Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the...
-
Upload
tania-shelby -
Category
Documents
-
view
213 -
download
0
Transcript of Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the...
![Page 1: Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b66fd550346d31b8b5b3a/html5/thumbnails/1.jpg)
Mantychore Nov 2010WP 7
Andrew Mackarel
![Page 2: Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b66fd550346d31b8b5b3a/html5/thumbnails/2.jpg)
Scope of WP 7
• MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which eventually check the viability of the movement of services (virtual machines (VMs and applications) using flexible device configuration utilities such as Infrastructure as a Service and Bandwidth on Demand solutions.
• Perform the integration between GSN and MANTYCHORE (physical integration between the GSN and the NRENs infrastructure and also the services integration).
![Page 3: Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b66fd550346d31b8b5b3a/html5/thumbnails/3.jpg)
GSN Node & Network
GSN / Mantychore Integration team meetings active focusing on• Test Case Generation• Solution Integration requirements and benefits analysis• Training
![Page 4: Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b66fd550346d31b8b5b3a/html5/thumbnails/4.jpg)
Backup Slides
![Page 5: Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b66fd550346d31b8b5b3a/html5/thumbnails/5.jpg)
IBBT GSN Node
![Page 6: Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b66fd550346d31b8b5b3a/html5/thumbnails/6.jpg)
i2CAT GSN Green Nodei2CAT Rural Node Plan:
• Rural location• Connectivity via a
radiofrequency link.
• Solar Panel setup• Capacity: 2000W
• Dual switch / Power Device Unit configuration
• Green Power for experimentation
• Regular grid for maintenance and operation
![Page 7: Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b66fd550346d31b8b5b3a/html5/thumbnails/7.jpg)
GSN Sept 2010 Demo