Managing the tail end production - Lift EG… · Non-Deal Roadshow Presentation 2 Abu Dhabi...
Transcript of Managing the tail end production - Lift EG… · Non-Deal Roadshow Presentation 2 Abu Dhabi...
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Managing the tail end production
Hans Kol – Manager Oil and Gas – TAQA Energy B.V.
0 Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Content
• About TAQA
• TAQA’s Dutch assets
• Tail end gas production
• Base management
• Future needs for tail end gas production
1 Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com 2
Abu Dhabi National Energy Company PJSC (TAQA)
• 72.5% owned by Abu Dhabi Government
• Listed on ADX (Abu Dhabi Securities Exchange)
• USD 32 billion energy business portfolio across the value chain
• Strategic focus on:
1) Oil & Gas: 135 MBOE/D, and
2) Power & Water - 6th largest independent power producer in the world
• Geographically diversified: North America, Europe, Middle East, North Africa and India
2 Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com 3 3
TAQA in the Netherlands:
Gas Storage and Pipelines:
• Bergermeer Gas Storage
- Max. Prod Capacity: 57 MMCM/D
- Working volume: 4,100 MMCM
• Alkmaar Peak Gas Installation
- Withdrawal Capacity: 36 MMCM/D
- Working volume: 500 MMCM
- Operational since: 1997
- 100% availability
• Rotterdam P18-A CO2 storage project
• Significant interests in NGT and Q1 pipelines
Exploration and Production:
• Operating production facilities for over 30 years
• P15, P18, L11-B en Bergen oil and gas production facilities
• Investment partner in more than 20 oil and gas fields
Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
19
72
19
74
19
76
19
78
19
80
19
82
19
84
19
86
19
88
19
90
19
92
19
94
19
96
19
98
20
00
20
02
20
04
20
06
20
08
20
10
20
12
20
14
20
16
20
18
20
20
Year
ly p
rod
uce
d V
olu
me,
BC
M
TQAQ Energy Gas Production - Onshore Bergen Concession
Starnmeer P
Schermer R
Schermer P
Groet-Oost
Groet
Bergen BU
Bergen R
Boekel
Bergermeer
Alkmaar
TAQA Energy Oil and Gas Onshore Bergen Concession
4
. Alkmaar
Tip of the tail
Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
20
20
Year
ly p
rod
uce
d V
olu
me,
BC
M
TQAQ Energy Gas Production - Offshore P15 & P18 Blocks
P18-6
P18-4
P18-2
P15-17
P15-16
P15-15
P15-14
P15-13
P15-12
P15-11
P15-10
P15-9
TAQA Energy Oil and Gas Offshore P15-18 Concession
5
. Den Haag
Tip of the tail
Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Tail end gas production Issues
• Increase in well problems
• Inefficient well designs
• Inefficient surface facilities
• Integrity concerns
• Most of these problems are caused by liquids dropping out in the wellbore due to gas velocity dropping below critical flowrate in all or part of the well.
6 Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Netherlands Deliquification Potential
7
EBN 2010 about potential of solving GWD:
- Offshore: 6 - 11 BCM (risked) reserves in 2020
- Onshore: 5 - 8 BCM (risked) reserves in 2020
Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Tail end gas production
8
• Reduce DPE
• Reduce G&A expenses
• Maintain production
Focus on revenues means:
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
201
0
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
202
0
Year
ly p
rod
uce
d V
olu
me,
BC
M
TQAQ Energy Gas Production - Offshore P15 & P18 Blocks
P18-6
P18-4
P18-2
P15-17
P15-16
P15-15
P15-14
P15-13
P15-12
P15-11
P15-10
P15-9Production driven
Revenue driven
Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Production – Base Management Excellence
9
Mapping the asset What do we have?
How do we run it?
What are the cash flow elements?
Opportunity
Identification
&
Evaluation IPSC, production, cashflow
Execution Safety
Measurement
&
Learning Results reporting
Data storage
Technical:
• Well performance: Barrel Chasing wellwork opportunities deliquification
• Plant and process performance: suction pressure
• Maintenance: good maintenance prevents replacement
Commercial:
• “As produced contracts”
• Supplier & contract efficiency
• Operational cost reductions.
Gas Well Deliquification Conference, Groningen, 25 Sept. 2012
A continuous effort to optimize the system:
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
TAIL END GAS PRODUCTION Requirements • Knowledge
Understanding the wells, i.e. good data and competent people
• Appropriate safety standards for low pressure wells
• Breakthrough in implementation of existing technologies
• Affordable technology
10 Gas Well Deliquification Conference, Groningen, 25 Sept. 2012