Managed Lanes Development Strategy Phase I District Four October 17, 2012.

download Managed Lanes Development Strategy Phase I District Four October 17, 2012.

If you can't read please download the document

Transcript of Managed Lanes Development Strategy Phase I District Four October 17, 2012.

  • Slide 1

Managed Lanes Development Strategy Phase I District Four October 17, 2012 Slide 2 2Agenda Welcome and introductions Lessons Learned Project overview and goals Managed lanes discussion District 4 Presentation Questions and Answers/Next steps Field Review I-595 3-Lane reversible managed lanes (under construction) driving for Floridas Turnpike to I-75 I-75 4-Lane managed lanes system (programmed for construction) driving from I-595 to Pines Boulevard Lunch break Field Review I-75 4-Lane managed lanes system (programmed for construction) driving from Pines Boulevard to SR 826 (Golden Glades Interchange) I-95 4-Lane managed lanes system (Phase 2 under construction & Phase 3 PD&E study driving from SR 826 (Golden Glades Interchange) to SW 10 th Street Travel back to Broward Operations Auditorium Adjourn Slide 3 3 District 3 One major limited access facility, I-10 Bridge Replacement Congestion problem is US 98, an arterial Slide 4 4 District 2 I-295 will have tolled lanes Increased typical section from one to two additional lanes in each direction Bottlenecks with peak hour congestion exists today but trying to be proactive for future congestion Slide 5 5 District 5 I-4 Ultimate Studying segments north and south of the Ultimate Looking at Concessionaire agreement Slide 6 6 Turnpike Enterprise Integrated Congestion Pricing Plan Veterans Expressway HEFT Two Tier Toll System Slide 7 7 District 4 Miami Express Lanes extend north to Oakland Park Boulevard (under construction) PD&E looking N. to Boca Raton Reevaluation to add HOT express lanes to S. of Linton Slide 8 8 District Visits Meeting Dates District 3: September 25 th District 2: September 27 th Turnpike: October 10 th District 5: October 11 th District 6: October 16 th District 4: October 17 th District 1: October 30 th District 7: October 31 st Slide 9 Project Overview and Goals 9 Slide 10 10 Project Overview Three Phases of Project Phase I Policy and Action Plan Phase II Procedures and Standards Phase III Tolling and Return on Investment Project Purpose: It is the intent of the Department to develop a policy and related procedures requiring consideration of Managed Lanes as a part of all added capacity improvement projects on highways. The planning and development process should be conducted so as to not preclude the future implementation of Managed Lanes within the corridor. Slide 11 11 Project Collaboration Project Sharepoint under development www.FloridaManagedLanes.com FDOT Systems Planning Office and consultants District/Turnpike Enterprise Champions SE Florida Regional Concept for Transportation Operations (RCTO) Coordination Managed Lanes Review Team (MLRT) Regional Expressway Authorities Other Stakeholders (e.g., FHWA) Slide 12 12 FDOT Definition: Managed Lanes Highway facilities or sets of lanes within an existing highway facility where operational strategies are proactively implemented and managed in response to changing conditions with a combination of tools. FDOT Definition: Slide 13 Managed Lanes Discussion 13 Slide 14 14 Issues to Consider Policy Finance Design Technology Operations Enforcement Supporting Strategies Institutional Aspects Public Acceptance Slide 15 15 District Discussion Purpose To learn from you What are your experiences and lessons learned with managed lanes? What do you want to get out of this project? What do you want us to evaluate? How can we develop a unified statewide system? What can central office do to help Districts/Turnpike with their managed lanes projects? Slide 16 16 Financial Structure: Feasibility: Regional vs. Project/Corridor Revenue Scenarios (Manage Demand, Generate Revenue) Construction Cost and Project Delivery Models Economy and Market Conditions Public Outreach and Legislative Agenda Public opinion on tolls and road pricing Enabling legislation, authorization to price pre-existing HOV lanes, carpool requirements, etc. Technology Evolution: All Electronic Tolling conversion National interoperability Enforcement options Potential Discussion Topics Slide 17 17 Consistency: Statewide vs. Regional approaches Access Schemes Passenger Occupancy Requirements Operational Hours Roadway Design Features: Traffic Separation Access Points Number of lanes Safety Enforcement Areas Potential Discussion Topics Slide 18 Next Steps 18 Slide 19 19 Next Steps Additional FDOT District visits Review State and National practices Assess current and future projects in Florida Develop policy statement and action plan Slide 20 Questions & Answers 20 Slide 21 Contacts H. Walker Systems Planning Office (850) 414-4926 [email protected] or Artie White (850) 553-3500 [email protected] Slide 22 Slide 23 23 Range of Facility Designs Slip Ramp Access to the I-680 HOT Lane Alameda County, California Pylon Separation on the I-95 Express Lanes Near Miami, Florida Lane Separation Techniques Slide 24 24 Range of Facility Designs Dedicated Access Ramps to I-15 Express Lanes San Diego, CA Access Options Continuous Access (Weave Lane Access) to the SR 167 HOT Lane Near Seattle, WA Slide 25 25 Range of Facility Designs I-5 Truck Bypass Los Angeles, CA Eligibility Lanes Slide 26 26 Range of Facility Designs Bus Rapid Transit Viaduct Brisbane, Queensland, Australia LYMMO Bus Rapid Transit with dedicated lanes Orlando, FL Eligibility Lanes Slide 27 27 Range of Facility Designs Barrier Separated Reversible HOT Lanes on I-25 Denver, CO Reversible Lanes Reversible lanes on Lions Gates Bridge Vancouver, British Columbia