Managing Performance
The experience of the World Bank Mauritania Country Office
![Page 2: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/2.jpg)
2Managing performance – The experience of the World Bank Mauritania Country Office
Initial observation: Four managerial concepts missing in Country Offices
– Responsibility (who does what?) Role of a country office (in many area, such as communication, mission management…)
– Selectivity / Trade offs The Bank is present in too many sectors - CAS don’t always play their role in selection process
– Performance Measurement (individual & collective) Lack of indicators in the Result Agreements
– Tracking of decisions: Low percentage of retreat reco implemented
![Page 3: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/3.jpg)
3Managing performance – The experience of the World Bank Mauritania Country Office
Solutions for these 4 missing concept used both for portfolio and internally
Our ResponseResponsibility: Business lines
Selectivity: Multi-criteria analysis tool / WPA & budget
Perf. Measurement: Perf. framework / Indicators/ Scorecard
Tracking: Improvement plans
Responsibilities
Improvement plan
Monitoring & Tracking
Results
Selectivity
EvaluationMeasure
Mission
1
2
3
4
![Page 4: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/4.jpg)
Business Lines
Collective & Individual Responsibilities
![Page 5: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/5.jpg)
5Managing performance – The experience of the World Bank Mauritania Country Office
Collective & Individual Responsibilities
The mission’s activities has been divided into 50 business lines and organized around 9 core functions
This distribution helps structure the activities of the country office and adapt the organization of the office in order to clarify who does what.
![Page 6: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/6.jpg)
6Managing performance – The experience of the World Bank Mauritania Country Office
9 Functions (groups of Business Lines)
1. Country strategy and data
2. Donors partnership
3. Portfolio management (core business)
4. Government assistance (other than projects)
5. Human resources
6. Working together
7. Resources management
8. Communication
9. Knowledge management
![Page 7: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/7.jpg)
7Managing performance – The experience of the World Bank Mauritania Country Office
Business lines questions non résolues
Idées et best practices (autres bureaux) (sous la
ligne)
Forces/ ………………………………. Opportunités (sous la ligne)
Faiblesses/ ……………………………….
Menaces (sous la ligne)
2.2 CAS
Motivation de l’équipe de la Bm Expérience de la Bm dans d’autres
pays pour des exercices similaires ………………………………..
Bon timing pour le CAS et CSLP 2 Implication des Lead Spécialists dans
le processus du CAS Exercice de scénario déjà engagé par le
PNUD Organisation de soirées thématiques
informelles lors des passages de spécialistes
Limitation des fonds IDA rend l’exercice un peu théorique
……………………………….. Risque d’un Core Team non permanent Processus participatif qui peut ralentir la
mise en œuvre Questions de certains partenaires sur la
pertinence d’élaborer des stratégies durant la période de transition
Results of the use of these functions & BL
Definition of a clear organizational structure and unambiguous responsibilities
Identification, after analysis of the dysfunctions, of indicators associated to each Business line.
– A SWOT analysis of each business line helps define the most appropriate indicators and an action plan. Process mapping has also been used for important BL
![Page 8: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/8.jpg)
WPA, budget & multi-criteria analysis
Selectivity
![Page 9: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/9.jpg)
9Managing performance – The experience of the World Bank Mauritania Country Office
Multi-criteria analysis tool
1. World Bank’s comparative advantage
2.
Secto
r’s
need
s
3. Relative weight
![Page 10: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/10.jpg)
10Managing performance – The experience of the World Bank Mauritania Country Office
![Page 11: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/11.jpg)
Performance measurement
Indicators & Scorecard
![Page 12: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/12.jpg)
12Managing performance – The experience of the World Bank Mauritania Country Office
Performance Measurement
Performance criteria are defined for each function, and indicators are defined for each criteria;
Indicators must measure inputs, process, outputs and results, in order to cover the entire range of activities of a function;
Indicators must be Specific, Measurable, Ambitious, Realistic and Timely (SMART);
Indicators are defined according to a mid-term objective, and re-defined if this objective is reached – and adapted to the problem being addressed;
Performance criteria are fixed; If possible, these indicators are compared (benchmarking) with
performances in other countries / offices.
![Page 13: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/13.jpg)
13Managing performance – The experience of the World Bank Mauritania Country Office
business lines indicateurs
stat
ut
30/0
6/05
stat
ut
30/0
6/06
stat
ut
31/0
8/06
stat
ut
30/0
9/20
06ta
rget
31/
12/0
6st
atu
t 31
/12/
06
1- S
trat
égie
d
ével
op
pem
ent
pay
s CSLP et besoins pays CSLP/CDMT compatibles 90%
Evaluation de la performance du pays# ateliers de restitution réalisés (CEM, PER, CPIA,…) avec les acteurs concernés
1
Harmonisation & coordination avec les partenaires
Amélioration indicateur de la déclaration de Paris N/A
CAS satisfaction des participants N/A
1- S
trat
égie
d
ével
op
pem
ent
pay
s
2-
Par
ten
aria
ts
bai
lleu
rs e
t C
AS
These performance measures lead to a quarterly analysis and to a discussion at the staff meetings
Internal Performance Measurement(extract of the internal scorecard)
![Page 14: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/14.jpg)
14Managing performance – The experience of the World Bank Mauritania Country Office
These performance measures lead to a quarterly assessment / analysis and to a quarterly discussion at the CPPR
Portfolio Performance Measurement(extract of the portfolio scorecard)
A.Résultats B.Alignement C. Risques D. Efficacité E. I ntégrité des données
A.1 DO
B.1 Coordination
B.2 Suivi-
évaluation
C.1 Nbre de flags
C.2 Projet à risques
D.1 IP D.2 Décais-
sements D.3 reco. D.4 DNO D.5 DRF Fiche Projet
PRISM2
PRISM2 PET
PNDSE
PNDSE Sup
MAP/SIDA
PASN
PDIAIM2
PDRC
PRECASP
PDU
GDLN
![Page 15: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/15.jpg)
Improvement plans
Tracking System
![Page 16: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/16.jpg)
16Managing performance – The experience of the World Bank Mauritania Country Office
Performance assessment allows to define corrective actions (recommendations) in the following cases:
– Poor performance– Recommendations implemented but not with expected results
In order to obtain results on the ground / performance in the office
Improvement plans
![Page 17: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/17.jpg)
17Managing performance – The experience of the World Bank Mauritania Country Office
Recommendations are listed and followed:– For the country office, in the form of a list of tasks, originating from
an action plan defined during the annual retreat and staff meetings
N TempsResp1
Resp2
Taskinitial
deadlineReport Notes / Remarques Catégorie
34 TD AN Manuels de procedures (org et AF) finalisés-4/7-Inserrer process map (Antoine) 07/31/05 08/20/06
Retransmis a AN et TD pour rajout welcome letter et eventuels autres outils - 5/15/2006 au 6/30/06 Apres retraite - 31/07 report au 20/08, TD et AN doivent lire et valider + inclure règles overtime + règles de transmission du courrier
Travailler ens.
44 10h AN BA Commande des étagères pour le filing 09/05/05 08/15/06 date 04/30/06 report au 15/5 (y inclus reception etagères) --8/15/2006 Travailler ens.
105 10h TD Mise en place du filing room 09/05/05 06/30/0631/3/06 travail en cours ---report a changer a tout moment - voir avec Thiane identification appui extérieur
Travailler ens.
Improvement plans(extract of the internal improvement plans)
![Page 18: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/18.jpg)
18Managing performance – The experience of the World Bank Mauritania Country Office
Improvement plans(extract of external improvement plans)
– For the portfolio, in the form of a recommendation tracking matrix, originating from the aide memoires.
Both tools are broadly shared with all actors involved, and provide information on deadlines and responsibilities I l n’y a plus de
problème de contrepartie au niveau du projet;
2006-12-072006-09-30Disponibilisation des fonds de contrepartie;
C1
Difficultés de mobiliserles fonds de contrepartienotamment pour certaines agences;
C
Le texte a étépris et le personnel sera recrutéprochainement ;
0000-00-002006-11-30Recrutement du personnel de l?ANAT
B1
Retard important dans la mise en place de l’ANATpour l’exécution des programmes ;
B
2006-09-212006-09-30
Accélérer l?exécutiondes travaux, (des progrès sontconstatés, maisdoivent se maintenir)
A2
2006-12-072006-09-30Prolongation de la 1ere phase (BM) ;
A1
Niveau de décaissementfaible par rapport aux prévisions ;
A
Réponses du gouvernement
Date RéalisationDeadlineRecommandationsPoints de blocage
I l n’y a plus de problème de contrepartie au niveau du projet;
2006-12-072006-09-30Disponibilisation des fonds de contrepartie;
C1
Difficultés de mobiliserles fonds de contrepartienotamment pour certaines agences;
C
Le texte a étépris et le personnel sera recrutéprochainement ;
0000-00-002006-11-30Recrutement du personnel de l?ANAT
B1
Retard important dans la mise en place de l’ANATpour l’exécution des programmes ;
B
2006-09-212006-09-30
Accélérer l?exécutiondes travaux, (des progrès sontconstatés, maisdoivent se maintenir)
A2
2006-12-072006-09-30Prolongation de la 1ere phase (BM) ;
A1
Niveau de décaissementfaible par rapport aux prévisions ;
A
Réponses du gouvernement
Date RéalisationDeadlineRecommandationsPoints de blocage
![Page 19: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/19.jpg)
Implementation of these concepts
![Page 20: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/20.jpg)
20Managing performance – The experience of the World Bank Mauritania Country Office
Shared sense of urgency to change Shared will to professionalize the activities of the country office Promotion of a team spirit within the office Transparency and integrity of the information shared within the
team (all staff, including project staff)
Implementation: Success factors
![Page 21: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/21.jpg)
21Managing performance – The experience of the World Bank Mauritania Country Office
The country office uses two on-line monitoring systems:– An internal monitoring system (list of tasks, common calendar,
scorecard and dashboard currently being finalized)
– A portfolio monitoring system: www.lppms.org
The objective of these systems is to allow for greater internalization of the monitoring tools, and a greater diffusion of results
Implementation: Monitoring
![Page 22: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/22.jpg)
Process & Related Human Resources Issues
From overall to individual performance management
![Page 23: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/23.jpg)
23Managing performance – The experience of the World Bank Mauritania Country Office
From overall to individual performance management
A direct link between overall and individual performance management allows to:
– Link individual and team performance, in a coherent way, in order to ensure that all staff participate to the office’s accomplishments;
– Ensure maximum performance through (i) the implementation of corrective actions in case of poor performance, (ii) the monitoring of bottlenecks and (iii) prioritization of tasks;
– Reduce stress levels and improve work-life balance through improved time management and prioritization of tasks;
– Promote initiative, by allowing exchange of individual experiences and create emulation during staff meetings;
![Page 24: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/24.jpg)
24Managing performance – The experience of the World Bank Mauritania Country Office
These performance measures lead to a quarterly analysis and to a discussion at the staff meetings
Internal Performance Measurement
Staff meetings et retraite % du staff présents et à l’heure dans la salle de réunion ? 90%
Country Team # Country Team organisés par an ? 4
Incoming missions autres que TTL satisfaction VIP ?6- T
rava
iller
en
sem
ble
business lines indicateurs
stat
ut
30/0
6/05
stat
ut
30/0
6/06
targ
et 3
1/03
/07
stat
ut
31/0
3/07
targ
et 3
0/06
/07
(extract of the overal internal scorecard)
![Page 25: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/25.jpg)
25Managing performance – The experience of the World Bank Mauritania Country Office
Internal performance is linked to the individual
improvement plans
•This detailed scorecard is reviewed quarterly in order to update the overall scorecard
•The actions in the improvement plan are entered on my portal and each staff member can follow up individually his own performance while contributing to the evolution of the internal performance.
6. Travailler ensemble 6.1. Country Team Informer et consulter l'ensemble du staff travaillant sur la Mauritanie sur toutes les activités liées au pays, promouvoir une approche participative et un esprit d'équipe Thiane
i611. # Country Team organisés par an i612. % secteurs représentés au CT i613. % d’actualisation du team calendar
(hebdomadaire) i614. # de staff meetings par mois ayant une liste
des taches, une agenda, et des minutes i615. Note global du score card > 3.5
4 100% 100%
4 90%
100%
2
3,5
611. Planifier au moins 4 CT avec Agenda : 1 avant annual meetings et CPPR, 1 en fin d’année, (TD, chaque trimestre)
612. Actualiser régulièrement le Team Calendar (ACS, continu)
6.2. Meeting with Washington (RLT, Town Hall, etc) Faciliter la participation du staff aux meetings de Washington François
i621. % meetings auxquels assiste le staff du bureau Mauritanie
i622. % de staff sectoriel de Washington participant aux réunions auxquelles ils sont conviés
65%
N/A
N/A
65%
80%
621. Partager l’information a temps avec le staff (TD, continue) 622. Planifier participation du staff sectoriel de Washington aux meetings (Staff,
continue)
6.3. Staff meeting et retraite Améliorer la communication et la réflexion commune ainsi que le suivi des activités Aissata
i630. % des tâches actualisées par semaine i631. % de tâches mise en place sur le web i632. % du staff présents et à l’heure dans la salle
de réunion i633. % PV diffusées en temps dans le M drive (3
jours ouvrables après la réunion) i634. Retraites organisée en 08 check list finalisée
à J-15
90%
90%
100%
100% 100% 100%
100%
100%
630. Assurer le suivi de la liste des tâches : (TD, continu, all staff) 631. Mettre á jour de la liste des taches sur le web (all staff, continue) 632. Envoyer à temps Convocations aux staffs meetings (TD, continu) 633. Préparer et poster les PV de staff meeting dans le M drive (ACS, 3 jours
ouvrables après la réunion) 634. Etablir les TDRs et Check list logistique pour la retraite (AN/ stagiaires,
31/03/08)
6.4. Staff moral & work life balance Equilibrer la vie professionnelle et la vie privée Aissata
i641. Amélioration de l’indicateur work-life balance du staff survey
i642. # d’activités organisées par le staff association
10%
10%
3
641. Réaliser une enquête en interne sur l’application des AWs (AN, 31/08/07) 642. Organiser des distractions (fêtes de fin d’année, anniversaire, sorties avec les
familles, etc.) (AN/TD/MT, continue) 643. Réaliser des activités par le bureau du staff association (YA, continu) 644. Quantifier le plan de travail (ON, 31/08/07)
6.5. Incoming missions autre que les TTL (VIP, etc.…) Assurer une gestion efficace des missions Thiane
i651. Satisfaction des VIP i652. % Agenda disponible 6 jours ouvrables avant
arrivée
100% 100%
100% 100%
651. Mettre à jour les tableaux de missions trimestriels tous les mois (ACS, tous les mois)
652. Actualiser le CO Calendar (TD, tous les mois) 653. Déposer le Welcome letter à l’hôtel pour les missionnaires qui ne sont pas
accueillis par les chauffeurs de la Bm (BSD/ST/KS) 654. S’assurer de la mise à jour du- Welcome letter & quick-contact liste sont mises à
jour (ON 30 /06/07)
Business lines + objectifs
Indicateurs Perf 6/ 05
Perf 6/06
obj 6/07
Perf 6/07
obj 08
Recommendations ……………………………………………………………………………………
Plan d’amélioration (resp., deadline for each action) (sous la ligne)
![Page 26: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/26.jpg)
26Managing performance – The experience of the World Bank Mauritania Country Office
The RA are linked the office scorecard
The indicators of the detailed scorecard are included in the results agreements.
Since the scorecard indicators are reviewed quarterly then certain indicators of the RA are also updated quarterly which helps the annual OPE evaluation.
Key Results Indicators(Top 3-5 results for which I am accountable) (How I will know each result is achieved)4. Working together >>> Ref Business Line 6 • 100% staff aware of meetings, retreat and TownhallStaff meeting & retreat / VC request • 100% of tasks updated before staff meetings (Ref i630)
• 100% of SL tasks available in the internal portal (Ref i631)• Retreat organized in 08 with check list finalized 15 days before (Ref i634)
5 - RM – Logistic >>> Ref Business line 7 • 100% mail prepared taking into account the CO and CD procedures/guidelinesCO daily tasks supervision • 100% mail delivered timelyManagement of diffusion lists (AFMMR/CT) • 100% of officials changes available in the system/0 complain VIP Incoming missions • VIP Satisfaction (Ref i651)
• Agenda is finalized 6 opening days before arrival (Ref i652)
RESULTS AGREEMENT 2008
![Page 27: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/27.jpg)
27Managing performance – The experience of the World Bank Mauritania Country Office
Link between RA and the office scorecard :
the responsability matrix
6. Travailler ensemble6.1. Country Team 3 0 0 O X X X X X X X6.2. Meeting with DC (RLT, Town Hall, etc) 2 0 0 O X X X X X6.3. Staff meeting et retraite 5 3 3 X X X O X X X X X X X X X X X X X X O X X X X6.4. Moral du staff & work life balance 2 2 2 X X X O X X X X X X X X X X X X X X X X X X X6.5. Incoming missions autre que les TTL (VIP, etc…) 2 2 2 X X X X X O X6.6. Filing physique et informatique 3 3 3 O X X X6.7. Contacts et CV 1 1 1 O X X X X X
Business Lines # ind. SL
# ind. SL dans les
RA
# ind. RA du (des) resp &
dans SL Franc
ois
Amad
ou
Hawa
Aissat
a
AwaAbd
oulay
e
Sileye
Batou
ly
Brahim
Cherif
Fatim
a
Kalido
u
Maim
ouna
CisséHar
oune
Mou
staph
a
Salam
ata
Souley
man
e
Thiane
Yahya
Ba Pierre
/ Nico
las
Olivia
Other
s (Fro
m D
C or o
ther
s age
ncies
)
The responsibility matrix shows:
1. Who is responsible for which business line
2. Who are the staff members working on that business line
3. The number of indicators from the detailed scorecard in the RA.
![Page 28: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/28.jpg)
28Managing performance – The experience of the World Bank Mauritania Country Office
Sum up
Internal performance is closely linked to individual performance Indicators of the scorecard are present in the Results
agreements Thus the performance of the office and the individual
performance evolve jointly. The quarterly evaluation of the performance of the scorecard
enables a more efficient and reliable individual performance evaluation (OPE )
![Page 29: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/29.jpg)
29Managing performance – The experience of the World Bank Mauritania Country Office
Integration of individual performance into overall performanceIn
divi
dual
Indi
vidu
alO
vera
llO
vera
ll Overall Performance Evaluation
Internal Performance Scorecard
Individual Improvement
Plan
Responsibility Matrix
Respon-sibilities
TasksObjectives
Results Agreement A
ggre
gate
, coo
rdin
ate
Dec
ompo
se, a
ssig
n
![Page 30: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/30.jpg)
Impact
Does it work?
![Page 31: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/31.jpg)
31Managing performance – The experience of the World Bank Mauritania Country Office
Impact
Impact on staff: – Increased sense of responsibility;– Stress reduction;– Sense of Initiative.
Impacts on client:– A more concrete dialogue with Ministers, and the possibility to adapt the
level of dialogue depending on the issues: Prime Minister’s Office, line Ministries, etc;
– A formalization of joint reviews: audiences with key partner Ministry of Economic Affairs (MAED) based on tools, quarterly CPPR in the presence of MAED and respective line Ministries, quarterly audience with the PM;
– The implementation of a monitoring system on the MAED level, possibly with other donor institutions.
![Page 32: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/32.jpg)
32Managing performance – The experience of the World Bank Mauritania Country Office
Internally: – Implement an internal multi-criteria analysis– Develop process maps for all business lines
Portfolio: – The government uses multi-criteria tools for all donors– Common document formats are standardized (aide memoires,
NOR, etc.)– Use of functions / BL systematized for projects
What is next?
![Page 33: Managing Performance The experience of the World Bank Mauritania Country Office.](https://reader034.fdocuments.in/reader034/viewer/2022051316/56649ea35503460f94ba6e19/html5/thumbnails/33.jpg)
33Managing performance – The experience of the World Bank Mauritania Country Office
Implementation step by step
Steps Internal tools Portfolio tools
1.a. Collective
Responsibility
1. Definition of Business lines
2. Swot Analysis
3. Indicators and targets
4. Action plan
For now and for us 1 Project = 1 BL but for the project manager and the TTL it could go beyond in defining internal BL for each project
1.b. Individual responsibility
1. Matrix of responsibilities
2. Result agreement and learning plans
3. OPE
Performance contract
2. Performance measurement
1. Scorecard
2. Benchmarking when possible (initiative with Benin)
1. Scorecard
2. Benchmarking when possible
3. Tracking
1. Improvement plan
2. Monitoring and update of the plan
3. Main milestones calendar
1. Recommendation matrix updated during mission and discussed with MEF
2. Main milestones calendar
4. SelectivityTo be developed 1. Selectivity tools based on needs and
WB added value by sector (bubble chart)