Mahatma Gandhi National Rural Employment Guarantee Scheme
Rajasthan
An approach for creation of durable
assets and enhancement of
livelihood through Convergence by
Kuldeep Ranka IAS
Secy., EGS, Jaipur1
Convergence
An approach to build durable assets while
providing employment under MGNREGS.
2
Necessity of Convergence
limitation of MGNREGS Labour & Material ratio (L M Ratio)-• 60:40 L M Ratio is required
• For GP as PIA, ratio to be maintained at GP Level
• for line departments, ratio to be maintained at block level
To expedite utilization of funds of other programme- • mainly material component is required from other scheme. Therefore fund
utilization is expedited.
Additional financial support for IHHL construction.• Only Rs. 4600 is the motivational amount in NBA, where as actual cost of toilet
is about Rs.13000. Therefore additional financial support up to Rs. 4500 is made available from EGS.
3
Necessity of Convergence
To involve line departments like PWD, water resource, forest for there expertise for-
• Road and Cross Drainage works by PWD,• Water retaining structure by water resource department.• Plantation by forest department depending upon life, climate, growth rate, etc. Need of community demand for village infrastructure like• internal village concrete roads,• Aanganbari bhawan etc..• Development of traditional water bodies. Need of individual demand for sustainable livelihood Like apna
khet apna kam, diggi nirman, horticulture etc.
4
Necessity of Convergence
To take-up bigger project’s.• Bigger and important projects may be constructed by
convergence. • Many Big projects have been constructed by conversing
MGNREGA and other schemes.• Number of diggis / Tankas have been constructed.
5
TSC
NREGS
MP/MLA FUND
IWMPBADP
FOREST
ICDS
6
Sanctioning Procedure of Work in Convergence
Annual Action Plan of MGNREGA
Estimate of work in convergence
Technical Section of work in convergence
By JEn/AEn/XEn
AS & FS of work in convergence
By DPC
Work Execution By PIA
Recommendation by Competitive Authority
MPLAD/ MLALAD
Panchayat Samiti Zila Parishad
Gram Panchayat
NBA/ Line Department
Annual Action Plan of Other Schemes
By JEn/AEn/XEn
Gram Sabha
General Body Panchayat Simiti
General Body Zila Parishad
Ward Sabha
Major Activities under Convergence
Dovetailing with – BRGF Scheme
Nature of works :-
(a) Block Level Bharat Nirman Rajeev Gandhi Seva Kendra-
Amount spent - Rs. 14.4 Cr. (out of total cost of Rs 25 lacs, @ 16.75 lacs
per Block converged from BRGF scheme , 86 Kendra constructed)
(b) Installation of solar systems at GP Bharat Nirman Rajeev Gandhi Seva
Kendra.
Amount spent - Rs. 15.24 Cr. (out of total cost of Rs 3.03 lacs, @ 1.98 lacs
per Solar System converged from BRGF scheme , 770 solar systems
installed.8
Major Activities under Convergence
Dovetailing with scheme of Agriculture Department nature of works :-
(a) Diggies (water tanks) – 1206 works
(b) Khala Construction & Covering (water cource) – 153 works (312.53
lacs)
(c) Sewan Grass, Pasture land Development (RKVY & Agriculture
Department) works amount 43.75 lacs.
9
Major Activities under Convergence
Dovetailing with MPLAD, MLALAD, BRGF, SFC, TFC, BADP, Un Tied Fund scheme
Nature of works CC/Interlocking Block tile/ Stone Kharanja.166 works,Amount spent Rs.503 lacs
10
Major Activities under Convergence
Dovetailing with NBA
Nature of works :-IHHLAmount spent – Amount upto Rs 4500/ is being provided for
construction of each IHHL under NBA.
•Total works sanctioned under NBA – 9.31 Lacs (including 4.30 lacs of CM BPL & IAY).• Convergence with NREGA – 6.20 Lacs (including 2.85 lacs of CM BPL & IAY).• 93000 MR's (15%) have been issued against 6.20 lacs toilets.• 1.47 lacs (16%) Toilets have been completed against 9.31 lacs toilets. 11
Reason of Less Convergence with NREGS
Lack of MIS Support - Present MIS doesn’t give exact status of convergence.
Uneven Employment Demand - EGS is a demand based programme, Demand is not uniform during the year. So uneven availability of labour results in delayed completion of works and enhanced cost.
12
Reason of Less Convergence with NREGS
Coordination between two agencies – There is time lag in issuing individual sanctions, release of installments etc. Due to lack of coordination between two agencies, pace of work suffers.
Processes under MGNREGS – Processes in EGS are very rigid. Funds of other scheme used for dovetailing has to confirm to same processes. Therefore implementing agencies at times do not take initiative for convergence.
13
Suggestion for effective Convergence
Adequate MIS Support – MIS support needs to be enhanced for convergence of works.
Advance preparation of action plan and release of funds by concerned funding department to MGNREGS.
14
Suggestion for effective Convergence
All Activities which are permissible under MGNREGS should not be allowed independently – Many activities of MoRD like development of watershed & Soil conservation is admissible activity is permissible under EGS. Therefore watershed & Soil conservation activities should not be allowed independently. Suitable change may be made in the guidelines of EGS & Water shed.
other ministries which are willing to create assets for their use should transfer funds to the EGS implementing department at state level Like ministries of WCD for construction of Aangan bari, Ministry of Drinking water and sanitation for construction of IHHL, Ministry of Youth Affairs & Sports for construction of play field etc.
15
Pari Sampati Nirman Nidhi
Parisampatti Nirman Nidhi
(Community Assets Creation Funds)• Hon’ble CM announced creation of separate fund for construction of durable
assets under MGNREGS
• Amount earmarked in FY 2013-14: Rs. 150 Cr
• Thrust – GP which have used 40% material component under MGNREGS and works are still incomplete, will get additional funds from Parisampatti Nidhi for creation and completion of durable assets.
• Result- Need not to look other schemes for creating durable assets having material more then 40%.
.16
Some photographs of assets created under convergence…….
17
18
BNRGSK with BRGF FUNDS
SOLAR PANEL AT BNRGSK
18
19
DIGGI
TANKA
19
20
NADI
KHALA (W/C)
20
21
PULIA 21
22
CC Block ROAD Bhilwara
22
23
ANICUT
CHECK DAM
23
IHHL
24
Water Harvesting Structure
It is Dovetailed of MGNREGA (Labour 8.09 Lacs, Material 13.03 Lacs), MPLAD (6.00 Lacs) and MLALAD (6.00 Lacs), Total Fund:- 33.12 Lacs