MAHARASHTRA POLLUTION CONTROL BOARD · SHRI DATTA SHETKARI SAHAKARI SAKHAR KARKHANA LTD., 251...
Transcript of MAHARASHTRA POLLUTION CONTROL BOARD · SHRI DATTA SHETKARI SAHAKARI SAKHAR KARKHANA LTD., 251...
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 1 of 21
MAHARASHTRA POLLUTION CONTROL BOARD
Minutes of 9th Consent Appraisal Committee Meeting of 2018-2019 held on 08.01.2019 at 11.00 a.m. in the chamber of Hon’ble Chairman, 3rd Floor, Maharashtra
Pollution Control Board, Kalpataru Point, Sion, Mumbai, Maharashtra.
……….
Following members of the Consent Appraisal Committee were present:
1. Shri Sudhir Shrivastava, Chairman
Chairperson, MPCB, Mumbai.
2. Shri. P.P. Nandusekhar Member
Technical Advisor, MIDC
3. Shri. P. K. Mirashe Member Convener
Assistant Secretary (Technical), MPC Board, Mumbai
Following Officer of MPCB were present for the meeting:
1. Shri. A. S. Supate, Principal Scientific Officer, MPCB, Mumbai Special Invitee
2. Shri. V. M. Motghare, JD(APC), MPCB, Mumbai Special Invitee
3. Shri. Y. B. Sontakke, JD(WPC), MPCB, Mumbai Special Invitee
Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.
Chairperson of the committee welcomed the members of the committee and allowed proceeding of the meeting to start.
The Minutes of 8th Consent Appraisal Committee Meeting of 2018-2019 held on 10.12.2018 (Booklet No. 14 of
Consent to Operate/Renewal cases) circulated vide letter no. BO/CAC-CAELL/TB/B- 190109-FTS-0083 dtd. 09.01.2019 were confirmed.
The meeting thereafter deliberated on the fresh agenda items (Booklet No. 15) placed before the committee and following decisions were taken:
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 2 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
Booklet No. 15
Consent to Operate/Renewal 1 MPCB-
CONSENT-
0000032121
Fabtech Sugar Ltd
(Distillery Division),
651,671At/P Nandur
Mangalwedha
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has Biomethanation plant
followed by MEE followed by Composting for the
treatment of spent wash 65 KLPD molasses based distillery.
Also provided impervious lagoon of capacity 15 days & 7.5
days (2 Nos) for storage of spent wash & provided an online
CMS and scrubber to 20 TPH bagasse fired boiler.
Hence, it was decided to grant renewal of consent to operate
for 65 KLPD distillery unit, subject to obtaining
clarification regarding 63.14 Crs., by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5 lakhs
towards O & M of pollution control systems.
(ii) Industry shall provide piezometric wells of compost
yard within 2 months and submit bank guarantee of Rs. 2
lakhs towards compliance of same.
After submission of requisite consent fee, if any.
2 MPCB-
CONSENT-
0000046788
Padmashri Dr.
Vitthalrao Vikhe Patil
Sahakari Sakhar
Karkhana Ltd,
(Chemical Division),
198/A/2 Pravaranagar,
Rahata
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry is engaged manufacturing of
acetaldehyde by vapors phase oxidation method in presence
of silver catalyst. Plant was not in operation since March
2018.
It was decided to grant renewal of consent to operate for
acetaldehyde by vapour phase oxidation method in
presence of silver catalyst, by imposing following
conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 3 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
Consent shall be issued after verification of ETP operation
status and after submission of requisite consent fee, if any.
3
MPCB-
CONSENT-
0000048678
Jawahar Shetkari
Sahakari Sakhar
Karkhana Ltd., 315/7
to 315/15, 925/9
Hupari Hatkanangale
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided adequate
Effluent Treatment Plant, Wet Scrubber as air pollution
control system to boiler, provided online monitoring system
and JVS results are within consented limits.
Hence, it was decided to grant renewal of consent to operate
for 12000 TCD sugar and 28.5 MW cogeneration unit, by
imposing following conditions:
(i) Industry shall extend existing bank guarantee of Rs. 15
lakh submitted towards O & M of pollution control systems.
(ii) Industry shall extend existing bank guarantee of Rs. 25
lakh submitted towards excess crushing in future.
4 MPCB-
CONSENT-
0000050113
Gangamai Industries
And Constructions
Ltd.,
6,222/3,223,224,225/1,
225,/2,225/3,232,233
At. Najik Babhulgaon
Shevgaon
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided full-fledged
Effluent Treatment Plant, air pollution control systems in
the form of ESP including online monitoring system and
connected to CPCB and MPCB server.
Hence, it was decided to grant renewal of consent to operate
for 5500 TCD sugar unit and 32 MW cogeneration unit, by
imposing following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakhs
towards O & M of pollution control systems.
Consent shall be issued after verification of JVS reports &
if exceeded proportionate Bank Guarantee to be forfeited.
5 MPCB-
CONSENT-
0000049045
The Malegaon
Sahakari Sakhar
Karkhana Ltd.,
APPROVED
31.07.2019 Committee noted that Industry has industry has provided
full-fledged Effluent Treatment Plant, ESP as air pollution
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 4 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
232,234 Shivnagar
Malegaon BK
Baramati
Renewal of
Consent to
Operate
control system including online monitoring and JVS are
within consented limit.
Hence, it was decided to grant renewal of consent to operate
for 4000 TCD sugar and 21 MW co-generation unit, by
imposing following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
6 MPCB-
CONSENT-
0000050281
Padmashree Dr. D. Y.
Patil S.S.K. Ltd.,
35,43,69 Vesraf-
Palsambe
Gaganbavada
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided full-fledged
Effluent Treatment Plant, stem is taken from adjoining Co-
gen unit M/s. Orient Green Power Ltd. and provided
online monitoring and JVS are within consented limit.
Hence, it was decided to grant renewal of consent to operate
for 4500 TCD, by imposing following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
7
MPCB-
CONSENT-
0000050430
Kukadi Sahakari
Sakhar Karkhana Ltd.,
Gut No.-95,97,98 &
102 Pimpalgon Pisa
Shrigonda
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has obtain Environment
Clearance on 14.05.2018, Effluent Treatment Plant, wet
scrubber as air pollution control system also provided
online monitoring system. However, JVS are exceeding
consented standards.
It was decided to grant renewal of consent to operate for
3500 TCD sugar unit and 12 MW cogeneration unit and
amalgamation with 2000 TCD sugar and 15 MW
cogeneration unit. (Total - 5500 TCD and 27 MW co-
generation unit), by imposing following conditions:
(i) Forfeit bank guarantee of Rs. 2.5 lakh as JVS are
exceeding consented standards and top-up with double the
amount i.e. Rs. 5 lakhs, hence to make total BG of Rs. 7.5
lakh towards O & M of pollution control systems.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 5 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
8
MPCB-
CONSENT-
0000051440
VITTHALRAO
SHINDE SSK LTD.,
415,417,418&419
Gangamainagar-
pimpalner Madha
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has provided MEE followed
by bio-composting for treatment of spent wash and compost
yard of 11 acres.
Hence, it was decided to grant renewal of consent to operate
for 60 KLPD molasses base distillery unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
9 MPCB-
CONSENT-
0000051431
Dr. Babasaheb
Ambedkar Sahakari
Sakhar Karkhana Ltd.,
117,118,202,203,204
Dr. Babasaheb
Ambedkar Sahakari
Sakhar Karkhana Ltd.
Arvindnagar,
at/post-Keshegaon
osmanabad
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has obtained NOC from
CGWA and uploaded on 30.12.2016, Effluent Treatment
Plant, Wet scrubber as air pollution control system and
provided online monitoring system, However, JVS are
exceeding consented standards.
It was decided to grant renewal for consent to operate for
5000 TCD sugar and 26 MW cogeneration unit, subject to
verification regarding completion of CPU, by imposing
following conditions:
(i) Forfeit bank guarantee of Rs. 7.5 lakh out of Rs. 15 lakh
as JVS are exceeding consented standards and top-up with
Rs. 15 lakh, hence to make total BG of Rs. 22.5 lakh
towards O & M of pollution control systems.
(ii) Return bank guarantee of Rs. 5 lakh obtained for NOC
from CGWA for utilization of ground water as PP has
obtained NOC.
10 MPCB-
CONSENT-
0000051283
Kancheshwar Sugar
Ltd., Mangrul Tuljapur
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
online monitoring system, however JVS are exceeding the
consented standards.
Hence, it was decided to grant renewal of consent to operate
for 3500 TCD sugar and 15 MW cogeneration unit, by
imposing following conditions:
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 6 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
(i) Forfeit bank guarantee of Rs. 2.5 lakh as JVS are
exceeding prescribed consented standards and top-up with
Rs. 5 lakh, hence to make total BG of Rs. 7.5 lakh towards
O & M of pollution control systems.
11 MPCB-
CONSENT-
0000050779
Ajinkyatara Sahakari
Sakhar Karkhana Ltd.,
325 Shahunagar-
Shendre Satara
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry is taking steam from M/s.
Renuka Sugars Ltd., ETP provided with online monitoring
system and CPU and JVS are with in consented limit.
Hence, it was decided to grant renewal of consent to
operate for 2500 TCD sugar unit, by imposing following
conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
12 MPCB-
CONSENT-
0000050839
Ajinkyatara Sahakari
Sakhar Karkhana Ltd
Distillery Div., 325
Shahunagar Shendre
Satara
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has provided Re-boiler
followed by Bio Composting facility for the treatment of
spent wash, industry has also provided impervious lagoon
of 5 days capacity (2 nos) and 30 days capacity for the
storage of spent wash.
Hence, it was decided to grant renewal of consent to operate
for 30 KLPD molasses based distillery unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control
systems.
13 MPCB-
CONSENT-
0000051668
SHRI DATTA
SHETKARI
SAHAKARI SAKHAR
KARKHANA LTD.,
251 DATTANAGAR,
SHIROL
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry for treatment of spent wash
has provided integrated evaporation system followed by
bio-composting, 30 days storage lagoons for spent wash and
10 acres compost yard.
Hence, it was decided to grant renewal of consent to operate
for 60 KLPD molasses based distillery unit, by imposing
following conditions:
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 7 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
14 MPCB-
CONSENT-
0000051927
KARMAYOGI
SHANKARRAOJI
PATIL S.S.K. LTD.,
A/P Mahatma
Phulenagar (Bijwadi),
Tal.
Indapur, Dist. Pune
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, wet scrubber as air pollution control
systems and online monitoring system provided and JVS
are within consented limit.
Hence, it was decided to grant renewal of consent to operate
for 8500 TCD sugar and 18.5 MW cogeneration unit, by
imposing following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakhs
towards O & M of pollution control systems.
(ii) Industry shall install CPU within 3 months and submit
bank guarantee of Rs. 5 lakhs towards compliance of same.
15 MPCB-
CONSENT-
0000051994
KARMAYOGI
SHANKARRAOJI
PATIL SAH.
SAKHAR
KARKHANA LTD
(DISTILLERY) A.P.
MAHATMA
PHULENAGAR(BIJ
WADI), TAL.
INDAPUR, DIST.
PUNE
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has provided Bio-digester
followed by Bio-Composting for treatment of spent wash,
concrete compost yard of 8 Acres and online monitoring
system provided.
Hence, it was decided to grant renewal of consent to operate
for 30 KLPD distillery, subject to verification of bank
guarantee, by imposing following conditions:
(i) Industry shall submit/extend bank guarantee of Rs. 5
lakh towards O & M of pollution control systems.
16 MPCB-
CONSENT-
0000051925
Athani Sugars Ltd.,
Shahuwadi Unit
(Leesse of
Udaysingrao Gaikwad
S.S.K. Ltd.,
Sonawade) A/p-
Sonawade-Bambvade,
Tal- Shahuwadi,Dist
Kolhapur
APPROVED
Renewal of
Consent to
Operate
31.07.2021 Committee noted that Industry has provided wet scrubber
as APC system, online monitoring system provided and
JVS are within consented limit.
Hence, it was decided to grant renewal of consent to operate
for 2500 TCD sugar unit, by imposing following
conditions:
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 8 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
(i) Industry shall submit Bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
(ii) Return the existing Bank Guarantee of Rs. 15 lakh
obtain as per earlier consent.
Consent shall be issued after submission of requisite
consent fee, if any.
17 MPCB-
CONSENT-
0000052264
Jarandeshwar Sugar
Mills Pvt. Ltd., 803
A/P Chimangaon
Koregaon
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
online monitoring system provided. However, JVS are
exceeding consented standards.
It was decided to grant renewal of consent to operate for
10,000 TCD sugar and 32 MW co-generation unit, by
imposing following conditions:
(i) Forfeit Bank guarantee of Rs. 7.5 lakh as JVS are
exceeding consented standards and discharge of effluent
outside factory premises and top-up with Re. 15 lakh
towards O & M of pollution control systems.
18 MPCB-
CONSENT-
0000052091
DR. BABASAHEB
AMBEDKAR S.S.K.
LTD, 116,117,118,119
DR. BABASAHEB
AMBEDKAR S.S.K.
LTD;
ARVINDNAGAR,
KESHEGAON
OSMANABAD
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has provided MEE and bio
composting for treatment of spent wash and also provided
30 days impervious lagoon & leachate collection tank for
spent wash.
Hence, it was decided to grant renewal of consent to operate
for 60 KLPD molasses based distillery unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 9 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
19 MPCB-
CONSENT-
0000052237
The Saswad Mali
Sugar Factory Ltd.,
A/P-Malinagar Tal-
Malshiras Dist-Solapur
APPROVED
Renewal of
Consent to
Operate
31.08.2021 Committee noted that Industry has provided Bio
methanation plant followed by MEE system followed by
composting for the treatment of spent wash and also
obtained CGWA exemption NOC dated 08.08.2017.
Hence, it was decided to grant renewal of consent to operate
for 30 KLPD molasses based distillery unit, subject to
compliance of Proposed directions are issued by the
Board on 07/09/2018, by imposing following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
20 MPCB-
CONSENT-
0000052256
Shree Siddheshwar
SSK Ltd Kumathe,
21/1 to 21/6 Kumathe
North Solapur
APPROVED
Renewal of
Consent to
Operate
31.08.2021 Committee noted that Industry has Bio methanation plant
followed by composting for treatment of spent wash and
wet scrubber as APC system and 6 acres of compost yard.
Hence, it was decided to grant renewal of consent to operate
for 20 KLPD molasses based distillery unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
(ii) Industry shall dismantle of existing kachha spent wash
storage lagoons within 1 month and submit bank guarantee
of Rs. 5 lakh towards compliance of same.
21 MPCB-
CONSENT-
0000052215
Vitthal Refined Sugars
Ltd, Gat No-
247,248,252,254,256
At Post- Pande Gat
No-
247,248,252,254,256
A/p Pande Tal
Karmala Dist.Solapur
Karmala
APPROVED
Renewal of
Consent to
Operate
31.08.2021 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
online monitoring system. However, JVS are exceeding the
consented limits.
Hence, it was decided to grant renewal of consent to operate
for 3500 TCD sugar and 14 MW Co-generation unit, by
imposing following conditions:
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 10 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
(i) Forfeit bank guarantee of Rs. 3.75 lakh as JVS results
are exceeding prescribed consented standards and top-up
with Rs. 7.5 lakh, hence to make total bank guarantee of Rs.
11.25 lakh towards O & M of pollution control systems.
22 MPCB-
CONSENT-
0000052561
Green power sugars
Ltd. (Distillery unit)
613,614 and 616
Gopuj Khatav
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry for treatment of spent wash
industry have provided Bio methanation followed by MEE
followed Bio composting and also provided 2 no’s of pucca
lagoons i.e. HDPE lined & concreted. One is located at
industry site & is of 5 days storage capacity & the other is
located at compost yard is of 15 days storage capacity &,
compost yard is about 4 km. from the industry.
Hence, it was decided to grant renewal of consent to operate
for 45 KLPD molasses based distillery unit, by imposing
following conditions:
(i) Industry shall submit/extend bank guarantee of Rs. 5
lakhs towards O & M of pollution control systems.
23 MPCB-
CONSENT-
0000052438
The Pdmashri Dr.
Vitthalrao Vikhe Patil
Sahakari Sakhar
Karkhana Ltd., Gut
No-196/1, 198/A/2
Prvaranagar ,Loni
Rahata
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry is utilising the Steam
generating from the Boiler of M/s. PREL, Loni, Tal –
Rahata, Dist – A’Nagar on the BOT basis to which ESP is
provided, also noted that Hon’ble NGT (WZ) Pune vide
Application No – 143/2017(WZ) case in pending and
Effluent Treatment Plant provided with online monitoring
system. However JVS are exceeding consented standards.
Hence, it was decided to grant renewal of consent to for
4000 TCD sugar unit, by imposing following conditions:
(i) Forfeit bank guarantee of Rs. 2.5 lakh as JVS are
exceeding consented standards and top up with Rs. 5 lkah
towards O & M of pollution control systems.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 11 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
(ii) Industry shall extend existing Bank Guarantee of Rs. 5
lakh submitted towards installation of CPU within 3
months.
(iii) Industry shall operate ETP and untreated effluent
should not be discharged on land.
24 MPCB-
CONSENT-
0000052601
Jai Hind Sugar Private,
359 Aachegaon South
Solapur
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
online monitoring system. However JVS results are
exceeding consented standards.
Hence, it was decided to grant renewal of consent to operate
for 3500 TCD sugar and 18 MW co-generation unit, by
imposing following conditions:
(i) Forfeit bank guarantee of Rs. 2.5 lakh as JVS are
exceeding consented standards and to-up with Rs. 5 lakhs,
hence to make total bank guarantee of Rs. 7.5 lakh towards
O & M of pollution control systems.
(ii) Forfeit bank guarantee of Rs. 5 lakhs as industry has not
installed CPU as per previous consent conditions and top-
up with Rs. 10 lakhs for installation of CPU within 3
months.
25 MPCB-
CONSENT-
0000052792
Shri Sant Tukaram
S.S.K.,
146,147,148,149,151,1
52. Pune.Kasarsai-
Darumbre Mulshi
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
online monitoring system provided. However, JVS are
exceeding the consented standard.
Hence, it was decided to grant renewal of consent to operate
for 3000 TCD sugar and 15 MW cogeneration unit, by
imposing following conditions:
(i) Forfeit bank guarantee of Rs. 4.75 lakh out of 9.5 lakh
as JVS are exceeding consented standards and top-up with
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 12 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
Rs. 9.5, hence to make total bank guarantee of Rs. 14.25
lakh towards O & M of pollution control systems.
26 MPCB-
CONSENT-
0000052737
Jagruti Sugar And
Allied Industries Ltd,
81,101,102,103,105,11
1 Talegaon(Bh) Devni
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, Wet scrubber as air pollution control
system and online monitoring system provided, However
JVS are exceeding the consented standard.
Hence, it was decided to grant renewal of consent to operate
for 2500 TCD sugar and 12.3 MW co-generation unit, by
imposing following conditions:
(i) Forfeit bank guarantee of Rs. 5 lakhs as JVS are
exceeding consented standards and top-up with Rs. 10,
towards O & M of pollution control systems.
(ii) Industry shall install CPU within 3 months and submit
bank guarantee of Rs. 5 lakhs towards compliance of same.
27 MPCB-
CONSENT-
0000052839
Bhairavnath Sugar
Works Ltd., G
N68,62,63,65,66,69
Sonari & 37,38,39, 40
Mugaon Shivajinagar
Paranda
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has Effluent Treatment
Plant, Wet scrubber & ESP as air pollution control system,
online monitoring system provided, however, JVS results
of treated effluent are exceeding consented standards.
Hence, it was decided to grant renewal of consent to operate
for 3500 TCD sugar and 14.5 MW cogeneration unit,
subject to verification of CPU from SRO, by imposing
following conditions:
(i) Forfeit bank guarantee of Rs. 5 lakhs as JVS are
exceeding consented standards and top-up with Rs. 10
lakhs, hence to make total bank guarantee of Rs. 15 lakhs
towards O & M of pollution control systems.
28 MPCB-
CONSENT-
0000052004
Loknete Sunderraoji
Solanke Sahakari
Sakhar Karkhana Ltd.,
176 At. Sundernagar,
APPROVED
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system, online
monitoring system provided and JVS are exceeding
consented standards.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 13 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
Tq.Dharur, Dist. Beed.
Dharur
Renewal of
Consent to
Operate
Hence, it was decided to grant renewal of consent to operate
for 5000 TCD sugar and 22 MW co-generation unit, by
imposing following conditions:
(i) Forfeit bank guarantee of Rs. 8.5 lakh out of 17 lakhs as
JVS are exceeding consented standards and top-up with Rs.
17 lakhs, hence to make total bank guarantee of Rs. 25.5
lakh towards O & M of pollution control systems.
29 MPCB-
CONSENT-
0000051998
Sant Muktai Sugar &
Energy Ltd., Gatno.-
340/345 to 350
Ghodasgaon
Muktainagar
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, Wet Scrubber as air pollution control
system and online monitoring system provided however
JVS are exceeding consented standards.
Hence, it was decided to grant renewal of consent to operate
for 2500 TCD sugar unit and 12 MW cogeneration, by
imposing following conditions:
(i) Forfeit bank guarantee of Rs. 2.5 lakh as JVS are
exceeding consented standards and top-up with Rs. 5 lakhs,
hence to make total bank guarantee of Rs. 7.5 lakh towards
O & M of pollution control systems.
30 MPCB-
CONSENT-
0000053192
Rena Sahakari Sakhar
Karkhana .Ltd
(Distillery Unit),
180,183,185,186,189,1
90,191,192,193,194,19
5,196 Niwada Renapur
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has Bio-mechanization,
multiple effect evaporator followed by composting on 5.5
acre for treatment of spent wash and also provided lagoon
of capacity 3 days & 30 days for storage.
Hence, it was decided to grant renewal of consent to operate
for 30 KLPD molasses based distillery unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakhs
towards O & M of pollution control systems.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 14 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
31 MPCB-
CONSENT-
0000053404
Gangakhed Sugar &
Energy Ltd.,
103,104,105,106,142
Vijaynagar, Makhani
Gangakhed
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
online monitoring system, however JVS of ETP outlet of
last crushing season are exceeding.
Hence, it was decided to grant renewal of consent to operate
for 6000 TCD sugar unit and 30 MW cogeneration unit,
subject to verification of JVS results, by imposing
following conditions:
(i) Forfeit bank guarantee of Rs. 2.5 lakh out of 5 lakhs as
JVS are exceeding consented standards and top-up with Rs.
5 lakhs. Hence to make total bank guarantee of Rs. 7.5 lakh
towards O & M of pollution control systems.
32 MPCB-
CONSENT-
0000052836
Vikas Sahakari Sakhar
Karkhana Ltd.Unit-2,
66,67,72,74,75
At.Post.Tondar
Tq.Udgir Dist.Latur
Udgir
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, Wet scrubber as air pollution control
system and provided online monitoring system. However,
JVS results are exceeding consented standards.
It was decided to grant renewal of consent to operate for
2500 TCD sugar unit, subject to verification of installation
of CPU by SRO, by imposing following conditions:
(i) Forfeit bank guarantee of Rs. 5 lakh out of Rs. 10 lakh
as JVS are exceeding consented standards and top-up with
Rs. 10 lakh, hence to make total bank guarantee of Rs. 15
lakh towards O & M of pollution control systems.
33 MPCB-
CONSENT-
0000053346
Krantiagrani Dr. G. D.
Bapu Lad S. S. K.
Ltd., 514 Vita Road
Kundal Palus
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, Wet scrubber as air pollution control
system and provided online monitoring system. However,
JVS results are exceeding consented standards.
Hence, it was decided to grant renewal of consent to operate
for 6500 TCD sugar and 19.7 MW cogeneration unit, by
imposing following conditions:
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 15 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
(i) Forfeit bank guarantee of Rs. 4.25 lakh and top-up with
Rs. 8.5 lakh, hence to make total bank guarantee of Rs.
12.75 lakh towards O & M of pollution control system.
34 MPCB-
CONSENT-
0000053487
SHRI SANT DAMAJI
SAHAKARI
SAKHAR
KARKHANA LTD.,
3743 to 3755
MANGALWEDHA
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, Wet scrubber as air pollution control
system and provided online monitoring system. However,
JVS results are exceeding consented standards.
Hence, it was decided to grant renewal of consent to operate
for 2500 TCD sugar, subject to verification of installation
of wet scrubber and CPU, by imposing following
conditions:
(i) Forfeit bank guarantee of Rs. 4 lakhs out of Rs. 8 lakhs
as a JVS are exceeding consented standards and top-up of
Rs. 8 lakhs towards O & M of pollution control system.
35 MPCB-
CONSENT-
0000052080
Sahakar Shiromani
Vasantrao Kale SSK.
Ltd.(Sugar +Co-Gen),
941/1,947,950,999/1,9
99/2,1000,1001 At-
Chandrabhaganagar
Post-Bhalwani
Pandharpur
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
provided online monitoring system. However, JVS results
are exceeding consented standards and CPU not provided
as per earlier consent condition.
Hence, it was decided to grant renewal of consent to operate
for 2500 TCD sugar unit and 18 MW co-generation unit, by
imposing following conditions:
(i) Forfeit bank guarantee of Rs. 6 lakh bank JVS are
exceeding prescribed consented standards and top-up with
Rs. 12 lakhs towards O & M of pollution control systems.
(ii) Forfeit bank guarantee of Rs. 5 lakhs as unit has not
provided CPU as per earlier consent condition and top-up
with Rs. 10 lakh towards installation of CPU within 3
months.
36 MPCB-
CONSENT-
0000051430
Shree. Dudhganga
Vedganga Sahakari
Sakhar Karkhana Ltd.,
APPROVED
31.07.2019 Committee noted that Industry has provided adequate
Effluent Treatment Plant, ESP as air pollution control
system and online monitoring system. However, JVS are
exceeding the consented limits,
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 16 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
1051 Bidri
(Mouninagar) Kagal
Renewal of
Consent to
Operate
Hence, it was decided to grant renewal of consent to operate
for 5000 TCD sugar and 20 MW cogeneration unit, by
imposing following conditions:
(i) Forfeit bank guarantee of Rs. 3 lakhs out of Rs. 6 lakh as
JVS are exceeding consented standards and top-up with Rs.
6 lakhs, hence to make total bank guarantee of Rs. 8 lakhs
towards O & M of pollution control systems.
(ii) Industry shall extend existing bank guarantee of Rs. 10
lakh submitted towards not to carry out excess crushing in
future.
37 MPCB-
CONSENT-
0000053457
VIKASRATNA
VILASRAO
DESHMUKH
MANJARA SSSK
LTD.,
99,109,110,111,289
VILASNAGAR
LATUR
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided adequate
Effluent Treatment Plant, ESP as air pollution control
system and online monitoring system. However, JVS are
exceeding the consented standards.
Hence, it was decided to grant renewal of renewal of
consent to operate with
amalgamation 1st operate for 3500 TCD sugar and 18 MW
cogeneration unit, subject to verification of CPU
installation, by imposing following conditions:
(i) Forfeit bank guarantee of Rs. 2.5 lakh as JVS are
exceeding consented standards and top-up with Rs. 5 lakhs,
hence to make total bank guarantee of Rs. 7.5 lakh towards
O & M of pollution control systems.
38 MPCB-
CONSENT-
0000053662
Sahakar Maharshi
Shivajirao Narayanrao
Nagawade SSK Ltd.,
51/2 Shrigonda
Factory Shrigonda
NOT
APPROVED
Renewal of
Consent to
Operate
------- Committee noted that Industry has exceeding the consented
crushing capacity & also attracts the provision of
Environmental Clearance as it was exceeded more than
5000 TCD capacity and also JVS are exceeding consented
standards.
Hence, it was decided to issue SCN for refusal of consent
to operate, on following non-compliances:
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 17 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
(i) JVS results are exceeding prescribed consented
standards.
(ii) O & M of pollution control system is not proper.
(iii) Industry has already carried out excess crushing, which
is Violation of Environmental Clearance and consent
conditions
39 MPCB-
CONSENT-
0000053752
Vikasratna vilasrao
deshmukh manjara
sssk ltd.,
99,108,109,110,111 at-
chincholirao wadi
vilas nagar latur
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has provided Bio-
mechanization, multiple effect evaporator followed by
composting on 7 acre area for treatment of spent wash and
also provided days, 15 days & 30 days for storage of spent
wash.
Hence, it was decided to grant renewal of consent to operate
for 60 KLPD molasses based distillery unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
40 MPCB-
CONSENT-
0000053717
Y. M. KRISHNA S. S.
K. LTD, 500
SHIVNAGAR
KARAD
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided adequate
Effluent Treatment Plant, ESP as an APC system and online
monitoring system. However, JVS are exceeding the
consented standards.
Hence, it was decided to grant renewal of consent to
operate for 7500 TCD sugar & 16 MW cogeneration, by
imposing following conditions:
(i) Forfeit bank guarantee of Rs. 5 lakh as JVS are
exceeding consented standards and top up with Rs. 10
lakhs towards O & M of pollution control systems.
41 MPCB-
CONSENT-
0000055070
GANGAKHED
SUGAR AND
ENERGY LTD.,
103,104, 105, 106, 142
VIJAYNAGAR,
APPROVED
31.08.2019 Committee noted that Industry has for treatment of spent
wash distillery has provided Re-boiler and MEE followed
by incineration boiler of 24 TPH Capacity.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 18 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
MAKHANI
GANGAKHED
Renewal of
Consent to
Operate
Hence, it was decided to grant renewal of consent to operate
for 60 KLPD molasses based distillery unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
42 MPCB-
CONSENT-
0000053226
Sadashivrao Mandlik
Kagal Taluka
S.S.L.Ltd., 425
Haidwada-kaulage,
Tal-Kagal,
Dist. Kolhapur
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided adequate
Effluent Treatment Plant, ESP as air pollution control
system, online monitoring system and JVS within
consented standards.
Hence, it was decided to grant renewal of consent to operate
for 4500 TCD sugar and 15 MW cogeneration unit, by
imposing following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakhs
towards O & M of pollution control systems
43 MPCB-
CONSENT-
0000055335
Vishwasrao Naik
Sahakari Sakhar
Karkhana
Ltd.(Distillery Unit),
182, 224, 223, 175,
189, 183, 162
Yashwantnagar,
Chikhali Shirala
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry for treatment of spent wash
unit has provided the RO system followed by mechanical
aerobic composting to achieve the zero discharge.
Hence, it was decided to grant renewal of consent to operate
for 30 KLPD molasses based distillery unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control.
44 MPCB-
CONSENT-
0000051646
JUBILANT
INDUSTRIES LTD.,
Gat no 25/26/27/28/32
Village Nimbut-Nira
Taluka -Baramati
District Pune
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has applied for renewal of
consent to operate for Potable Liquor Bottling - 550 KL/M
and effluent is Nil as industry is using fresh bottles for
product.
Hence, it was decided to grant renewal of consent to operate
for Potable Liquor Bottling - 550 KL/M. subject to order
passed by Hon'ble NGT in Application No. 7/2014.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 19 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
45 MPCB-
CONSENT-
0000055863
VASANTRAO DADA
PATIL SAHAKARI
SAKHAR
KARKHANA LTD.,
GUT NO.- 799/2
LOHONER DEOLA
Not APPROVED
Renewal of
Consent to
Operate
-------- It was decided to issue SCN for refusal of consent to operate
for distillery unit, on following compliances:
(i) Industry has not upgraded APC system and not
submitted bank guarantee.
(ii) Industry has increased capital investment from 18.01Cr
to 49.62Cr (i.e. 31.61 Crs) without C to E from board and
not paid fees on increase in investment
46 MPCB-
CONSENT-
0000057158
Shri Dutt India Pvt.
Ltd (Operator of M/s.
Vasantdada Shetkari
Sahakari Sakhar
Karakhana Ltd.),
173/156/167/188 A/p-
Madhavnagar Road,
Sangli Miraj
APPROVED
Renewal of
Consent to
Operate
31.08.2019 Committee noted that Industry has provided Re-boiler
followed by 7.5 acres concrete compost yard for treatment
of spent wash and also provided 5 day and 30 days R.C.C
lagoons for storage.
Hence, it was decided to grant renewal of consent to operate
for 45 KLPD distillery unit, by imposing following
conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
47 MPCB-
CONSENT-
0000057229
JAILAXMI SUGAR
PRODUCTS
(NITALI) PVT. LTD.
(Operate by Shila Atul
Sugar Tech. Pvt. Ltd.),
405 TO 412 and 469
NITALI
OSMANABAD
Not APPROVED
Renewal of
Consent to
Operate
-------- It was decided to issue SCN for refusal for consent to
operate, on following non-compliances:
(i) PP has not submitted change of name document i.e. M/s.
Shila Atul Sugar tech. Pvt. Ltd. (Operative Jailaxmi Sugar
Products(Nitali) Pvt. Ltd.) and previous consent in the name
of Jailaxmi Sugar Products(Nitali) Pvt. Ltd.
(ii) Not submitted additional consent fee.
(iii) Industry has failed to provide online monitoring system
48 MPCB-
CONSENT-
0000055733
VASANTRAO DADA
PATIL SAHAKARI
SAKHAR
KARKHANA LTD.,
Vithewadi Tal Deola
Dist
Nashik
Not APPROVED
Renewal of
Consent to
Operate
-------- It was decided to issue SCN for refusal of consent to
operate, on following non-Compliance:
(i) Industry has increase capital investment 184.53Cr to
243.86Cr (i.e 59.33 Crs.) with consent to establish.
(ii) Industry has not upgraded air pollution control system.
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 20 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
(iii) Industry has not provided online monitoring system as
per CPCB directions.
49 MPCB-
CONSENT-
0000052787
PURNA SAHAKARI
SAKHAR
KARKHANA LTD.,
Survey No. 238, 239,
240 AT
BABHULGAON
BASMATHNAGAR
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
online monitoring system. However, industry has not
installed CPU and JVS collected in last crushing season are
exceeding the prescribed consented limits.
Hence, it was decided to grant renewal of consent to
Operate for 2500 TCD sugar unit and 18 MW cogeneration
unit, by imposing following conditions:
(i) Forfeit bank guarantee of Rs. 5 lakhs as JVS are
exceeding consented standards and top-up with Rs. 10
lakhs, hence to make total bank guarantee of Rs. 15 lakhs
towards O & M of pollution control systems.
(ii) Also forfeit bank guarantee of Rs. 5 lakhs as industry
has not provided CPU and top-up with Rs. 10 lakh towards
installation of CPU within 3 months.
50 MPCB-
CONSENT-
0000053524
Rajgad Sahakari
Sakhar Karkhana Ltd,
Gut n0. 317,318,320,
321 Anantnagar Bhor
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, Wet Scrubber as air pollution control
system and install online monitoring system.
Hence, it was decided to grant renewal of consent to operate
for 1250 TCD sugar unit, subject to verification of JVS
results, by imposing following conditions:
(i) Industry shall extend existing bank guarantee of Rs. 10
lakh submitted towards O & M of pollution control systems.
(ii) Industry shall install CPU within 3 months and submit
bank guarantee of Rs. 5 lakh towards compliance of same.
51 MPCB-
CONSENT-
0000059765
SABMiller Breweries
Pvt. Ltd ( unit -
Foster's) M-99
APPROVED
30.11.2019 Committee noted that Industry has provided Effluent
Treatment Plant and provision made by the industry for
9th CAC meeting of 2018-2019 (Book-let no. 15 of Renewal of Consent to Operate) dated 08.01.2019 Page 21 of 21
Sr.
No
ApplicationU
nique
Number
Industry name and
Address
Decision on
grant of consent
Consent
granted
upto
Remarks / Discussion
jogeshwari,Waluj ,
MIDC Ganagapur
Renewal of
Consent to
Operate
disposal of treated effluent into CETP pipeline and industry
not in operation since last 4 years.
Hence, it was decided to grant renewal of consent for Beer
manufacturing activity, by imposing following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakhs
towards compliance of consent conditions.
Consent shall be issued after receipt of report from Regional
Office, Aurangabad about operational status of pollution
control systems.
52 MPCB-
CONSENT-
0000031993
Shri Ambalika Sugar
Pvt. Ltd., Gat no.
231,392 Ambika
Nagar, A/P- Jagdamba
Factory, Tal. Karjat,
Dist.
Ahmednagar
APPROVED
Renewal of
Consent to
Operate
31.07.2019 Committee noted that Industry has provided Effluent
Treatment Plant, ESP as air pollution control system and
online monitoring system & JVS are within consented
standards.
Hence, it was decided to grant renewal of consent for 7500
TCD sugar and 38 MW cogeneration unit, by imposing
following conditions:
(i) Industry shall submit bank guarantee of Rs. 5 lakhs
towards O & M of pollution control systems.
(ii) Industry shall provide CPU within 3 months and submit
bank guarantee of Rs. 5 lakh towards compliance of same.
The meeting is ended with vote of thanks.
Draft Minutes of 9th CAC Meeting 2018-19 (Booklet No. 15 of Consent to Operate/ Renewal) held on 08.01.2019 submitted for approval and signature please.