Earthquake Resistant HousingAn Illustrated Manual for Building a Safe Home
Authors: Maria Auxiliadora Samaniego Ramos, Javier Ponce Valverde, Stephen Forneris AIAEditor: Stephen Forneris AIA
Based upon the International Building Code 2006
Habitation parasismiqueManuel illustr pour la construction dune habitation solide
Auteurs: Maria Auxiliadora Samaniego Ramos, Javier Ponce Valverde, Stephen Forneris AIAditeur: Stephen Forneris AIA
Bas sur the International Building Code 2006
-
8/8/2019 Manual 1.2 French English SpPlans
2/220
Introduction
Chaque anne travers le monde, des milliers de personnes meurent inutilement dans des tremble-ments de terre et des milliers dautres sont grivement blesses. Une proportion importante de ces
morts et de ces blesss pourrait tre vite en adoptant le plan propos par le prsent manuel. linstar dautres catastrophes naturelles, les sismes sont difciles prdire et impossibles prve-nir. Mais ils tuent et mutilent des gens, essentiellement dans les pays o de rgles simples enmatire de construction ne sont pas respectes.
Le 23 dcembre 2003, seules deux personnes sont dcdes Paso Robles (Californie) lors dunsisme dune magnitude de 6,5 sur lchelle de Richter. Cinq jours plus tard, 26 000 personnes ontperdu la vie dans la ville iranienne de Bam dans un tremblement de terre dune magnitude de 6,7.Quel lment peut expliquer cette norme diffrence sur le plan de la mortalit ? Les dices cali-forniens avaient t construits de faon protger les personnes ; ce ntait pas le cas en Iran.
Puisquil est possible de construire des btiments qui rsistent aux sismes, gnralement ennencourant que des cots lgrement plus levs, ne pas le faire serait inacceptable. Voici lesprincipes fondamentaux appliquer pour btir des habitations sres :
Il faut que tous ceux qui btissent quil sagisse de personnes individuelles ou dentreprisesgigantesques suivent les rgles simples en matire de construction qui protgent les personnesdans leurs dices. Il faut que partout, les autorits locales et nationales adoptent un code du btiment et en-gagent des inspecteurs chargs de la stricte application dudit code. Il faut que les banques et autres organismes de prt, ainsi que les compagnies dassurance,conditionnent leurs prts ou politiques la mise en uvre de codes du btiment et de systmesdinspection efcaces.
-
8/8/2019 Manual 1.2 French English SpPlans
3/220
Earthquake Resistant HousingAn Illustrated Manual for Building a Safe Home
Authors:Editor: Stephen Forneris AIA
Based upon The International Building Code 2006
-
8/8/2019 Manual 1.2 French English SpPlans
4/220
-
8/8/2019 Manual 1.2 French English SpPlans
5/220
ACKNOWLEDGEMENTS
REMERCIEMENTS
I would like to thank Donald and Shelley Rubin for their very gracious
donation, which made this work possible. Beyond nancial support,
Donald provided hours of consultation and careful, articulate criticism,which helped this work take form. Getting a chance to know him
through this project was a gift in itself.
I am also grateful to the many Ecuadorian friends who donatedcountless hours of writing and drawing to this project: Paula Pettinelli,
Isabel Guererro, Maria Samaniego, Gina Perez, Jaime Argudo, andTania Guzmn. Most importantly, I would like to thank Javier Ponce,
whose precision has often been compared to that of a Swiss watch.
Furthermore, the International Code Council, particularly our contactRick Okawa, provided the rst link to formalizing this work into aninsfrastructure that can be maintained beyond this one manual. It is
our hope that ICC can continue developing works in this nature andspread safety and security to all the people in the world.
Finally, Id like to thank Bruce Payne, Paul Chase, Rachel Weingeist,Etienne Cofnier, and Mailande Moran, all of whom were crucial to thisprojects development.
-
8/8/2019 Manual 1.2 French English SpPlans
6/220
CREDITS/ ONT COLLABOR
CE PROJETProject Management/ Gestion du projet
Stephen Forneris
Javier Ponce
Graphic Design/ Graphisme
Paula PettinelliWriting/ Rdaction
Mariuxi Samaniego
Gina Perez
Tania Guzman
Isabel Guerrero
Mariella Isaas
Technical Support/Appui techniqueDavid Sauders
-
8/8/2019 Manual 1.2 French English SpPlans
7/220
CONTENTS TABLE DES MATIRES
9-29
AGRADECIMIENTOS
1. INTRODUCTION1.1. Historique du projet12
1.2. Rsum et objectif du projet13
1.3. Qui utilisera ce manuel et qui en
bnciera?141.4. Prsentation du manuel 15
1.4.1. Langues 15
1.4.2. Chapitres 15
1.4.3. Contenu du chapitre 16
1.4.4. Sections complmentaires 17
1.5. Elments de la construction 17
1.6. Considrations gnrales 20
1.6.1. Contraintesnancires20
1.6.2. Permis et expertise technique 20
1.6.3. Caractristiques du site et de la
maison 21
1.7. Documents de construction 22
1.8. Spcicationspourlaconstruction23
1.9. quipement et outils 24
1. INTRODUCTION1.1. Project background12
1.2. Project abstract and goal13
1.3. Whowilluseandbenetfrom
thismanual?141.4. Construction manual
overview 15
1.4.1. Language 15
1.4.2. Chapters 15
1.4.3. Chapter content16
1.4.4. Additional sections 17
1.5. Elements of construction 17
1.6. General considerations20
1.6.1. Financial limitations20
1.6.2. Technical assesment and permits20
1.6.3. Characteristics of the site and house21
1.7. Construction documents22
1.8. Constructionspecications23
1.9. Equipment and tools24
AKNOWLEDGEMENTS
-
8/8/2019 Manual 1.2 French English SpPlans
8/220
76-99
64-73
CONTENTS TABLE DES MATIRES
4. DALLES DE BTON4.1. Outils et matriaux64
4.2. Procdure suivre 66
4.2.1. Remblayage et compactage66
4.2.2. Structure du radier67
4.2.3. Coulage du bton68
4.3. Liste de contrle 73
6. MAONNERIE
5. STRUCTURE5.1. Outils et matriaux 76
5.2. Procdures suivre 78
5.2.1. Poutres dancrage et dalle debton de ltage 78
5.2.2. Structure de lescalier 85
5.2.4. Structure des poutres 91
5.3. Liste de contrle 99
4. CONCRETE SLABS4.1. Tools and materials 64
4.2. Procedures 66
4.2.1. Placement and
compactationofll66
4.2.2. Ground slab structure67
4.2.3. Casting 68
4.3. Inspectors checklist71
5. GIRDERS AND BEAMS5.1. Tools and materials 76
5.2. Procedures 78
5.2.1.LinkBeamsandsecondoor
concrete slab 785.2.3. Stair structure 85
5.2.4. Structure of the beam 91
5.3. Inspectors checklist97
6 . MASONRY
-
8/8/2019 Manual 1.2 French English SpPlans
9/220
128-137
139-145
CONTENTS TABLE DES MATIRES
146-163
8. INSTALLATIONSLECTRIQUES ET PLOMBERIE
8.1. Plomberie 128
8.2. Installations lectriques 132
8.3. Tableau des installations 134
8.4. Liste de contrle 137
9. FINITIONS
10. PROCDURESCOMPLMENTAIRES10.1. Mortier 146
10.2. Bton 148
10.3. Sable stabilis 150
10 4 Cales en bton 152
8. MECHANICAL,ELECTRICAL ANDPLUMBING INSTALLATIONS8.1. Plumbing installations 128
8.2. Electrical installations 132
8.3. Installations chart134
8.4. Inspectors checklist135
9. FINISHES
10. ADDITIONALPROCEDURES
10.1. Mortar146
10.2. Concrete 148
10.3. Mud slab unreinforced
concrete 150
-
8/8/2019 Manual 1.2 French English SpPlans
10/220
Le prsent manuel est un guide simple et complet quidcrit le processus de construction dune habitation de
base (unifamiliale) en prenant pour rfrence le Codeinternational du btiment (International Building Code,IBC). Ce document ne remplace donc pas ledit code,
qui doit toujours tre considr comme la principalesource dinformation et de rfrence. Ce manuel doittre utilis en ayant toujours porte de main le Code
international du btiment, ainsi que les codes en matirede rsidence, plomberie et lectricit. Les concepteurset constructeurs devront dterminer les codes quil fautappliquer en fonction de chaque situation.
This manual is an easy and comprehensive guide tothe construction process of a basic house (single family
dwelling) that constantly refers to the InternationalBuilding Code (I.B.C.). Therefore, this document doesnot replace the mentioned code, which must always
be considered the main source of information andreference. This manual is useful as long as a copy of theInternational Building Code, as well as the Residential,
Plumbing, and Code Council Electrical Codes are handy.The designer and builder must determine which codes toapply for each project situation.
References are mentioned in this manual as follows:
(IBC: 0000)
Le prsent manuel se rfre aux codes de la manire
suivante :
(IBC: 0000)
Specic section of the Code Section spcique du Code
-
8/8/2019 Manual 1.2 French English SpPlans
11/220
1.1. Historique du projet12
1.2. Rsum et objectif du projet13
1.3. Qui utilisera ce manuel et qui en
bnciera?14
1.4. Prsentation du manuel15
1.4.1. Langues 151.4.2. Chapitres 15
1.4.3. Contenu du chapitre 16
1.4.4. Sections complmentaires 17
1.5. Elments de la construction 17
1.6. Considrations gnrales20
1.6.1. Contraintesnancires20
1.6.2. Permis et expertise technique20
1.6.3. Caractristiques du site et de lamaison21
1.7. Documents de construction22
1.8. Spcicationspourlaconstruction23
1.9. quipement et outils24
1.10. Normes de scurit29
1.1. Project background12
1.2. Project abstract and goal13
1.3. Who will use this manual
andwhowillbenet?14
1.4. Construction manual
overview 151.4.1. Language 15
1.4.2. Chapters 15
1.4.3. Chapter content16
1.4.4. Additional sections 17
1.5. Elements of construction 17
1.6. General considerations20
1.6.1. Financial limitations20
1.6.2. Technical assesmentand permits20
1.6.3. Characteristics of the
site and the house21
1.7. Construction documents22
1.8. Constructionspecications23
1.9. Equipment and tools24
1 10 Safety guidelines and requirements 29
INTRODUCTION INTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
12/220
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
1.1 PROJECT BACKGROUND
The United States government, through USAID,invests hundreds of millions of dollars each year tohelp developing nations after they suffer devastatingdamage from natural disasters. Whether this aid goesto new buildings or to the reconstruction of damagedhomes and structures, most of the building is donewithout adequate protection from future disasters.
For local architects or contractors in these countries,and for architects and builders from around the worldengaged in reconstruction, accessible and easilyunderstood plans and specications are rarely providedor made readily available. The results are inefcient andunsafe. In future catastrophes, the new and repairedbuildings will be just as likely to kill their inhabitants asthe structures they replace.
In the USA, by contrast, licensed constructionprofessionals, working in a culture of buildingcodes and inspections, utilize checklists to monitorstep-by-step adherence to appropriate plansand specications. Transferring similar, if simpler,practices, along with the knowledge on whichthey are based, to post-disaster builders will savemany lives at little cost Such a transfer would also
1.1 HISTORIQUE DU PROJET
Grce USAID, le gouvernement amricain investitchaque anne des centaines de millions de dollarspour aider les pays en voie de dveloppementdvasts par des catastrophes naturelles. Que cetteaide aille ldication de nouveaux btiments ou la reconstruction dhabitations et de structuresendommages, la plupart de ces constructions sontralises sans garantir une protection sufsante encas de futures catastrophes.
Pour les architectes ou entrepreneurs de cespays, et pour les architectes et constructeurs dumonde entier engags dans la reconstruction,il est rarement possible de recevoir ou davoirfacilement accs des plans et spcicationsaisment comprhensibles. Cela dbouche sur desrsultats inefcaces et peu srs. Lors de futurescatastrophes, les btiments neufs ou rpars
risquent tout autant de tuer leurs habitants que lesstructures quils remplacent.
Aux tats-Unis en revanche, les professionnelsagrs du btiment, travaillant dans une culturehabitue aux codes et inspections, utilisent deslistes de contrle pour vrier chaque momentla conformit aux plans et spcications. Latransmission de pratiques similaires, voire plus
-
8/8/2019 Manual 1.2 French English SpPlans
13/220
1
INTRODUCTIONINTRODUCTION
the cities of tomorrow.- Robert Neuwirth, Shadow Cities (Routledge,
2005).
We propose to develop a small number of code-compliant housing plans, along with specicationsand checklists, to be distributed worldwide freeof charge. These plans will make it possible toreconstruct or build safe and relatively inexpensivebuildings to replace sub-par structures destroyed
in natural disasters. They should also begin toaddress the huge world-wide need for safe homesin squatter communities.
1.2 PROJECT ABSTRACT AND GOAL
Inspired by the CASA Act bill of 2002 (Code and Safetyfor Americas, Public Law 107-228), we intend to createa user-friendly and practical set of plans, specicationsand compliance checklists based on 2006 UnitedStates building codes and standards, but tailoredto particular regional conditions. These documentswill be available for use by architects, engineers andeven non-professional builders. We plan to begin by
briques que tout gouvernement. Elles ont cr unegigantesque conomie cache Elles sont les plus
grands btisseurs de logements du monde, elles sonten train de crer les villes de demain. -Robert Neuwirth, Shadow Cities (Routledge, 2005).
Nous proposons dlaborer un petit nombre deplans dhabitations respectant les codes, ainsi quedes spcications et listes de contrle, qui serontdistribus gratuitement partout dans le monde. Cesplans permettront de reconstruire ou de btir des
dices solides un cot relativement peu lev,pour remplacer des btiments inadapts, dtruits lorsde catastrophes naturelles. Ils devraient galementcommencer rpondre au besoin qui se faitnormment sentir dans le monde entier de construiredes habitations sres dans les lotissements illgaux.
1.2 RSUM ET OBJECTIF DU PROJET
En nous inspirant de la Loi CASA (Code and Safetyfor Americas, Loi publique 107-228) de 2002, notreintention est de crer un ensemble de plans, despcications et de listes de contrle de conformitpratiques, faciles utiliser, bass sur les normeset codes amricains du btiment de 2006, maisadapts aux conditions rgionales particulires. Cesdocuments pourront tre utiliss par des architectes,des ingnieurs et mme par des constructeurs non
-
8/8/2019 Manual 1.2 French English SpPlans
14/220
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
1.3 QUI UTILISERA CE MANUEL ET QUI ENBNFICIERA ?
1) LES PERSONNESQuiconque a besoin de reconstruire simplement et bas prix suite une catastrophe naturelle, ou abesoin dune maison simple et peu coteuse.
2) LES CITS ET VILLESLes municipalits ou autres autorits qui veulent
xer des critres de qualit, de durabilit et descurit dans le secteur du btiment.
3) LES BANQUES ET COMPAGNIESDASSURANCELes agences de prt qui ont besoin de xerdes critres minima de qualit en matire deconstruction an de protger leur investissement et
assurer sa durabilit..4) LES ORGANISATIONS HUMANITAIRESLes organisations non gouvernementales, dontbeaucoup oprent avec des btisseurs volontaires,qui ont besoin dun guide pratique pour construire,inspecter et garantir la scurit des habitationsbties pour les sinistrs.
1.3 WHO WILL USE THIS MANUAL AND WHOWILL BENEFIT?
1) PEOPLEAnyone in need of simple, low-cost disasterreconstruction or of a simple, low-cost home.
2) CITIES AND TOWNSMunicipalities or other governments that want toestablish benchmarks of quality, durability, and safety in
construction.
3) BANKS AND INSURANCE COMPANIESLending agencies who need to establish minimumbenchmarks for quality in construction to protecttheir investment and assure its durability.
4) HUMANITARIAN ORGANIZATIONS
Non - governmental organizations, many of whichuse volunteer builders, that need a ready guide forbuilding, inspecting, and certifying the safety of thehomes built for those in need.
INTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
15/220
1
INTRODUCTIONINTRODUCTION
1.4.1 Langues
Ce manuel a t rdig enanglais et en franais. Danschaque section, vous trouverez lecontenu en deux colonnes : surla gauche de la page, la versionanglaise, sur la droite, la versionfranaise.
1.4.2 Chapitres
Ce manuel est divis enchapitres, facilement identiablesgrce la table des matires.Chaque chapitre est reprsentpar un point bleu qui indique
1.4 PRSENTATION DU MANUEL
1.4.1 Language
This manual has been developedin English and Spanish. Within eachsection, you will nd the contentin two columns: on the left side ofthe page, you will nd the Englishversion, and the Spanish version willbe on the right side.
1.4.2 Chapters
This manual is divided into chapters,easily identied within the contentssection. Each chapter is representedwith a cyan bullet that indicates thepagesandanimagethat represents
1.4 CONSTRUCTION MANUALOVERVIEW
HOUSING PROTOTYPE CONSTRUCTION MANUAL
-
8/8/2019 Manual 1.2 French English SpPlans
16/220
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
1.4.3 Contenu du chapitre
Les pages impaires prsententun point bleu avec un numro quiindique le numro du chapitre.
Au dbut du manuel, lutilisateuraura une liste graphique desoutils mentionns dans lemanuel. Chaque outil estassoci un code qui facilite sa
recherche.
Les outils et matriauxncessaires pour chaque phase
ainsi que la quantit requiseseront indiqus dans un tableauau dbut de chaque chapitre.
1.4.3 Chapter Content
Odd pages include a small cyanbullet, which identies the numberof the chapter. At the beginningof the manual, the user will have agraphic list of the tools mentionedwithin the manual. Each tool hasbeen identied with a useful codethat makes it easier to nd.
The tools and materials neededfor each phase and the amount
required will be listed in the boxat the beginning of each chapter.
INTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
17/220
1
INTRODUCTIONINTRODUCTION
1.4.4 Sections complmentaires
Les annexes offrent desinformations utiles relatives auprocessus de construction, tellesquun guide des procdureslmentaires de construction,les quivalences en systmemtrique et un jeu completdes plans de lhabitation. Ces
informations ne se trouvent pasdans les chapitres.
1.5 LMENTS DE LACONSTRUCTION
1.5 ELEMENTS OFCONSTRUCTION
1.4.4 Additional Sections
The appendices offer usefulinformation for the building process,such as: a Basic Building ProcessGuide, Metric Equivalencies, andthe Complete Set of ConstructionDocuments of the House. Thisinformation is not included in thechapters.
Boundaryline/ Limitesdu terrain
HOUSING PROTOTYPE CONSTRUCTION MANUAL
-
8/8/2019 Manual 1.2 French English SpPlans
18/220
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
Roof/ Toiture
Louvers/Grilles deventilation
Walls/Murs
Slab/Dalle
Window/Fentre
Door/Porte
Handrail/Maincourante
Stairs/Escalier
Border/Bordure
Fig. 3. Parts of the construction / Parties dune construction
Il est important didentier chacune des partiesde la maison an de comprendre la logique de sa
It is important to identify each of the parts of the housein order to understand the logic of its construction.
INTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
19/220
1
INTRODUCTIONINTRODUCTION
1.5.4 Structure
POUTRES DANCRAGE: Partie de la structure quirelie tous les autres lments (par exemple, lesmurs du rez-de-chausse au plancher de ltage,et le plancher de ltage aux murs de cet tage).Il sagit aussi de llment sur lequel sappuiera la
structure mtallique de la toiture.
DALLE DE LTAGE : Il sagit de llment de lastructure qui est arm et coul avec les poutrespour ne former quun seul lment. Pour cettemaison, le plancher sera en bton lger de 15 cmdpaisseur (utilisation de briques).
1.5.5 Murs porteurs : Il sagit des lments quienclosent chaque espace intrieur de la maison.Leur fonction principale est de sparer lesespaces dune construction. Ici, les murs seronten maonnerie renforce et seront par consquentconsidrs comme faisant partie de la structure.Les poutres dancrage, le plancher de ltage, lespoutres du toit et lescalier font galement partie dela structure.
1.5.4 Structure
LINK BEAMS: Part of the structure that securesevery other element (for example, linking the groundoor walls to the second oor slab, and the secondoor slab to the walls of the corresponding level).These are also the supportive elements for themetal roong structure.
SECOND FLOOR SLAB: This slab is the structuralelement which is assembled and cast along withthe beams to form a single element. For this home,the slab will be built using 15 cm wide lightweightconcrete (using bricks).
1.5.5 Bearing Walls: Walls are the elements thatenclose every internal space. Their main functionis to divide construction spaces. In this case, wallswill be of reinforced masonry, and therefore will beconsidered part of the structure. Link beams, thesecond oor slab, roof girders, and stairs are also
parts of the structure.
DOOR AND WINDOW OPENINGS: These are wooden
HOUSING PROTOTYPE CONSTRUCTION MANUAL
-
8/8/2019 Manual 1.2 French English SpPlans
20/220
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
1.6 Considrations gnrales
1.6.1 Contraintes nancires : Ce projet vise convenir des petits budgets, cest--dire desfamilles disposant de peu de moyens nanciers.Nanmoins, lun de ses principaux objectifs estde prouver quavec des instructions et un travaildquipe appropris, nimporte qui peut nonseulement btir son propre logement, mais il peutle faire correctement, en toute scurit, sans
encourir de frais inutiles. Pour ce faire, il convientde toujours prendre en compte ce qui suit :
a) Lespace dont a besoin la famille.b) Le type de matriaux utiliser et la faon de lesutiliser tout au long des travaux.
Il existe des matriaux de construction de tous
types et de toutes les qualits. Leur choix devrapermettre un mode de vie sain et confortable moindre cot.
An de rpartir et de tirer au maximum prot desressources nancires de la famille, la constructiondune habitation prsentant les caractristiquesde celle propose dans ce manuel peut se raliser
1.6 General consideratios
1.6.1 Financial Limitations: This project isoriented to suit low budgets for families withfew nancial resources. Nevertheless, one of itsmain objectives is to prove that, with appropriateinstruction and teamwork, anyone can not onlybuild their own house, but do it in a correct, safeway without unnecessary expenses. To achievethis, one should always consider the following:
a) The amount of space that the family needs.b) The type of materials to be used and the waythey will be processed and placed during theconstruction process.
Construction Materials are available in a widevariety of specications and manufacture
types. Their selection must allow a healthy andcomfortable lifestyle at the lowest possible cost.
In order to distribute and take the best advantageof the familys nancial resources, the constructionof a house with the characteristics of the oneproposed in this manual can be carried out in twophases. Once the ground oor is nished and
INTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
21/220
1
INTRODUCTIONINTRODUCTION
le contrat. Lentrepreneur veut savoir que lesproduits appropris ont t utiliss et que le
dlai de construction sera respect ou, sil y ades obstacles, comment ils peuvent tre rsolus.Larchitecte et lingnieur veulent savoir que leursplans sont mis en uvre tels quils les ont conus.Les autorits veulent savoir que les normesqui ont t xes pour la protection du publicsont respectes. Certes, chacun de ces intrtsparticuliers suppose une inspection des travauxralise en fonction dune perspective diffrente,mais chacun inspectera les mmes travaux etpar consquent, bon nombre des activits serontidentiques. Je prsenterai ci-aprs la procduredinspection sous langle des rgles imposes parles autorits.
La procdure dinspection se fait selonlenchanement des travaux de construction. Elle
commence par le site de construction et se poursuitpendant les travaux jusqu leur achvement etloccupation du btiment (Voir Fig.4).
1.6.3 Caractristiques du site et de la maison:Lors de linspection, il est trs important de prendreen compte les aspects suivants : la localisation dusite la localisation et lorientation de lhabitation
contractor wants to know that the right products havebeen used and that the construction timeline is on trackor, if there are obstacles, how they may be resolved.The architect and engineer want to know that theirdesign is being implemented as they had conceivedit. The government wants to know that the standardsthat have been set for protection of the public arebeing met. While each of these interests inspects froma different point of view, each is inspecting the samework and therefore many of the activities will be thesame. Bellow I will present the inspection process from
the governmental regulatory aspect.
The inspection process is done in sequence with theconstruction work. It begins with the building siteand continues through the construction work untilcompletion of the work and the occupancy of thebuilding (See Fig. 4).
1.6.3 Characteristics of the site and the house:It is very important aspects to keep the followingthings in mind during the inspection: site location/orientation, house location/orientation, naturallighting, and ventilation.
With these aspects, it is intended to provide every roomof the house with a pleasant and suitable climate to
HOUSING PROTOTYPE CONSTRUCTION MANUAL
-
8/8/2019 Manual 1.2 French English SpPlans
22/220
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
Fig. 4. Source: Building Codes Illustrated: p. 310.
H/2 or 15 (4572) maxium toprovide protection from site
drainage and erosion.H/2 ou 4,57 m max. pour protgercontrelasschementetlrosion
H/3 or 40 (12192) maxium to providevertical and lateral support for footings
and prevent settlement.
H/3 ou 12,19 m max. pour fournirun support latral et vertical aux
murs porteurs de faon viter lestassements.
Ideal conditions/
Fig. 4. Source :
Pour conditions. /
Conditionsdfavorables
Rock/Roche Clay/ ArgileSand/Sable Organic soils/ Terrevgtale
Must have aprofessionalengineer /Ingnieurprofessionnelindispensable
INTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
23/220
1
INTRODUCTION
all construction element heights will appear in thesections and elevations. Reference to the detaileddrawings may be found within the plan. Finally, youwill nd details describing the construction system,sequences, tools and materials to be used (12.6).
1.7.2 Structural Documents: The structural planincludes elevations, beams, column and slabsections, details of rebar assembly, and technicalspecications (12.6).
1.7.3 Sanitary Drainage and Water SupplySystems Documents: These include plans, sectionsand details. This will also include: utility serviceentrance, sewer, septic and water tank details, ifnecessary. It also includes technical specications(12.6).
1.7.4 Electric Power Supply System Documents:Includes plans, sections, utility service entranceand switchgear details. This will also include raiserdiagram and technical specications (12.6).
partie du projet darchitect. Les dimensions verticales,les ouvertures, les allges de fentres et toutes leshauteurs des lments de la construction apparatrontsur les coupes et les lvations. Les plans renverrontgalement au croquis dtaills. Enn, vous trouverezune description du systme de construction, dessquences, ainsi que des outils et matriaux utiliser(12.6).
1.7.2 Plans de la structure: Ils reprennent les
lvations, les poutres, les sections des colonneset des dalles, les dtails de montage des barresdarmature et les spcications techniques (12.6).
1.7.3 Plans des rseaux dvacuation etdalimentation en eau : Ils comprennent les plans,sections et dtails. Ils comprennent aussi les dtailsdes arrives deau, canalisations, fosse septique
et citerne, sil y a lieu. Ils incluent galement lesspcications techniques (12.6).
1.7.4 Plans lectriques: Ils comprennent les plans,sections et dtails de lalimentation et des rseauxlectriques. Ils incluent aussi les gaines techniques etles spcications techniques (12.6).It is important to follow the plan
instructions closely to ensure efcient
HOUSING PROTOTYPE CONSTRUCTION MANUAL
-
8/8/2019 Manual 1.2 French English SpPlans
24/220
MANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
PLUMBING UTILITIES: Sewage: PVC Conduit adhesive pipe
Drinking water: PVC Conduit screw pipeELECTRICAL: E.M.T.FINISHES: Exterior walls: Exposed concrete masonry units,
exterior coating to seal out humidity (optional)
(IBC:2103.1).
Interior walls: Ceramic tile covering in Shower
Areas (IBC:2103.4). Floors: Smooth concrete surface. Ceramic tiles in
shower area (IBC:1905/2103.4).
Ceramic Plumbing Fixtures
Wooden doors Natural Wood Finish (IBC:1008).
Hard wood and glass windows
(IBC:1714.5/2403).
Iron handrail with corrosion-resistant paint
coating (IBC: 1009.10/1607.7).
Kitchen Cabinets: MDF
Kitchen counter: MDF Structure and Board
PLOMBERIE :Eaux uses : conduites en PVC coller
Eau potable : conduites en PVC visserINSTALLATIONS LECTRIQUES: E.M.T.FINITIONS : Murs extrieurs : bloc de bton, enduit extrieur
de protection contre lhumidit (en option)
(IBC:2103.1).
Murs intrieurs : carrelage en cramique dans les
douches (IBC:2103.4).
Sols : Surface en bton lisse. Carrelage en
cramique dans les douche (IBC:1905/2103.4).
Sanitaires en cramique.
Portes en bois Finition en bois naturel (IBC:1008).
Fentres en verre et en bois dur (IBC:1714.5/2403).
Mains courantes mtallique avec couche de peintureantirouille (IBC: 1009.10/1607.7).
Meubles de cuisine : M.D.F.
Plan de travail de la cuisine : Structure et panneau
MDF.
INTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
25/220
1
INTRODUCTION
012
Brush/Pinceau
Bucket/Seau
Wheelbarrow/Brouette
Chisel/Ciseau
Shears/Cisaille
Nails/Clous
Sledgehammer/Masse
Cold chisel/Ciseau froid
005 006 007 008
009 010 011
013 014 015 016
HOUSING PROTOTYPE CONSTRUCTION MANUAL
-
8/8/2019 Manual 1.2 French English SpPlans
26/220
MANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
Plumb bob/Fil plomb
Plastic container/Rcipient en plastique
Plumb & level/Niveau bulle
Saw/Scie
Hand saw/Scie main
Rope/Corde
Wood chisel/Ciseau bois
Chalk/Craie
025 026 027 028
029 030 031 032
033 034 035 035036
1.00 mt.
INTRODUCTIONINTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
27/220
1
INTRODUCTION
Planches en bois/MouleElles sont utilises pour monter lecoffrage. Leurs longueurs varient enfonction de la dimension exacte etde la forme du moule.
Le moule consiste en planches debois traverses transversalement pardes lattes qui les unissent les unesaux autres, ou qui les xent au solou la surface de support (Voir page93).
Matriaux ncessaires :- Planches de bois de 20 cm.(largeur)- Lattes de 40 cm.- Clous- Marteau
4.00m
tabli en boisStructure qui sert de supportpour diffrentes activits (scier,clouer, etc.).
Matriaux ncessaires :
1m.
0.9-1m.
0.4m
038
0.20m
.
Wood boards/ Formwork:These are used to assembleforms. Their lengths varyaccording to the exact dimensionand shape of the form.
Formwork consists basicallyof wood boards crossedtransversally by stakes that jointhem together, or x them tothe ground or to the supportingsurface (See page 93).
Materials needed:- 20 cm. (width) wood boards- 40 cm. stakes- Nails- Hammer
Wood HorseStructure that works as a supportfor different activities such assawing, nailing, etc.
Materials needed:
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
28/220
MANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
DameElle est utilise pour compacterle sol manuellement. La basecubique en bton est fabriqueen utilisant un moule danslequel est insr verticalementun poteau de bois. Une planchehorizontale y est attache pourservir de poigne.
Matriaux ncessaires :
- Poteau de bois de 10 x 7 cm.- Bton- Planches de bois- Clous
1.2m
0.4m
0.4 m
Tamis
Il consiste en un cadre auquel estclou un treillis mtallique. Il estutilis pour nettoyer le sable deses impurets.
1.2m
041
DameThis is used to manually compactsoil. The cubic concrete base ismanufactured using a form, and astud embedded in the concrete onone end. A cross stud is attached toserve as a handle.
Materials needed:- 10 x 7 cm.wood studs- Concrete
- Wood Boards- Nails
Sieve
This consists of a frame to whicha wire mesh is nailed. This is usedto strain sand of debris and wasteparticles that may contaminate it.
INTRODUCTIONINTRODUCTION
-
8/8/2019 Manual 1.2 French English SpPlans
29/220
1
INTRODUCTION
An dviter les accidents lorsdes travaux en hauteur, il estimportant de prendre toutes lesmesures de scurit ncessaires.
Un ouvrier peut viter une
chute en utilisant le matrielde scurit appropri, commemontr sur le croquis. En casdaccident, la personne restesuspendue en lair par unecorde.
Le cadre mtallique et lesentretoises rendent leschafaudages plus srs.
Metal framework and bracing makescaffolds safer.
In order to prevent accidents whileworking on heights, it is importantto take all needed safety measures.
A worker can prevent fallingusing the appropriate safety
equipment, as shown inthe picture. In case of anaccident, the person will remainsuspended in the air from a rope.
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
30/220
MANUEL DE CONSTRUCTION D UNE MAISON PROTOTYPE
Hard hatProtects your head from
falling objects and tools
GlovesWill be your best friends
during the whole process.They protect your handsfrom cuts and electricaldischarges.
BootsProtect your feet from fallingtools or materials, and fromelectrical discharges.
Le casque durIl protge votre tte en cas
de chute dobjets et doutils.
Les gantsCe seront vos meilleurs amis
pendant tous les travaux.Ils protgent vos mainsdes coupures et dchargeslectriques.
Les bottesElles protgent vos piedsen cas de chute doutils etde matriaux et en cas dedcharges lectriques.
-
8/8/2019 Manual 1.2 French English SpPlans
31/220
SITEWORK AMNAGEMENT DU
TERRAIN 2.1 Outils et matriaux32 2.2 Procdures suivre33
2.2.1 tude de sol34
2.2.2 Nettoyage et nivellement du
terrain 34
2.2.3 Trac des fondations34
2.3 Liste de contrle39
2.1. Tools and materials322.2. Procedures 33
2.2.1. Soil study34
2.2.2. Land clearing and leveling34
2.2.3. Foundation layout34
2.3. Inspectors checklist39
SITEWORK2
AMNAGEMENT DU TERRAIN
-
8/8/2019 Manual 1.2 French English SpPlans
32/220
4 days
estimated duration2
Pickaxe (REF. 004) Wheelbarrow (REF. 007) Nails (REF. 010)
Sledgehammer (REF. 011) Square (REF. 014) Stake (REF. 015) Measuring tape (REF. 016) Axe (REF. 017) String (REF. 018) Hammer (REF. 021)
Shovel (REF. 022) Pick (REF. 023) Saw (REF. 028) Chalk (REF. 032) Clay or sand
MATERIALS 2.1 OUTILS ET MATRIAUX2.1 TOOLS AND MATERIALS
Pic (REF. 004) Brouette (REF. 007) Clous (REF. 010)
Masse (REF. 011) querre (REF. 014) Piquets (REF. 015) Mtre ruban (REF. 016) Hache (REF. 017) Fil (REF. 018) Marteau (REF. 021)
Pelle (REF. 022) Pioche (REF. 023) Scie (REF. 028) Craie (REF. 032) Argile ou sable
4 jours
dure estime
SITEWORKAMNAGEMENT DU TERRAIN
-
8/8/2019 Manual 1.2 French English SpPlans
33/220
2
AMNAGEMENT DU TERRAIN
2.2 PROCDURE SUIVRE
2.2.1 tude de sol
Une tude gotechnique professionnelle du terrain
qui sera utilis pour la construction doit tre
ralise par un laboratoire professionnel agr.
Cette valuation dbouchera sur la prsentation
dun rapport technique. Ce rapport fera une
description dtaille des travaux effectus, de leurs
rsultats, et il formulera des recommandations propos de la conception et de la construction. Il
sera sign par un ingnieur agr (IBC : 1802).
Le sol est gnralement classi en fonction
de la taille de ses particules et de certaines
caractristiques, telles que son pourcentage
dhumidit.
Les meilleurs types de sol pour les fondations sont
les sols gros grains, tels que le gravier, le sable
rocailleux, ou les sols qui ne perdent pas leurs
proprits essentielles en prsence deau.
2.2 PROCEDURES
2.2.1 Soil study
A professional geotechnical evaluation and
investigation of the land that will be used for the
construction must be carried out by a licensed
professional and certied lab. This evaluation will
be completed when a technical report is presented.
This report will have a detailed description of
the work, results, design and, constructionrecommendations. This report will be signed by a
licensed engineer (IBC:1802).
Soil is basically classied according to its particle size
and to certain characteristics, such as the percentage of
humidity it contains.
The best soil types for foundations are coarse-grained
soils, such as gravel, rock sands, or soils which do not
lose their basic properties in the presence of water.
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
34/220
1
2
2.2.2. Dblaiement etnivellement du terrain
Tous les matriaux superustels que les dbris, pierres,
broussailles et racines, doivent
tre enlevs.
(IBC:3304/3305).
La terre doit tre rpartie de
faon homogne au moyen dune
pelle.
2.2.2 Land clearing and leveling
Soil must be scattered evenly
using a shovel.
Excess material must be removedfrom the land, such as debris,
stones, bushes and roots
(IBC:3304/3305).
SITEWORKAMNAGEMENT DU TERRAIN
-
8/8/2019 Manual 1.2 French English SpPlans
35/220
2
3
4
2 Humidiez le point de repreinitial avec un peu deau pour
marquer lendroit.
laide dun pic, prparez le trou
o sera enfonc le piquet.
Enfoncez le piquet dans le sol
Wet the initial land reference
point with a little water to form a
marker.
Use a pickaxe to prepare the hole
where the stake or benchmark is
going to be nailed.
Nail the stake or benchmark into the
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
36/220
6
7
8
LIMITES DE LA CONSTRUCTION/TRAC DE LA PROPRIT :Tendez une corde ou un l entre
les piquets sur les quatre ctspour dnir le primtre du
terrain.
MARGES DE RECUL : Danschaque coin, plantez un piquet
1 m. de la limite lintrieur du
primtre et tendez une corde
entre chaque piquet. Procdez de
cette faon si les dimensions du
terrain le permettent.
Dessinez les lignes sur le sol
CONSTRUCTION LIMITS/PROPERTY LAYOUT: Extend astretched rope or string between
the stakes on every side toestablish the land perimeter.
SETBACKS: Place the stake 1 m.from the boundary towards the
inside of the pen in each corner
and stretch a string between
each stake. This process is
carried out if there is ample extra
space to do so.
Using lime, draw on the ground.
SITEWORKAMNAGEMENT DU TERRAIN
-
8/8/2019 Manual 1.2 French English SpPlans
37/220
2
11
12
10TRAC DE LA MAISON : Lesplanches de piquetage doivent
tre au moins 50 cm au-dessus
du niveau du sol, en fonction dela hauteur du plancher ni. Les
piquets enfoncs dans le sol
doivent donc avoir une hauteur
au minimum de 70 cm.
Sur la latte horizontale qui forme
la planche de piquetage, marquez
lextrmit de lun des cts du
rectangle dessins sur le sol.
Placez un clou sur ce point.
HOUSE LAYOUT:Batter boards must extend at
least 50 cm. above ground level,
depending on the height of thenished oor. For this reason, the
nailed stakes must be at least
70 cm. high.
On the horizontal stake that forms
the batter board, mark the end of
one of the sides of the rectangle
drawn on the land.
Hammer a nail on this point.
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
38/220
IMPORTANT
When the site inspection reveals site conditions thatwere not taken into account in the design information,
or if soil conditions are in the bad range (See Fig. 5
on page 22), then further soil investigation may be
required. Such conditions include expansive soils, soils
subject to liquefaction, site soils differing from the
design assumptions, or the presence of ll materials.
The site work must be evaluated for the effects, if any,
that it will have on adjacent buildings. Excavations for
footings and grading cuts may undermine the footings
of adjacent buildings, and grading lls may create
surcharge loads that adversely affect the foundations of
adjacent buildings.
IMPORTANT
Lorsque linspection du site rvle des conditionsqui nont pas t prises en compte lors de la
conception ou si la nature du sol est mauvaise (voir
Fig. 5 page 22), une tude complmentaire peut
se rvler ncessaire. Ceci sapplique dans le cas
de sols expansifs, de sols sujets la liqufaction,
de sols qui diffrent de ceux prvus lors de la
conception, ou lorsquil y a prsence de matriauxde remblai.
Il faut valuer les effets ventuels des travaux sur
les btiments adjacents. Les travaux dexcavation
pour les semelles et le terrassement peuvent
affecter les semelles des immeubles voisins, et les
terres de remblai peuvent crer des surcharges qui
ont un effet dfavorable sur les fondations de cesimmeubles.
INSPECTORS CHECKLISTLISTE DE CONTRLE
-
8/8/2019 Manual 1.2 French English SpPlans
39/220
2
SITEWORK
SITE CLEARING
1. Is the site site soil cleared from organic material to a depth notless than 30.5 cm? (IBC:3304.1).
SOIL INVESTIGATION AND GRADING
1. Does site grading allow rainfall drainage away from the house?(5% minimal slope allowed - IBC:1803.3/1803.4/1805.3.4).
2. Site soil identication (IBC:1802) Circle one:
RockGravelSandSiltCl
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
40/220
NOTES / NOTES
INSPECTORS CHECKLISTLISTE DE CONTRLE
-
8/8/2019 Manual 1.2 French English SpPlans
41/220
2
OBRAS PRELIMINARES
DBLAIEMENT DU TERRAIN
1. La terre vgtale est-elle t dblaye du terrain jusqu uneprofondeur minimale de 30,5 cm ? (IBC:3304.1).
TUDE DE SOL ET NIVELLEMENT
1. Le nivellement du terrain permet-il le drainage deseaux de pluie ? (inclinaison minimale autorise de 5%-IBC:1803.3/1803.4/1805.3.4).
2. Identication du type de sol (IBC:1802).Entourez un de ces solsRocheGravierSableLi
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
42/220
NOTES / NOTES
-
8/8/2019 Manual 1.2 French English SpPlans
43/220
FOUNDATIONS FONDATIONS
3.1 Outils et matriaux443.2 Procdures suivre46
3.2.1 Arpentage46
3.2.2 Terrassement48
3.2.3 Fondations 50
3.3 Liste de contrle 59
3.1. Tools and materials 443.2. Procedures 46
3.2.1. Measuring 46
3.2.2. Leveling 48
3.2.3. Building foundation 50
3.3. Inspectors checklist59
FOUNDATIONSestimated duration
3 FONDATIONSdure estime
-
8/8/2019 Manual 1.2 French English SpPlans
44/220
15 days
estimated duration
15 jours
dure estime
3.1 TOOLS AND MATERIALS 3.1 OUTILS ET MAT-RIAUX
3.1 TOOLS AND MATERIALS
Ciseau froid (REF.012) Cintreuse (REF. 013) Mtre ruban (REF. 016) Fil (REF. 018) Tuyau transparent (REF. 020)
Marteau (REF. 021) Pelle (REF. 022) Pic (REF. 023) Rcipient en plastique (REF.026) Scie main (REF. 029) Dame (REF. 041)
Truelle (REF. 003) Seau (REF. 006) Brouette (REF. 007)
Ciseau (REF. 008) Maillet (REF. 011) Cold chisel (REF.012) Bar bender (REF. 013) Measuring tape (REF. 016) String (REF. 018) Transparent hose (REF. 020)
Hammer (REF. 021) Shovel (REF. 022) Pick (REF. 023) Plastic container (REF. 026) Hand saw (REF. 029) Tamper (REF. 041) Sieve (REF 042)
Brick trowel (REF. 003) Bucket (REF. 006) Wheelbarrow (REF. 007)
Chisel (REF. 008) Sledgehammer (REF. 011)
FOUNDATIONSFONDATIONS
-
8/8/2019 Manual 1.2 French English SpPlans
45/220
3
To see more about materials, see section
12.2.
006003 008007 011
Voir dtails sur les matriaux la section
12.2.
COFFRAGE
Planches de contreplaqu 1/2
Pieces de renfort en bois pour lecoffrage
Clous
Fil mtallique
BTON 250 Kg/cm2 - 5.86 m3
Ciment Portland
Sable organique propre et sans sel
Gravier
Pierres concasses
Eau
FORMWORK
Plywood sheets 1/2
Formwork wood studs Nails
Wire
CONCRETE 250 Kg/cm2 - 5.86 m3
Portland cement
Clean organic and salt free
sand
Gravel
Crushed stone
Water
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
46/220
1
2
3.2 PROCDURE SUIVRE3.2 PROCEDURES
3.2.1 Arpentage
TRAC DES TRAVAUXDEXCAVATION : Mesurez 45cm vers lextrieur des axes du
primtre marqu pour le trac
des fondations. Cette oprationest ralise pour la maison et
pour lescalier.
Tendez des ls paralllement
laxe, indiquant les dimensions dela surface dexcavation.
3.2.1 Measuring
EXCAVATION LAYOUT: Measure45 cm. to the outside of the
boundary axes marked in the
foundation layout. This is done
for the house and for the stairs.
Stretch strings so that they run
parallel to the axis, indicating thedimensions of the excavation
areas.
FOUNDATIONSFONDATIONS
-
8/8/2019 Manual 1.2 French English SpPlans
47/220
3
ce stade, il est important de
marquer lexcavation pour le
remblayage sous les fondations
de lescalier. Placez de la terrecompacte ou du gravier sous la
zone de lescalier. Cela se fera au
mme niveau que la fondation du
reste du btiment.
Toutes les fondations du btimentprincipal et de lescalier seront
une profondeur de A=23 cm sous
le niveau du sol. La semelle au
niveau du depart descalier sera
plus basse que ce niveau. Cest
pourquoi il faut marquer cette
partie de la structure commerecommand prcdemment
et conformment aux mesures
indiques sur le plan.
NIVEAU EXTRIEUR ET NIVEAUDU SOL FINI: Mesurez partir du
5
6
7
At this point, it is important to mark
the excavation for backll under the
stairs foundation. Place compacted
earth or gravel under the stair area.
This will be at the same level of the
foundation of the rest of building.
The entire main building and stairfoundation depth will be
A= 23 cm. below grade level. The
footing at the start of the stairs
will be lower than this level. For
this reason, you should mark this
structural component according
to the previous recommendationsand following the dimensions that
appear in the plan.
EXTERIOR GRADE ANDFINISHED FLOOR LEVEL:
A
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
48/220
9 Tracez une ligne 1m au-dessusdu niveau de sol intrieur. Cette
ligne doit rester visible jusqu
la n des travaux. Toutes les
hauteurs seront mesures partir
de ce repre et seront transfres
chaque endroit du chantier
(10.8). Cela deviendra le niveau
de rfrence du btiment.
3.2.2 Nivellement
1 Retirez les matriaux du sol laide dune pelle et dune
brouette et gardez-les sur lechantier pour plus tard. Vous
pouvez les utiliser par la suite
pour remblayer une fois les
fondations termines.
Draw a line 1m. above the interior
oor level. Keep this line visible until
work is completed. All heights will
be measured from this reference,
and will be transferred to every
place in the construction site(10.8).
This will become the building
benchmark or reference level.
3.2.2 Leveling
Remove any material from
the oor using a shovel and a
wheelbarrow and store it on sitefor later use. You may use this
material later as backll when the
foundation is nished.
FOUNDATIONSFONDATIONS
-
8/8/2019 Manual 1.2 French English SpPlans
49/220
3
Vriez la profondeur de
lexcavation par rapport au
niveau du sol. Il faut contrler
le long du bord de lexcavationet plusieurs points centraux
en utilisant des ls servant de
repre pour transfrer le niveau
du sol au centre de la surface
dexcavation.
Compactez la surface
dexcavation laide dune dame
tout en aspergeant les matriaux
deau. Pour la consolidation du
sol, veillez garder la surface
humide sans la saturer deau.
4
5
Remplissez la surface
dexcavation avec le matriau
6
Verify the excavation depth in
comparison to the ground level.
This will be veried along the
excavation border and at several
central points using reference
strings to transfer grade level to
the center of the excavation area.
Compact the excavation areausing a tamper, and sprinkle
water on the material at the same
time. To help earth consolidation,
be careful to keep area damp, but
not saturated with water.
Fill the excavation area using
special ll material (gravel). Do this
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
8
-
8/8/2019 Manual 1.2 French English SpPlans
50/220
Aprs avoir compact ces
couches, vriez leurs niveaux.
Quand le terrain est prt, il est
important de marquer la chaux
la largeur de la semelle continue
de la maison et de lescalier
(Voir tape #10), en utilisant les
mesures indiques sur le plan de
rfrence E-01. Cela vous permet
de visualiser o il faut coulerla dalle de bton arm et o
commencer monter le coffrage
et le treillis.
8
9
10La semelle continue est unlment de la structure dont la
After compacting these layers, verify
their levels.
When the land is ready, it is
important to mark with lime
the width of the house and stair
continuous spread footing (See
step #10). This is done using the
dimensions in reference plan E-01.
This allows you to visualize where
the slab of reinforced concretemust be cast, and where to start the
formwork and the rebar assembly.
Continuous spread footing is a
structural element that is formed
FOUNDATIONSFONDATIONS
2
-
8/8/2019 Manual 1.2 French English SpPlans
51/220
3
2 Creusez et retirez les matriauxavec le pic et la pelle. Il est
important que lexcavation se
fasse selon les dimensions
appropries (voir plan E-01).
Laissez un espace denviron5 cm. pour lenrobage des
tuyaux avec du sable. Le sable
sera aussi un bon moyen de
marquer les tuyaux qui devront
tre dterrs dans le futur.
REMARQUE : Les tuyaux
dalimentation et dvacuation
deau doivent tre loigns dau
moins 152,4 cm (IPC 603.2)
3
4COFFRAGE ET ACIER RENFORC
Dig and remove material using
a pick and shovel. It is important
that the excavation is done with
the appropriate dimensions (see
reference plan E-01).
Leave a space of approximately 5cm. to protect pipes with a sand ll
cover. Sand will also provide a good
way of marking pipes that need to
be excavated in the future. NOTE:
Water service pipe and building
sewer must be separated by a
minimum of 152.4 cm. (IPC 603.2)
FORMWORK AND REINFORCED
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
6
-
8/8/2019 Manual 1.2 French English SpPlans
52/220
6 Montez le renforcement en acierpour la semelle. Cet assemblage
se fait tant pour la maison que
pour lescalier, comme indiqu au
point 10.7 et conformment aux
plans E-01 et E-07.
Ce treillis est plac sur les calesde bton o la semelle sera
coule. Laissez un espace de
5 cm pour le recouvrement en
bton de tous les cts.
7
8 Coupez des barres darmaturede 10 et 16 mm pour obtenir
Build the steel reinforcement for the
footing. This is done for the home
as well as for the stairs, according to
10.7 and following the plans E-01
and E-04.
This truss is placed on theconcrete plates where the footing
will be cast. You should leave a
5 cm. space for concrete
coverage on all sides.
Cut 10 mm. and 16 mm. rebar to
build 1.40 m. long steel dowels.
FOUNDATIONSFONDATIONS
10
-
8/8/2019 Manual 1.2 French English SpPlans
53/220
3
10
11
Montez le renforcement en acier
pour la semelle la base de
lescalier, conformment au plan
de la structure E-03.
Pour la base, fabriquez untreillis avec des barres de 10
mm de diamtre en utilisant du
l mtallique pour attacher les
barres. Placez le treillis la partie
infrieure de la base sur les cales
de bton. Il doit tre surlev de
5 cm par rapport au niveau du
coffrage (I.B.C. 1907/1907.7.1)
Placez verticalement les barres
darmature de 10 mm de
12
Build the steel reinforcement for
the footing at the start of the stairs,
according to the structural plan
E-03.
For the base, make a 10 mm.diameter rebar mesh. Using wire
to tie the pieces together, place
this mesh at the lower part of
the base on the concrete plates.
It must be elevated 5 cm from
formwork. (IBC: 1907/1907.7.1)
Vertically place 10 mm. diameter
rebar to through the foundation
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
14
-
8/8/2019 Manual 1.2 French English SpPlans
54/220
14Coupez des planches en
contreplaqu en respectant
les mesures exactes pour
former la base et la poutre de
fondation pour chaque type de
semelle continue (Voir plans
de la structure E-01). Fixez-les
entre elles et au terrain (IBC:
1906/1906.1, 1906.2).
15Les piquets en bois (A) sont
utiliss pour renforcer an
dempcher une dformation
ou courbure lorsque le bton
est vers. Tous les cts
de la semelle doivent tre
perpendiculaires au terraincompact. Vous pouvez vrier
et corriger cela en utilisant une
querre.
16 En raison de sa forme, la semelle
Cut plywood boards at the exact
measure to shape the base and
grade beam for each type of
continuous spread footing. (See
structural plans E-01). Unify the
base mold and x it to the ground
(IBC: 1906/1906.1/1906.2).
Wood studs (A) are used asreinforcement to prevent
misshaping or bending when the
concrete is poured in. All footing
sides must be perpendicular to the
compacted land. You may verify and
correct this using a square.
Because of its shape, the
A A
FOUNDATIONSFONDATIONS
18
-
8/8/2019 Manual 1.2 French English SpPlans
55/220
3
18
19 Lespace intrieur entre lesplanches doit toujours tre
gal la largeur de la semelle
(base et poutre de fondation),
conformment au plan de la
structure. Voir plan E-01 de la
semelle continue.
Si la poutre de fondation a lun
de ses cts align sur laxe
correspondant, mesurez la
largeur totale de la poutre vers
lintrieur de laxe. Placez les
planches de chaque ct de ces
marques.
20Gnralement le placement du
bton se fait en plusieurs parties
If the grade beam has one
of its sides aligned to the
corresponding axis, measure
the total width of the beam to
the interior of the axis. Place
the boards at each side of these
marks.
Always make sure that the interiorspace between the boards is equal
to the footing width (base and
grade beam), according to the
structural plan. See continuous
spread footing plan E-01.
Placing of concrete is usually
done in several parts in order
AB
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
22L d t i i
-
8/8/2019 Manual 1.2 French English SpPlans
56/220
23
La mme procdure est suivie
pour le coffrage du mur de
fondation la base de lescalier.
Il faut utiliser les dimensions
indiques dans le plan E-03.
COULAGE DE LA FONDATION:
Vriez les dimensions et le
chevauchement des barres
horizontales. Vriez galement si
lespace entre les triers est celui
indiqu sur le plan de la structure.
Nettoyez la main et avec de
leau lespace lintrieur du
24
The same procedure is used for the
foundation wall formwork at the
start of the stairs. This is done using
the dimensions indicated in the
plan E-03.
FOUNDATION PLACEMENT: Verifythe dimensions and overlapping
of horizontal bars. Also verify the
spacing between the stirrups,
according to the structural plan.
Clean by hand and with water
the space within the formwork
FOUNDATIONSFONDATIONS
26
-
8/8/2019 Manual 1.2 French English SpPlans
57/220
3
Prparez le bton selon le
procd pour 250kg/cm dcrit
au point 10.2 (IBC: 1905).
Versez le mlange dans le
coffrage en le remuant autour
des barres darmature et dans les
coins pour empcher la formation
de vides qui pourraient affecter la
rsistance du bton.
26
27
28
Prepare the concrete according
to the process for 250kg/cm
described in 10.2 (IBC: 1905).
Pour the mixture inside the
formwork thoroughly, working it
around the rebar reinforcement
and into corners to consolidate
and prevent the formation
of voids that may affect theresistance of the concrete.
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
DCOFFRAGE E l l30
-
8/8/2019 Manual 1.2 French English SpPlans
58/220
DCOFFRAGE : Enlevez lecoffrage le lendemain du coulage
du bton. Retirez les querres et
les bois transversaux du coffrage.
Retirez du terrain les planchessans les sparer des lattes. De
cette faon, elles sont prtes
tre utilises la prochaine
tape.
TRAITEMENT DU BTON :Mouillez la semelle plusieurs fois
32
31
STRIPPING:Strip the formwork on the day after
casting. Remove the squares and
transversal wooden strips from the
built formwork.
Remove the boards from the landwithout separating them from the
stakes. This way, they are ready to
be used in the next step.
CURING: Wet the footing severaltimes a day. This is especially
INSPECTORS CHECKLISTLISTE DE CONTRLE
-
8/8/2019 Manual 1.2 French English SpPlans
59/220
3
FOUNDATIONS
1. Is the construction area 55 m2?
2. Has the protection to adjacent footings benn checked? (IBC:1803.1).
3. Is the houses footing depth 0.90 m? (IBC: 1805.2).
4. Is the stairs footing depth 1.30 m?.
5. Are ll and compaction tests done?(IBC: 1704.7/1803.2/1803.5/3304).
6. Is the nal level of compacted material checked?
7. Are sanitary drainage and water supply system coordinated?(IPC:305.5/305.6.1/306/605.1).
8. Is piping support checked?(IPC: 306.1).
9. Is the till material appropriate for the rst 30 cm. placed overi i ? (IPC 306 2 2/306 2 3/306 3)
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
60/220
NOTES / NOTES
INSPECTORS CHECKLISTLISTE DE CONTRLE
FONDATIONS
-
8/8/2019 Manual 1.2 French English SpPlans
61/220
3
FONDATIONS
1. La supercie de construction est-elle de 55 m2 ?
2. La protection des fondations voisines a-t-elle t vrie ?(IBC : 1803.1)
3. La profondeur de la fondation de la maison est-elle de0,90 m? (IBC : 1805.2)
4. La profondeur de la fondation de lescalier est-elle d1,30 m ?
5. Les tests de remblayage et de compactage ont-ils teffectus ? (IBC :1704.7/1803.2/1803.5/3304)
6. Le niveau nal de matriel compact a-t-il t contrl ?
7. Les systmes dvacuation des eaux et dalimentation en eausont-ils coordonns ? (IPC : 305.5/305.6.1/306/605.1)
8. Le support des canalisations a-t-il t vri ? (IPC : 306.1)
9. Le matriau de remblai convient-il pour les 30premiers centimtres placs sur les canalisations ? (IPC :306 2 2/306 2 3/306 3)
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
62/220
NOTES / NOTES
-
8/8/2019 Manual 1.2 French English SpPlans
63/220
CONCRETE SLABS DALLES DE BTON
4.1. Outils et matriaux644.2. Procdures suivre 654.2.1. Remblayage et compactage 66
4.2.2. Structure du radier67
4.2.3. Coulage du bton 68
4.3. Liste de contrle 71
4.1. Tools and materials644.2. Procedures 66
4.2.1. Placement and
compactationofll66
4.2.2. Ground slab structure67
4.2.3. Casting 68
4.3. Inspectors checklist71
CONCRETE SLABS4 DALLE DE BTON
4 days
estimated duration
4 jours
dure estime
-
8/8/2019 Manual 1.2 French English SpPlans
64/220
Wire (REF. 001) Brick trowel (REF. 003) Bucket (REF. 006)
Wheelbarrow (REF. 007) Shears (REF. 009) Sledgehammer (REF. 011) Cold chisel (REF. 012) Bar bender (REF. 013) Measuring tape (REF. 016) String (REF. 018)
Trowel (REF. 019) Transparent hose (REF. 020) Hammer (REF. 021) Shovel (REF. 022) Pick (REF. 023) Plastic Tray (REF. 026)
4 days 4 jours
4.1 OUTILS ET MATRIAUX4.1 TOOLS AND MATERIALS
Fil mtallique (REF. 001) Truelle brique (REF. 003) Seau (REF. 006)
Brouette (REF. 007) Cisaille (REF. 009) Maillet (REF. 011) Ciseau froid (REF. 012) Cintreuse (REF. 013) Mtre ruban (REF. 016) Ficelle (REF. 018)
Truelle (REF. 019) Tuyau transparent (REF. 020) Marteau (REF. 021) Pelle (REF. 022) Pioche (REF. 023) Rcipient en plastique (REF. 026)
CONCRETE SLABSDALES DE BTON
-
8/8/2019 Manual 1.2 French English SpPlans
65/220
4To see more about materials, go to12.2.
Pour de plus amples dtails sur lesmatriaux, voir 12.2.
003 006 007 009001
011 013 016 018012
Sable organique rivire
sans sel
Gravier Eau
PLASTIQUE INDUSTRIEL NOIR
Clean organic and salt
free sand
Gravel Water
BLACK INDUSTRIAL PLASTIC
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
4 2 PROCDURE SUIVRE4 2 PROCEDURES
-
8/8/2019 Manual 1.2 French English SpPlans
66/220
laide du niveau deau, vriez
les niveaux du terrain qui a
t compact lors de la phase
de dblaiement du sol et de
construction des fondations.
Ce processus doit tre ralis chaque tape des travaux (IBC:
1803.3).
A laide dune brouette, versez
le matriau de remblai dans la
zone dlimite par les poutres de
fondation.
4.2 PROCDURE SUIVRE
4.2.1 Remblayage et
compactage1
2
4.2.1 Placement and
compaction of ll
Using the water level, check
the levels of the land that has
been compacted during the soil
improvement and foundation
building phase. You must repeat
this process at every phase of the
building process (IBC: 1803.3).
4.2 PROCEDURES
Using a wheelbarrow, place the
ll material within the foundation
beam limits.
CONCRETE SLABSDALES DE BTON
Compactez le matriau par4Compact the material in
-
8/8/2019 Manual 1.2 French English SpPlans
67/220
4
p p
couches de 10 cm. Gardez-le
humide et utilisez une dame
pour compacter chaque couche
jusqu ce que vous arriviez une hauteur totale de 28 cm au-
dessus du niveau dexcavation.
Cest le niveau auquel le radier
sera coul (IBC: 1803.5). Voir
plan de la structure E-01.
.2.2 Structure du radier
Vriez nouveau les niveaux..
1
5
Compact the material in
10 cm. layers. Keep it moist, and
use a tamper to compact each layer
until the total height is 28 cm. above
the excavation level. This is the
level at which the ground slab will
be cast (IBC: 1803.5). See structural
plan E-01.
Check levels once again.
4.2.2 Ground slab structure
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
3Fabriquez un treillis en plaantForm a grid by placing rebar
-
8/8/2019 Manual 1.2 French English SpPlans
68/220
Sparez ce treillis du sol en leplaant sur des cales de bton
situes tous les 40 cm (IBC:
1907.5/.2/.1/1907.7).
4.2.3 Coulage du bton
4
Fabriquez un treillis en plaantles barres darmature tous les 20
cm conformment au plan de la
structure. Fixez-les entre elles
avec un l mtallique pour former
un treillis. Voir plan de la structure
E-01.
g y p g
every 20 cm. according to the
structural plan. These are tied to
each other using wire to form a
mesh. See structural plan E-01.
Separate this mesh from theground by placing it over
concrete plates located every 40
cm. (IBC: 1907.5/.2./1/1907.7).
4.2.3 Casting
CONCRETE SLABSDALES DE BTON
7Versez le mlange dans laPour the mixture inside the area
-
8/8/2019 Manual 1.2 French English SpPlans
69/220
4
g
surface prpare pour le coulage,
en ltendant soigneusement.
Comme pour la fondation, on
peut utiliser un morceau de
barre darmature avec un bout
rond (IBC: 1905.10). La surface
compacte et le treillis doivent
tre remplis et couverts de bton
jusqu ce que le niveau de la
poutre de fondation du primtresoit atteint.
talez le bton de faon
homogne laide dune pelle.
Nivelez la surface avec une
rgle mtallique (ou un tube en
aluminium). Avec une truelle
en mtal ou en bois, nivelez nouveau le radier pour lui donner
une nition lisse.
M l d it t9
8
prepared for the casting, carefully
spreading it out. As with the
foundation, this can be done using a
piece of rebar with a round end (IBC:1905.10). The compacted area and
mesh must be lled and covered
with concrete until reaching the
same level of the perimeter beam of
the foundation.
Spread the concrete evenly using
a shovel. Level the surface with a
metal ruler (or aluminum tube).
Using a metal or wooden trowel,
level the ground slab once more to
give it a smooth surface nish.
M k h h h h
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
70/220
IMPORTANT
The ground slab is an important part of the
construction. This element separates the buildingfrom the natural humidity of the soil. It is the surface
upon which the interior home wall layout will be
made and built. The homeowner will place furniture
and the familys belongings on the ground slab. For
this reason, it is important to build this over well-
compacted, resistant, and well-graded soil. To achieve
this, it is important to have every tool handy to verify
dimensions and levels.
To increase efciency, measure each dimension
as exactly as possible from the beginning, taking
the greatest advantage of the resources available.
Precision will result in reduced work costs. If the groundslab level is exact, activities such as masonry, door
installation, and general nishing will be easier. Correct
performance of this step will prevent the need for
future repairs.
IMPORTANT
Le radier est une partie importante de la
construction. Cet lment spare le btiment delhumidit naturelle du sol. Il sagit de la surface sur
laquelle les parois intrieures de la maison seront
traces et construites et sur laquelle la famille qui
loccupera placera ses meubles et autres biens. Il
est donc important de la construire sur un sol bien
compact, rsistant et bien nivell. Pour cela, il faut
avoir porte de main tous les outils ncessaires
pour vrier les dimensions et les niveaux.
An dtre plus efcace, mesurez chaque
dimension le plus prcisment possible ds le
dpart, tirant au maximum parti des moyens
disponibles. Cette prcision permettra de rduire lecot des travaux. Si le niveau du radier est exact,
les activits telles que la maonnerie, linstallation
des portes et la nition gnrale seront plus faciles.
La ralisation correcte de cette tape vitera davoir
besoin de faire des rparations ultrieurement.
INSPECTORS CHECKLISTLISTE DE CONTRLE
CONCRETE SLABS
-
8/8/2019 Manual 1.2 French English SpPlans
71/220
4
CONCRETE SLABS
1. Is the soil good for construction? (IBC: 1802).
2. Have soil compaction and materials been conrmed? (IBC:1704.7).
3. Has vapor retarder been checked? (IBC: 1910.1).
4. Have the ground slab mesh dimensions and steel beenchecked? (IBC: 1907.4/ 1907.5/ 1907.6).
5. Is the concrete leveled?
6. Did the slab remain wet for seven days, 24 hours a day, during the
curing?
7. Is the ground oor thickness not less than 3 1/2 (889 mm.)?(IBC: 1910.1)
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
72/220
NOTES / NOTES
INSPECTORS CHECKLISTLISTE DE CONTRLE
DALLES EN BTON
-
8/8/2019 Manual 1.2 French English SpPlans
73/220
4
1. Le sol convient-il pour la construction ? (IBC: 1802)2. Le compactage du sol et les matriaux ont-ils t contrls?(IBC: 1704.7).
3. Le pare-vapeur a-t-il t contrl ? (IBC: 1910.1).
4. Les dimensions et lacier du treillis du radier ont-ils tcontrls ? (IBC: 19074/ 1907.5/ 1907.6).
5. Le bton a-t-il t nivel ?
6. La dalle est-elle reste humide pendant sept jours, 24 heures
sur 24, pendant le traitement du bton ?
7. Lpaisseur du plancher du rez-de-chausse est-elle auminimum de 89 cm (3 1/2 ) ? (IBC: 1910.1)
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
-
8/8/2019 Manual 1.2 French English SpPlans
74/220
NOTES / NOTES
GIRDERS AND BEAMS STRUCTURE
-
8/8/2019 Manual 1.2 French English SpPlans
75/220
GIRDERS AND BEAMS STRUCTURE
5.1. Outils et matriaux 765.2. Procdures suivre 78
5.2.1. Poutres dancrage et dalle de
bton de ltage 78
5.2.3. Structure de lescalier85
5.2.4. Structure des poutres 91
5.3. Liste de contrle 91
5.1. Tools and materials 765.2. Procedures 78
5.2.1.LinkBeamsandsecondoor
concrete slab 78
5.2.3. Stair structure 85
5.2.4. Structure of the beam 91
5.3. Inspectors checklist97
GIRDERS AND BEAMS STRUCTURE5
30 days 30 jours
estimated duration dure estime
-
8/8/2019 Manual 1.2 French English SpPlans
76/220
30 days 30 jours
5.1. OUTILS ET MATRIAUX5.1 TOOLS AND MATERIALS
Truelle brique (REF. 003) Seau (REF. 006) Brouette (REF. 007) Burin (REF. 008)
Cisaille (REF. 009) Clous (REF. 010) Maillet (REF. 011) Ciseau froid (REF. 012) Cintreuse (REF. 013) Mtre ruban (REF. 016) Fil (REF. 018) Truelle (REF. 019) Tuyau transparent (REF. 020) Marteau (REF. 021) Pelle (REF. 022) Rcipient en plastique (REF. 026) Niveau bulle (REF 027)
Brick trowel (REF. 003) Bucket (REF. 006) Wheelbarrow (REF. 007) Chisel (REF. 008) Shears (REF. 009) Nails (REF. 010) Sledgehammer (REF. 011) Cold chisel (REF. 012) Bar bender (REF. 013) Measuring tape (REF. 016) String (REF. 018) Trowel (REF. 019) Transparent hose (REF. 020) Hammer (REF. 021) Shovel (REF. 022) Plastic tray (REF. 026) Plumb & level (REF 027)
GIRDERS AND BEAMSSTRUCTURE
Lattes pour coffrage Formwork strip
-
8/8/2019 Manual 1.2 French English SpPlans
77/220
5
003 006 007 008
009
Lattes pour coffrage
Clous
Fil mtallique
BTON
Ciment Portland
Sable rivire propre sans
sel
Gravier
Eau
Formwork strip
Nails
Wire
CONCRETE
Portland cement
Clean organic and salt
free sand
Gravel
WaterTo see more about materials, see12.2.
Pour de plus amples dtails sur lesmatriaux, voir 12.2.
009
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
5.2 PROCDURE SUIVRE5.2 PROCEDURE
-
8/8/2019 Manual 1.2 French English SpPlans
78/220
1
2
5.2.1 Poutres dancrage et dalle
de bton de ltage
COFFRAGE DES POUTRES:Prenez des planches de
contreplaqu de 40 et 25 cm
de large et clouez-y des lattes
transversalement tous les 40 cm.
Les lattes transversales doivent
tre respectivement dau moins
50 et 35 cm de long.
Fixez les planches de 40 cm
sur la face extrieure des mursextrieurs (A) et celles de 25 cm
lintrieur (B) en clouant les
lattes (C) sur la dernire range
comme indiqu sur la gure.
5.2.1 Link Beams and Second
Floor Concrete Slab
BEAM FORMWORK: Take 40cm. and 25 cm. width plywood
boards and nail stakes to them
transversally every 40 cm.
Transversal stakes must be at
least 50 cm. and 35 cm long,
respectively.
Place the 40 cm. boards on the
exterior face of the boundarywalls (A) and the 25 cm. boards
to the interior (B). Do this by
nailing stakes (C) to the last
course, as indicated on the
picture.
B
A
CC
GIRDERS AND BEAMSSTRUCTURE
4
-
8/8/2019 Manual 1.2 French English SpPlans
79/220
5
4
5
Ensuite, placez les barres
darmature en forme de L
comme indiqu sur le croquis,pour xer les murs suprieurs
la dalle. Les barres darmature
seront soudes larmature de la
dalle une fois quelle sera place
sur le coffrage.
Une fois le coffrage termin,
placez larmature en acier
lintrieur, sur des cales en
bton, pour former les poutres
de chanage du toit. Terminez
larmature des murs de ltage au
niveau des poutres de chanageen pliant 90 degrs les 10
derniers cm de leur extrmit
suprieure, comme indiqu sur le
croquis.
Next, place the L shaped rebar
as shown in the picture, in order
to tie the upper walls to the slab.The rebar will be welded to the
slabs structural armor once it is
placed on the formwork.
Once the formwork has been
nished, place the structural
steel reinforcement inside, on the
concrete pedestals, to form the
roofs link beams. Finish the steel
reinforcement in second oors
walls at the link beams, foldingthe last 10 cm. of its upper end
90 degrees, as shown in the
picture.
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
A
7 La longueur des tais (H)correspond la hauteur comprise
The support length (H) is the height
between the top of the ground slab
-
8/8/2019 Manual 1.2 French English SpPlans
80/220
B
C
H
correspond la hauteur comprise
entre le dessus du radier (B) et
le dessus de la dalle de ltage
termine (A).
between the top of the ground slab
(B) and the top of the nished 2nd
oor slab (A).
8
9
Fixez les tais et mettez-les
niveau sil y a lieu, en utilisant des
calles de bois ou des briques
lextrmit infrieure
inferior.
Ces tais sont xs horizontalement
et diagonalement les uns par
rapport aux autres et aux murs au
Secure the shores and level them
as needed, using board pieces orbricks located at the lower end.
These shores are horizontally and
diagonally tied to each other and
to the walls using 2 x 4 wood
GIRDERS AND BEAMSSTRUCTURE
11Appliquez une couche dhuile
diesel avec un pinceau sur le
Cover the built formwork with diesel
oil using a paintbrush to make the
-
8/8/2019 Manual 1.2 French English SpPlans
81/220
5
diesel avec un pinceau sur le
coffrage termin pour faciliter le
dcoffrage ultrieur.
ARMATURE EN ACIER :Assemblez les poutres de la dalle
conformment aux instructions
du plan de la structure E-02 (IBC:
1907).
oil using a paintbrush to make the
future stripping easier.
STEEL REINFORCEMENT:Assemble slab beams following
the instructions of the structural
plan E-02(IBC: 1907).
12
13La poutre en acier qui en
rsulte est place sur la range
The resulting steel beam is placed
on the upper wall course, over the
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
15Vriez les niveaux du coffrage
et corrigez les imperfections qui
Verify levels of the built formwork
and correct imperfections that
-
8/8/2019 Manual 1.2 French English SpPlans
82/220
et corrigez les imperfections qui
pourraient par la suite causer des
dformations dans la structure
couler. vitez aussi une pressionentre les parties du coffrage
pour prvenir des dformations
ultrieures.
and correct imperfections that
may later cause deformations on
the structure to be cast. Also, avoid
pressure among formwork pieces toprevent later deformations.
17
PLACEMENT DES NERVURES:Faites le trac demplacement
des nervures selon le plan de la
structure E-02.
Sur le trac marqu sur les
planches, posez deux agglos de
b l d l
VOID LOCATION ANDPLACEMENT: Lay out the voidsand ribs according to E-02
structural plan.
On the layout marked on the
boards, place two concrete masonry
unitspervoid Thesearelaidinpairs
16
GIRDERS AND BEAMSSTRUCTURE
19This truss must also be separated
from the formwork using concrete
Ce treillis doit aussi tre spar
du coffrage au moyen de cales
-
8/8/2019 Manual 1.2 French English SpPlans
83/220
5
from the formwork using concrete
plates (IBC: 1907.7.1).
g y
de bton (IBC: 1907.7.1).
20
COORDINATION DESSYSTMES DE PLOMBERIEET DLECTRICIT :Avant decouler la dalle, il faut installer
les systmes de plomberie et
dlectricit selon les plans.
Dans chaque pice, laissez
visibles les raccordements
21
PLUMBING AND ELECTRICALSYSTEMS COORDINATION:Before casting the slab, you should
install the plumbing and electrical
systems according to the plans.
Leave exposed piping
connections for electrical layout
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
23PRPARATION DU BTON ETCOULAGE : Une fois le mlange
CONCRETE PREPARATION ANDCASTING: Once the mixture has
-
8/8/2019 Manual 1.2 French English SpPlans
84/220
prpar comme indiqu au point
10.2, placez-le dans la brouette
ou dans plusieurs cuves aumoyen dune pelle. Puis versez-le
dans le coffrage (IBC: 1905.8).
Rpandez le mlange de faon
homogne dans tout lespace
couler en utilisant dabord la pelle
et ensuite la rgle mtallique,
jusquau niveau du plancher ni.
C S G Obeen prepared according to 10.2,place it using the shovel in the
wheelbarrow or in several tubs.Then pour it in the formwork (IBC:1905.8). Fill with the mixture evenlyon the complete space to be cast,rst using the shovel and thenthe metal ruler, spreading it untilreaching the level of the nished
oor.
Homognisez soigneusement le
mlange pendant le coulage (IBC:
1905.10). Nivelez la dalle pendant
le coulage au moyen dune truelle
en mtal ou en bois pour donnerune nition lisse la surface.
24Carefully consolidate the mixture
as the casting takes place
(IBC: 1905.10). Level the slab along
the casting process. Using a metal
or a wooden trowel will produce asmooth surface nish.
GIRDERS AND BEAMSSTRUCTURE
5.2.2 Structure de lescalier5.2.2 Stair Structure
-
8/8/2019 Manual 1.2 French English SpPlans
85/220
5
A
B1 COFFRAGE: Tracez la forme de
lescalier sur le mur latral. Nousappellerons la partie incline la
dalle oblique (A) et le plan
horizontal donnant accs
ltage le palier (B).
FORMWORK: Outline the stair run
on the sidewall. This slope willbe called the inclined slab (A).
The horizontal plane reaching the
second oor will be called the
landing (B).
Les marches sont traces laide
dun mtre et dun niveau, en
suivant les mesures du plan de la
structure E-03.
2
3
The steps are outlined using a
meter and a level, according to the
dimensions in structural plan E-03.
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
Marquez avec de la chaux sur le
sol la largeur de lescalier (voir
5Outline with lime the width of thestairway, on the oor (see exact
-
8/8/2019 Manual 1.2 French English SpPlans
86/220
les mesures exactes sur les plans
de la structure et de construction
E-03, A-101 et A-102). Coupezdu contreplaqu pour former la
paroi sous lescalier. Utilisez le
mur construit prcdemment
comme limite. Supportez cette
structure avec des poteaux en
bois.
dimensions on structural and
construction plans E-03; A-101
and A-102). Cut plywood to formthe bottom edge of the stairs. Use
previously constructed walls as
limits. Support that structure off of
hte ground with wood studs.
Fixez des traverses horizontales
en bois au mur, aux colonnes
et aux poteaux verticaux pour
renforcer la structure du coffrage
qui supportera la dalle de btonoblique qui sera coule.
6
7
Fix horizontal wood walers to the
wall, columns and vertical studs to
reinforce the formwork structure
that will support the concrete
inclined slab that will be cast.
GIRDERS AND BEAMSSTRUCTURE
ALe treillis suprieur et infrieur
est fabriqu avec des barres de
9Upper and lower meshreinforcements are assembled by
l i 8 d10 di
-
8/8/2019 Manual 1.2 French English SpPlans
87/220
5
8 mm et 10 mm de diamtre qui
sont coupes, plies et places
de la faon et avec la longueurindiques dans le plan E-03.
placing 8 mm. and 10 mm. diameter
rebar that is cut, bent, and placed in
the manner and length indicated inplan E-03.
10 Une fois que les treillis pour le
palier et pour la dalle obliquesont assembls, placez-les sur
les cales de bton lintrieur du
coffrage.
Once the mesh for both the landing
and the inclined slab are assembled,place them on the concrete plates
inside the formwork.
The reinforcement truss previously
described (A) must be properly tied
with wire to the loose rebar (B) that
11Larmature dcrite prcdemment
(A) doit tre correctement xe
avec du l mtallique aux barresA B
HOUSING PROTOTYPE CONSTRUCTION MANUALMANUEL DE CONSTRUCTION DUNE MAISON PROTOTYPE
13Sur le ct extrieur de lescalier,
placez deux sries de fers en
Along the outer side of the stair,
place two steel dowel tiers (8 mm.
-
8/8/201