Transcript of Mancini

RI-COSTUIRE L'INVOLUCRO 9 APRILE 2014

ENGINEERING ARCHITECTUREwww.for-arch.com

EDIFICIO ALTOTERZIARIO

620 € / mq SLP

PALAZZO REGIONE FUKSAS

23 %

> 50.000 mq SLP

CLASSE AITACA

EDIFICIO TERZIARIO

242 € / mq SLP

EDIFICIO OROMILANO

FIERA

16 %

< 50.000 mq SLP

CLASSE A ALTA

EDIFICIO BASSOTERZIARIO

340 € / mq SLP

LAVAZZA HEADQUARTERS

TORINO

21 %

< 50.000 mq SLP

CLASSE ALEED

CONDOMINIORESIDENZA

420 € / mq SLP

BRESCIAEX COMPARTO

MILANO

32 %

< 5.000 mq SLP

CLASSE A

CASA UNIFAMILIARE

240 € / mq SLP

CASA FIGLIA SIGNORAPAUTASSO

24 %

< 200 mq SLP

CLASSE A

COSTO DELL'INVOLUCROIncidenza percentuale del costo sul totale per la costruzione (escluse coperure e solai contro terra)

* *

ENGINEERING ARCHITECTUREwww.for-arch.com

TOURBIOCLIMATIQUE

Roberto Mancini

ENGINEERING ARCHITECTUREwww.for-arch.com

TOUR BIOCLIMATIQUESi parla forse di involucro ?

ENGINEERING ARCHITECTUREwww.for-arch.com

Canali impiantistici, analoghi ai canali proteici della cellula, di

collegamento tra ambiente esterno ed ambiente interno

London Imax (Fonte: fotografia dell’autore)

ANALOGIA (OVVIA) CON LA MEMBRANA CELLULAREPiù o meno parliamo della stessa cosa, più o meno le regole sono quelle

ENGINEERING ARCHITECTUREwww.for-arch.com

PELLE DECORATA E ISPIRAZIONEDa Paco Rabanne a Future System: la dimensione creativa e simbolica

ENGINEERING ARCHITECTUREwww.for-arch.com

LA DIMENSIONE PRESTAZIONALE: PER ORA TUTTO BENEMa questo è solo un aspetto della sostenibilità

ENGINEERING ARCHITECTUREwww.for-arch.com

SE ESALTSSIMO LE PRESTAZIONI ?Senza dimenticare il valore estetico

ENGINEERING ARCHITECTUREwww.for-arch.com

E SE INVECE TRASCURASSIMOIL VALORE ESTETICO ?Ecco una vera "integrazione" dei pannelli fotovoltaici nella casa spaziale

ENGINEERING ARCHITECTUREwww.for-arch.com

PITTURA DECORAZIONE PELLE PROTEZIONEAd un certo punto, qualcuno ci racconta che c'è un supporto strutturale ed un rivestimento 1860

ENGINEERING ARCHITECTUREwww.for-arch.com

DYNAMIC SOLAR SHADING & GLARE CONTROLIl Velarium dell'Amphitheatrum nei secoli passati

ENGINEERING ARCHITECTUREwww.for-arch.com

LUOGO DI TRANSIZIONECosa diverrebbe l'interno se non vi fosse un esterno ?

ENGINEERING ARCHITECTUREwww.for-arch.com

MA QUANTE PRESTAZIONI?L'involucro fa quasi tutto

ENGINEERING ARCHITECTUREwww.for-arch.com

SILENT EX PLOSIONSNorvegian artist Espen Dietrichson levitates architecture

Non possiamo più pensarlo "staccato" e "vuoto"

ENGINEERING ARCHITECTUREwww.for-arch.com

PROGETTAREPer chi sono questi disegni complicati ?

ENGINEERING ARCHITECTUREwww.for-arch.com

STRUMENTI PER COMPRENDERE L'ESTERNO E L'INTERNOQuali competenze? Quante risorse?

ENGINEERING ARCHITECTUREwww.for-arch.com

STRUMENTI PER PRE-VALUTARENon abbiamo più scuse (e purtroppo non siamo Mies)

ENGINEERING ARCHITECTUREwww.for-arch.com

STRUMENTI PER CONVINCEREComunicazione e semplificazione del progetto

ENGINEERING ARCHITECTUREwww.for-arch.com

STRUMENTI PER SEMPLIFICARE COORDINAREbim bum bam? Hai 13.000 € da investire ?

ENGINEERING ARCHITECTUREwww.for-arch.com

PROGETTARE OGGI E' PIU FACILE DI IERIAlemno si è quasi sicuri di quello che si costruirà

ENGINEERING ARCHITECTUREwww.for-arch.com

PROGETTARE I DUE LATILa vivibilità degli spazi interni, la percezione del colore, la permeabilità ottica

ENGINEERING ARCHITECTUREwww.for-arch.com

RI-PROGETTAREJavist Convention Center: un caso al limite

ENGINEERING ARCHITECTUREwww.for-arch.com

RIPROGETTARE L'INVOLUCROMolti casi di recladding

ENGINEERING ARCHITECTUREwww.for-arch.com

1. The looming requirement for facade retrofit should be regarded as a fundamental infrastructure problem; energy efficiency and carbon reduction goals cannot be achieved without addressing this problem. 2. Meeting the demand will be costly and complex, with a high potential for the process being wasteful. 3. There is urgent need for defining appropriate retrofit strategies, evaluation criteria for their application, and the definition of means and methods for the implementation of the various strategies, possibly taking the form of best-practice guidelines for the various stakeholders. 4. Design practices for new facades that anticipate and accommodate the eventual need for retrofit could facilitate future retrofit requirements. Facade systems should be designed to facilitate the retrofitting of new materials and technology as developments occur. 5. Sustainable facade retrofit practices must be developed; a focus on material reuse is imperative to avoid filling landfills with discarded facade materials, particularly glass. 6. New architectural glass recycling (not down-cycling) technologies are needed. 7. Advanced facade solutions using raw float glass should be pursued because of the uncompromised material life and the potential for easy recycling. Double-skin strategies may accommodate this in certain applications. 8. Costing models that factor in the environmental cost of damaging construction practices and the true cost of energy are urgently needed to correct inaccurate perceptions of long payback periods for energy efficient technology.

FACADE RETROFITLine guides for beginners

ENGINEERING ARCHITECTUREwww.for-arch.com

PROGETTARE PER IL RETROFITTINGRMIT BUILDING MELBOURN

ENGINEERING ARCHITECTUREwww.for-arch.com

MA SIETE SICURI ?

ENGINEERING ARCHITECTUREwww.for-arch.com

LESSON NUMBER 2Come lo tengo pulito ?

ENGINEERING ARCHITECTUREwww.for-arch.com

SONO ALL'ALTEZZA ?

ENGINEERING ARCHITECTUREwww.for-arch.com

VETROCAMERA ESTERNO

10 10 .4 + 16 + 10_ Stratificato Extrachiaro temprato (serigrafia in faccia lastra sud)_ Extrachiaro temprato StopRay Vision 60T_ 16 intercapedine aria_ 10 Monolitico extrachiaro temprato

CAMBIO GENERAZIONALE, CERTO, MA ANCHE COMPETENZAIl dialogo seve anche qui

ENGINEERING ARCHITECTUREwww.for-arch.com

"This section addresses the mitigation of explosion effects on the exterior envelope of a new building designed to meet federal anti-terrorist design requirements." ..........

SAFETY & SECURITYCi dobbiamo difendere dagli aerei e dai terroristi (stranieri)

ENGINEERING ARCHITECTUREwww.for-arch.com

NUOVI MATERIALI, RICERCA, DOMANI E' UN GIORNO NUOVOMa come possiamo essere aggiornati?

NESOCELL

ENGINEERING ARCHITECTUREwww.for-arch.com

EGCOBOXE il ponte termico non c'è più

ENGINEERING ARCHITECTUREwww.for-arch.com

Building Enclosure Commissioning (BECx) is a quality-oriented process to enhance the delivery of a new building or the retro-fit of an existing building in accordance with the Owner’s Project Requirements (OPR). The process includes tasks to achieve, verify, and document that the enclosure design and construction meets the expectations of the Owner and the performance criteria identified in the Construction Documents (CDs). The BECx process is comprised of numerous tasks and is performed during the standard phases of a project: Pre-Design, Design, Construction, and Occupancy. The primary tasks include:• Establishing a well-defined OPR and BECx Plan• Verifying that the details and specifications meet the OPR through careful design reviews of the CDs performed by a party knowledgeable in the detailing, performance, and construction practices/installation of building enclosures• Developing a building enclosure specification for inclusion in Division 1 of the Project Manual, inclusive of project specific field testing• Reviewing construction phase submittals and developing project-specific checklists• Laboratory or field mock-up of building enclosure and testing to validate performance• Periodic or ”milestone” observing, documenting and reporting of work during construction for compliance with CDs• Testing of assemblies throughout construction to validate performance• Report for the building enclosure “close-out”• Facility personnel training related to building enclosure operation and maintenance

LESSON NUMBER 1The Enclosure Commissioning (BECX)

ENGINEERING ARCHITECTUREwww.for-arch.com

GREENPIXUn esempio di metodo: Zero Energy Media Wall Beijing

ENGINEERING ARCHITECTUREwww.for-arch.com

ENGINEERING ARCHITECTUREwww.for-arch.com

2292 LEDLARGE SCALE LOW RESOLUTION

ENGINEERING ARCHITECTUREwww.for-arch.com

ENGINEERING ARCHITECTUREwww.for-arch.com

ENGINEERING ARCHITECTUREwww.for-arch.com

BUDGET & TEMPILa definizione delle strategie

ENGINEERING ARCHITECTUREwww.for-arch.com

BUDGET & TEMPIMa si risparmia davvero? A che prezzo?

Edificio campione S7V 0 =,25 Zona D 1455 GG (Roma)Superficie Mq 100 netti

ENGINEERING ARCHITECTUREwww.for-arch.com

COMUNE DI MILANO

Riduzione degli oneri di urbanizzazione Commerciale

Zona climatica E

Gradi giorno (GG) 2404

Superficie riscaldata dell'involucro tipo [S] 1200

Volume lordo riscaldato tipo [V] 2400

Fattore di forma [S/V] 0,5000

Valore limite di fabbisogno annuo di energia 16,95

Classi energetiche EPh % sconto su

oneri di OOUU

classe A+ 0<Eph<3 kWh/m3a 2 30,00%

classe A 3≤Eph<6 kWh/m3a 3 30,00%

4 30,00%

5 30,00%

classe B 6≤Eph<11 kWh/m3a 6 30,00%

9 30,00%

10 27,15%

classe C 11≤Eph<27 kWh/m3a 11 22,94%

13 14,51%

16 5,94%

17 0,00%

COMUNE DI MILANO

Riduzione degli oneri di urbanizzazione Commerciale

Zona climatica E

Gradi giorno (GG) 2404

Superficie riscaldata dell'involucro tipo [S] 1200

Volume lordo riscaldato tipo [V] 2400

Fattore di forma [S/V] 0,5000

Valore limite di fabbisogno annuo di energia 16,95

Classi energetiche EPh % sconto su

oneri di OOUU

classe A+ 0<Eph<3 kWh/m3a 2 30,00%

classe A 3≤Eph<6 kWh/m3a 3 30,00%

4 30,00%

5 30,00%

classe B 6≤Eph<11 kWh/m3a 6 30,00%

9 30,00%

10 27,15%

classe C 11≤Eph<27 kWh/m3a 11 22,94%

13 14,51%

16 5,94%

17 0,00%

LE ANALISI DI OPPORTUNITA'Costi VS Risparmi

ENGINEERING ARCHITECTUREwww.for-arch.com

1- Vetrata per residenziale standard

PERFORMANCE

Ug = 1,4 W/(mq.k)

Acustic = 35 Db

Solar Factor = 60

Selettività =1,3

VOCE €/mq

VETRO ESTERNO 4

VETRO INTERNO 14

TAGLIO E MOLATURA 10

SIGILLATURA IN VETRATA 26

CANALINO 2

GAS – aria 100% 0

SFRIDO E altri costi 8

COSTO TOTALE 64

STRUTTURA

Vetro esterno 4mm

Camera 16mm Aria

Vetro interno Low-E di sicurezza

ENGINEERING ARCHITECTUREwww.for-arch.com

2- Vetrata per residenziale selettiva acustica

PERFORMANCE

Ug = 1,0 W/(mq.k)

Acustic = 50 Db

Solar Factor = 50

Selettività =1,6

VOCE €/mq

VETRO ESTERNO 18

VETRO INTERNO 8

TAGLIO E MOLATURA 10

SIGILLATURA IN VETRATA 26

CANALINO 2

GAS – argon 90% 3

SFRIDO E altri costi 10

COSTO TOTALE 77

STRUTTURA

Vetro esterno selettivo 66mm

Camera 20 mm Argon

Vetro interno 44 acustico

ENGINEERING ARCHITECTUREwww.for-arch.com

3- Vetrata ad alto protezione solare

PERFORMANCE

Ug = 1,0 W/(mq.k)

Acustic = 45 Db

Solar Factor = 20

Selettività =1,6

VOCE €/mq

VETRO ESTERNO 25

VETRO INTERNO 8

TAGLIO E MOLATURA 10

SIGILLATURA IN VETRATA 26

CANALINO 2

GAS – argon 90% 3

SFRIDO E altri costi 10

Tempra 8 mm 16

COSTO TOTALE 100

STRUTTURA

Vetro esterno 8mm selettivo temp

Camera 16mm Aria

Vetro interno di sicurezza

ENGINEERING ARCHITECTUREwww.for-arch.com

4- Vetrata super-selettiva (3Ag)

PERFORMANCE

Ug = 1,0 W/(mq.k)

Acustic = 45 Db

Solar Factor = 25

Selettività =2,1

VOCE €/mq

VETRO ESTERNO 40

VETRO INTERNO 8

TAGLIO E MOLATURA 10

SIGILLATURA IN VETRATA 26

CANALINO 2

GAS – argon 90% 3

SFRIDO E altri costi 15

COSTO TOTALE 104

STRUTTURA

Vetro esterno Ultra 44mm

Camera 16mm Argon 90%

Vetro interno di sicurezza

ENGINEERING ARCHITECTUREwww.for-arch.com

5- Vetrata Tripla

PERFORMANCE

Ug = 0,5 W/(mq.k)

Acustic = 42 Db

Solar Factor = 40

Selettività =1,7

VOCE €/mq

VETRO ESTERNO 16

VETRO INTERNO 16

TAGLIO E MOLATURA 15

SIGILL. IN doppia VETRATA 35

CANALINI 4

GAS – argon 5

SFRIDO E altri costi 15

Vetro centrale Temprato 10

COSTO TOTALE 116

STRUTTURA

Vetro esterno selettivo 55mm

Camera 16mm Argon90%

Vetro intermedio temprato 6mm

Camera 16mm Argon90%

Vetro interno Low-E di sicurezza

ENGINEERING ARCHITECTUREwww.for-arch.com

6- Vetrata con trasformazioni speciali

PERFORMANCE

Ug = 1,0 W/(mq.k)

Acustic = 42 Db

Solar Factor = 20

Selettività =1,8

VOCE €/mq

VETRO ESTERNO 30

VETRO INTERNO 10

TAGLIO E MOLATURA 10

SIGILLATURA IN VETRATA 26

CANALINO 2

GAS – argon 90% 3

SFRIDO E altri costi 8

Tempra 20

Serigrafia 15

COSTO TOTALE 124

STRUTTURA

Vetro esterno 10mm selettivo

temprato

Camera 16mm Aria

Vetro interno di sicurezza

ENGINEERING ARCHITECTUREwww.for-arch.com

Veruschka, Poncho by John Paol Goebel, 1966

INVOLUCRO IN CLASSE A+ E RISCALDAMENTO A CIPPATOOra sappiamo come organizzarci