Manchester Christmas Meeting 2006 OPAL ATLAS –Trigger system commissioning –Trigger...

16
Manchester Christmas Meeting 2006 Manchester Christmas Meeting 2006 OPAL ATLAS – Trigger system commissioning – Trigger configuration – Trigger information in all data formats/DB – Trigger analysis tools – Top physics analysis – Large scale testing of HLT farms on the Grid – Our group effort in trigger and physics analysis Jet algorithm studies at the Tevatron/LHC (M. Wobisch) Thorsten Wengler Manchester, 21 Dec 06

Transcript of Manchester Christmas Meeting 2006 OPAL ATLAS –Trigger system commissioning –Trigger...

Manchester Christmas Meeting 2006Manchester Christmas Meeting 2006

• OPAL

• ATLAS– Trigger system commissioning– Trigger configuration– Trigger information in all data formats/DB– Trigger analysis tools– Top physics analysis– Large scale testing of HLT farms on the Grid– Our group effort in trigger and physics analysis

• Jet algorithm studies at the Tevatron/LHC (M. Wobisch)

• SUSY in e collisions at the LC (A. Oh, A. De Roeck)

Thorsten WenglerManchester, 21 Dec 06

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 2

Trigger CommissioningTrigger Commissioning

The ATLAS Trigger/DAQ project:

T.W.

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 3

Cosmic data taking 18./19. Nov 2006, toroid field on

We have built the first complete trigger chain in the pit …We have built the first complete trigger chain in the pit …

• … and taken data, e.g. here with field on!– Final trigger electronics– Using central trigger logic

and timing signals

• Also integration with HLT has started

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 4

Installation is far from finished …Installation is far from finished …

• First out of 6 big wheels installed– Fully equipped with trigger

electronics– Access and testing in the pit

are a nightm… challenge!– First wheel took 6 month to

install– Time for remaining wheels is

… 6 month.

• Calorimeter trigger installation going on …

TGC detectors with on-detectortrigger electronics in cavern

…a person

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 5

With Simon

Trigger configurationTrigger configuration

Working on main interface to operate the trigger online

– Java GUI– DB structure– Data handling offline– Just had major review

Assignment of trigger thersholds to input cable lines

Master view of Lvl1 configuration

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 6

How to analyse trigger data in ATLAS + …How to analyse trigger data in ATLAS + …

CERN-ATL-COM-DAQ-2006-044

– With J. Haller, A. Hoecker, J. Stelzer

– What trigger data is needed to account for the trigger in analysis

– Where is it stored

– How is it accessed

– How does it fit into the picture of how we will do analysis in ATLAS

ATLAS reference paper

– Editor of TDAQ/Lvl1 section

– To be submitted by ~June ‘07

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 7

Next round of ATLAS physics notes (CSC)Next round of ATLAS physics notes (CSC)

• Development of trigger analysis tools– With Simon, A. Krazsnahorkay, D.

Berge– Now used ATLAS wide– Main editor for note on triggering

top events (Spring ‘07)

• Analysis of top events– Trigger studies (above + Un-ki,

Jenna, [Jiri])– Top cross section– Include top properties with help

from Christian

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 8

Full dummy slice 64 nodes

Full dummy slice ~10 nodes

77 node LVL2 system ran 48hrs

Manchester GRID Tier 2 cluster as ATLAS HLT test siteManchester GRID Tier 2 cluster as ATLAS HLT test site

With A. Forti, S. Wheeler, H. Garitaonandia

• Up to 900 nodes• Large system on short notice• Regular release testing

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 9

Our group effort in trigger and physics analysisOur group effort in trigger and physics analysis

• Resources needed (minimum)– Enough people to make an impact and establish the group as the

experts in one or more areas, say a 50% involvement of• 3 or more academic and research staff• 2 or more postdocs• 3-4 or more students

– Money for local computing equipment and travel

From last year’s Christmas meetingTrigger:• James, Paul B., [Jiri] - HLT running/monitoring• Simon, Thorsten - configuration

… not (yet) counting FP420/diffractive here.

Analysis (including trigger studies):• Paul B. - QGC• Jenna, Fred, Simon, Thorsten, Un-ki, (Christian), (Paul M.) - top x-section,

properties, top to charged Higgs, … Joe - MC verification• [Jiri] - jet physics (QCD?/top?)• Steve, Paul M. - magnetic field mapping, ID alignment

o.k.o.k.

-1(2)

Backup SlidesBackup Slides

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 11

We have built the first complete trigger chain in the pit …We have built the first complete trigger chain in the pit …

CalorimetersCalorimetersCalorimetersCalorimeters

Calorimeter Trigger

Calorimeter Trigger

RPC DetectorsRPC DetectorsRPC DetectorsRPC Detectors TGC DetectorsTGC DetectorsTGC DetectorsTGC Detectors

Central TriggerCentral Trigger

ProcessorProcessor

Central TriggerCentral Trigger

ProcessorProcessor

LTP(I) /BUSYLTP(I) /BUSY

TTCTTC

LTP(I) /BUSYLTP(I) /BUSY

TTCTTC

RPC muon TriggerRPC muon Trigger TGC muon TriggerTGC muon TriggerTGC muon TriggerTGC muon Trigger

Mu-CTPMu-CTP Interface InterfaceMu-CTPMu-CTP Interface Interface

Front-endsFront-endsFront-endsFront-ends Lvl2 TriggerLvl2 TriggerLvl2 TriggerLvl2 Trigger

RoIs

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 12

ATLAS PIT, Jura side, 17 Dec 2006ATLAS PIT, Jura side, 17 Dec 2006

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 13

Linear collider studies: SUSYLinear collider studies: SUSY

Assume and discovered at s = 1TeV LC, but > 1/2 s can use e collisions with polarized photons to extend range

Will hopefully still lead to a paper.

QuickTime™ and aPhoto - JPEG decompressor

are needed to see this picture.QuickTime™ and a

Photo - JPEG decompress orare needed to see this pic ture.

QuickTime™ and aPhoto - JPEG decompress or

are needed to see this pic ture.

QuickTime™ and aPhoto - JPEG decompressor

are needed to see this picture.

Barger, Han, Kelly, hep-ph/9709366

Sherpa + TESLA Simdet 4 Det.-Sim.

A.DeRoeck, A.Oh, T.W. Mo = 500 GeV, P=+1

Mo = 700 GeV, P=+1ECFA@ Durham’04

pe vs. cos(e)

…etc

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 14

Manchester Tier2 Grid Cluster for ATLAS HLT testsManchester Tier2 Grid Cluster for ATLAS HLT tests

• Aim: Provision of Manchester Tier2 GRID cluster as a medium to large scale TDAQ testbed facility of up to 900 nodes, available at short notice (~one week)

• Use: HLT testing; regular large scale multi-node testing (e.g. nightlies)

• Immediate plans: consolidation and further testing of grid tools; user documentation

• Regular maintenance: Track pre-series releases; regular running of a full partition; regular reports to this(?) meeting

• Longer term: debugging of TDAQ configurations and configuration database generation tools, HLT testing (algorithms) etc.

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 15

StatusStatus

• grid-tdaq-tools have been developed– reserve nodes; provide list of reserved nodes (input to other

tools)– start pmg agents– log collection– log cleanup– kill processes– debug tools

• Image from point1 installed; can run independently (without further modification)– tdaq-01-04-01 – tdaq-01-06-01

• Will be usable by anyone with a valid GRID certificate (and who is a member of the ATLAS VO)

T. Wengler Xmas meeting, Manchester, 21 Dec 2006 16

Technical spec on Manchester Tier-2Technical spec on Manchester Tier-2

• 1000 nodes (100 for engineers only)• Currently split in 2 separate clusters (different s/w areas)• Gb/s interfaces connected to 1 Gb/s rack switches; each

rack switchgroups 20 machines and is connected to a top level 10Gb/s cisco switch

• 2.8 GHz dual-cpu (Intel)• OS SL3.0.4• 4 GB of memory per node• 500 GB disk per node• http://www.gridpp.ac.uk/northgrid/manchester/• http://www.gridpp.ac.uk/wiki/Manchester_(10_Questions)