5 th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 1 of 19 MAHARASHTRA POLLUTION CONTROL BOARD Minutes of 5 th Consent Appraisal Committee Meeting of 2017-2018 held on 27.09.2017 at 2.30 p.m. at MHADA Office, Grihanirman Bhavan, Kalanagar, Bandra (East), Mumbai, Maharashtra 400051. ………. The Consent Appraisal Committee meeting of the Board was held on 27.09.2017. Following members of the Consent Appraisal Committee were present: 1. Shri Milind Mhaiskar, Chairman Vice President & CEO , MHADA and Chairperson, MPCB, Mumbai. 2. Dr. P. Anbalagan Member Member Secretary, MPC Board, Mumbai 3. Shri. Padmakar Nandusekar Member Technical Advisor (Environment), MIDC, Mumbai 4. Shri. Tuhin Banarji, Member Scientist, NEERI 5. Shri. P. K. Mirashe Member Convener Assistant Secretary (Technical), MPC Board, Mumbai Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them. Following Officer of MPCB were present for the meeting: 1. Shri V. M. Motghare, JD (APC), Mumbai, Special Invitee 2. Shri Y. B. Sontakke, JD(APC), Mumbai, Special Invitee 3. Shri A. R. Supate , PSO, Mumbai, Special Invitee 4. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee

Transcript of MAHARASHTRA POLLUTION CONTROL...

Page 1: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 1 of 19

MAHARASHTRA POLLUTION CONTROL BOARD

Minutes of 5th Consent Appraisal Committee Meeting of 2017-2018 held on 27.09.2017 at 2.30 p.m. at MHADA Office, Grihanirman Bhavan, Kalanagar,

Bandra (East), Mumbai, Maharashtra 400051. ………. The Consent Appraisal Committee meeting of the Board was held on 27.09.2017. Following members of the Consent Appraisal Committee were

present:

1. Shri Milind Mhaiskar, Chairman Vice President & CEO , MHADA and Chairperson, MPCB, Mumbai.

2. Dr. P. Anbalagan Member

Member Secretary, MPC Board, Mumbai 3. Shri. Padmakar Nandusekar Member

Technical Advisor (Environment), MIDC, Mumbai

4. Shri. Tuhin Banarji, Member Scientist, NEERI

5. Shri. P. K. Mirashe Member Convener Assistant Secretary (Technical), MPC Board, Mumbai

Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.

Following Officer of MPCB were present for the meeting:

1. Shri V. M. Motghare, JD (APC), Mumbai, Special Invitee

2. Shri Y. B. Sontakke, JD(APC), Mumbai, Special Invitee

3. Shri A. R. Supate , PSO, Mumbai, Special Invitee

4. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee

Page 2: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 2 of 19

Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of 2nd and 3rd

Consent Appraisal Committee meeting held on 08.08.2017 and 10.08.2017 respectively circulated vide letter no.BO/CAC-Cell/TB/B-3742 dtd. 15.09.2017

were confirmed.

The meeting thereafter deliberated on the fresh agenda items of 1st consent to operate [Book-let no. 000000000006] is placed before the

committee and following decisions were taken.

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

(Book-let No. 06)

Consent to 1st Operate

1 MPCB-CONSENT-0000009648

Manas Agro Industries & Infrastructure Limited (Unit-1), (Distillery Unit) H.No. 397 Village - Bela, Nagpur - Chandrapur Road, Tahsil - Umrer, District Nagpur Umrer

APPROVED

Renewal of consent with name change

of distillery unit

31.07.2018 It was decided to grant renewal of consent to operate with name change from M/s. Purti Power and Sugar Ltd to M/s. MANAS AGRO INDUSTRIES & INFRASTRUCTURE LIMITED for 45 KLPD molasses based distillery to manufacture Rectified Spirit-1350 KL/M, Fusel Oil- 2.70 KL/M and & Extra Neutral Alcohol (ENA)- 45000 Lit/day by imposing following conditions 1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution

control system.

Consent shall be issued after submission of 1. BG of Rs. 15 lakh towards O&M of pollution control system and

compliance of consent conditions,

2. A copy of ROC for name change from M/s. Purti Power and Sugar Ltd

to M/s. MANAS AGRO INDUSTRIES & INFRASTRUCTURE LIMITED.

3. NOC from M/s. Purti Power and Sugar Ltd., for transfer of EC.

4. Verification report regarding installation of online monitoring system.

5. Industry shall get EC transfer/amendment on the name of M/s. Manas

Agro Industries & Infrastructure Limited within 03 months

2 MPCB-CONSENT-0000010960

MANAS AGRO INDUSTRIES & INFRASTRUCTURE

APPROVED

31.07.2018 It was decided to grant plain renewal of consent to operate for 2500 TCD Sugar unit & 22 MW co-gen unit with name change from M/s. Purti Power

Page 3: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 3 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

LIMITED H.NO. 397 KHURSAPAR (BELA) UMRER

Renewal of consent with change in name of Sugar & Co- gen

Unit

& Sugar Limited to M/s. Manas Agro Industries & Infrastructure Ltd by imposing following conditions. 1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards

O&M of ETP and APC system.

2. Industry shall get EC transfer/amendment on the name of M/s. Manas

Agro Industries & Infrastructure Limited within 03 months

The decision regarding forfeiture/release of BG of Rs. 5 lakh towards provision of online monitoring system as per the directions of CPCB will be taken after receipt of verification report from SRO. Consent shall be issued after submission of 1. Submission of ROC for name change from M/s. Purti Power & Sugar

Limited to M/s. Manas Agro Industries & Infrastructure Ltd.

2. Submission of Latest JVS results from SRO

3. Additional requisite consent fee, if applicable.

3 MPCB-CONSENT-0000017267

MANAS AGRO INDUSTRIES & INFRASTRUCTURE LIMITED (UNIT-1) H.NO. 397 KHURSAPAR (BELA) UMRER, Nagpur.

APPROVED

1st Consent to Operate for

expansion and amalgamation with

existing consent with name change

31.07.2018 Committee noted that the industry has obtained EC for expansion of Molasses based distillery from 45 KLPD to 135 KLPD vide letter dated 24.02.2016 and amendment dated 19.08.2016. It was decided to grant 1st consent to operate to manufacture Rectified Spirit-1350 KL/M & Extra neutral alcohol-2.70 KL/M by imposing specific conditions of EC and with following conditions 1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution

control system

2. Industry shall comply with the EC conditions.

Consent shall be issued after 1. ROC for name change from M/s. Purti Power and Sugar Ltd to M/s.

Manas Agro Industries & Infrastructure Limited.

2. NOC from competent authority for transfer of EC.

Page 4: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 4 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

4 MPCB-CONSENT-0000024529

SRJ Peety Steels Private Limited, Plot No: D-51/1, D-51/2, D-50/1, D-52/1, E-8/9 and E-8/10 Additional MIDC Jalna, Jalna.

NOT APPROVED

1st Consent to Operate for

expansion with Renewal of existing consent and their

amalgamation

--- Committee noted that industry has obtained EC dated 17.05.2016. It is also noted that industry failed to provide secondary fume extraction system (at roof top) as stipulated in CtoE and also failed to submit the BG of Rs. 5 lakh towards for up gradation of existing APCS. In view of above, It was decided not to consider the case for 1st operate and call the proposal from the industry regarding secondary emission control system. It was also decided to take the opinion of IIT/NEERI towards operational issues and its effectiveness.

5 MPCB-CONSENT-0000025957

Laxmi Organic Industries Ltd. Plot No. A-22/2/3 MIDC Mahad, Raigad.

NOT APPROVED

1st Operate for expansion

APPROVED

Plain Renewal of consent

---

30.04.2022

Committee noted that Board has granted consent to establish for expansion with ZLD condition. However, industry has applied 1st Consent to operate for expansion without provision of ZLD thereby not complied the ZLD condition prescribed in consent to establish. In view of above, it was decided to defer the case and call the ZLD proposal from the industry and revert back to next CAC. It was also decided to grant plain renewal of existing consent to operate by imposing following conditions 1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution

control system.

6 MPCB-CONSENT-0000021198

Raheja Vistas, 37/3, 37/4, 27/1, 27/2, 27/3, 27/4, 25/4, 26/1+9a, 26/2a+2b Village Mohammadwadi Haveli, Pune

APPROVED

1st Consent to Operate (part)

31.08.2019 It was decided to grant 1st Consent to Operate (part) for Residential and Commercial building having total plot area 1,30,877.97 sq. mtr & BUA 47,683.73 sq. mtr by imposing following conditions:- 1. PP shall submit undertaking in Board’s prescribed format within 15

days regarding compliance of conditions of Environmental Clearance

(EC) and

Consent to Establish.

2. PP shall submit the undertaking within 15 days in the prescribed format

regarding the part of the built-up area/ building for which application

Page 5: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 5 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

for 1st Consent to Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall extend/ submit the BG of Rs. 25 lakhs towards

O&M of pollution control system.

4. PP shall achieve the treated domestic effluent standard for the

parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled for secondary

purposes such as toilet flushing, air conditioning, cooling tower make

up, firefighting etc. and remaining shall be utilized on land for gardening

and connected to the sewerage system provided by local body.

Consent shall be issued after: (1) Submission of Certificate from Architect regarding BUA completed for which they have applied for 1st Consent to Operate. (2) After installation of online monitoring system for the parameters Flow, BOD, and TSS at STP outlet and verification of the same from SRO/RO. (3) After receipt of additional consent fees, if applicable.

7 MPCB-CONSENT-0000026240

Natural Sugar and Allied Industries Ltd –(Steel Unit) 249 Sainagar Ghargaon, Tq. Kallam, Dist. Osmanabad

NOT APPROVED

Renewal of Consent

---- Committee noted that consent was valid upto 30.04.2013. The industry is not in operation since last three years and also the operational status of pollution control system is not known. In view of above, it was decided to issue SCN for refusal of renewal of consent to operate due to above non-compliances.

8 MPCB-CONSENT-0000002382

USV Private Limited, D-115, TTC Industrial Area, MIDC Shirvane, Navi Mumbai.

APPROVED

Amendment in existing consent for

addition of BMW quantities

30.04.2019 Committee noted that Board has granted consent to operate which is valid upto 30.04.2019. In view of above, It was decided to grant amendment in existing consent to operate for addition of BMW details with overriding effect. The consent amendment shall be issued after confirming annual returns of BMW.

9 MPCB-CONSENT-0000025680

Mallak Specialties Pvt. Ltd. Plot No. C-103 MIDC Mahad, Mahad Raigad.

APPROVED

1st Consent to Operate for

expansion (part) and

28.02.2019 It was decided to grant 1st consent to operate for expansion (part) and amalgamation with existing consent to operate with overriding effect by imposing following conditions:

Page 6: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 6 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

amalgamation with existing consent

1. Industry shall discharge the treated trade effluent from proposed

expansion at the outlet of CETP to existing 6 MLD new separate sump

for disposal into disposal pipeline of MIDC.

Consent shall be granted after receipt of verification report from SRO regarding completion of installation of online monitoring system at outlet of ETP and before entering into MIDC new sump and connectivity of online monitoring data to MPCB server.

10 MPCB-CONSENT-0000025670

Alkyl Amines Chemicals Limited, Plot No. D- 6/1, D-6/2 MIDC Kurkumbh, Tq. Daund, Dist. Pune

APPROVED

1st Operate for coal fired boiler with existing fuel and amalgamation

28.02.2018 It was decided to grant consent to 1st operate for coal fired boiler of seam generation capacity 28 TPH by keeping existing coal fired boiler of 18 TPH and 10 TPH as stand-by with existing fuel quantity and existing stack height and with overriding effect of existing consent which is valid upto 28.02.2018.

11 MPCB-CONSENT-0000024898

Endurance Technologies Ltd, Plot No. B-22 MIDC, Chakan, Tq. Khed, Pune.

APPROVED

Renewal of Consent with increase in CI

31.05.2022 The committee noted that the industry using plot A-12 for disposal of treated effluent on land for gardening of two adjacent sister concern unit. Also noted the request of industry for waving of condition. Also noted the reuse/recycle of treated effluent generation restricting effluent generation commensurate with land availability at both the existing units. It was decided to grant renewal of consent to operate with increase in CI by imposing following conditions. 1. Industry shall extend the existing BG of Rs. 5 lakh towards O&M of

pollution control system.

Decision regarding forfeiture/release of BG of Rs. 2 lakh obtained towards submission of APC system details at all furnaces will be taken after receipt of verification report from SRO. Consent shall be issued after submission of detail water budget including effluent generation and land availability within existing premises for disposal and same shall be verified by SRO.

Page 7: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 7 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

12 MPCB-CONSENT-0000026159

Tata Autocomp Systems Ltd. Interiors and Plastics Division (IPD), Plot no. D 236, MIDC Chakan Phase II, Village Varale, Tal-Khed, Dist- Pune. Khed, Pune.

APPROVED

1st Operate (Part-II)

30.04.2018 It was decided to grant 1st consent to operate (Part-II) by imposing following conditions. Consent shall be issued only after receipt of detailed product list and its quantity as prescribed in consent to establish as industry has club all the products and its quantity in the application and after receipt of verification report from SRO regarding completion work of plant and machinery including STP as per minutes of CAC dated 08.08.2017 of earlier part operate application.

13 MPCB-CONSENT-0000026553

Amit Builders, 1, Wadala-Pathrdi Road Pathardigaon, Pathrdi, Dist. Nasik.

NOT APPROVED

1st Operate (Part)

--- It was decided to issue SCN for refusal of 1st Consent to Operate (part) as project proponent failed to submit the following information. 1. PP Failed to submit the details of STP and OWC.

2. CA certificate is not in Board’s prescribed format.

3. PP failed to provide online monitoring system for the parameters Flow,

BOD, and TSS at STP outlet.

14 MPCB-CONSENT-0000019783

Shri Gurudatt Sugars Ltd, Gat No. 61/A Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi, Tal - Shirol, Dist – Kolhapur.

NOT APPROVED

1st Consent to Operate for

expansion and amalgamation with existing consent to

operate

--- Committee noted that industry has obtained EC vide letter dated 20.03.2017 for expansion of Sugar from 4900 TCD to 6000 TCD and Co-gen from 15 MW to 21 MW. It is also noted that industry has not complied with ZLD condition as per EC and proposes disposal of treated effluent on land for irrigation. In view of above, it was decided to issue SCN for refusal of 1st Consent to Operate for expansion and amalgamation with existing consent to operate as industry failed to comply with ZLD conditions prescribed in EC.

15 MPCB-CONSENT-0000026786

Shri Gurudatt Sugars Ltd. Gat No. 61/A, At Post - Takaliwadi Akiwat Takaliwadi Road Shirol, Kolhapur.

APPROVED

Renewal of consent

31.07.2018 Committee noted that Industry has provided online monitoring system to the ETP outlet and boiler stack, Industry has provided ESP & Wet scrubber as an APC system to the boilers, provided Condensate Polishing Unit and complied CREP condition.

Page 8: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 8 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

In view of above, considering overall compliance, it was decided to grant plain renewal of consent to operate for 4900 TCD Sugar unit and 15 MW Co-gen unit by imposing following conditions 1. Forfeited BG of Rs. 2.5 lakh out of BG of Rs. 10 lakh obtained towards

O&M of pollution control system as the JVS result are exceeding the

consented standards and obtain top-up BG of Rs. 5 lakh to make the

total BG of Rs. 12.5 lakh towards compliance of the same.

2. Forfeited BG of Rs. 10 lakh obtained towards not to carry out excess

crushing in future as industry has carried out excess crushing during last

crushing season 2016-17 and obtained top-up BG of Rs. 20 lakh towards

compliance of the same.

It was also decided to return the BG of Rs. 9 lakh obtained towards reduction of waste water generation to 100 lit/tone of cane crushed as industry has complied the same.

16 MPCB-CONSENT-0000027097

Glenmark Pharmaceuticals Ltd, Plot No. B-25, Shendra MIDC, Aurangabad.

APPROVED

1st Consent to Operate (Part) for

expansion and amalgamation with

existing consent

30.04.2020 Committee noted the EC granted vide letter dated 02.05.2017 for various API products having total capacity 18.4 MT/M and also noted the compliance of consent to establish conditions and decided to grant Consent to 1st Operate (Part) to manufacture 1) Oxcarbazepine = 4.16 MT/M (50,000 Kg/Day) & 2) Telmisartan = 2.08 MT/M (25,000 Kg/Day) by amalgamation with existing consent with overriding effect.

17 MPCB-CONSENT-0000024486

Housing Development & infrastructure Ltd. (Formerly A. Y Associates) S. No. 942 Pt. At Village Mahim, Tal Palghar, Dist- Thane. Palghar

APPROVED

1st Consent to Operate (Part)

28.02.2019 It was decided to grant 1st Consent to Operate (Phase-I) for Residential cum Commercial project on Total Plot Area - 6,83,910 sq. mtr. and Construction BUA - 43,837.72 Sq. Mtr (out of 5,72,264.31 Sq. mtrs. in C to E) by imposing following conditions:

1. PP shall submit undertaking in Boards prescribed format within 15 days

regarding compliance of conditions of Environmental Clearance (EC)

and

Consent to Establish.

Page 9: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 9 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

2. PP shall submit the undertaking within 15 days in the prescribed format

regarding the part of the built-up area/ building for which application

for 1st Consent to Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall submit the BG of Rs. 25 lakhs towards O & M of

pollution control system.

4. PP shall achieve the treated domestic effluent standard for the

parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled for secondary

purposes such as toilet flushing, air conditioning, cooling tower make

up, firefighting etc. and remaining shall be utilized on land for gardening

and connected to the sewerage system provided by local body.

Consent shall be issued after: (1) Submission of Certificate from Architect regarding BUA completed for which they have applied for 1st Consent to Operate (phase-I). 2) After installation of online monitoring system for the parameters Flow, BOD, and TSS at STP outlet and verification of the same from SRO/RO. (3) After submission of additional fees.

18 MPCB-CONSENT-0000027014

Baramati Agro Ltd, Gat No.98,99, Shetphagade Tq. Indapur, Dist. Pune.

APPROVED

Renewal of consent to operate

31.07.2018 It was decided to grant renewal of consent to operate to manufacture Sugar- 4500 TCD and Co-gen unit- 20 MW by imposing following conditions 1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards

achieve consented standards of effluent.

2. Industry shall submit the fresh BG of Rs. 5 lakh towards O&M of APC

system to achieve emission standards.

Consent shall be issued after submission of proper water budget with disposal details by industry and consent fee.

19 MPCB-CONSENT-0000027668

Baramati Agro Ltd, Gat No. 98, 99. Shetphalgade, Tq. Indapur, Dist. Pune.

APPROVED

1st consent to Operate and

amalgamation with existing unit

31.07.2018 It was decided to grant 1st consent to operate for expansion to Sugar unit having capacity- 4500 TCD (from 4500 TCD to 9000 TCD) and Co-gen unit- 10 MW ( from 20 MW to 30 MW) by imposing following conditions. 1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards

O&M of ETP so as to achieve consented standards of effluent.

Page 10: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 10 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

2. Industry shall submit the fresh BG of Rs. 5 lakh towards O&M of APC

system to achieve emission standards.

It was decided to forfeit the BG of Rs. 10 lakh obtained in CtoE toward not to take effective steps prior obtaining EC, as industry failed to comply the same.

The decision regarding forfeiture/release of BG of Rs. 15 lakh obtained towards up-gradation of ETP will be taken after receipt of verification report from SRO and latest JVS results.

Consent shall be issued after submission of proper water budget, NOC from CGWA/irrigation department by industry and consent fee, if any.

20 MPCB-CONSENT-0000024198

UltraTech Cement Limited (Unit: Awarpur Cement Works) 56M/1&56M2 Awarpur Korpana, Dist. Chandrapur.

APPROVED

1st consent to Operate (Part)

31.10.2020 The Committee noted that EC obtained from MoEF&CC dated 11.09.2015 for expansion of Cement plant (Clinker from 3.30 MTPA to 4.5 MTPA and Cement from 4.48 MTPA to 6 MTPA). In view of above, it was decided to grant 1st consent to operate for additional manufacturing of Cement - 1.52 MMT/A & Clinker - 1.2 MMT/A by imposing following conditions- 1. To forfeit Bank guarantee of 5.00 Lakhs obtained towards control of

fugitive emission as industry failed to comply the same.

2. Specific permission for use of hazardous waste shall be considered

based on SOP’s in place on case to case basis.

3. Industry shall comply the conditions prescribed in EC granted dated

11.09.2015.

Consent shall be issued after receipt of verification report from RO, Chandrapur regarding compliance made by the industry in respect of non-compliances reported by SRO, Chandarpur vide warning notice dated 20.06.2017

21 MPCB-CONSENT-0000027377

KPIT Technologies Limited, Plot No. 17 Phase III, MIDC

APPROVED

1st Consent to Operate

30.06.2019 It was decided to grant 1st Consent to Operate (part) for construction of KPIT Technological Software Development Park for total plot area of 93,061 sq mtr and total construction BUA of 28,422 sq m. (part) out of 1,36,900 Sqr. Mtrs. as per EC by imposing following conditions:

Page 11: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 11 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

Hinjawadi, Mulshi, Pune.

1. PP shall submit affidavit in Board’s prescribed format within 15 days

regarding compliance of conditions of Environmental Clearance (EC)

and Consent to Establish.

2. PP shall submit the affidavit within 15 days in the prescribed format

regarding the part of the built up area/ building for which application

for 1st Consent to Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall extend/ submit the BG of Rs. 25 lakhs towards

O &M of pollution control system.

4. PP shall achieve the treated domestic effluent standard for the

parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled for secondary

purposes such as toilet flushing, air conditioning, cooling tower make

up, firefighting etc. and remaining shall be utilized on land for gardening

and connected to the sewerage system provided by local body.

Consent shall be issued after: 1. After receipt of verification report of SRO regarding adequacy of STP &

OWC.

2. Submission of Certificate from Architect regarding BUA completed for

which they have applied for 1st Consent to Operate.

3. After installation of online monitoring system for the parameters Flow,

BOD, and TSS at STP outlet and verification of the same from SRO/RO.

22 MPCB-CONSENT-0000028296

Ladhad Hospital, Wankhede Layout, Buldhana, Dist. Buldhana.

APPROVED

Combined 1st Consent to Operate

with BMW Authorization

31.05.2019 It was decided to grant combined Consent to operate with BMW Authorization from 40 Beds to 210 Beds by imposing BMW BG regime and standards conditions with following conditions:- 1. PP shall submit the BG of Rs. 5 lakh towards installation of STP within

03 months.

Consent shall be issued after receipt of latest OC, water budget and receipt of additional fees if any.

Page 12: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 12 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

23 MPCB-CONSENT-0000028681

Schreiber Dynamix Dairies Pvt. Ltd., Plot No. E-94, Baramati MIDC, Tq. Baramati, Dist. Pune.

APPROVED

1st Operate for expansion and

amalgamation with existing consent

31.12.2019 Committee noted the steps taken towards installation of pollution control system for the control of pollution arise from expansion activity. It was decided to grant 1st consent to operate for expansion and amalgamation with existing consent to manufacture 1. UHT-High Viscous Products- 1750 MT/M 2. UHT-Oats Milk Dairy Products- 692 MT/M by imposing following conditions. 1. This consent is issued with then overriding effect of earlier consent

granted by the Board vide consent letter dated 3.02.2017.

It was also decided to return the BG of Rs. 10 lakh submitted towards compliance of consent to establish as industry has complied the same.

Consent shall be issued after submission of requisite consent fee, if any.

24 MPCB-CONSENT-0000028883

EPCOS India Private Limited, Plot No. E25/1 MIDC Satpur, Dist. Nashik.

NOT APPROVED

1st Operate for expansion and

amalgamation with existing consent

--- Committee noted that industry has completed the construction work of new plant, however, not installed machinery required for the manufacturing of proposed products. Also noted the proposal of PP about shifting of machinery from their old unit. In view of above, it was decided to issue SCN for refusal of 1st Consent to Operate for expansion due to above non-compliances

25 MPCB-CONSENT-0000029288

ACG Pharmapack Pvt. Ltd. Gat No. 448, 464 AB, 465 AB, 467 AB, Village - Shindewadi, Tal:- Khandala, Dist:- Satara.

APPROVED

1st Operate for expansion and

amalgamation with existing consent

28.02.2019 It was decided to grant consent to 1st operate for expansion and amalgamation with the existing consent with overriding effect. The categorization committee should examine the proposal of industry for change in category from Red to Orange and revert back to next CAC meeting.

26 MPCB-CONSENT-0000029180

Gigaplex Estates Pvt. Ltd. Plot No. IT-5 Building No. 3, Gigaplex IT park, MIDC knowledge park, Airoli, Navi Mumbai.

APPROVED

1st Operate (Part)

31.07.2019 It was decided to grant 1st operate (part) for total Plot Area 2,02,300 sq. mtrs and BUA 80,615.17 sqr. Mtrs out of (BUA- 5,50,827 sq. mtrs as per EC) by imposing following conditions:- 1. PP shall submit undertaking in Boards prescribed format within 15 days

regarding compliance of conditions of Environmental Clearance (EC)

and Consent to Establish.

Page 13: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 13 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

2. PP shall submit the undertaking within 15 days in the prescribed format

regarding the part of the built-up area/ building for which application

for 1st Consent to Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall extend/ submit the BG of Rs. 25 lakhs towards

O & M of pollution control system.

4. PP shall achieve the treated domestic effluent standard for the

parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled for secondary

purposes such as toilet flushing, air conditioning, cooling tower make

up, firefighting etc. and remaining shall be utilized on land for gardening

and connected to the sewerage system provided by local body.

Consent shall be issued after: 1. Submission of Certificate from Architect regarding BUA completed for

which they have applied for 1st Consent to Operate.

2. After installation of online monitoring system for the parameters Flow,

BOD, and TSS at STP outlet and verification of the same from SRO/RO.

3. After submission of additional consent fees, if applicable.

27 MPCB-CONSENT-0000029004

Kolte-Patil I-Ven Township (Pune) Ltd. - Survey no. 74 Village-Jambhe Marunji, Nere Mulshi, Pune.

APPROVED

1st Consent to Operate (Part)

30.10.2018 The committee noted that PP has obtained EC for proposed township project for total plot area 22,25,795 sq.m and total BUA 1,58,38,082 Sq. mtrs vide letter dated 06.09.2007 and revalidated EC dated 16.12.2014 for further five years It was decided to grant 1st consent to operate (part) for residential project on total plot area = 22,25,795 sq.m. and total construction BUA = 35,612.24 out of total construction BUA of 1,58,38,082 sqm as per EC dated 06.09.2007 and revalidated EC dated 16.12.2014 by imposing following conditions 1. PP shall submit affidavit in Board’s prescribed format within 15 days

regarding compliance of conditions of Environmental Clearance (EC)

and Consent to Establish.

Page 14: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 14 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

2. PP shall submit the affidavit within 15 days in the prescribed format

regarding the part of the built up area/ building for which application

for 1st Consent to Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall extend/ submit the BG of Rs. 25 lakhs towards

O & M of pollution control system.

4. PP shall achieve the treated domestic effluent standard for the

parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled for secondary

purposes such as toilet flushing, air conditioning, cooling tower make

up, firefighting etc. and remaining shall be utilized on land for gardening

and connected to the sewerage system provided by local body.

6. PP shall revalidate EC and C to E as same was expired.

Consent shall be granted after: 1. Submission of Certificate from Architect regarding BUA completed for

which they have applied for 1st Consent to Operate.

2. Submission of proper water budget for phase II.

3. After installation of online monitoring system for the parameters Flow,

BOD, and TSS at STP outlet and installation of OWC and verification of

the same from SRO/RO.

28 MPCB-CONSENT-0000030006

Pimpri-Chinchwad Municipal Corporation, Sector 17 & 19, Chikhali EWS Project, Tq. Haveli, Pimpri-Chinchwad, Pune.

APPROVED

1st Consent to Operate (Part)

31.01.2021 The committee noted PCMC has obtained EC vide letter dated 10.10.2011 for SRA project at Sector 17(p) & 19(p) of Chiklhali. PCMC has also provided STP of capacity 32 MLD at Chikhali and MSW facility at Moshi. Committee also noted that Board has approved the renewal of consent to operate (part) in CAC meeting held on 09.03.2016 for the period upto 31.01.2021 for EWS residential building township project (108 bldg.) on plot area of 2,53,018.5 Sq. mtrs. And having Construction BUA of 2,18,114.85 Sq. mtrs (out of total construction BUA of 3,25,633.84 Sq. mtrs as per EC) subject to submission of latest CA certificate and requisite consent fee. PP has not submitted the latest CA certificate and additional consent fee, therefore consent was not issued.

Page 15: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 15 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

In view of above, it was decided to grant 1st consent to operate (Part) for 31 Bldgs. Of BUA 62,607.042 Sq. mtrs. 1. PP shall submit undertaking in Board’s prescribed format within 15

days regarding compliance of conditions of Environmental Clearance

(EC) and Consent to Establish.

2. PP shall submit the undertaking within 15 days in the prescribed format

regarding the part of the built up area/ building for which application

for 1st Consent to Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall extend/ submit the BG of Rs. 25 lakhs towards

O & M of pollution control system.

4. PP shall achieve the treated domestic effluent standard for the

parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled for secondary

purposes such as toilet flushing, air conditioning, cooling tower make

up, fire fighting etc. and remaining shall be utilized on land for

gardening and connected to the sewerage system provided by local

body.

Consent shall be granted after: 1. Submission of Certificate from Architect regarding BUA completed for

which they have applied for 1st Consent to Operate.

2. Submission of 3 months online monitoring report of 32 MLD STP

provided at Chikhali and after verification of sewerage connection to 32

MLD STP at Chikhali by SRO

3. After submission of requisite additional consent fee, if applicable.

It was decided to amalgamate the renewal of consent to operate (part) approved in CAC meeting held on 09.03.2016 with this 1st consent to operate (part) (UAN no. 0000030006)

Page 16: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 16 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

29 MPCB-CONSENT-0000030061

Newfound Properties & Leasing Pvt. Ltd., Gen-2/1D, Gen-2/1/E & Gen-2/1/F Building No. 2, Special Economic Zone, TTC Industrial Area, Juinagar, MIDC, Opp. Juinagar Railway St Thane.

APPROVED

1st Operate (Part)

31.08.2019 It was decided to grant 1st Consent to Operate (part) of Construction of IT Park for Total plot area 2,37,860.23 sqr. Mtrs & BUA 16,319.72 sqr. mtrs. may be consider imposing following conditions:-

1. PP shall submit undertaking in Board’s prescribed format within 15 days

regarding compliance of conditions of Environmental Clearance (EC)

and

Consent to Establish.

2. PP shall submit the undertaking within 15 days in the prescribed format

regarding the part of the built-up area/ building for which application

for 1st Consent to Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall extend/ submit the BG of Rs. 25 lakhs towards

O &M of pollution control system.

4. PP shall achieve the treated domestic effluent standard for the

parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled for secondary

purposes such as toilet flushing, air conditioning, cooling tower make

up, firefighting etc. and remaining shall be utilized on land for gardening

and connected to the sewerage system provided by local body.

Consent shall be issued after: 1. Submission of Certificate from Architect regarding BUA completed for

which they have applied for 1st Consent to Operate.

2. After installation of online monitoring system for the parameters Flow,

BOD, and TSS at STP outlet and verification of the same from SRO/RO.

3. After receipt of additional fees, if applicable

30 MPCB-CONSENT-0000030143

Anik Development Corporation (A Division of Ajmera Realty and Infra India Ltd.) CTS No. 1A/1, 1A/2, 1A/3, 1A/6 of Village Anik

APPROVED

1st Consent to Operate (Part)

28.02.2019 Committee noted that PP has obtained EC dated 21.03.2013 for construction of residential project “Bhakti Park” for total plot area 1,11,732.32 Sq. mtrs and total BUA 3,32,067 Sq. mtrs. It was also noted that PP has installed STP of capacity 170 CMD and OWC facility.

Page 17: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 17 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

Bhakti Park, Wadala Kurla, Mumbai.

It was decided to grant the 1st consent to operate (part) for development of residential project on total plot area 1,11,732.32 Sq. mtrs and Construction BUA-84,160 Sq. mtrs.by imposing following conditions 1. PP shall submit undertaking in Board’s prescribed format within 15

days regarding compliance of conditions of Environmental Clearance

(EC) and

Consent to Establish.

2. PP shall submit the undertaking within 15 days in the prescribed format

regarding the part of the built-up area/ building for which application

for 1st Consent to Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall extend/ submit the BG of Rs. 25 lakhs towards

O &M of pollution control system.

4. PP shall achieve the treated domestic effluent standard for the

parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled for secondary

purposes such as toilet flushing, air conditioning, cooling tower make

up, firefighting etc. and remaining shall be utilized on land for gardening

and connected to the sewerage system provided by local body.

Consent shall be issued after: 1. Submission of Certificate from Architect regarding BUA completed for

which they have applied for 1st Consent to Operate.

2. After installation of online monitoring system for the parameters Flow,

BOD, and TSS at STP outlet and verification of the same from SRO/RO.

3. After submission of Latest CA certificate as per Board’s prescribed

format and after receipt of additional fees.

31 MPCB-CONSENT-0000029931

Hindustan Unilever Limited, Plot No. B-7 MIDC, Lote Parshuram, Tal- Khed, Dist- Ratnagiri.

APPROVED

Amendment in existing consent for

change in no of

31.01.2018 It was decided to grant amendment in existing consent to operate for change in number of stack and addition of hazardous waste category as per application with overriding effect.

Page 18: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 18 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

stack and hazardous waste quantity.

32 MPCB-CONSENT-0000030158

Varroc Engineering Pvt. Ltd. Plot No. L-4, MIDC Waluj, Aurangabad MIDC Waluj, Aurangabad.

NOT APPROVED

1st Operate for expansion and

amalgamation with existing consent.

---- Committee noted that Industry has carried out expansion activity without obtaining consent to establish and operate from the Board. The JVS results are also exceeding the consented standards. Industry has increased the CI from 51.93 Cr to 177.12 Cr without obtaining consent from the Board. In view of above, it was decided to issue SCN for refusal of 1st consent to operate and stop work direction with forfeiture of BG due to above non-compliances.

33 MPCB-CONSENT-0000002745

Singhori Open Cast Mine at Silewara Saoner, Western Coalfield Limited, Nagpur.

NOT APPROVED

1st Operate

--- Board has issued the SCN vide letter dated 19.11.2016. The reply submitted by the industry in respect of SCN is not satisfactory. Committee

noted the following non-compliances

1. Required pollution control arrangement not yet provided.

2. The total land acquisition is also not completed.

3. PP has not revalidated consent to establish and EC.

In view of above, it was decided to issue final refusal and stop work due to above non-compliances.

34 MPCB-CONSENT-0000030639

Embio Limited, Plot No. E-21, 22/2/3 MIDC, Mahad Mahad, Raigad

APPROVED

1st operate for biogas fired power genset of 1.5 MW followed by waste

heat recovery boiler followed by back pressure steam

turbine of 0.35 MW and H2S scrubber to

generate 426 Kg.

30.04.2022 The committee noted the provisions made towards control of emission arise from proposed bio-gas fired power genset and use of waste heat, it is therefore, decided to grant consent to 1st Consent to Operate for 10 TPH coal fired boiler, H2S scrubber, Power Genset 1.5 MW and steam turbine 0.35 MW along with by-product sulphur and amalgamation with existing consent to operate.

Page 19: MAHARASHTRA POLLUTION CONTROL BOARDmpcb.gov.in/consentappraisal/pdf/5th_CAC_minutes_booklet_no_6... · 5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated

5th CAC meeting of 2017-2018 (Book-let no 6 of Consent to operate cases) dated 27.09.2017 Page 19 of 19

Sr. No.

Application unique number

Name of Industry Decision on grant of

consent

Consent granted up

to Remarks/Discussion (1)

35 MPCB-CONSENT-0000016678

Ceat Specialty Tyres Ltd Plot NO. G-2 Addl MIDC Ambernath , Bohonoli Village Ambernath.

APPROVED

1st Operate (Part)

30.09.2018 Committee noted the mega project and industry proposal submitted dated 27.07.2017 to comply the ZLD condition. Considering the commitment made by the industry, it was decided to grant 1st Consent to Operate (Part) to manufacture Automotive Tyres of Different Sizes (tractor, Radial and Off road tyre radial)- 40 MT/Day (out of 200 MT/day of total consented capacity) by imposing following conditions 1. Industry shall install RO with reactor by Nov. 2017 for treatment of

treated effluent till installation of RO& MEE and submit the BG of Rs.

10 lakh towards compliance of the same.

2. Industry shall install RO followed by MEE to achieve ZLD by April 2018

and submit the BG of Rs. 25 lakh towards compliance of the same.

3. Industry shall store the generated effluent in RCC tank of capacity 150

KL within the factory premises till installation of RO and reactor and

shall be treated once the system is ready to deliver ZLD. At the same

time, there shall not be any discharge or used treated effluent on land

for gardening and submit the BG of Rs. 5 lakh towards compliance of

the same.

4. Industry shall install the 03 Nos. of CAAQMS within 03 months and

submit the BG of Rs. 5 lakh towards compliance of the same.

Review Item

36 MPCB-CONSENT-0000029852

Volkswagen India Pvt. Ltd., Plot No. E-1, MIDC Ind. Area, Chakan, (Phase-III), Village- Nighoje, Mahalunge, Kharabwadi, Tq. Khed, Pune

APPROVED

Amendment in consent to operate

for change in product

nomenclature

Committee noted that industry has applied for change in nomenclature of the product without change in overall consented production quantity i.e. 1,53,887 Nos./Annum. Since there is no change in production quantity, water budget, HW and Non-HW including emission load. In view of above, it was decided to amend the existing consent to operate for nomenclature of product name form Passenger Vehicles to Passenger Vehicles and other components aggregate (viz. engine and vehicle parts).

The meeting is ended with vote of thanks