Managing Project Risk

13
Using Web-based Applications to Capture Rich As-built Data During Construction Johan Smet Geospatial World Forum 2013

description

Using Web-based Applications to Capture Rich As-built Data During Construction Johan Smet Geospatial World Forum 2013. Managing Project Risk. Quality. Cost. Schedule. Safety. Liability. The Basics: Field Productivity. Guiding tools with millimeter accuracy. Highly increased efficiency - PowerPoint PPT Presentation

Transcript of Managing Project Risk

Page 1: Managing Project Risk

Using Web-based Applicationsto Capture Rich As-built Data

During Construction

Johan SmetGeospatial World Forum 2013

Page 2: Managing Project Risk

Managing Project Risk

Quality

Cost

Safety

Schedule

Liability

Page 3: Managing Project Risk

The Basics: Field Productivity

z

• Highly increased efficiency• 11% materials savings• +30-70% machine productivity• 43% fuel savings• 50% rework reduction• 30% Project cost reduction

• Improved Safety• Reduced environmental

impact

• Guiding tools with millimeter accuracy

Page 4: Managing Project Risk

Connecting the Site

Page 5: Managing Project Risk

Connecting the Site

Page 6: Managing Project Risk

Utilization/ allocation

Alerts Maintenance

Real-time Asset Management

Page 7: Managing Project Risk

Connecting the Site

Page 8: Managing Project Risk

Connecting the Site

Page 9: Managing Project Risk

Coverage Elevation

map and profile Cut/fill Volumes

Real-time Progress Monitoring

Page 10: Managing Project Risk

Cycle times Load counts Haul distances Material moved Optimize!

Real-time Production Monitoring

Page 11: Managing Project Risk

Pass count Compaction

Value or Temp Lift thickness

Real-time Quality Monitoring

Page 12: Managing Project Risk

Quality

Cost

Safety

Schedule

Liability

Managing Project Risk• Optimizing asset allocation• Field task efficiency• Identifying and managing outliers• Fine-tuning production workflows

• Improving accuracy for all operators• “100% sampling”

• Consistent and predictable processes• Faster decisions, exception management

• Keeping people away from machines• Fewer working hours for the same output

• Permanent record

+ Visibility of the “One Truth”

Page 13: Managing Project Risk

Using Web-based Applicationsto Capture Rich As-built Data

During Construction

Johan SmetGeospatial World Forum 2013