Main Yuksel Presentation 06_15v10-long-Rev13-June2015

65
YÜKSEL İNŞAAT A.Ş. Company Presentation | As of 01 January 2015

Transcript of Main Yuksel Presentation 06_15v10-long-Rev13-June2015

Page 1: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

YÜKSEL İNŞAAT A.Ş.

Company Presentation | As of 01 January 2015

Page 2: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

2

Section 2

Section 4

Section 3

Section 5

Capabilities

Management

Diversification

References

Table of Contents

Section 1 Company Overview

2

Page 3: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

Section 1 | Company Overview

Page 4: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

4

An International Construction Company with Strong Technical Capabilities

• Yüksel İnşaat is a privately owned, incorporated company having a

capital of TL300 million.

• Yüksel İnşaat is the flagship of Yüksel Holding with US$486 million

annual turnover in 2014, which is more than 94% of Yüksel group

companies’ turnover in the same period, that is US$515 million.

• For 2014, total assets and equity of Yüksel Group were recorded as

US$1,165 million and US$372 million respectively.

• As of 01 January 2015, the company had order book of US$4.32 billion

(Yüksel share US$2.45 billion) and backlog of US$1.31 billion largely in

public-sector infrastructure.

• Yüksel has 52 years of experience in construction industry.

• Yüksel is ranked consistently among the top 250 International

Contractors over the last 10 years according to Engineering News

Record Magazine (ENR250). Yüksel was ranked from 85th to 132nd place

between 2006 and 2015.

• Approximately 7,000 employees are working for Yüksel.

• Yüksel provides high-quality works and possess ISO 9001 Quality

Reassurance, OHSAS 18001 Occupational Health and Safety and ISO

14001 Environmental Management Systems.

QUALITY

ENVIRONMENTAL

HEALTH & SAFETY

4

Page 5: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

5

ENR Global Sourcebook Rankings, 2013 & 2014

GENERAL RANKINGS

SEGMENTAL RANKINGS

Based on International Revenue

GENERAL RANKINGS

SEGMENTAL RANKINGS

124th in Top 250

229th in Top 250Based on Total Revenue

Highways 25th in Top 25

Transmission Lines &

Aqueducts18th in Top 25

Water Treatment &

Desalination25th in Top 25

Water Supply 32nd in Top 50

Hotels, Motels & Convention

Centers18th in Top 25

Government Offices 16th in Top 25

Water Treatment &

Desalination24th in Top 25

Water Supply 33th in Top 50

Transmission Lines &

Aqueducts13th in Top 25

Government Offices 19th in Top 25

Based on International Revenue 132nd in Top 250

230th in Top 250Based on Total Revenue

5

Page 6: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

6

Award of 2030m

Karakaya

Reservoir

Railway Bridge-

the longest

railroad bridge

in Turkey.

A Strong 52-Years Track Record in Infrastructure Construction

First international

venture was in

Saudi Arabia –

Riyadh Quassim

Water Transmission

System and

Reservoir Project

Yüksel, the

flagship entity

of the Group,

established in

Ankara

Completed

construction of

700MW

Altinkaya Dam

and Hydro-

Electric Power

Plant in Turkey

Yüksel Holding

was formed as

the umbrella

company for

the Group

Largest

infrastructure

project in Turkey:

the Gebze – Izmir

Motorway and

Izmit Bay

Crossing under

BOT scheme.

Contract value of

USD 6.8bn

Award of the

construction of

infrastructure

facilities in Kabul,

by NATO

Maintenance and

Supply Agency

2008

First contract

for U.S.

Government

was signed

Key Milestones

1991 / 1995

Award of Ankaray

(8.7 km double

track Light Rail

Mass Transit

System) and Urfa-

Suruç (76 km

Motorway)

Award of the

largest natural gas

pipeline project in

Turkey: TANAP

(Trans-Anatolian

Natural Gas

Pipeline)

Completed

construction of

Ankara Waste

Water Treatment

Plant, the largest

in Turkey and the

second largest of

its kind in Europe

1963 1983 1998 2014

1981 1989 1997 2003 2010

6

Page 7: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

7

Steady Growth in Revenue

The above values represent the turnover of the Yüksel İnşaat A.Ş. only. 7

0

100

200

300

400

500

600

700

800

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

159

127

297

396 446

571 623

720

716

521

654 7

21

486

Yüksel (Total Sales) x million USD

Page 8: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

8

0

500

1000

1500

2000

2500

3000

2008 2009 2010 2011 2012 2013 2014

29

89

24

30

24

87

22

85

25

22

25

07

24

50

13

88

11

44

98

3 13

83

12

23

13

97

13

11

Order Book and Backlog Values as of 31st of Decembers

Order Book(Yüksel Share)- USD million

Backlog - USDmillion

Order Book, Backlog & New Awards

New awards Values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2006 2007 2008 2009 2010 2011 2012 2013 2014

68

5

12

16

14

01

42

6

83

4 96

0

36

5

10

15

18

52

50

3

91

4

13

89

42

6

53

1 69

4

16

8

64

8

71

4

New Awards as of 31st of Decembers

New Awards -USD million

New Awards(Yuksel Share)- USD million

8

Page 9: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

9

Competent and Qualified Senior Management Team

Vice President

(Senior)

Bülent GÜNGÖR

40 years experience

Vice President

(Technical)

Adil AĞOĞLU

38 years experience

Vice President

(Technical)

Cüneyt KARACASU

32 years experience

Vice President

(Financial)

Candan AK

33 years experience

Chairman & CEO

Emin SAZAK

27 years experience

President

Suha ÜNSAL

39 years experience

Vice President

(Technical)

Erol ÖZDEMİR

29 years experience

Vice President

(Technical)

Tolga AKKAŞ

20 years experience

9

Page 10: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

10

Yüksel Controls Most of the Major Group Entities

Further information on the Yüksel Group Companies could be obtained from www.yuksel.net 10

Page 11: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

11

Real Estate Development

Fiba – Yüksel Uluslararası

Proje Geliştirme ve Yatırım A.Ş.

• International construction company with 52 years of experience in

Turkey and abroad

• Specialization in infrastructure and superstructure construction projects

with focus on value added services

• Diversified portfolio in terms of project type and geography

• Ability to bid for large and complex contracts

• Long-standing relations with Governments

Contracting

Sasel Elektromekanik A.Ş.

Yüksel Yapı A.Ş.

Yüksel İnşaat A.Ş.

The Flagship of the Group

Energy

Yüksel Enerji Elektrik Üret. & Yüksel Enerji Holding

Hydroelectric Power Plant Projects

• Ownership in 250 acres of land in Çubuklu, İstanbul having wide views

of the Bosphorus and close proximity to city center

• A Green Field Project, Fiba – Yüksel Çubuklu Valley, which involves the

development of high-end modern homes, recreation areas and a hotel

• First phase of the Project, total value of around US$ 100 mn, sold out

• One of the leading expertise companies providing design, engineering

and contracting services in electromechanical works

• Turn-key prefabricated structural elements production and erection

Business Verticals

• A Plant having 74MW installed capacity is under operation since 2012.

• A Plant with 19 MW installed capacity started operation in 2013 and

was sold in 2014. 11

Page 12: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

12

Transportation Power, Dams & Industrial Buildings Pipelines Environmental

• The segment covers the

construction of roads, motorways,

highways, bridges, railways, rail

mass transit systems and light rail

transit systems (LRTS) and

airports

• Construction of 11 highways, 7

motorways and 4 light/heavy

railway system projects in Turkey

and abroad

• In total, 25 km of bridges, 971 km

of highways, 208 km of

motorways, 60 km of tunnels and

39 km of railway system/railway

infrastructure have been

committed

• The segment includes the

construction of dams, HEPPs, civil

works of combined cycle power

plants, factories

• Construction of 8 rock filled, 3

earth filled and 4 concrete major

Dams & HEPPs in Turkey and

Saudi Arabia

• Total installed capacity of HEPPs

undertaken by Yüksel is 2,421MW

• The segment covers the

construction of business and

trade centers, high-end office

buildings, five-star hotels,

shopping malls, airport terminals,

holiday villages, tourist resorts,

residential high rise buildings,

university complexes, warehouses

and hospitals

• Has been involved in more than

75 prominent building projects in

Turkey and abroad

• It has committed circa 3 mn m2 of

total construction area over the

last 52 years

• The segment includes the

construction of potable water

lines, sewage lines, pumping

stations and reservoirs

• Has signed numerous contracts to

undertake several large scale

water transmission lines and

reservoirs both in Turkey and the

Gulf Region

• In aggregate more then 1,800 km

of pipelines have been

accomplished

• The segment covers the

construction of waste and potable

water treatment plants and

infrastructural networks

• Has accomplished a total

treatment capacity of 2.1 million

m3/day

Order Book Order Book Order Book Order Book Order Book

1,084 97 469 533 267

Completed Completed Completed Completed Completed

2,279 2,014 3,688 1,326 653

Total Order Book = 2,450

Total Completed = 10,973 *

* The total value for completed projects also includes works in other construction segments.

All values indicate Yüksel share in the contracts in US$ million.

The completed projects’ values are based on the updated contract amounts according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods

Diversified Construction Segments

12

Page 13: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

13

US$ amounts shown above are based on the total updated contract amounts of on-going and completed projects

US Government and NATO Projects are also accounted for in the breakdown by project type.

Marine Structures (Since 1963)

Environmental (Since 1978)

Transportation ( Since 1973)

Power & Dams & Industrial (Since 1980)

Material Supply & O&M (Since 2003)

1960 1970 20101980 1990 2000

US Govt. & NATO Projects (Since 2003)

Oil & Gas and Water Pipelines (Since 1973)

Buildings (Since 1974)

Energy (Since 2005)

Land Development (Since 1997)

Co

ntra

ctin

g S

erv

ices

R

eal E

sta

te

& E

nerg

y

Strong Track Record

US$490m

US$6,395m

US$2,945m

US$4,794m

US$1,842m

US$3,488m

US$530m

US$2,212m*

US$220m

US$320m

13

Page 14: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

14

Geographical Diversification

Yüksel has worked in 15 different countries.

Current

Markets

New

Markets /

Offices 14

Page 15: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

Section 2 | Capabilities

Page 16: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

16

Strong construction capabilities

With solid history of project

execution and delivery

Sound order book of projects

largely with government entities

across geographies

Diversified business model

across geographical regions

and project types

Established track record of

operational efficiency and

financial performance

Highly qualified, competent and

experienced management team

and workforce

Prudent and proactive corporate

strategy with robust risk

management practice

Key Strengths

16

Page 17: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

17

Values shown above represent the total updated contract amounts in US$ (share of Yüksel in the contracts are shown in paranthesis) as of 01 January 2015

Contract values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods

Summary of Completed and Ongoing Projects

Completed Projects Ongoing Projects Total

Turkey International Turkey International Turkey International

126 projects

$7.99 billion($5.32 billion)

221 projects

$7.91 billion($5.65 billion)

9 projects

$1.55 billion($613 million)

28 projects

$3.04 billion($2.01 billion)

135 projects

$9.54 billion($5.93 billion)

249 projects

$10.95 billion($7.66 billion)

347 projects

$15.90 billion($10.97 billion)

37 projects

$4.59 billion($2.63 billion)

384 projects

$20.49 billion($13.60 billion)

17

Page 18: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

18

30 No. Construction Sites Abroad

Saudi Arabia - 17 no.

Afghanistan - 1 no.

Libya - 4 no.

Qatar - 3 no.

Iraq - 2 no.

Kazakhstan - 1 no.

Republic of Congo - 1 no.

Oman - 1 no.

Turkish = 561

Non-Turkish = 4,527

Subcontractor = 383

Hired = 81

Total = 5,552

Head Office, Ankara

Main Logistic Area, Ankara

Liaison Office, Istanbul

Turkish = 200

Total = 200

9 No. Construction Sites in Turkey

Turkish = 316

Subcontractor = 775

Hired = 23

Total = 1,114

Global Presence

As of 01 January 2015

GRAND TOTAL

6,866 Employees

18

Page 19: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

19

Manpower

As of 01 January 2015

Distribution of Manpower based on Education Distribution of Manpower based on Source & Nationality

Geographical Distribution of Manpower

0

500

1,000

1,500

2,000

2,500

3,000

1313

2624

2082

80171 123 96

344

17 15

0500

1,0001,5002,0002,5003,0003,5004,0004,5005,000

427 498 421930

4589

0500

1,0001,5002,0002,5003,0003,5004,0004,5005,000

1076

4527

1158

104

19

Page 20: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

Section 3 | Diversification

Page 21: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

21

Reasonably spread across geographies Diversified portfolio by project segments

Broad Segmental Diversification Across Geographical Regions

Distribution of Completed Projects ($15.90 Billion in Total)

Distribution of Order Book ($4.59 Billion in Total)

Distribution of Completed Projects ($15.90 Billion in Total)

Distribution of Order Book ($4.59 Billion in Total)

Contract values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods

21

Page 22: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

22

Reasonably spread across geographies

Distribution of Turnover

Distribution of Turnover across countries ($486 million in Total)

Diversified portfolio by project segments

Distribution of Turnover according to work segments ($486 million in Total)

22

Page 23: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

23

Sizeable order books of US$4.59 billion across various project types (Yüksel Share: US$2.63 billion)

S/N Contract Client Country Value (US$ million)

1 Doha Metro, Red Line South Elevated & At Grade Package (22.50 %) Government Qatar 654

2 Infrastructure of the Third Phase of Riyadh Bus Rapid Transit System (BRT) Project (100%) * Government Saudi Arabia 610

3 TANAP - Trans-Anatolian Natural Gas Pipeline, Lot 2 (25 %) Government Turkey 540

4 Lusail Development CP4 – A1, A6 Roads, Marina and Southern Interchanges (50.00 %) Government Qatar 463

5 Kora-Shaqlawa-Qandeel Highway (100.00 %) Government Iraq 256

6 Ordu Ring Road Construction of the section btw. Km: 21+000 - 40+114.544 (25.00 %) Government Turkey 242

7 İstanbul Metro, between Unkapanı and Yenikapı - İstanbul (49.50 %) Government Turkey 206

8 Water Transmission from Dams of Hilli, Yobba and Al Laith to Shu’aibah Plant (Phase 2) (100.00 %) Government Saudi Arabia 174

9 Stormwater Networks in Al Naseem East, Al Naseem West and Maizaliah in Riyadh (100.00 %) Government Saudi Arabia 172

10Construction of 1585 Houses and facilities, infrastructure and landscape works in Ankara Gölbaşı İncek

(50.00 %)Government Turkey 167

11 Al Fateh University Agriculture, Veterinary and Science Faculty Buildings Projects Tripoli (100.00 %) Government Libya 160

12 F-15 Modernization Program, King Khalid Air Base Campus Construction (100.00 %) Government Saudi Arabia 136

13 Construction of infrastructure work of campuse A in Al Fateh University Tripoli (100.00 %) Government Libya 119

14 Establishment of Sea Water Pumping stations (201 C01) (50.00 %) Government Saudi Arabia 117

15 Gebze Orhangazi İzmir Highway between Km 19+213 - Km 30+700 construction work (50.00 %) Government Turkey 116

16 Dualization of Ibri - Yanqoul Stage 2 (60.00 %) Government Oman 109

17 Silvan Dam Construction (55.00 %) Government Turkey 107

18 Maintenance of Coastal Road Sirte – Ajdabiyah Section (90.74 %) Government Libya 105

19 Maintenance of Coastal Road Dernah-Imsaad Section (90.00 %) Government Libya 96

20 University of Dammam : Girls Colleges in Al Rayan Complex (50.00 %) Government Saudi Arabia 95

21 Çetin Hydropower Plant Civil Works including Hydraulic Steelworks and Auxiliary Powerhouse (55.00 %) Government Turkey 78

22 The First Stretch of Abu Bakr Siddique Road Development Project (100.00 %) Government Saudi Arabia 76

23 Faisal University, Teaching Hospital Al Hassa Phase 2A (50.00 %) Government Saudi Arabia 65

24 Ivedik Drinking Water Treatment Plant, Improvement of Unit 1 & Unit 2 & Construction of Unit 3 (100.00 %) Government Turkey 53

25 Refurbishment of King Fahad Hospital – Hofuf (50.00 %) Government Saudi Arabia 47

26 Mbamou Palace Hotel Construction & Renovation – Brazzaville (90.00 %) GovernmentRepublic of

Congo34

27 Others Government Various 202

Note: Values shown above represent the total updated contract amounts according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods. Share of Yüksel in the contracts are shown in paranthesis

Sound Order Book of Projects Largely with Government Entities

37 no. of Current Projects; 37 no. for Governmental Entities23

* This project has been awarded to Yüksel in 2015. The Value of this Project is not included in the Total Value of Ongoing Projects.

Page 24: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

Section 4 | Management

Page 25: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

25

Project Manager

Group Manager

Vice President

President

Board of Directors

VISITING SCHEME REPORTING SCHEME

Daily communication

Weekly reporting

Monthly written reporting

Quarterly reporting

Twice a year

Every two months

Once a month

Twice a month

Work Sites

Everyday

Robust Management Culture

25

Page 26: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

26

Identification Selection TenderAward &

PerformanceDevelopment

Periodicals (for tenders)

Publications and/or web

sites (of investing

institutions)

Geographical/country

based investment

announcements and

publications

Invitations from current

or past clients

Introduction by clients or

business associates

Size

Duration

Suitable scope

Country

Fund availability

Client profile and

reputation

Pre-qualification criteria

Decision to participate

Partnering/teaming

discussions

Prospective partner

selection (scope

suitability, resource

availability, past

experience and

performance)

Assessment of project,

contractual, market, etc.

risks

Detailed cost estimation

and projection

Tender preparation and

submission

Key personnel planning

Appointment of Front

End Management and

Key Staff

Financial modelling,

planning and scheduling

Detailed project planning

Execution of project plan

with strict adherence to

project timeline and

costs

Handing Over

Process duration can be 1 to 5 years with 2 to 3 years as average

Superior project management capability gained over 52 years of successful operations

A Systematic Work Flow Process

26

Page 27: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

27

Well defined selection process Careful selection of subcontractors and suppliers

Best qualified and experienced subcontractors/suppliers

Experienced in project territory

Demonstrate sound & enough resources to execute the contract

Financial resources

Technical resources (equipments & plants & robust database etc.)

Human resources (qualified manpower and experienced technical

staff)

Capable of sharing the risk of the project (bonds, etc.)

Demonstrate good partnership skills in its past performance

Good relationships with the potential clients (preferably)

No bad litigation history

Open to direct communication

Good understanding of project requirements

Prepared to invest same effort with Yüksel throughout the project

execution

1

Definition of procurement requirement

Procurement Conditions (Warranties, Planned budget, delivery

schedule, technical qualifications, requested norms & standards,

mock-ups, etc.)

Bill of Quantities

Place of Procurement (Head Office or Site)

2 Issuing of the RFQ (Request for Quotation)

3 Collecting the quotations

4

Evaluation of received quotations

Registering of Supplier/Subcontractors, which are complying with

the conditions of RFQ, in Approved Vendors/Subcontractors List

Verification of Supplier/Subcontractors (Should not be in the

Black List)

Defining the optimum proposal by technical and financial

analysis

5Negotiations with the short listed suitable

suppliers/subcontractors

6 Signing Agreement with the Supplier/Sub-Contractor

Proper initial selection

Preliminary planning meetings to assure a complete understanding of

scope, quality requirements, safety requirements and schedule

Detailed execution plans from subcontractors that will address

schedules, manpower and supervision in detail

Inclusion of subcontractors in all weekly project planning meetings

Inclusion of subcontractors in the detailed schedule and in short term

look-ahead schedule development to assures buy-in, understanding

and cooperation

Inclusion of subcontractors in the CAPP safety incentive plans.

Efforts to integrate partners

Care and Effort Invested in Selecting Subcontractors and Partners

27

Page 28: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

Section 5 | References

Page 29: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

29

126 projects of US$7.99 billion completed in Turkey (Yüksel Share: US$5.32 billion)

Power, Dams & Industrial (3,302)

Altınkaya Dam and Hydraulic Power Plant – SAMSUN (50.00 %) 616

Kandil Group Projects (Kandil, Sarıgüzel & Hacınınoğlu Dams & HEPPs) – KAHRAMANMARAŞ (100.00%) 583

Borçka Dam and Hydroelectric Power Plant – ARTVİN (55.25 %) 536

Karkamış Dam and Hydroelectric Power Plant – GAZİANTEP (55.00 %) 358

Muratlı Dam and Hydroelectric Power Plant – ARTVİN (31.13 %) 353

Transportation (2,248)

ANKARAY-Ankara Light Rail Transit System – ANKARA (17.87 %) 517

Bolaman-Perşembe (Blacksea Coastal) Highway – ORDU (33.33 %) 427

Ankara-Pozantı Motorway, between Kemerhisar – Eminlik – NİĞDE (25.00 %) 309

Gaziantep-Şanlıurfa Motorway, between Suruç-Şanlıurfa – ŞANLIURFA (50.00 %) 290

Kadıköy-Kartal Rail Mass Transportation System Construction Works – İSTANBUL (26.00 %) 233

Borçka-Artvin ve Borçka-Murgul 1st Stage Highway – Borçka-Artvin 2nd Stage Highway ARTVİN (96.67 %) 153

İstanbul Metro, Taksim and Unkapanı – İSTANBUL (49.00 %) 105

Buildings (1,508)

Metrocity Business &Trade Center – Residence Complex ISTANBUL (100.00 %) 185

Construction of Bosphorus (Swiss) Hotel – ISTANBUL (100.00 %) 109

Akmerkez Shopping, Offices, Apart Hotel Complex – İSTANBUL (100.00 %) 106

Hapimag Holiday Village and Hotel Bodrum – MUĞLA (100.00 %) 91

Construction of General Directorate Facilities for Turkish Radio and Television Establishment – ANKARA (100.00 %) 85

Restoration of Çırağan Palace and Construction of Çırağan Hotel – İSTANBUL (100.00 %) 78

Environmental (541)

Ankara Central Wastewater Treatment Plant – ANKARA (31.31 %) 317

Turnkey Construction, Commissioning and Operation Works for three years of Adana East and West Wastewater

Treatment Plants – ADANA (24.43 %)101

Marine Structures (484)

Bandırma Harbor – BALIKESİR (100.00 %) 68

Petrochemical Complex Port Aliaga – İZMİR (100.00 %) 48

Completion Construction for Extending the İsdemir Port – İSKENDERUN (100.00 %) 44

Pipelines (483)

Melen Intake Weir and Melen & Cumhuriyet Pumping System – SAKARYA-İSTANBUL (55.00%) 93

Berdan-Mersin Pipeline for Supplying Water for Potable and Industrial Use of Mersin – MERSİN (100.00 %) 67

Van Drinking Water Line – VAN (100.00 %) 66

Note: Above list includes only the major projects completed; values shown above represent the total updated contract amounts in US$m (share of Yüksel in the contracts are shown in paranthesis);

contract values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods

Solid History of Project Execution and Delivery in Turkey

29

Page 30: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

30

221 overseas projects completed totaling US$7.91 billion (Yüksel Share: US$5.65 billion)

Saudi Arabia (3,040)

Yanbu - Medine Water Transmission System (32.59 %) 712

Eastern Province Water Transmission System - Phase 2 (100.00 %) 459

Medine -Yanbu Power Plant, Phase 2 – Lot 1 (12.45 %) 365

Al-Jubail Reverse Osmosis Desalination Plant (17.38 %) 240

King Faisal University Al Hasa Campus Phase 3 Infrastructure Works (50.00%) 209

Murwani Dam (100.00 %) 104

Afghanistan (1,058)

Kabul International Airport NATO Facilities (100.00 %) 132

FY08-FY09 Projects, Bagram Air Base (100.00 %) 113

Afghan National Army Regional Brigade Facilities, Khost, Afghanistan (100.00 %) 78

Construction of USA Embassy in Kabul – AFGHANISTAN (100.00 %) 64

Iraq (843)Reoccurring and Non-reoccurring O&M for all H Sites (100.00 %) 202

Various services and material supply in Camp Anaconda (100.00 %) 62

Uzbekistan (816)

Horezm Sugar Plant – URGENCH (46.30 %) 134

ITEC Business Center – TASHKENT (100.00 %) 111

ITEC Intercontinental Hotel – TASHKENT (100.00 %) 94

Construction of Tashkent U.S. Embassy Compound in UZBEKISTAN (40.00 %) 82

National Bank of Uzbekistan (NBU) Head Office Building – TASHKENT (100.00 %) 57

Kazakhstan (576)Almaty Financial District D Block ALMATY (50.00 %) 99

Alma-Ata Ankara Hotel /ALMATY (100.00 %) 89

Qatar (803)

Doha Expressway (Package 7) Salwa Road – Phase 2 (Industrial I/C to Al Asiri I/C) (50.00 %) 500

North-South Extensions of Ras Abu Abboud Road - Doha (50.00%) 250

NDIA Project – Airside & Landside Roadways & Parking / Bridge Construction Works (100.00 %) 38

Jordan (236) Jordan Armed Forces General Headquarters Complex (100.00 %) 205

United Arab Emirates (222)Widening of Existing Dubai Bypass – Phase I and II (100.00 %) 123

Dubai International Airport Roads - Phase II – Expansions Beirut Road / Al Nahda Junction (100.00 %) 99

Romania (91) Bucharest - Constanta Motorway Construction Project - Subsection 2-Fundulea – Lehliu (34.00 %) 91

Georgia (81) Construction of Tblisi U.S. Embassy Compound in GEORGIA (40.00 %) 81

Ukraine (77) ST. Sophia Hyatt Regency Hotel Project – KIEV (100.00 %) 77

Note: Above list includes only the major projects completed; values shown above represent the total updated contract amounts in US$m (share of Yüksel in the contracts are shown in paranthesis);

contract values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods

Solid History of Project Execution and Delivery in International Markets

30

Page 31: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

Section 5.1 | Completed Projects

Page 32: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

32

1) Altınkaya Dam and HEPP 700 MW, Turkey

Rock fill / clay core type

Installed Power Cap. / Annual Energ. Gen: 4x175 = 700 MW /

1,632GWh

Reservoir Capacity of 5763 hm3,

Crest Height and Length:195 / 634 m.

Amount of rock fill : 16,000,000cu.m,

Amount of concrete: 575,000m³,

Tunnel Length / Cross Section: 1,700m. / 9.8m.

Design-Build

Project Highlights Project Statistics

Project Place: Samsun

Project Country: Turkey

Employer: General Directorate of State Water Works (DSI)

Date of Contract: 1980

Date of Completion: 1989

Project Value: US$ 270.7 million (Yüksel Share: 50 %)

Updated Project Value (as per PPI of USA) : US$ 616.2 million

32

Page 33: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

33

2) Borçka Dam and HEPP 300 MW (2X150MW), Turkey

Rock fill on clay core type

Installed Power Cap. / Annual Energ. Gen: 2x 150 = 300 MW /

1039GWh

Reservoir Capacity of 419 hm3

Crest Height and Length: 86 / 728 m.

Amount fill : 7.78 Million cu.m

Design-Build Project

Project Highlights Project Statistics

Project Place: Artvin

Project Country: Turkey

Employer: DSI (General Directorate of State Hydraulic Works)

Date of Contract: 1999

Date of Completion: 2008

Project Value: US$ 457.5million (Yüksel Share: 64.8%)

Updated Project Value (as per PPI of USA) : US$ 688.9 million

Consortium Partners: Yüksel-Strabag-Temelsu (Construction) ;

Va Tech Elin-Va Tech Voest-Verbundplan Voith Sulzer

Papiermaschinen (Electromechanical)

33

Page 34: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

34

3) Karkamış Dam and HEPP 189MW (6x31,5 MW), Turkey

Earthfill on Clay Core (Run of River type)

Installed Power Capacity: 189MW (6x31,5 MW)

Annual Energy Generation: 653 GWh

Reservoir Capacity of 157 hm3

Crest Height and Length: 40 / 1647 m.

Amount fill : 2.1 Million cu.m,

Design-Build Project

Project Highlights Project Statistics

Project Place: Gaziantep

Project Country: Turkey

Employer: DSI (General Directorate of State Hydraulic Works)

Date of Contract: 1995

Date of Completion: 2010

Project Value: US$ 228.6 million (Yüksel Share: 54.8%)

Updated Project Value (as per PPI of USA) : US$ 358.05 million

Consort. Partners: Va Tech Elin-Verbundplan -Voit Sulzer-Temelsu

34

Page 35: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

35

4) Kandil Group of Dams and HEPPs 440 MW, Turkey

Project Place: Kahramanmaraş

Project Country: Turkey

Employer: ERE Hidroelektrik Üretim A.Ş. (ENERJİSA)

Date of Contract: 2008

Date of Completion: 2013

Project Value: US$ 516.1 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 583.2 million

Project Highlights Project Statistics

Kandil Dam & HEPP

Concrete face rock fill type, Energy tunnel 9,400 m

Crest Height and Length: 104 / 347 m

Sarıgüzel Dam & HEPP

Sand-gravel fill concrete covered front face, Energy tunnel 4,000 m

Crest Height and Length: 82 / 464 m

Hacınınoğlu Dam & Regulator

Concrete gravity type, Energy tunnel of 5,500 m in length

Crest Height and Length: 32 / 177 m

Installed capacity: 440 MW, Energy production: 1117.6 GWh

Hydro-mechanical equipment supply and erection included in scope

35

Page 36: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

36

5) Bolaman - Perşembe Highway, Turkey

On Black Sea coastline

Construction of 2 x 2 lane – 27.5 kilometres highway

Five tunnels having a total length of 2 x 4,587 metres

34 bridges having a total length of 7,600 metres

The longest highway tunnel in Turkey, Nefise Akçelik Tüneli, forms

part of this project with a length of 2 x 3,777 metres.

Project Highlights Project Statistics

Project Place: Ordu

Project Country: Turkey

Employer: General Directorate of State Highways

Date of Contract: 1997

Date of Completion: 2009

Project Value: US$ 280.7 million (Yüksel Share: 33.3 %)

Updated Project Value (as per PPI of USA) : US$ 426.6 million

Joint Venture Partners: Nurol and Tekfen

36

Page 37: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

37

North-South Extensions to Ras Abu Abboud Road

Project Place: Doha

Project Country: Qatar

Employer: NDIA (New Doha International Airport)

Date of Contract: 2007

Date of Completion: 2009

Project Value: US$ 208.2 million Yüksel Share: 50 %)

Updated Project Value (as per PPI of USA) : US$ 250.3 million

Project Highlights Project Statistics

Construction of a dual four to five lanes free carriageway of

approximately 4 km length

Construction of a two lane directional link tunnel of approximately 740

m length

Reconstruction of the east-west bridge at Ras Abu Abboud Road

interchange

Construction of an underpass at the Naval Base junction

Construction of a buried drainage compound for storm water

6) North-South Extensions to Ras Abu Abboud Road, Qatar

37

Page 38: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

38

Project Place: Doha

Project Country: Qatar

Employer: Public Works Authority (ASHGHAL)

Date of Contract: 2010

Date of Completion: 2013

Project Value: US$ 446.2 million (Yüksel Share: 50 %)

Updated Project Value (as per PPI of USA) : US$ 497.03 million

Project Highlights Project Statistics

Construction of 6.8 Km long 2x4 Expressway plus 2x3 slip roads

4 signalized interchanges with 3 underpasses along the mainline

New asphalt pavement construction, storm water drainage system,

TSE network

Relocating and upgrading the existing utilities network

Relocating foul sewerage lines

2200 linear meters of micro tunneling

Street lighting, traffic signs, road markings and traffic signals

Landscaping work

7) Doha Expressway (Package 7) Salwa Road – Phase 2, Qatar

38

Page 39: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

39

Project Place: Şanlıurfa

Project Country: Turkey

Employer: KRG – General Directorate of State Highways

Date of Contract: 1998

Date of Completion: 2010

Project Value: US$ 189.32 million (Yüksel Share: 50 %)

Updated Project Value (as per PPI of USA) : US$ 290.23 million

Project Highlights Project Statistics

The Project is a connection for TEM (Trans European Motorway) to

GAP area and then to the Syria / Habur border crossing.

The scope of work includes 17.26 km of 2x2-lane and 58.50 km of

2x3-lane highway sections

The Project was undertaken by a partnership including Yüksel İnşaat

A.Ş.

8) Gaziantep – Şanlıurfa Motorway, Turkey

39

Page 40: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

40

9) Ankara Light Rail Transit System, Turkey

Project Place: Ankara

Project Country: Turkey

Employer: Ankara Metropolitan Municipality General Directorate of

Electricity Gas and Public Transportaton.(EGO)

Date of Contract: 1991

Date of Completion: 1996

Project Value: US$ 314.35 million (Yüksel Share: 17.9 %.)

Updated Project Value (as per PPI of USA) : US$ 517.36 million

Consortium Partners: Siemens-AEG-Breda-Simko-Bayindir)

Project Highlights Project Statistics

8,527 km in length together with all auxillary facilities

11 Stations, 1,226 m

1,754 m Bored Tunnel

4,917m cut and cover Tunnel

412 m open trench

217 m at grade

Design-Build Project

40

Page 41: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

41

Excavation support and design works of double lane subway tunnels

in length of 8,888 m

1,025,215 m3 excavation work

51,691 m3 concrete

18,907 ton re-bar

8,304 units TBM pre-cast segments

12,328 m (6,164 x 2) bore tunnel (EPB-TBM) and 5,448 m (2,724 x 2)

deep tunnel (NATM)

7 underground deep tunnel

Project Highlights Project Statistics

Project Place: İstanbul

Project Country: Turkey

Employer: İstanbul Metropolitan Municipality İETT General

Directorate

Date of Contract: 2005

Date of Completion: 2010

Project Value: US$ 181.45 million (Yüksel Share: 26 %)

Updated Project Value (as per PPI of USA) : US$ 233.33 million

10) Kadıköy – Kartal Mass Transportation System, Turkey

41

Page 42: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

42

11) Yanbu – Medina Water Transmission System, Saudi Arabia

Design-Build Project of transmission of desalinated water from the

Yanbu industrial area to Yanbu city, Rayyis and Madinah with a

capacity of 363,000 m³/day.

The project consists of four different groups of work: pipeline, stations,

reservoirs and housing compound.

Yüksel performed a 60” and 32” steel pipeline work of 200 kilometers

Yüksel constructed a 4 x 140,000 m³ steel reservoir foundation

(101.8m dia.),10 x 50,000 m³ 1 x 35,000 m³, 2 x 25,000 m³, 2 x 5,000

m³,1 x 1,000 m³ reinforced concrete reservoirs and station buildings

18 luxurious three floor buildings (108 flats) at Yanbu, a house at

Musayjeed, two guest villas and a house in Medinah with a total gross

construction area of 40,000 m²

Project Highlights Project Statistics

Project Place: Yanbu - Medina

Project Country: Saudi Arabia

Employer: Saline Water Conversion Corporation (SWCC)

Date of Contract: 1993

Date of Completion: 2001

Project Value: US$ 443.5 million (Yüksel Share: 31.9%)

Updated Project Value (as per PPI of USA) : US$ 712.16 million

Consortium Partners: Saudi Techint Co. Ltd.-Techint International

Construction Co./Yüksel İnşaat Saudia Co.

42

Page 43: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

43

12) Eastern Province Water Transmission System – Phase 2, Saudi Arabia

Design-Build Project of treated water transmission line from Marafia

seawater treatment plant in Jubail to Damman

133km steel pipeline which shall transmit 500,000 m3 water/day

78km – 76”

24km – 68”

17km – 64”

Contract includes construction of 2 pump stations with 8 pumps

having 14,623 m3/hr total capacity as well as water tanks having

730,000 m3 reservoir volume

Project Highlights Project Statistics

Project Place: Jubail-Al Khobar

Project Country: Saudi Arabia

Employer: Saline Water Conversion Corporation (SWCC)

Date of Contract: 2008

Date of Completion: 2011

Project Value: US$ 406.6 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 459.48 million

Siemens was supplier and Electrical Services Provider)

43

Page 44: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

44

13) Ankara Central Wastewater Treatment Plant, Turkey

Project Place: Ankara

Project Country: Turkey

Employer: Ankara Metropolitan Municipality General Directorate of

Ankara Water and Sewerage Administration

Date of Contract: 1992

Date of Completion: 1998

Project Value: US$ 194.88 million (Yüksel Share: 31.3 %)

Updated Project Value (as per PPI of USA) : US$ 316.85 million

Consortium Partners: Brochier GmbH, Preussag Noell, AEG

Project Highlights Project Statistics

Construction land : 182 ha

Domestic effluent : 676,200m3/day

Industrial effluent : 103,680m3/day

Excavation : 3,000,000 m3

Concrete : 250,000 m3

Reinforcement : 20,000 tons

Second largest in Europe and largest in Turkey

Design-Build Project

44

Page 45: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

45

14) Metrocity Business & Trade Center – Residence Complex, Turkey

Design-Build Project in Levent on 24,000 m2 land area.

Consists of a total construction area of 210,200 m2, including a 23-

storey 16,500 m2 office block, two 27-storey residential blocks having

an area of 46,700 m2, a 52,000 m2 shopping center and 85,000 m2

social facilities as well as parking lots.

The first section, Metrocity Millennium, has two 27-storey residential

towers.

The other sections of the complex contain a 23-storey office tower

with a total of 16,500 square meters, social facilities, a 52,000 m2

shopping center and parking for 2,200 vehicles.

Project Highlights Project Statistics

Project Place: Istanbul

Project Country: Turkey

Employer: Yüksel Yapı A.Ş.

Date of Contract: 1997

Date of Completion: 2006

Project Value: US$ 122 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 185.4 million

45

Page 46: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

46

15) Jordan Armed Forces General Headquarters Complex, Jordan

Total construction area of 112,500 m2 on 350,000 m2 land area

14 typical office buildings, a main administrative building, a blast proof

underground command center building, 3 soldier dormitories, a sports

center facility with a swimming pool, 3 admin and depot buildings, a

mosque, a heating center and fire brigade building, 5 burried potable

and storm water tanks, 1 large and 3 small size transformer buildings,

9 compound access control buildings, 27 observing structures

Design-Build Project including all infrastructural and landscaping

works within the compund area.

4,000m long reinforced concrete high perimeter walls, 105,000m²

asphalt roads, 2 helipads and 864 vehicle capacity parking lots.

Project Highlights Project Statistics

Project Place: Amman

Project Country: Jordan

Employer: DIP (Development & Investment Project Foundation)

Date of Contract: 2004

Date of Completion: 2008

Project Value: US$ 151.7 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 204.6 million

46

Page 47: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

47

Project Place: Kabul

Project Country: Afghanistan

Employer: NATO Maintenance and Supply Agency (NAMSA)

Date of Contract: 2008

Date of Completion: 2010

Project Value: US$ 116.6 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 131.75 million

Project Highlights Project Statistics

Design-Build Project

Infrastructural works on 1,000,000 m2 land area

Construction of 30 buildings including terminal, main office, temporary

and permanent accommodation facilities, canteen, treatment and

maintenance having about total 30,000 m2 gross construction area

The facility shall be used by the International Security Assistance

Force (ISAF) and will be providing service for total of 3,800 people

16) Kabul International Airport NATO Facilities, Afghanistan

47

Page 48: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

Section 5.2 | Ongoing Projects

Page 49: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

49

1) Silvan Dam Construction (160 MW), Turkey

Project Place: Diyarbakır

Project Country: Turkey

Employer: DSI (General Directorate of State Hydraulic Works)

Date of Contract: 2011

Date of Completion: Ongoing

Project Value: US$ 102.23 million (Yüksel Share: 50 %)

Updated Project Value (as per PPI of USA) : US$ 107.49 million

Project Highlights Project Statistics

Rock Fill Dam with Concrete Covered Face

Crest Height and Length: 174.5 m / 440 m

Dam Body Volume: 8,50 hm3

Construction of the dam body, downstream and upstream cofferdams,

power and derivation tunnels, spillway and injection works.

The dam access road, temporary downstream bridge, other bridges

as required by the project, and material transport roads are also

included in the scope.

49

Page 50: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

50

Project Place: Erbil

Project Country: Iraq

Employer: KRG - Ministry of Construction & Housing, General

Directorate of Roads & Bridges

Date of Contract: 2009

Date of Completion: Ongoing

Project Value: US$ 220.82 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 256.27 million

Project Highlights Project Statistics

51 km 2 x 2 highway construction

Contract include 2 tunnels having total length of 1,315 m

The project is a section of the main highway to Iran

Excavation works over 5,000,000 m3

Fill and compaction works over 3,500,000 m3

2) Kora-Shaqlawa-Qandeel Highway, Iraq

50

Page 51: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

51

Project Place: Ordu

Project Country: Turkey

Employer: General Directorate of State Highways

Date of Contract: 2012

Date of Completion: Ongoing

Project Value: US$ 234.42 million (Yüksel Share: 25%)

Updated Project Value (as per PPI of USA) : US$ 241.78 million

Project Highlights Project Statistics

19.1 km of 2X2 lane ring road construction from Km: 21+000 and to

Km: 41+114

Earthworks, road construction, asphalt pavement, road marking, road

drainage and small culvert structures within the scope

Constrution of two double tube tunnels and two viaducts.

Boztepe Tunnel: 3311 m (twin tube)

Öceli Tunnel : 2020 m (twin tube)

Civil Viaduct: 672 m (13,5 m x 2)

Melet Viaduct: 1198 m (13,5 m x 2)

3) Ordu Ring Road, Turkey

51

Page 52: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

52

Project Place: Doha

Project Country: Qatar

Employer: Lusail Development Company

Date of Contract: 2013

Date of Completion: Ongoing

Project Value: US$ 454.77 million (Yüksel Share: 50%)

Updated Project Value (as per PPI of USA) : US$ 463.29 million

Project Highlights Project Statistics

Construction of 4.8 km long, 2x4 expressway with 6 signalized grade

separated interchanges on the roads A1, A6, A10, D11.

6 underpasses at Junction 12, Junction 13, Junction 14, Marina,

Wadi and at Southern interchange.

Construction of 2 flyovers at Marina and Southern interchanges.

Construction of feature Arch at Marina interchange.

Construction of 2 tunnels along road A1.

Construction of new storm-water drainage system which

involves construction of 15 shafts, 4’600 lm micro-tunneling of

2’400 and 3’000 mm diameters.

Construction of new utilities such as TSE network, waste water,

foul sewer lines, district cooling and gas distribution system,

telecom network, fire protection network, irrigation network, 4 electrical

substations with electrical cable lines.

Street lighting, traffic signs, road markings and traffic signals.

Landscaping.

4) Lusail Development – Construction Package 4 (CP4) –

A1, A6 Roads, Marina and Southern Interchanges, Qatar

52

Page 53: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

53

Project Place: Riyadh

Project Country: Saudi Arabia

Employer: Ar Riyadh Development Authority (ADA)

Date of Contract: 2013

Date of Completion: Ongoing

Project Value: US$ 74.94 million (Yüksel Share: 100.0 %)

Updated Project Value (as per PPI of USA) : US$ 76.34 million

Project Highlights Project Statistics

Construction of 2.2 km asphalt road

326m overfly bridge

3 no. pedestrian overpasses

All civil mechanical and electrical infrastructure works

16,980m storm drainage pipeline

Construction of Reverse Osmosis Plant with tanks and 3 water wells

Landscaping & hardscaping works

Relocation of existing utilities at junction points.

5) The First Stretch of Abu Bakr Siddique Road Development Project, Saudi Arabia

53

Page 54: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

54

Project Place: İstanbul

Project Country: Turkey

Employer: İstanbul Metropolitan Municipality

Date of Contract: 1998 (Taksim-Unkapanı) & (Unkapanı – Yenikapı)

Date of Completion: 2009 (Taksim-Unkapanı)

Ongoing (Unkapanı-Yenikapı)

Project Value:

US$ 68.32 million (Yüksel Share: 49.0 %) (Taksim - Unkapanı)

US$ 134.29 million (Yüksel Share: 49.5 %) (Unkapanı - Yenikapı)

Updated Project Value (as per PPI of USA) :

US$ 104.73 million (Taksim – Unkapanı)

US$ 205.87 million (Unkapanı - Yenikapı)

Project Highlights Project Statistics

2 Contracts

Taksim – Unkapanı (completed)

4.029 m.of bored tunnel

One station in Sishane

Protection of historical structures.

Unkapanı – Yenikapı (ongoing)

6,270m. of bored tunnel

600m. of light rail system, 20m. of depressed (with retaining wall)

Two stations in Yenikapı (cut and cover) and Şehzadebaşı (bored).

The Yenikapı Station is cut and covered and also is designed as a

station for the light rail metro.

6) Taksim - Unkapanı & Unkapanı - Yenikapı Metro System, Turkey

54

Page 55: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

55

Project Place: Doha

Project Country: Qatar

Employer: Qatar Rail Company (QRail)

Date of Contract: 2014

Date of Completion: Ongoing

Project Value: US$ 653.89 million (Yüksel Share: 22.5 %)

Updated Project Value (as per PPI of USA) : US$ 653.89 million

Project Highlights Project Statistics

Design-Build Turn – Key contract for civil works of the elevated and

at-grade sections of the Doha Metro Red Line South

Total Line Length: 7,432 m

Elevated Viaduct: 6,295 m

Ramp Section: 715 m

At-Grade Section: 422 m

3 No. of Elevated Metro Stations

Highway Works: 1,570 m of trough and underpass

Utility relocations;

Related MEP works

7) Doha Metro Project Redline South Elevated and At Grade, Qatar

55

Page 56: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

56

8) Water Transmission from Hali, Yubah and Al Laith Dams to Shu’aibah Plant (Ph 2), Saudi Arabia

Treated water transmission line from Hali, Yubah and Al Laith Dams

to Shu’aibah Plant to supply water to Makkah.

175 km steel pipeline of 60’’

Construction of line valves chambers, air and drain valve chambers

including necessary valves, fiber optic cables, and thrust boring

activities

Project Highlights Project Statistics

Project Place: Saudi Arabia (Western Region)

Project Country: Saudi Arabia

Employer: Ministry of Water and Electricity

Date of Contract: 2011

Date of Completion: Ongoing

Project Value: US$ 165.74 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 174.26 million

56

Page 57: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

57

Project Place: Riyadh

Project Country: Saudi Arabia

Employer: Riyadh Municipality

Date of Contract: 2013

Date of Completion: Ongoing

Project Value: US$ 168.8 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 171.96 million

Project Highlights Project Statistics

Construction of Storm Water Drainage System in Naseem East, West

and Al Maizaliah Districts in Riyadh City

Box culverts with 40 km total length

GRP pipelines with 300-1200mm diameter having 126 km total length

including all civil and mechanical works

413,249 m2 re-asphalting works

226,000 m long traffic diversion

Relocation of existing utilities

9) Stormwater Networks in Al Naseem East & West and Maizaliah Districts in Riyadh, Saudi Arabia

57

Page 58: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

58

Project Place: Ras Al Khair

Project Country: Saudi Arabia

Employer: Royal Commission for Yanbu & Jubail

Date of Contract: 2013

Date of Completion: Ongoing

Project Value: US$ 114.49 million (Yüksel Share: 50 %)

Updated Project Value (as per PPI of USA) : US$ 116.63 million

Project Highlights Project Statistics

Construction of seawater cooling pump station

Construction of Hypochlorite Generation Building and all associated

ancillary buildings including civil, architectural, electromechanical

works

Dredging of Intake Canal and Depositing on Site: 200,000 m3

Shaping Dredged Fill to Achieve Required Grades: 200,000 m2

Asphalt Concrete Surface & Base Courses: 24,000 m2

Potable Water & Stormwater RTRP & PVC Pipelines: 2,690 m

Storm Channel Reinforced Concrete: 1,600 m

Sanitary Lift Station: 1 No

10) Procurement & Construction of Sea Water Pump Stations 201-C01, Saudi Arabia

58

Page 59: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

59

Project Place: Ankara

Project Country: Turkey

Employer: Ankara Water Channel Administration Water Construction

Department Head Office

Date of Contract: 2012

Date of Completion: Ongoing

Project Value: US$ 51.17 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 52.78 million

Project Highlights Project Statistics

The biggest water treatment plant of Turkey, the “İvedik Water

Treatment Plant” designed to supply water for drinking, usage and

industrial purposes to Ankara until year 2020.

Planned to be constructed in four stages (Units I., II., III., & IV.)

Each stage containes units with capacity of 564 000 m3/day.

Units I. and II. completed and put in operation in 1984 and 1992.

The rehabilitation of Units I. & II. and the construction of Unit III. with

capacity of 564 000 m3/day are included in the scope of the contract

11) İvedik Drinking Water Treatment Plant, Improvement of Unit I & Unit II, Construction of Unit III,

Turkey

59

Page 60: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

60

Project Place: Brazzaville

Project Country: Republic of Congo

Employer: Anonim Congo Construction (ACC)

Date of Contract: 2014

Date of Completion: Ongoing

Project Value: US$ 33.9 million (Yüksel Share: 90 %)

Updated Project Value (as per PPI of USA) : US$ 33.9 million

Project Highlights Project Statistics

The gross construction area of the building: Approximately 21,000

m2,

Converting the existing facility to a five star hotel complex,

Performing design studies, finishing works, mechanical-electrical

installations, interior design and landscape activities,

Construction of ballroom/restaurant along with underground parking

facilitie.

12) Mbamou Palace Hotel Construction & Renovation – Brazzaville, Republic of the Congo

60

Page 61: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

61

Project Place: Kamis Mushayt

Project Country: Saudi Arabia

Employer: Gilbane Federal

Date of Contract: 2014

Date of Completion: Ongoing

Project Value: US$ 135.56 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 135.56 million

Project Highlights Project Statistics

Construction of additional facilities that shall be used for training 1200

RSAD personnel in total related with F-15 aircrafts in King Khalid

Airport located,

Approximate area of the aforementioned facilities is equal to 46.000

m2 in total,

Four sleeping quarters (28.800 m2 in total), Military Training Facilities:

(10.550 m2), Headquarters Building: (790 m2), Kitchen and Dining

Hall Building (2.770 m2), Mosque (600 m2), Social Facilities (530 m2)

Aviation Electronics Facilities- 1830 m2

13) F-15 Fleet Modernization Program, Royal Saudi Air Force Projects: KKAB-13-0001, KKAB-13-

0002 At King Khalid Air Base (KKAB), Khamis Mushayt - Saudi Arabia

61

Page 62: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

62

Project Country: Oman

Employer: Ministry of Transport and Communication, Sultanate of

Oman Directorate General of Roads & Land Transport

Date of Contract: 2014

Date of Completion: Ongoing

Project Value: US$ 109.18 million (Yüksel Share: 60 %)

Updated Project Value (as per PPI of USA) : US$ 109.18 million

Project Highlights Project Statistics

Dualization of 38 km existing single lane,

Construction of 65 km single lane along with rehabilition of 4.5 km Al-

Arid Road,

The alignment consists of 10 roundabout,4 vehicular underpass and

total 735 culvert cell in 110 different locations.

14) Dualization of Ibri - Yanqul Road (Stage II) - Oman

62

Page 63: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

63

Project Place: Sivas, Erzincan, Gümüşhane and Bayburt

Project Country: Turkey

Employer: Tanap Doğalgaz İletişim A.Ş.

Date of Contract: 2014

Date of Completion: Ongoing

Project Value: US$ 539.84 million (Yüksel Share: 25 %)

Updated Project Value (as per PPI of USA) : US$ 539.84 million

Project Highlights Project Statistics

Second lot out of 1334 km long three pipeline construction packages

Construction of 450 km (between km 375 and km 825), 56’’ diameter

pipeline that will go through Sivas, Erzincan, Gümüşhane and Bayburt

cities of Turkey.

The works, including procurement of materials (except for CLIENT

Supplied Items), construction, installation, testing, training CLIENT

personnel, pre-commissioning and providing commissioning

assistance, are planned to be completed in 36 months.

Starting from the Georgia border, TANAP will cross Turkey in east-

west direction and connect to TAP Project (Trans Adriatic Pipeline) in

Greece border.

15) TANAP (Trans-Anatolian Natural Gas Pipeline) II. Lot - Turkey

63

Page 64: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

64

Project Place: Riyadh

Project Country: Saudi Arabia

Employer: Ar-Riyadh Development Authority (ADA)

Date of Contract: 2015

Date of Completion: Ongoing

Project Value: US$ 610 million (Yüksel Share: 100 %)

Updated Project Value (as per PPI of USA) : US$ 610 million

Project Highlights Project Statistics

22 km road rehabilitation works,

Construction of 21 pairs of Bus Rapid Transit System Stations, 2574

ea. Community Bus Stops and 7 ea. Pedestrian Bridges with all civil,

mechanical and electrical works,

The project consists of two different packages (Package A and

Package B) and comprises of supply, installation, testing &

commissioning of all project materials.

16) Infrastructure of the Third Phase of Riyadh Bus Rapid Transit System (BRT) Project –

Saudi Arabia *

64* This project has been awarded to Yüksel in 2015. The Value of this Project is not included in the Total Value of Ongoing Projects.

Page 65: Main Yuksel Presentation 06_15v10-long-Rev13-June2015

V10 / Jan 2015

65

Thank you for your attention.

Questions?

Contact Information:

E-mail: [email protected]

Phone: +90 312 284 25 45

Fax: +90 312 286 17 37

Address: Yüksel İnşaat A.Ş., Söğütözü Cad. 14/A-B 06560 Beştepeler-Ankara/Turkey