Málaga SmartcityModel of sustainable energy management for the cities of the future
5th Annual Strategic Asset Management for Utilities. Berlin
0 3 | 0 3 | 11endesa distribución
Reproduction is forbidden unless authorized. All rights reserved
Imagine you could generate only the energy that you need: in your own house, your industry or your street. Using new tecnologies, with renewables energies.
Imagine you know what you consume in each moment, in each electric device you have turned on.Imagine you reduce your consum
20% and contributed to reduced CO2 emission .
Imagine this happens and has a name:
Imagine…
Imagine an intelligent grid which controls all their loads, generators, storage, e.v., customers …
Imagine…
Imagine…
Imagine…Imagine…
Imagine…
Reproduction is forbidden unless authorized. All rights reserved
The traditional utilities business will be largely affected
Control Center
Generation Transmission Distribution Final User
Red de transporteCentral generadora Estación elevadora Subestación de transformación
Centro detransformación Usuario final
Control Center
Quality Profitability
Sustainability
Security
Adaptability
Energy Efficiency
Renewable energy over primary energy
CO2 reduction
20%
20%
- 20%
Objectives EU
Objectives ENDESA
Reproduction is forbidden unless authorized. All rights reserved
SMART GRIDS The electric company of the future.
SmartCity
Smart Energy Management
Smart Buildings
Smart Energy Generation
Smart and Informed Customer
Smart Mobility
Smart Energy Storage
º
Smart Lighting
@Smart ICT
People
Networks
Citizens become part
of the solutionICT
v• Real-time IP network
Comunications
AMI (Advanced Meter Infrastructure)
v
• Smart meters (electricity, water and gas)• Demand response
• Smart buildings and homes• Smart and informed
customersADA (Advanced Distribution Automation)
v• Real-time monitoring• Network failure and recovery• Network automation
DER (Distributed Energy Resources)
v• Electric vehicles• Energy storage• Distributed generation of renewable sources
GIS
CBM
CIS
DMS
EMS
DSM
OMS
SCADA
AMI
DERADA
ICT
Reproduction is forbidden unless authorized. All rights reserved
Worldwide initiatives
SubtituloSmart City will become a reference point along with some other international projects already in progress
SmartgridCityBoulder, Colorado$100MStart: 08/2008Xcel Energy
GridSmartColumbus, Ohio$180MStart: 2008American Electric Power + IBM SmartGrid + AMI
Malta70M€ - first stageStart: 2009Enemalta + IBM
EcoCityMasdar - Dubai$ 22.000 M In progressGeneral Electric + IBM
Smart TrafficStockholmCO2 Reduction by 18% IBM Málaga
31 M€Start: 2009Endesa
smart
• Smart City Málaga: the main difference with other projects around the world is working in all the areas related with LV and MV grids: generation, distribution, automation, storage, demand, smartmeters, e-mobility, buildings, customers,….
SmartgridJeju Island Koreai40M$In progressKEPCO
SmartgridDenmarkSmartmettering and AMR
Reproduction is forbidden unless authorized. All rights reserved
Scope of the project
31 million budget for companies and research centers
4 year and fully functional, technology in the field and important
involvement of final customers
Design and deployment, analysis of results, final reports, and dissemination activities
“Living lab” to test new products and services, proof of concept
“Demo projects call other projects”, new opportunities will arise
as a consequence of this project
Reproduction is forbidden unless authorized. All rights reserved
Participants
Project coordinators
Research centers
Reproduction is forbidden unless authorized. All rights reserved
Location: Malaga, new seawalk
MV and LV generation
MV grid automation, new grid
Friendly customers form demand response applications
New expansion area residential
Possibility to incorporate other local initiatives Smart House, G4V, Green Emotion
Support from the governments.
Reproduction is forbidden unless authorized. All rights reserved
Location
Reproduction is forbidden unless authorized. All rights reserved
WorkGroups
WP
03
Harm
on
izati
on
wit
h D
EN
ISE
WP
02
Op
era
tio
n d
ep
loym
en
t an
d
com
mu
nic
ati
on
pla
n
WP01 Project managing and monitoring
WP04: Telecommunications
WP05
WP11
WP06
WP07WP09
WP08
WP10 WP12
WP01 – Project Management
WP08 – Energy Efficiency and Demand Response
WP09 – LV Automation
WP10 - Micro generation and storate (DER)
WP11 - SmartMeters (AMI)
WP12 – Electric Vehicles (G2V)
WP04 - Telecomunication
WP03 – Coordination DENISE
WP02 – Deployment and Communication
WP05 – Information Systems
WP06 – MV Automation
WP07 - Mini generation and storage (mDER)
Reproduction is forbidden unless authorized. All rights reserved
WP04 Telecomunication
ICT
75 transformers communicated using PLC, WIMAX and other technologies
Redundant ring architecture
Advanced monitoring and control
@
µStorage
mStorage
Public Lighting
º
Reproduction is forbidden unless authorized. All rights reserved
WP04 Telecomunication
Reproduction is forbidden unless authorized. All rights reserved
Network Automation
A good part of the telecommunications necessary for this purpose will be PLC though existing lines.Communications between substations take place through fiber optics.
iNode -- Connects the MV with the LV grid . Acts as an autonomous concentrators and sends the control system what happens in the grid.
SS1WAN IP
SS2SS3
iSocke t
LV Grid
iSocket - Connects to the LV grid to generators, storage and loads, implements functions for local regulation.
WP04 Telecomunication
Reproduction is forbidden unless authorized. All rights reserved
WP05 Systems. Information Technologies
Center for deployment of information systems needed for advanced and intelligent smartGrid management,
Systems for Monitoring Communications
System for SmartMeters
System for Distribution automation
System for Data adquisition
System for Demand response
System for Consumer Portal
System for Electric vehicle management
System for Project collaboration
Armonización con el proyecto DENISE
Despliegue operacional y marketingG
esti
ón d
e pr
oyec
to
y co
mu
nic
ació
n
AM
I
Red
MT
mD
ER
Tele
com
un
icac
ion
es
Red
BT
DER
Ges
tión
Dem
anda
V2
G
Tecnología
Adquisición de datos
Ges
tión
de
Vehí
culo
s
Ges
tión
de
la D
eman
da
Con
sum
erPo
rtal
Tele
gest
ión
Sist
ema
Col
abor
ativ
o
Show Room
Mon
itoriz
ació
nC
omun
icac
.
Dis
trib
ució
n
Mon
itoriz
ació
n
Sm
artG
rid
The System z10,
the flagship of the IBM Systems
Reproduction is forbidden unless authorized. All rights reserved
WP06 MV Network Automatization
San Sebastiá
n
Polígono
6058 0
(PF,C )
7108(2B)
7107 (PM)
314 402398
(PF,P M)
389
LAIV
394
9153 7 (C)
MUPRESP A
81478 (PF,mG )
Nueva Diputació
n
NU_DIPUTA C
7111Depuradora
4780102105
6096 5
(2A)
77457
7236 1
65293 (C)
Nuevo Tabacaler
a 324(2PM,
PF)
10102 0
83606
EMASA Pacífico
8233 3
8233 4
(2A)
7865 7
7865 8
7616 1
80159(µG,
Alum)
P81693 (Suministro
)
E.D.A.R (mG)
Emasa
312 (µG)
307 (2A,µG)
387(2B)
349
403 (PM,µG
)404
6266 3
(C,2A )
6263 7 (C)
PANIFI
CAD
7105(µG,2.2
A)HIPER
Polid. Municipal
7109 AKY
102810
7423 0
(PF)
7423 1
7423 2
7423 3
(2B)
7423 4
7423 5
10281 1 (PM)
10485 6
69067 (µG)
1009757423
6 (PF)
7423 7
(2A)74229
7668 (PM‐C)
7083 (2A)
RTVA CSur
ErausquinINDUSTRIA
L
HIPER
CUEVAS_BAJ
TABAC
ALERA
PACÍFIC
O
TRRE
MOLI
PATO‐2
E.D.A.R.
A1
A3
A4
A5
A6
7110 (C)
321
Depurador a
SIN COMUNICACIONES. Solo tener en cuenta en pruebas
810801
(PF)802
797 (2B
)799
74221 (C)
73551
Supercor
397396 395(2B)
392391390843
(PF)
7927297
(2B)663
729 9
781 (PF
)
730 0
335(PF)
7296(PF)
70043 (C,mG)
A comunicar con otras tecnologías:
71273 NAVINCO
CT
CT
CT Ormazábal
CT NO Ormazábal
CT(C)Cliente
especial
CT compartido
CLIENT CT propiedad clienteLínea prop.cliente
PF PuntofronteraPM – 1ª maniobra2A - 2ª maniobra A2B - 2ª maniobra BµG – Generación BTmG – Generación MTAlum – Alumbrado
CT CT con telecontrol
CT CT no incluidoCambio maniobra
Cambio cabinas
491
4 9 1
529 203 425 351
395
89
175
301
647
391117117582
333
247281174279177171
1075
634
642197234
1075
7864448445139
207
187
94
101 2
349304 384 427 244 266 225
121
143
451
279 300 145 100 221
450
36219 17 780 80 74 609
824271
160
131906695256211
759
299 218 80
394
257 461 303 339 2
686
GOAL. To deploy an intelligent system for MV automatization with optimal solution -- economic, funcional and operative – for the new network requirements (distributed generation, electric vehicles, storage, renewables integration, etc)
Reproduction is forbidden unless authorized. All rights reserved
WP09 LV Network Automatization
Reproduction is forbidden unless authorized. All rights reserved
WP07 and WP10 Mini and Micro Generation and Storage
Mini Storage:
Trade Fairs of Málaga:
storage of 100kW /200kWh
Micro Storage:
3 x storage Sistems 5 kW/10 kWh
2 x CHP 5 kW
Generators:
33 kW LV
12,94 MW MV
70043 Pal. Ferias 0,1 Mw
81693 E.D.A.R. 10 Mw
403 Selene 3,8 Kw
69067 Finca El Pato 8 10 Kw
7105 Mainake 2 Kw
80159 Chiringuitos.Playa 10 Kw
307 Guindos 2,2 Kw
312 Pta.Blanca 5 Kw
µ-storage
º
M-storage
Lights Public
º
Photovoltaic
71273 Navinco 0,1 Mw
81478 Diputación 2,74 Mw
º
Reproduction is forbidden unless authorized. All rights reserved
WP07 Mini Generation and Storage
Reproduction is forbidden unless authorized. All rights reserved
WP10 Micro Generation and Storage
Reproduction is forbidden unless authorized. All rights reserved
WP08 Energy Efficiency
Edificio Nueva Diputación de Málaga
Diputación de Málaga
Nuevo Edificio Ayuntamiento Málaga
Hotel Puerta Málaga
Estadio Atletismo Ciudad de Málaga
Hotel Vincci Málaga
Mercadona
Clínica Quirón
Solar FV
Cogeneration
Trigeneration
Centro Acuático de Málaga
Palacio DeportesJosé Mª Martín Carpena
To develop all the systems for domestic customers, offices and public buildingsGOAL
Reproduction is forbidden unless authorized. All rights reserved
WP08 Energy Efficiency and Demand Response
In this project we will test advanced energy efficiency and demand response services in residential and SMEs, allowing the customer to become an active agent in the distrobution network. These services can be grouped in three different categories:
1. Information and analysis
tools (INF)
2. Energy Management and
price signals
3. Demand response (DR)
with direct load control
Reproduction is forbidden unless authorized. All rights reserved
WP08 Energy Efficiency. Conceptual Design. Domestic
Services and Applications
Customer- centric web
page
Retail Business
Grid Operation
Sub- station
Transf.
InternetInternet
PLC (?) Home
Area
Network
Retail Company
Distribution Company
Consumer Portal
LV GridLV Grid
Residential / SMEs
SmartMeter
Gateway
INF
DR
EM DR
Reproduction is forbidden unless authorized. All rights reserved
WP08 Energy Efficiency. Public Lighting
60 test LED and Halogenuro public lights
9 lights with wind generation
10 lights with photovoltaic generation
200 lights points remote controlled
12.100 w total power controlled
Reproduction is forbidden unless authorized. All rights reserved
WP08 Energy Efficiency. Public Lighting and FV
Reproduction is forbidden unless authorized. All rights reserved
WP11 AMI
13.000.000
Concentrators
Comm Network
PLC Communications
MeterMeter
140.000 Cenelec A Band
PLC of 28.8 kbps operated at 4.8 kbps
BPSK modulation
Security (AES-128 bits hardware encryption)
Field-proven METERS & MORE PROTOCOL
Architecture adapted to european regulation
Central Systems
Homes
Transformer
Functionalities:
AMMS System – central management and cordination of the whole metering system.
Electronic meters – Real-time operation. Allow the energy control and measurement, the remote connection / disconnection, over 6 tariff periods tarifarios.
Concentrator - Detects and manages (real-time, fully automated) the new meters conected ti the grid.
PLC-Power Line Communications– Automatic management of any network change.
Communication protocol, based in METERS & MORE, with all the reliability of Enel technology and experience.
Reproduction is forbidden unless authorized. All rights reserved
WP11 AMI
Cenelec A Band
PLC of 28.8 kbps operated at 4.8 kbps
BPSK modulation
Security (AES-128 bits hardware encryption)
Field-proven METERS & MORE PROTOCOL
Reproduction is forbidden unless authorized. All rights reserved
3.000 SmartMeters PLC compatibles with METER&MORE
First installations in Spain
PLC and GPRS
WP11 AMI
Reproduction is forbidden unless authorized. All rights reserved
WP11 AMI
Reproduction is forbidden unless authorized. All rights reserved
WP11 AMI
Reproduction is forbidden unless authorized. All rights reserved
WP12 Electric Vehicles
10 electric vehicles (BYD, Mitsubishi, ….)
2 plug-in hybrids
6 charge posts
Integration with renewable sources
V2G deployed (Microvett)
G4V, Green Emotion…
Reproduction is forbidden unless authorized. All rights reserved
Control and Monitoring Center
º
CMC
Reproduction is forbidden unless authorized. All rights reserved
Control and Monitoring Center
Reproduction is forbidden unless authorized. All rights reserved
Control and Monitoring Center
Reproduction is forbidden unless authorized. All rights reserved
Control and Monitoring Center
Reproduction is forbidden unless authorized. All rights reserved
@70 CCDD PLC40km MVL
3.000 Meters
200kw/h MV3* 10 kw/h LV
13Mw MV100Kw LV
Deployment of a public lighting system with 200 elements, micro wind (600w) and (85wp) photovoltaic generation
12 electricvehicles
º
CUSTOMERS300 industrial
900 service12.000 domesticDuration 4 Years
Budget 31 million €Consumed energy: 70 GWh/year,
Smartcity will save 6.000 Ton CO2 per year
Relevant Information
Reproduction is forbidden unless authorized. All rights reserved
Value Proposal for the city of Malaga
Involves one of the most significant challenges that society will face this century.
Turns the initiative into an international showplace to display technology relevant to the project.
Enables experience gaining and the addition of new capabilities which will encourage future research and development.
Puts in a competitive position both the industry and the national R+D, particularly in Andalucía.
Others initiatives in Málaga:
Malaga Valley (to promote ICT)
Eurocities member
Convenant of Mayors
G4V,Green Emotion.
Malaga and Andalucía region have become a window and an international point of reference
It yields knowledge and added value capabilities which will strengthen the development of the industry and the national R+D at the right moment
From past to future: Málaga City Hall
Benefits and Results
Reproduction is forbidden unless authorized. All rights reserved
Grid of today + ICT = Grid of the future
Thank you for you attention
www.smartcitymalaga.com
Photovoltaic and wind generators street lighting at the sea walk next summer
Reproduction is forbidden unless authorized. All rights reserved