Page 1: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson

Page 2: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 3: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 4: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 5: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Identify areas that are sensitive to development or other land use changes.

Specifically determine which groundwater and surface water areas are most vulnerable to non-point source pollution, taking into account various hydro-geologic and geographic criteria.

Use Geographical Information Systems to delineate the most vulnerable regions where development should not occur.

Page 6: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

The analysis will be based on the following data: Ground Vegetation Soil Hydraulic Conductivity (KSAT) Cave Density (Groundwater map only) Soil Thickness/Depth Floodplains Slope

All data is provided by Marston & Marston; excluding vegetation, which was acquired through the seamless data distribution server on the USGS website

Page 7: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 8: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Reference layer (not put into vulnerability study)

Areas where development is obstructed Data provided by Marston & Marston

(FEMA floodplains) Missing Data

Gillespie CountyKimble CountyMason County (except Mason City)Part of Blanco County

Page 9: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 10: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Provided by Marston & Marston Inc. Complete Data Set Steepest Slopes = Most Vulnerable

Area

Both groundwater and surface water

Slopes will be evaluated relatively○ Between 0 = low and 1 = high

Page 11: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 12: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 13: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 14: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 15: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
Page 16: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Each data set that we are evaluating will be divided into a continuous grid comprised of one square kilometer cells.

Each grid will be assigned a vulnerability score.

Image Source: https://www.e-education.psu.edu/natureofgeoinfo/c9_p6.html

Page 17: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Groundwater Vulnerability Evaluate soil thickness, soil KSAT, slope, land cover, and cave

density. Each item will be analyzed for its vulnerability criteria and

assigned a value from 0-1. A value of 0 indicates the least vulnerable areas. A value of 1 indicate the most vulnerable areas.

Page 18: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Surface Water Vulnerability Evaluate soil thickness, KSAT, slope, and land cover. Each item analyzed for vulnerability criteria and assigned a value

from 0-1. A value of 0 indicates the least vulnerable areas. A value of 1 indicate the most vulnerable areas.

Page 19: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Vulnerability Criteria

Groundwater Vulnerability

Surface Water Vulnerability

Soil Thickness Thin Soils Thin Soils

Soil KSAT Increased Values Decreased Values

Slope Steep Slope Steep Slope

Vegetation Cover

No Vegetation Cover

No Vegetation Cover

Cave Density High Cave Density

Page 20: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

[Soil Thickness * W] + [Soil KSAT * W] + [Slope * W ] + [Vegetation * W ] + [Cave Density * W] = Vulnerability Score

[Soil Thickness * W] + [Soil KSAT * W] + [Slope * W] + [Vegetation * W ] = Vulnerability Score

W = Weight (Level of importance)Initial values will be provided by the client.

Page 21: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Image Source: https://www.e-education.psu.edu/natureofgeoinfo/c9_p6.html

Page 22: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

ID TaskFeb 2009 Mar 2009 Apr 2009 May 2009

2/1 2/8 2/15 2/22 3/1 3/8 3/15 3/22 3/29 4/5 4/12 4/19 4/26

1 Data Collection

2 Data Processing

3 Data Analysis

Data Interpretation

5/3 5/10

5 Project Preparation

4

Important Dates: 2/23/09 Proposal due

3/2/09 Presentation to client

4/6/09 Progress report due

4/13/09 Progress Report Presentation

5/11/09 Project Presentation

Page 23: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Data CollectionTotal Hours (10 hours/week * 3 weeks * 4 consultants) 120

Hourly Pay $30.00Total

$3,600.00 Data AnalysisTotal Hours (10 hours/week * 8 weeks * 4 consultants) 320

Hourly Pay $30.00Total

$9,600.00 System Management Project Manager Total Hours 50

Hourly Pay $80.00Total

$4,000.00 Assistant Project Manager Total Hours 20

Hourly Pay $50.00Total

$1,000.00 Equipment CostsSupplies ($200/workstation * 4 workstations) $800.00

Maintenance ($125/workstation * 4 workstations) $500.00Depreciation([$2000/workstation * 4 workstations] *[4 months/36 months] * 2.5 [months equipmentwill be used for project] $2222.00Total

$3,522.00 Data Purchased Data $0.00

Total $0.00

Total Cost $21,722.00

Page 24: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Work Completed up to Today

Acquired 90% of data setsProvided by Scott Appleton of Marston & MarstonVegetation data obtained from USGSIn the process of retrieving missing data

Examined data layers and started classifying

Completed initial proposal Established goals and objectives

Page 25: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Final Deliverables The final product will include the following:

Detailed final report discussing findings.

Groundwater vulnerability static map.

Surface water vulnerability static map.

Website summarizing final report information.

Web maps with the ability to click and focus on specific areas.

Two posters summarizing the results of our analysis.

Page 26: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Potential Problems / Challenges

Missing Data Creating Deceptive Final ProductWhere data is missing the vulnerability

score will be based on fewer criteria Example: Mason County

○ Potential Solution = Clearly highlighting the areas that are assessed on less than 5 (or in the case of surface water 4) criteria and state which criteria were used for analysis

Page 27: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

Conclusion Rapid growth rates in the Central Texas region and the desire to

maintain quality water resources have motivated this analysis. Through a geospatial investigation, SMART will highlight areas in the Central Texas region where groundwater and surface water resources are vulnerable to non-point source pollution. The maps, along with accompanying products, will be delivered to the Hill Country Alliance and used as a reference for future development in the Central Texas area.

Page 28: Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.

The SMART team

John Daneri Project Manager

Jacob PowellAssistant Manager

Kathleen CallahanGIS Analyst

Leah GibsonGIS Analyst