Major Equipment1. Gas Turbine Generator (GTG)
2. Heat Recovery Steam Generator/Boiler (HRSG)
3. Fuel Gas Booster Compressor (FGBC)
4. Condensing Economizer
5. 27.6 kV Switchgear
6. 15 kV Switchgear
7. 5.0 MVA Step-Up Transformer
8. Protection and Control Panels
9. SCADA Panel and HMI
10. 600 V MCC
![Page 3: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/3.jpg)
CHP System: Major Equipment
1. 4.6 MWe Gas Turbine Generator Set (GTG)a) Solar Turbines – Centaur 50 – 22,800 operating hours
b) SoLoNOx Combustion System – 14 ppm NOx
c) 13.8 kV Generator
2. Heat Recovery Steam Generator (HRSG)a) Cleaver-Brooks
b) Steaming capacity of 90,000 lb/hr
c) Duct burner to supplement steam production
d) Economizer
e) Exhaust gas stack
3. Fuel Gas Booster Compressor (FGBC)a) Single Screw Emerson Vilter gas compressor
4. Condensing Economizera) 6 mmBtu/hr
![Page 4: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/4.jpg)
Gas Turbine Generator1. Solar Turbines – Centaur 50
2. Commissioned – November 2015
3. 22,800 operating hours (Full LTSA in place)
4. SoLoNOx Combustion System (<14 ppm)
5. InSight Remote Monitoring Software
6. Equipped with:• Inlet air filter
• Combustion Air Inlet Cooling Coil
• Ventilation Ductwork
• Silencers
• Neutral Grounding Transformer
• Remote Control System
• Lube Oil Cooler
![Page 5: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/5.jpg)
Gas Turbine
Generator
![Page 6: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/6.jpg)
asdf
Gas Turbine
Generator
• Combustion Inlet Air Filter
• Inlet Air Coil
![Page 7: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/7.jpg)
Heat Recovery Steam Generator
1. Cleaver-Brooks (manufactured in Lincoln, Nebraska)
2. Commissioned – November 2015
3. Capacity – 90,000 lb/hr (170 psig, sat.)
4. Natcom Duct Burner System
5. Burner Management System
6. Top exhaust to feedwater economizer
7. ‘Loose shipped’ components:• Feedwater control valve
• Steam Flow Meter (orifice plate)
• Natural Gas Flow Meter
• Automatic Vent Valve (19,000 lb/hr)
![Page 8: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/8.jpg)
![Page 9: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/9.jpg)
Fuel Gas Booster Compressor
1. Emerson Vilter Rotary Screw Compressor
2. Section Pressure – 30 psig
3. Discharge Pressure – 250 psig
4. Auxiliary Equipment
• After Cooler
• Lube Oil Cooler
![Page 10: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/10.jpg)
Condensing Economizer
1. E-Tech Vertical Flow Unit
(Stainless Steel)
2. 6 mmBtu/hr (125,000 lb/hr water,
89 F in, 145 F out)
3. NY Blower Fan
4. Man-safe Dampers & Actuators
5. Outlet Stack
![Page 11: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/11.jpg)
Step-Up Transformer
1. 5 MVA Oil Filled Step-Up
Transformer
2. OEM – Northern Transformer
3. Primary Voltage – 27.6 kV
4. Secondary Voltage – 13.8 kV
5. Equipped for Future Fans
![Page 12: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/12.jpg)
Switchgear (15 kV)
1. 15 kV (Class Switchgear)
• Nominal Voltage – 13.8 kV
2. Powell Electric (Edmonton)
3. 52-G Generator Breaker
4. Utility Metering Cell
5. Indoor Installation
![Page 13: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/13.jpg)
Balance of Plant Control System
![Page 14: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/14.jpg)
Protection & Control Panel
Motor
Control
Centre
(MCC)
![Page 15: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/15.jpg)
Chilled Water System
![Page 16: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/16.jpg)
Building Construction
![Page 17: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/17.jpg)
Load Shedding Design
1. SEL-751 used to initiate simultaneous tripping of 52-U and selective loads
2. Decision of what to trip based on amount of load coming from utility (i.e. >500 kW)
3. Send trip signal directly from SEL-751 to each breaker/controller (devices need remote trip capability)
![Page 18: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/18.jpg)
Load Shedding Block Diagram
![Page 19: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/19.jpg)
Performance Data(Through 3 Quarters for 2018)
![Page 20: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/20.jpg)
Improvements (since Commissioning)
1. Protection & Controls Settingsa) Fine-tuned to match equipment and site
conditions
b) Greatly improved islanding capabilities
2. Solar Turbines CGCM Modulea) Improving control functionality of turbine
to follow load by adding second CGCM
3. UPS Power Supplya) Added to all critical PLCs and contactors
for critical loads
![Page 21: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/21.jpg)
h
Process
Flow –
Base
Design
![Page 22: Major Equipment](https://reader036.fdocuments.in/reader036/viewer/2022071612/6156f785a097e25c764f7ec9/html5/thumbnails/22.jpg)
Optional Adder –
3 – 4 MWe
Condensing
Steam Turbine