM / B 3.8-2aPage TRM / B 3.8-3Page TRM / B 3.8-3aPage TRM / B 3.8-4Page TRM / B 3.8-4aPage TRM / B 3.8-5Pages TRM / B 3.8-6 through TRM / B 3.8-16Page TRM / B 3.8-17Pages TRM / B 3.8-18 through TRM / B 3.8-20Pages TRM / B 3.8-21 through TRM / B 3.8-24
REFUELING OPERATIONS BASESPages B 3.9-1 and B 3.9-2Pages B 3.9-3 through B 3.9-7
06/07/200710/05/200603/09/200104/15/200312/03/200407/05/200004/01/200909/25/200904/01/200904/08/2010
04/02/200201/28/200503/01/201004/02/200204/02/200204/02/200208/10/200408/31/199804/02/200201/28/200511/29/200605/28/2009
08/31/199810/23/1998
08/31/199803/27/200708/23/1999
08/31/199802/01/199904/07/200002/01/199912/03/200402/01/199908/31/199804/02/200204/02/2002
B 3.10 MISCELLANEOUS BASESPage B 3.10-1Pages TRM / B 3.10-2 and TRM / B 3.10-3Pages TRM / B 3.10-4 and TRM / B 3.10-5
B 3.11 RADIOACTIVE EFFLUENTS BASESPages B 3.11-1 through B 3.11-9Page TRM / B 3.11-10Pages TRM/B 3.11-11 and TRM/B 3.11-11 aPages TRM/B 3.11-12 and TRM/B 3.11-13Page TRM /B 3.11-14Page TRM/ B 3.11-15Pages B 3.11-16 through B 3.11-19Page TRM/ B 3.11-20Page TRM / B 3.11-20a
SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 07/15/2010
-
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title
Page TRM / B 3.11-21Pages TRM / B 3.11-22 and TRM / B 3.11-23Page TRM / B 3.11-23aPages TRM / B 3.11-24 and TRM / B 3.11-25Pages B 3.11-26 through B 3.11-27Pages TRM / B 3.11-28 and TRM / B 3.11-29Page TRM / B 3.11-30Pages TRM / B 3.11-31 and TRM / B 3.11-32Page TRM / B 3.11-33Pages TRM / B 3.11-34 and TRM / B 3.11-35Page TRM / B 3.11-36
Effective Date
05/13/200511/14/200605/13/200501/21/200408/31/199811/30/200506/30/201008/31/199806/30/201008/31/199802/12/1999
B.3.12 LOADS CONTROL PROGRAM BASESPage TRM / B 3.12-1Pages TRM / B 3.12-2 and TRM / B 3.12-3
09/19/200702/05/1999
TRM2 text LOES .doc7/8/10
SUSQUEHANNA- UNIT 2 TRM / LOES-9 EFFECTIVE DATE 07/15/2010
SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 07/15/2010
-
PPL Rev. 0Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction
3.4.6
3.4 Reactor Coolant System (RCS)
3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction
TRO 3.4.6 In single loop operation, establish operating Reactor Recirculation loop FlowRate to less than or equal to 53.0 Mlbm/hr
APPLICABILITY: MODES 1 and 2
ACTIONS
CONDITION REQUIRED ACTION COMPLETION TIME
A. Requirements of the TRO A.1 Restore reactor recirculation 2 hoursnot met flow rate to within limits
B. Requirements of B.1 Place Reactor Mode Switch in Immediately
Condition A not met Shutdown
AND
B.2 Restore reactor recirculation Immediatelyloop flow rate to within limits
TECHNICAL REQUIREMENT SURVEILLANCE
SURVEILLANCE FREQUENCY
TRS 3.4.6.1 Verify the operating loop flow rate is less than or Once every four hoursequal to 53.0 Mlbm/hr.
SUSQUEHANNA UNIT 2 TRM / 3.4-14 EFFECTIVE DATE 07/15/2010
-
PPL Rev. 0Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction
B 3.4.6
B 3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction
BASES
TRO TRO 3.4.6 requires that the operating loop flow rate be maintained lessthan or equal to 53.0 MIbm/hr during single loop operation. Note that theparameter of concern is the 3 minute average recirculation system loopflow (e.g., PICSY point NJF02B and NJF03B) not core flow. This restrictionavoids excessive vibration of jet pump components. Fatigue usage can beaccumulated when loop flow rates are above 54 MIbm/hr if large gaps arepresent. The single loop operation limits for either loop are set at 53Mlbm/hr to provide margin to the limit of 54 MIbm/hr. Excessive vibrationcan lead to cracking of the jet pump riser brace welds. The limitationcontained in this TRO will provide nuclear safety assurance in that jet pumpintegrity will be maintained and thus the FSAR Chapter 15 analysisassumption of maintaining 2/3 core height will be met. Additionally, thesemeasures will assure asset preservation and avoid lengthy repairs due topotential riser brace cracking. The required action to place the reactormode switch in shutdown will assure the flow rate is established withinlimits. The time frame of 2 hours is required to avoid excessive vibrationsthat occur at higher loop flow rates and the subsequent impact on jet pumpriser brace.
APPLICABILITY This Requirement is applicable whenever in reactor recirculation singleloop operation in Modes 1 and 2.
ACTIONS The Actions assure excessive jet pump vibration can not occur when insingle loop operation.
TRS The required surveillance assures that the maximum loop flow rate is notexceeded.
REFERENCES 1. FSAR Section 15.6
SUSQUEHANNA - UNIT 2 TRM / B 3.4-7 EFFECTIVE DATE 07/15/2010