Managing large projects that depend on new technology: the CERN...
Transcript of Managing large projects that depend on new technology: the CERN...
Managinglargeprojectsthatdependonnewtechnology:
theCERNapproach.
TomTaylorCERN
1Erice InternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Introduction- 1• CERNwasfoundedin1954toprovide:
Aworld-classlaboratoryinEuropeforhighenergyphysicsexperimentation
Thiswasthedeclaredintention…
ButalsoatthetimetherewasaseriousbraindrainofEuropeanscientiststotheUS,attractedby
– Betteropportunities fordoingresearch, better salaries
– CERNwouldprovideanalternativepoleofattraction
• Thenewlaboratorywouldprovideandmaintainfacilities
2EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Introduction- 2• Thefacilitieswouldbeparticleaccelerators
toreachthehighestpossibleenergies
– FirstacceleratorsatCERN:• Synchrocyclotron (SC)(1956)• Protonsynchrotron (PS)(1959)
– Theworld’sfirsthadroncollider:• Intersectingstoragerings(ISR)(1971)
– Thefollowingmainaccelerators• Superprotonsynchrotron (SPS)(1974)• p-pbar collider(SppS)(1984)• Largeelectronpositroncollider(LEP)(1987)• Largehadroncollider(LHC)(2008)
Fromthe1960stheaccelerators havebeenequalto,ormorepowerful than,equivalent facilitieselsewhere
3EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Introduction- 3
Howdidthishappen?– Succeedingmachinesmadebestuseofaccumulatedinfrastructure
– StimulationcamefromaconstantinterplaybetweenResearchandTechnology• Requirementsoftheexperimentspushedtechnicalinnovationintheaccelerators• Technicalinnovationenabledexperimentaliststoenvisionbetterexperiments
4EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
5EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
6EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Afewexamplesofnewtechnology• Magnetichorntoprovidedensebeamsof neutrinos• Developmentofstochasticcooling(alsotodensifybeams)• Productionandstudyofanti-particlesand anti-matter• Developmentofthetechnologyofultra-highvacuum• Pushingthelimits:superconductivityandcryogenics.• SuperconductingRFacceleration• Datahandlingandcommunications.WWWandgrid• Evolutionofdetectortechnology.:silicon,electronics• Largescaletechnologyforacceleratorsanddetectors– LHC“discoverymachine”
7EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
TheEssentialInterplayBetweenResearchandTechnology
Aremany,andacollectionisdescribedinaforthcomingbookTechnologymeetsResearch
8
examplesfromCERNof
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
9
Howisallthis“managed”?Atamacroscopic, intellectual, level:• Apull comesfromthedesiretoconfirm(ordisprove)theoreticalmodels• Apush comesfromexploitation ofnewconceptstoincreaseandmakeavailable
evergreatercentre-of-massenergyoftheinteractionsproducedinthe laboratory
Withinthegeneralframework,newdevicesappear,andolderonesareimproved.• Detectortechnologyevolvestoprovideincreased sensitivity andaccuracy• Technologyofacceleratorcomponentsevolvestoprovideincreases ofinteraction
rate,energy,andavailability
AstrengthofCERNhasbeenthebuilding upofcompetenceinthecoretechnologiescoupledwiththe judicioususeofinfrastructureassociatedwiththesequence ofincreasingly powerfulmachines
This includedtheestablishment ofwell-equippedworkshops,staffedwithhighlyskilled technicalpersonnel (withwhomtechnical solutions canbediscussed), formakingmodels andprototypes,aswellasfacilities formakingurgentrepairs
ThenatureofCERNencourages discussion between appliedandresearchscientistsEriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
ThenatureofCERN
10
Guidingprinciple:minimizebureaucracy!
Short,easytocomprehend,CERNConvention (constitution) - 32pagesLayingoutthewaytheorganizationisrun(Wisdomofthefoundingfathers…)
• Understandthecommongoal(InthecaseofCERN)
1. pushingthefrontierofknowledgeofparticlephysics2. Maintainingandimprovingtheacceleratorstobetterachieve1.
• Loyaltytotheorganization
• Createtherightatmospherewhereideascanflowupfromthebottom
• Accepttotakeontasksthat increaseanddevelopcompetenceofstaff
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 11
"TellmeandIforget.TeachmeandIremember.InvolvemeandIlearn."
- BenjaminFranklin
Thewayitisorganized• CERNCouncil– SciencePolicyCommittee– FinanceCommittee
• DirectorGeneral• Sectors,headedbydirectors– Acceleratorsandtechnical– Researchandcomputing– Administration
• Departments• Groups
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 12
Generaladministration
• Clearpurchasingrules• Clearstaffrulesandregulations• Bureaucracydesignedtominimizeburdenonscientificandtechnicalstaff
• Administratorsencouragedtotakeinterestandprideintheresearchandtechnicalgoalsandachievements
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 13
Staffing
• About2500staffmembers.Virtuallycapped.• Contractsinitially3years• Indefinitecontractsforselectedpersonnel– Createsloyalty.Membersconsiderthemselves“Cernois”beforetheiroriginalnationality.
– Createsanatmosphereofresponsibility.Equipmenthastoworkreliably– designformaintainability
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 14
AcceleratorSector
• Classicalhierarchicalstructure,butorganizedinsuchawayastoallow(encourage)goodideastopermeateupandbeadopted
• Looselyorganizedcrossgroupanddepartmentteamsworkonlargeprojects
• Operationandmaintenanceofacceleratorsisaccordedprimeimportance
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 15
Largeexperiments-1
• CERNprovidesthebeams,butcanaffordtofinanceonlypartoftheexperiments.– InthecaseoftheLHCabout20%.
• Experimentsarerunascollaborations basedonmemorandaofunderstanding(MoUs)
• AnMoUisnotalegallybindingcontractItisanagreementbased“honour”tosupplyequipmentatagenerallyacceptedvalue• Thisworks,butpresenceofCERNisimportant
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 16
Largeexperiments-2
• CERNprovidestheframework– Officeandlaboratoryspace– Essentialtechnicalstaffforcoordination– Essentialadministrativestaff
• CERNmanagementadvisesonstrategicdecisions– Expertcommittees
• CERNCouncilhastoagree– Financecommittee
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 17
Facingdifficulties
• Performarapidanalysisonthefailure• Presenttherecoveryplantoallconcernedinitsexecution.Giveeveryonethechancetoimproveit.Geteveryoneonboard
• Engagethoseinvolvedinsolvingthefinancialconsequences
• Handledproperly,difficultiescanimprovethedeterminationoftheteamtosucceed
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 18
Technologytransfer
19
Itisafactthatworkonacceleratorsanddetectors hasgenerated“useful”fallout,affectingeverydaylife.Thishasbeendocumented, anditdoesoffsetthehighcosttosocietyofthelargeinstallations.
Thishasmainlyhappenedthroughthepurchaseinindustryofequipmentbasedonnewconceptsordevelopments thathadbeenmodelled (andoftenprototyped)atCERNandthetransferofknowhowcamefromhelpingthecompanytofulfil thespecification. Manycompanies haveendorsedthisapproach.
Patentingwasnotpartofthemenu.
Fundingagencies nowexpectresearchorganizationstotakeoutpatents(unfortunately) .Thereturnsfromroyaltiesbarelycoverthecostofmaintaining atechnologytransfergroup,andthefilingofpatentsandthesecrecysurroundingthemusestimeandresources,anddetractsfromtheteambehaviour uponwhichsuccess depends.
CERNhasnotescaped thismovement.
(Arecentarticle intheEconomistwashighlycritical ofthewholeprocessofpatenting,citingfindingsfromserious studies thatsociety atlargedoesnotbenefit…)
Erice InternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
MaintaintheMagic• Appointrespectedscientistsasprojectleadersandcoordinators,abletoprovidetechnicalguidanceincaseofdifficulty
• Acknowledgeproductiveeffort• Encouragecooperationbetweendifferent“centres ofexcellence”
• Alwayskeepaneyeontheprimarygoal:avoidspendingtimeonnon-essentials
• Minimizethebureaucraticoverhead:gettheadministratorstoshareinthesenseofachievement,andimprovetheirefficiency.
• Reviewsshouldbefewandwellprepared.
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l 20
Examplesofbreakthroughs• Theoriginalplanwastobuilda10GeVweakfocusingsynchrotron.Design
studieswereinterrupted followingthepublicationbyCourantandSnyderofthetheoryofstrongfocusing.Thedesignwaschanged toa25GeVstrongfocusingsynchrotron. (Question:couldsuchaquickchangehappentoday?)
– Itrequiredveryprecisemagneticfield:->punchedlaminationsandpoleface windings– AccelerationandbeamextractionbroughtmanychallengestothePSteam->newideas
• Howtoproduceausablebeamofneutrinos? Beforedecayingintoelectronsandneutrinos, thekaonsandpionsproduced intheinteractionoftheenergeticprotonbeamwiththeprotonsinthetargetarefocusedusinganewdevice inventedatCERN:amagnetichorn
21EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
22
Magnetichorn(S.vanderMeer,1961)
Toroidalfieldfocusesthepions/kaonsproducedinthetargetPower:12kVcapacitordischarge(200µspulseofupto400kA)Environment:highlevelofinducedradioactivity
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
23
SchematiclayoutoftheneutrinosourceforbeamtoCNGS
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
24
Thankstothemagnetichorn,theexperimentwiththeGargamellebubblechamber⇒ evidenceforneutralcurrents(1973)
AneutralcurrenteventinGargamelle.Theneutrinobeamentersfromtheleft.Allthreetracksfromthecollisionvertexundergoeitherverylargeanglescatteringorinteraction,provingthatnomuonisproduced.(photoCERN) EriceInternationalSeminarsonPlanetary
Emergengies,49thSession,August2016l
Pushthroughaudaciousproposals:e.g.IntersectingStorageRings(ISR)• Highercentre-of-mass energies areclearlypossibleifbeamsarecollided
head-on• ThiswasfirstpointedoutbyWideröe inthe1930s.Itwasnotpursued then
forfear thattheinteractionratewouldbetoolow• Successfulexperiments wereconductedwithbeamofelectrons intheUS,
ItalyandCERNinthe1960s• Protonswouldprovide farhigherenergyofinteraction:thiswasthegoalof
theISR– thefirsthadron collider.
25EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
IntersectingStorageRings(ISR)• TheISRwastobethetestbedformanyoftheideastobe
exploitedlateron– Ultra-highvacuumtechnology– Applicationofsuperconductingmagnetsinanaccelerator– Method fordetermining luminosity(vanderMeerscan)– Romanpots– Gaseous detectors– Stochasticcooling– Precisioncalorimetry– 4π detector architecture
• BythistimeCERNhadbuiltupandtrainedstaffthatwasableandmotivatedtoinnovateonaevengranderscale
26Erice InternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Ultra-highvacuumtechnology
• MeasurementHowtomeasureUHV?State-of-the-art->notpossibleattherequiredlevelImprovedunderstanding->newdesign
• Cryogenicvacuumpumping
27EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Superconductinglow-betainsertion(toenhanceluminosity)
28
1972.Practicalsuperconductivityyoung,butobviouslyimportant
Goodapplication:alow-betainsertion(toimproveluminosity)Alsotolearnabouthowtouseitforthefuture…
• Basicconceptsdeveloped.Mock-upsbuiltandtested• Understandingofmechanicalandelectricalconstraints• Understandingofcryogenicconstraints• Magnetsdesignedandorderedfromindustry
Magnetsintegratedintothecollider.Goodexperience!Teamtrainedforfutureapplications…
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
29
CryogenicsfortheISRlow-betainsertion
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Multi-WireProportionalChamber(MWPC)G.Charpak,1968
30EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
31EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
TheProton-AntiprotonCollider• SimonvanderMeerandcolleagueshadbeenexperimentingwith
stochasticcooling(anideaoriginatinginRussia)attheISR,anddevelopingamplifierswithsufficientbandwidth.Withthepossibilityofshrinkingthedimensionsofabeamofantiprotons,CarloRubbiaseizedupontheideatoproposeap-pbar colliderattheSPS.Thiswastobedone inparallelwiththeLEPeffort,asbeingafastwaytoestablish theexistenceoftheZandWbosonsthatwerebeingpredicted bythe“StandardModel”.Thiswouldnothavebeenpossiblewithoutthethoroughunderstandingofthetechnique, andthedevelopment ofthenecessary equipmentusingthelatestwide-band technology.TwolargeexperimentsweredesignedandinstalledintheSPS.
• Onceagain,theskillsavailableatCERNthankstotrainingwithpreviousprojects, togetherwiththeteamspirit,enabled theorganizationtorise totheoccasion.The finalresultwasthediscoveryofthebosons, leadingtotheNobelprizeforCarloRubbiaandSimonvanderMeer.
32EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
StochasticCooling
33
Principlea
Pick-upmeasureshorizontalerror.Kickercorrectsangle
Spacedby¼λβ (+½nλβ )
Repeat forverticalerror
Amplifiermustbe wideband
aSee“Stochasticcoolingforbeginners“ byD.MöhlEriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
LargeHadronCollider(LHC)
• LEPtunnelwasexcavatedwiththeideaofeventuallyre-usingitforprotons
34EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
SuperconductingdipolesPowerfulPreciseandPlenty
35EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
36EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
13kAcable strand detail
Superconductingmagnettechnology
Acceptandimproveonideasfromotherlaboratories
RAL->Fermilab ->SCC->LHC
37EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Twinapertureconcept
BNL->CERN
HTScurrentleads
• Idea– Usenewtechnologytosavecryogenicpower
• Design,thenindustrializeprocess– Sothatanygoodmechanicalworkshopcantakeonthejob
–Morecompetitionreducescost
38EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
39
HTSsectionofa13kAlead(0.5mlong).
JointbetweenHTSstacksandNb-Ti wires(leadingtothecoldbusbar system)
Complete 13kAHTScurrentlead(1.5mlong).
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Computingclustersanddatastorage
40EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Localareanetworks
WWW
MgB2 cableforcoldpowertransfer
41
Magnesium diboride (MgB2)roundwirehasbeendeveloped inacollaborationwithindustry.Thiscanbecabledfortransferringmulti kAcurrentsforconnectingmagnetstodistantpowerconverters.WillbeusedfortheLHCluminosity upgrade.A20mlong,20kAcablehasbeentested.Thistypeofcableisbeingconsideredforuse incommercialpowertransmission.
EriceInternationalSeminarsonPlanetaryEmergengies,49thSession,August2016l
Thankyouforyourattention