Mahatma Gandhi National Rural Employment Guarantee Scheme Rajasthan

26
Mahatma Gandhi National Rural Employment Guarantee Scheme Rajasthan An approach for creation of durable assets and enhancement of livelihood through Convergence by Kuldeep Ranka IAS Secy., EGS, Jaipur 1

description

Mahatma Gandhi National Rural Employment Guarantee Scheme Rajasthan. An approach for creation of durable assets and enhancement of livelihood through Convergence by Kuldeep Ranka IAS Secy., EGS, Jaipur. Convergence. - PowerPoint PPT Presentation

Transcript of Mahatma Gandhi National Rural Employment Guarantee Scheme Rajasthan

Page 1: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Mahatma Gandhi National Rural Employment Guarantee Scheme

Rajasthan

An approach for creation of durable

assets and enhancement of

livelihood through Convergence by

Kuldeep Ranka IAS

Secy., EGS, Jaipur1

Page 2: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Convergence

An approach to build durable assets while

providing employment under MGNREGS.

2

Page 3: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Necessity of Convergence

limitation of MGNREGS Labour & Material ratio (L M Ratio)-• 60:40 L M Ratio is required

• For GP as PIA, ratio to be maintained at GP Level

• for line departments, ratio to be maintained at block level

To expedite utilization of funds of other programme- • mainly material component is required from other scheme. Therefore fund

utilization is expedited.

Additional financial support for IHHL construction.• Only Rs. 4600 is the motivational amount in NBA, where as actual cost of toilet

is about Rs.13000. Therefore additional financial support up to Rs. 4500 is made available from EGS.

3

Page 4: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Necessity of Convergence

To involve line departments like PWD, water resource, forest for there expertise for-

• Road and Cross Drainage works by PWD,• Water retaining structure by water resource department.• Plantation by forest department depending upon life, climate, growth rate, etc. Need of community demand for village infrastructure like• internal village concrete roads,• Aanganbari bhawan etc..• Development of traditional water bodies. Need of individual demand for sustainable livelihood Like apna

khet apna kam, diggi nirman, horticulture etc.

4

Page 5: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Necessity of Convergence

To take-up bigger project’s.• Bigger and important projects may be constructed by

convergence. • Many Big projects have been constructed by conversing

MGNREGA and other schemes.• Number of diggis / Tankas have been constructed.

5

Page 6: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

TSC

NREGS

MP/MLA FUND

IWMPBADP

FOREST

ICDS

6

Page 7: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Sanctioning Procedure of Work in Convergence

Annual Action Plan of MGNREGA

Estimate of work in convergence

Technical Section of work in convergence

By JEn/AEn/XEn

AS & FS of work in convergence

By DPC

Work Execution By PIA

Recommendation by Competitive Authority

MPLAD/ MLALAD

Panchayat Samiti Zila Parishad

Gram Panchayat

NBA/ Line Department

Annual Action Plan of Other Schemes

By JEn/AEn/XEn

Gram Sabha

General Body Panchayat Simiti

General Body Zila Parishad

Ward Sabha

Page 8: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Major Activities under Convergence

Dovetailing with – BRGF Scheme

Nature of works :-

(a) Block Level Bharat Nirman Rajeev Gandhi Seva Kendra-

Amount spent - Rs. 14.4 Cr. (out of total cost of Rs 25 lacs, @ 16.75 lacs

per Block converged from BRGF scheme , 86 Kendra constructed)

(b) Installation of solar systems at GP Bharat Nirman Rajeev Gandhi Seva

Kendra.

Amount spent - Rs. 15.24 Cr. (out of total cost of Rs 3.03 lacs, @ 1.98 lacs

per Solar System converged from BRGF scheme , 770 solar systems

installed.8

Page 9: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Major Activities under Convergence

Dovetailing with scheme of Agriculture Department nature of works :-

(a) Diggies (water tanks) – 1206 works

(b) Khala Construction & Covering (water cource) – 153 works (312.53

lacs)

(c) Sewan Grass, Pasture land Development (RKVY & Agriculture

Department) works amount 43.75 lacs.

9

Page 10: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Major Activities under Convergence

Dovetailing with MPLAD, MLALAD, BRGF, SFC, TFC, BADP, Un Tied Fund scheme

Nature of works CC/Interlocking Block tile/ Stone Kharanja.166 works,Amount spent Rs.503 lacs

10

Page 11: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Major Activities under Convergence

Dovetailing with NBA

Nature of works :-IHHLAmount spent – Amount upto Rs 4500/ is being provided for

construction of each IHHL under NBA.

•Total works sanctioned under NBA – 9.31 Lacs (including 4.30 lacs of CM BPL & IAY).• Convergence with NREGA – 6.20 Lacs (including 2.85 lacs of CM BPL & IAY).• 93000 MR's (15%) have been issued against 6.20 lacs toilets.• 1.47 lacs (16%) Toilets have been completed against 9.31 lacs toilets. 11

Page 12: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Reason of Less Convergence with NREGS

Lack of MIS Support - Present MIS doesn’t give exact status of convergence.

Uneven Employment Demand - EGS is a demand based programme, Demand is not uniform during the year. So uneven availability of labour results in delayed completion of works and enhanced cost.

12

Page 13: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Reason of Less Convergence with NREGS

Coordination between two agencies – There is time lag in issuing individual sanctions, release of installments etc. Due to lack of coordination between two agencies, pace of work suffers.

Processes under MGNREGS – Processes in EGS are very rigid. Funds of other scheme used for dovetailing has to confirm to same processes. Therefore implementing agencies at times do not take initiative for convergence.

13

Page 14: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Suggestion for effective Convergence

Adequate MIS Support – MIS support needs to be enhanced for convergence of works.

Advance preparation of action plan and release of funds by concerned funding department to MGNREGS.

14

Page 15: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Suggestion for effective Convergence

All Activities which are permissible under MGNREGS should not be allowed independently – Many activities of MoRD like development of watershed & Soil conservation is admissible activity is permissible under EGS. Therefore watershed & Soil conservation activities should not be allowed independently. Suitable change may be made in the guidelines of EGS & Water shed.

other ministries which are willing to create assets for their use should transfer funds to the EGS implementing department at state level Like ministries of WCD for construction of Aangan bari, Ministry of Drinking water and sanitation for construction of IHHL, Ministry of Youth Affairs & Sports for construction of play field etc.

15

Page 16: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Pari Sampati Nirman Nidhi

Parisampatti Nirman Nidhi

(Community Assets Creation Funds)• Hon’ble CM announced creation of separate fund for construction of durable

assets under MGNREGS

• Amount earmarked in FY 2013-14: Rs. 150 Cr

• Thrust – GP which have used 40% material component under MGNREGS and works are still incomplete, will get additional funds from Parisampatti Nidhi for creation and completion of durable assets.

• Result- Need not to look other schemes for creating durable assets having material more then 40%.

.16

Page 17: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Some photographs of assets created under convergence…….

17

Page 18: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

18

BNRGSK with BRGF FUNDS

SOLAR PANEL AT BNRGSK

18

Page 19: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

19

DIGGI

TANKA

19

Page 20: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

20

NADI

KHALA (W/C)

20

Page 21: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

21

PULIA 21

Page 22: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

22

CC Block ROAD Bhilwara

22

Page 23: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

23

ANICUT

CHECK DAM

23

Page 24: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

IHHL

24

Page 25: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

Water Harvesting Structure

It is Dovetailed of MGNREGA (Labour 8.09 Lacs, Material 13.03 Lacs), MPLAD (6.00 Lacs) and MLALAD (6.00 Lacs), Total Fund:- 33.12 Lacs

25

Page 26: Mahatma Gandhi         National Rural Employment Guarantee Scheme  Rajasthan

THANK YOU

26