MAINTENANCE OF MAINTENANCE TRAFFIC ICC … OFMAINTENANCE TRAFFIC ICC CONTRACT A ... crossover along...

44
1 1 MAINTENANCE MAINTENANCE OF TRAFFIC TRAFFIC ICC CONTRACT A ICC CONTRACT A Presented by: Presented by: Jack Alexander Goode, II Jack Alexander Goode, II A. Morton Thomas & Associates, Inc. A. Morton Thomas & Associates, Inc. Aneesha Griffin Aneesha Griffin Sabra Sabra , Wang & Associates, Inc. , Wang & Associates, Inc. In Conjunction With: In Conjunction With: Mid Mid - - Colonial District of Institute of Transportation Engineers Colonial District of Institute of Transportation Engineers 2009 District 2 Annual Meeting 2009 District 2 Annual Meeting April 29 April 29 May 1, 2009 May 1, 2009 Baltimore, Maryland Baltimore, Maryland

Transcript of MAINTENANCE OF MAINTENANCE TRAFFIC ICC … OFMAINTENANCE TRAFFIC ICC CONTRACT A ... crossover along...

11

MAINTENANCE MAINTENANCE OFTRAFFICTRAFFICICC CONTRACT AICC CONTRACT APresented by:Presented by:Jack Alexander Goode, IIJack Alexander Goode, IIA. Morton Thomas & Associates, Inc.A. Morton Thomas & Associates, Inc.

Aneesha GriffinAneesha GriffinSabraSabra, Wang & Associates, Inc., Wang & Associates, Inc.

In Conjunction With:In Conjunction With:MidMid--Colonial District of Institute of Transportation EngineersColonial District of Institute of Transportation Engineers2009 District 2 Annual Meeting2009 District 2 Annual MeetingApril 29 April 29 –– May 1, 2009May 1, 2009Baltimore, MarylandBaltimore, Maryland

22

PRESENTATION OBJECTIVESTo provide a general overview of Contract To provide a general overview of Contract ‘‘AA’’

To provide a project update on M.O.T. activitiesTo provide a project update on M.O.T. activities

To understand the role of an M.O.T. ManagerTo understand the role of an M.O.T. Manager

To understand the importance of public outreachTo understand the importance of public outreach

To understand the Transportation Management To understand the Transportation Management Plan (TMP) processPlan (TMP) process

33

AT THE END, ATTENDEES WILL:Have a brief understanding of the Contract Have a brief understanding of the Contract ‘‘AA’’constructionconstruction

Comprehend the role of an M.O.T. ManagerComprehend the role of an M.O.T. Manager

Gain knowledge of the TMP processGain knowledge of the TMP process

44

ABOUT THE SPEAKERS

55

GENERAL OVERVIEW

Project Limits: IProject Limits: I--270/I270/I--370 to MD 97370 to MD 97Approximate Contract Amount: $478.7MApproximate Contract Amount: $478.7M7.2 Mainline Miles7.2 Mainline Miles3 Interchanges / 23 Bridges3 Interchanges / 23 BridgesDD--B Team: B Team: IntercountyIntercounty Constructors (IC)Constructors (IC)A JV of: Granite, A JV of: Granite, CormanCorman, and , and WagmanWagman

66

PROJECT UPDATE ONM.O.T. ACTIVITIES

Realignment of IRealignment of I--370 EB / construction of median 370 EB / construction of median crossover along Icrossover along I--370 WB370 WBShady Grove Road bridgeShady Grove Road bridgeRedland Road bridgeRedland Road bridgeNeedwoodNeedwood Road / Emory Lane detour roadsRoad / Emory Lane detour roadsHaul routesHaul routesGeorgia Avenue (MD 97) bridge / traffic switchGeorgia Avenue (MD 97) bridge / traffic switch

77

PROJECT UPDATE ONM.O.T. ACTIVITIES

88

PROJECT UPDATE ONM.O.T. ACTIVITIES

99

PROJECT UPDATE ONM.O.T. ACTIVITIES

1010

PROJECT UPDATE ONM.O.T. ACTIVITIES

1111

PROJECT UPDATE ONM.O.T. ACTIVITIES

1212

PROJECT UPDATE ONM.O.T. ACTIVITIES

1313

M.O.T. MANAGER ROLE

Supervise M.O.T. Engineer / M.O.T. MaintainersSupervise M.O.T. Engineer / M.O.T. MaintainersConduct preConduct pre--traffic switch meetingstraffic switch meetingsMonitor traffic queues / operations on a daily Monitor traffic queues / operations on a daily basisbasisPrepare field design changes (FDC)Prepare field design changes (FDC)Review / respond to nonReview / respond to non--conformance (NC) conformance (NC) comments from ICCcomments from ICCReview weekly inspection Review weekly inspection ratings formratings form

1414

M.O.T. MANAGER ROLE

1515

M.O.T. MANAGER ROLE

1616

M.O.T. MANAGER ROLE

1717

M.O.T. MANAGER ROLE

1818

PUBLIC OUTREACHTimely responses to citizensTimely responses to citizens’’ concernsconcernsEarly notification of major traffic switchesEarly notification of major traffic switchesTeam involvement with preTeam involvement with pre--traffic switch meetingstraffic switch meetingsManager availability to answer M.O.T. questionsManager availability to answer M.O.T. questionsNewsletters / website updates for latest on construction Newsletters / website updates for latest on construction scheduleschedule((http://http://www.iccproject.com/newsletters.phpwww.iccproject.com/newsletters.php))Contract Contract ‘‘AA’’ Community LiaisonCommunity LiaisonOdessa Phillip (Odessa Phillip ([email protected]@iccproject.com))

1919

PUBLIC OUTREACH

2020

TRANSPORTATION MANAGEMENT PLAN

Project AreaProject AreaProject ConstraintsProject ConstraintsMOT PhasingMOT PhasingTraffic AnalysisTraffic AnalysisTMP MonitoringTMP Monitoring

2121

PROJECT AREA

Realignment of existing freewayRealignment of existing freewayAdditional impacts to:Additional impacts to:

Signalized multilane arterialsSignalized multilane arterialsMinor crossroadsMinor crossroads

13 discrete analysis regions13 discrete analysis regions

2222

PROJECT CONSTRAINTS

Pedestrian/bicycle accessPedestrian/bicycle accessAccess to public transportationAccess to public transportationSafetySafetyMinimize impactsMinimize impactsBridge widening over existing roadwaysBridge widening over existing roadwaysCoordination with other projectsCoordination with other projectsImpacts to existing Impacts to existing TCDsTCDsAchieving balanceAchieving balance

SafetySafetyDurationDurationImpacts / AccessImpacts / Access

2323

MOT PHASING

Seven minor crossroadsSeven minor crossroadsDetour road alignments / lane Detour road alignments / lane shiftsshifts

Shady Grove RoadShady Grove RoadSixSix--lane divided arteriallane divided arterialTemporary road closures for steel Temporary road closures for steel erectionerection

2424

CONSTRUCTION PHASING DIAGRAMS

2525

CONSTRUCTION PHASING DIAGRAMS

2626

MOT PHASING

MD 97MD 97FiveFive--lane divided arteriallane divided arterialNB MD 97 : Existing sidewalkNB MD 97 : Existing sidewalkSB MD 97 : Existing hiker/biker SB MD 97 : Existing hiker/biker trailtrailTemporary crossoverTemporary crossoverPedestrian detour possible???Pedestrian detour possible???

2727

CONSTRUCTION PHASING DIAGRAMS

2828

CONSTRUCTION PHASING DIAGRAMS

2929

CONSTRUCTION PHASING DIAGRAMS

3030

MOT PHASING

II--370370FourFour--lane divided freewaylane divided freewayModify two existing interchangesModify two existing interchangesConstruction one new Construction one new interchangeinterchangeWiden three existing bridgesWiden three existing bridges

3131

CONSTRUCTION PHASING DIAGRAMS

3232

CONSTRUCTION PHASING DIAGRAMS

3333

CONSTRUCTION PHASING DIAGRAMS

3434

CONSTRUCTION PHASING DIAGRAMS

3535

TRAFFIC ANALYSIS

Excluded from TMPExcluded from TMPPerformed during final designPerformed during final designDetour roadsDetour roads

Capacity evaluation using Excel / Capacity evaluation using Excel / QuickZoneQuickZone

Ramp modificationsRamp modificationsHCS and CORSIMHCS and CORSIM

Intersection modificationsIntersection modificationsSynchroSynchroModify two existing interchangesModify two existing interchanges

3636

TMP MONITORING

MOT Manager MOT Manager –– Jack GoodeJack GoodeVerification of work zone setupsVerification of work zone setupsField observationsField observationsRecords of work zone related Records of work zone related crashescrashesContingency plansContingency plansModify MOT plans based on field Modify MOT plans based on field conditionsconditions

3737

TMP Concept →→ MOT Design

Contractors desired sequencingContractors desired sequencingAvailability of construction materialsAvailability of construction materialsAvailability of other design componentsAvailability of other design componentsWork zone analysis resultsWork zone analysis resultsTieTie--in constructabilityin constructabilityStructure constructabilityStructure constructabilityTemporary lightingTemporary lightingMOT traffic signalsMOT traffic signalsStaged installation of ultimate signingStaged installation of ultimate signing

3838

TMP Concept →→ MOT Design

3939

TMP Concept →→ MOT Design

4040

TMP Concept →→ MOT Design

4141

TMP Concept →→ MOT Design

4242

TMP Concept →→ MOT Design

4343

SUMMARY

TMPTMP““Big PictureBig Picture””Identify constraintsIdentify constraintsIdentify coordination issuesIdentify coordination issues

MOT DesignMOT DesignAwareness of ContractorAwareness of Contractor’’s needss needsOther disciplines add constraintsOther disciplines add constraintsConsideration of all temporary Consideration of all temporary TCDsTCDsMultiple ways to perform designMultiple ways to perform design