Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII...

15
1 MAHINDRA & MAHINDRA LTD MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR AUTOMOTIVE SECTOR- PLANT I PLANT I NASHIK NASHIK CII National Award for Excellence in water Management 2008 16 th Dec – 17 th Dec 2008 CII-Hyderabad Norbert De Souza Avinash Wagh Prasanna Kulkarni C E R T I F I C A T I O N C E R T I F I C A T I O N OHSAS OHSAS 18001:2007 18001:2007 ISO 14001:2004 ISO 14001:2004 ISO/IEC 27001 ISO/IEC 27001- 2005 2005 ISO TS 16949 ISO TS 16949 Occupational Health & Safety Occupational Health & Safety Environment Environment Quality Quality Information Information Security Security

Transcript of Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII...

Page 1: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

1

MAHINDRA & MAHINDRA LTDMAHINDRA & MAHINDRA LTDAUTOMOTIVE SECTORAUTOMOTIVE SECTOR-- PLANT I PLANT I

NASHIKNASHIK

CII National Award for Excellence

in water Management 200816th Dec – 17th Dec 2008

CII-Hyderabad

Norbert De Souza Av inash Wagh Prasanna Kulkarni

C E R T I F I C A T I O N C E R T I F I C A T I O N

OHSAS OHSAS 18001:200718001:2007

ISO 14001:2004ISO 14001:2004

ISO/IEC 27001ISO/IEC 27001-- 20052005

ISO TS 16949ISO TS 16949

Occupational Heal th & SafetyOccupational Heal th & Safety

Env ironmentEnv ironment

QualityQualityInformationInformation

SecuritySecurity

Page 2: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

2

Dispatch

Body Shop

Paint Shop

Assembly

CustomerCustomer

Think outside the sink

Water saving projects Process flowPress Shop

13501350

430 800 400

430 400

280280Water Management

Garden

Process Cooling/Distribution Domestic

ETP STP

Page 3: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

3

Water audits

1. For total plant audit by CII in 2006

2. For treated water distribution by MMK in 2006

3. For Sewage distribution system by C11 in 2008

4. For rain water harvest by Greenfield technology in 2007

5. For ground water survey by GSDA in 2007

6. For total plant water balance by Technogreen in 2007

7. For sustenance by internal audits.

[[ Water saving projectsWater saving projects-- 2004 To 20082004 To 2008

Page 4: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

4

DI SprayRinse

ELECTROCOAT PROCESS

X X X X X X X X X X X X X X X XX X X X

XXXXXX

XXXXXX

PTBODIES

ENTERING

UF sprayRinse

2

UF D ip Rinse tank

X X X X X X X X X X X X X X X XX X X X

XXXXXX

XXXXXX

XXXXXXDI

SprayRinse

X X X X X X X X X X X X X X X XX X X X

Electrocoating Dip tank

UF sprayRinse

1

ED B50 stage DI

Spray rinse was running

Fresh D I Spray also

was running

BEFORE:

AFTER:X X X X X X X X X X X X X X X XX X X X

XXXXXX

XXXXXX

PTBODIES

ENTERING

UF sprayRinse

2

UF Dip Rinse tank

X X X X X X X X X X X X X X X XX X X X

XXXXXX

XXXXXX

Electroco ating D ip tank

UF sprayRinse

1

ED B50 stage &

Fresh spray are Kept

OFF

ELECTROCOAT PROCESS

ED B50 STAGE ELIMINATION

XTotal Water Saved = 13490 M3 Investment = 0

Specific water reduction by process optimizationWater saving projects

Sof t Water Ta nk

Pain t S ho p

Storm Wat er Gu tter G at e

C ollecti on Ta nk

Water saving projects

Total Water Saved = 2971 M3

Investment= 0

Rain water harvesting at paint shop

Page 5: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

5

Water Saved : 1253 m3 this monsoon Investment : Rs 0.2 lacks

Rain Water Harvesting Project for cooling tower pondsWater saving projects

Compressor cooling tower Body-shop tower

BeforeVariable Pressure12 Pumps

AfterUniform pressure2 PumpsSavings- 1.15 lac Kwh/annum

Water Savings : 30000 m3/ AnnumInvestment : 30 lacks

Water distribution through gravity & all pipes are above the ground. No underground leakages

Water saving projects

Page 6: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

6

Electricity – 207 kWH/body LPG – 26 kgs/body

- 167 kWh/body - 13 kgs/body

BeforeTwo fixtures required After

Single fixture

Water Savings 10 CMD OR 2880 m3/annum

Optimizing the painting process by combining cab & cargo on single fixture.

Water saving projects

Before

Before3.22 Lacs Units/Year

After1.60 Lacs Units/Year

Water Savings /annum 1500 m3

Investment Rs.14.5 Lacks

Replacement of inefficient pumps with efficient Hydro MPC for air compressor water circulation .

Water saving projects

Page 7: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

7

Before Before After After

Fire hydrant line above the groundFire hydrant line above the ground

Water Saving: 250 m3 leakage losses eliminated

Investment : 40 Lacks

Water saving projects

Global Norms / Bench mark

2.74Toyota Motor-1.97

Ta ta Motors – 5.23Ford India- 2.56GM- 7.56

Specific Water

ConsumptionM3/v ehicle

MPCB Benchmark**

International Benchmark*

National Benchmark *

0Renault-0.5

Ford India-0.67

Specific Water Consumption

M3/vehicle

MPCB Benchmark**

International Benchmark*

National Benchmark*

Benchmarks for Wastewater Disc harge

Benchmarks for Specific Water Cons umption

*:- Source from CII, Hydera ba d.

**: Mahar ashtra Po llution C ontrol B oard

Page 8: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

8

187180

148

121107

0

50

100

150

200

M3 /C

apita

2004 2005 2006 2007 2008

Per Capita consumption

*4%

21%

35%

* % Reduction with the base y ear 04-05

43%

Improvement by 43 % Better

F Daily input and output water monitoring.

F Tighter consumption control in the high consumption shop

F Internal water management team.

F Continuous improvements through team

review.

F Internal and External audit for improvement

validation.

FMonthly water quality analysis.

Sustainability

Page 9: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

9

830830

430430 400400

Treated Water Balance CMD

•Treated water reuse for the Press shop car body panel washing.

• Investment: Zero

• Water Saving: 1560 m3/annum

• Implemented in Nov 2008

• Investment: Zero

• Water Saving: 120 m3/annum

• Implemented in Oct 2007

Page 10: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

10

Wat

er

cons

umpt

ion

M3

Before After

30000 m 3

15600 m 3

Raw water inlet

Raw water

InIn--house Project.house Project.

Waste water recycledWaste water recycled

RecycleRecycle

Waste Water Tank

Recycling of treated water

Water Saving: 15600 M3

Investment: 0.2 Lacks

Monitoring system

Ø30 meters across the plant.ØDaily morning meter reading. ØDaily MIS report to top management. ØDaily shop consumption published.ØVariability captured by departments.ØDaily water management.ØFortnightly CFT meets for

opportunities.

Page 11: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

11

ØMonthly treated water balance charts.ØMonthly water balance charts.ØMonthly specific water trends.ØWater testing as per MPCB norms.ØWater testing as per ISO10500 STD.ØMonthly water cooler management.ØMonthly management review.

Monitoring system

Monitoring &Reporting

ØWater meters at user interface

Ø Daily monitoring & analysis

Ø Daily Pressure Monitoring

Put a Stop - to the Drop

Page 12: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

12

Green Areas in Nashik Plant

Green Areas in side Nashik Plant shop area

Page 13: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

13

Awareness & Involvement within the Plant

ØCelebration of Water Conservation week-24th to 30th

March

ØOrganizing Slogan , Poster Competition for Employees and their families.

ØAwareness session to workmen through “Workers

Training Course”.

ØECON stall on Founders Day(2nd Oct)-

visited by 15-20 thousand people.

Preservation Towards Environment

• Expertise team for EMS

• Tree plantation target - 1 Lac / year

• Special team in R&D working for Alternative fuel

• Rain water harvesting for paint shop.

• Formation of vendor cluster to reduce transportation

• New research on non ODS refrigerant

Page 14: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

14

• Special management programs to reduce hazardous waste

• Introducing energy efficient equipment in new projects/expansions.

• Involving employee in environment preservation program.

• Maximize use of treated water.

Preservation Towards Environment

Environmental projects Environmental projects

• Planting of 1 Million trees

• Planting of “Jatropha”Plant

• Use of Bio Diesel

• Use of Renewable energy

• Use of Treated water

Page 15: Mahindra & Mahindra - Nashik...1 MAHINDRA & MAHINDRA LTD AUTOMOTIVE SECTOR - PLANT I NASHIK CII National Award for Excellence in water Management 2008 16th Dec – 17th Dec 2008 CII-Hyderabad

15

• Recycle of used thinner

• Recycle of Exhaust gases in paint shops

• Scrubber chambers for spray booths

• Reduction/Reuse of effluent sludge.

Environmental projects Environmental projects

At Mahindra we follow Five Mantras

vLEADERSHIP

vCOST EFFECTIVE

vCUSTOMER CENTRIC

vGLOBALISATION

vINNOVATION