manpower planning and allocation
-
Upload
jigyasamiddha -
Category
Documents
-
view
274 -
download
0
Transcript of manpower planning and allocation
-
7/30/2019 manpower planning and allocation
1/18
SUMMER INTERNSHIP AT
ON MANPOWER PLANNING ANDALLOCATION
-
7/30/2019 manpower planning and allocation
2/18
OBJECTIVE
(WHAT I WAS SUPPOSED TO DO !)
To had an Industrial/Corporate exposure
To imply practically what has been learnt from the
books yet
To gain the most of it And a lot more
-
7/30/2019 manpower planning and allocation
3/18
WHAT I DID !
Got the Topic
Set my objectives
Considered the environment
Observed their working Learnt
Surveyed
Analyzed
Interpreted Kept my suggestions
Proved Helpful
Gained
-
7/30/2019 manpower planning and allocation
4/18
TOPIC
PROCESS OF MANPOWER PLANNING ANDALLOCATION
(IN A MANUFACTURING CONCERN)
Manpower = the working class, consists of:
NTTF
Layam
UOU
Casuals
-
7/30/2019 manpower planning and allocation
5/18
OBJECTIVES
Affect of demand on RPD(Rate Per Day)
RPDs affect on allocation of manpower.
Reasons of gap between IED and other Departments.
For the fulfillment of same there was a need of
Considering the Environment
For the environment observation, interaction with IED
was done.
-
7/30/2019 manpower planning and allocation
6/18
ABOUT ASHOK LEYLAND
Founded in 1948, Raghunandan Saran, Public Company
Headquarters: Chennai, Tamil Nadu, India
Parent Company: Hinduja Group
Its a manufacturing concern that manufactures different
kinds of vehicles in its different Plants
-
7/30/2019 manpower planning and allocation
7/18
7 Plants in different areas of India- Chennai, Hosur(3units), Alwar, Bhandar, Pantnagar
Divided into 4 units- Chassis, Engine, Cab BU, CWP
& Axle.
Has 4 Types of workforce- NTTF, UOU, Layam and
Casuals.
-
7/30/2019 manpower planning and allocation
8/18
OBSERVATION
The working of HR
The workplace environment
Visited ALs shops
Secondary data was utilized
-
7/30/2019 manpower planning and allocation
9/18
LEARNING
How to prepare Organizational Charts
Process of calculation of Manpower
Reasons of gap that arise between the departments
due to the variations between supplied manpower
and actual manpower
-
7/30/2019 manpower planning and allocation
10/18
TOOL USED IN THE LEARNING
MOST: Maynard Operation Sequence Technique
In this technique, a pre-determined motion study is done,
that sets a standard time for workers.
Basically, a task is broken into individual motion
elements and each is assigned a numerical units.
-
7/30/2019 manpower planning and allocation
11/18
No. of trucks to be produced in a day = 100
Work time = 8 Hrs, i.e. 480 mins.
Total Time = 480/100 = 4.8 min,
This 4.8 min. means in every 4.8 mins end of the previous
work and starting the new work, in simple words, it means
every operator has to work for 4.8 mins. maximum on the
same stage after this, his work will restart from the same
stage for the same time and vehicle will be passing fromhis stage to the another, as his output will be now input for
the next stage.
-
7/30/2019 manpower planning and allocation
12/18
SURVEY
A survey was conducted to continue with the further work,based on the following Research Methodology.
Data Source: Primary and Secondary DataResearch Approach: Survey
Research Instrument: Questionnaire
Sampling Scheme: Quota Sampling
Approach: Direct
Sample Size: 20Strategy Adopted: Exploratory
-
7/30/2019 manpower planning and allocation
13/18
FINDINGS
Variations exists between the actual and supplied
manpower.
IEDs calculations were not wrong, reasons were theworkplace behavior of workforce.
Absenteeism.
MOST is acceptable.
Supervisors suggested for increasing the time period
of stay of the casuals in the Plant.
-
7/30/2019 manpower planning and allocation
14/18
SUGGESTIONS
Superior-Subordinate relation should be manageable.
Requisition for requirement of manpower should be given
on time.
Casuals should be informed that if they come on regular
basis, they are provided with monetary benefits. Need of proper communication channel between HRD and
the other departments.
Need of Orientation programme for the workforce.
Classes of NTTF Associates on the working day should beminimized.
MOST is required to revise.
-
7/30/2019 manpower planning and allocation
15/18
HOW DID I PROVED MYSELF
HELPFUL THERE
Carried out the Gap analysis.
Suggested a Performa that was proved helpful.
Prepared organizational charts for them as per their
requirement.
http://c/Users/shivang/Desktop/performa.docxhttp://c/Users/shivang/Desktop/ORG.%20charts.xlsxhttp://c/Users/shivang/Desktop/ORG.%20charts.xlsxhttp://c/Users/shivang/Desktop/performa.docx -
7/30/2019 manpower planning and allocation
16/18
GAINING
Learnt how to work sensibly in recession.
How sensitive issues are taken care of.
Effective manpower planning is cost-effective
Importance of Organizational charts
-
7/30/2019 manpower planning and allocation
17/18
QUERRIES..??
-
7/30/2019 manpower planning and allocation
18/18
THANK YOU..!