MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf ·...

8
MAHARASHTRA JEEVAN PRADHIKARAN Name of work :- Malmatha 25 Villages R.R. Water Supply Scheme . Tal. Malegaon Repairs to Dam, Designing, Providing, Constructing of Unconventional Water Treatment Plant of 5 MLD capacity, Pure water Pumping Machinery, L/L & Jointing Connecting Main, L/Main, Designing Const of RCC ESR, RCC GSR’S, P/L/L & jointing Distribution System, Miscellenous Work & Trial Run of scheme for 1 year. Tender Notice No:- 2 for 2012-2013 Estimated cost :- Rs 9,26,82,960/- MINUTES OF PRE- BID MEETING HELD ON 6/7/2012 Sr.No. Point raised by Contractor Clarification given by M.J.P. M/s. R.A. Ghule, Palghar 1 ÃÖ²Ö¾ÖŁÔ ú ŁÎú.6 - †Ö¸ü.ÃÖß.ÃÖß. ‹´Ö.²Öß.†Ö¸ü/‡Ô.‹ÃÖ.†Ö¸ü. ²ÖÖÓ¬ÖŗÖê (-ÖÖê™ü´Ö¬μÖê) ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›üŗÖê²ÖÖ²ÖŸÖ ¿Öê›üμÖã»Ö ²Öß ´Ö¬μÖê 16 ńÖÖÓ¾Öê פü»Öê»Öß †ÃÖæ-Ö †Öò²»ÖßńÖê ™ü¸üß ›üÖ™üÖ ´Ö¬μÖê ‹ŁæúŗÖ 18 ńÖÖÓ¾Öê ¤üÖŃÖ×¾Ö»Öê»Öß †ÖÆêüŸÖ ¾Ö ¯ÖÏŸμÖĩÖÖŸÖ 3 ńÖÖÓ¾Öê ˆ¤üÖ. ×™ü‘Ö¸üß, ńÖÖ»ÖŗÖê, ´ÖÖ-ÖŁêú μÖê£Öê ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›üŗÖê ¤üÖŃÖ×¾Ö»Öê †ÖÆêü. ¯ÖŗÖ -Ö¾μÖÖ-Öê ²ÖÖÓ¬ÖŗÖê ¤üÖŃÖ×¾Ö»Öê»Öê -ÖÖÆüߟÖ. ‡Ô.‹ÃÖ. †Ö¸ü. ŸÖÖê›üŗμÖÖÃÖ ×-Ö×¾Ö¤êü“μÖÖ †™üß-Öê ¾Ö “ÖÖ»Öæ ¤ü¸ü ÃÖãדÖ-Öê ¤ü¸ü ‘Öê‰ú-Ö ŸμÖÖ“Öß ØŁú´ÖŸÖ ŸμÖÖŸÖ ¬Ö¹ý-Ö •Ö¸ü Æêü ŁúÖ´Ö Łú¸üŗÖÖ¸ü †ÃÖÖ»Ö ŸÖ¸ü“Ö Æêü ŁúÖ´Ö Łú¸üŗÖê ¿ÖŒμÖ ¾ÖÖ™üŸÖê. †-μÖ£ÖÖ ×-Ö×¾Ö¤êü-ÖãÃÖÖ¸ü Æêü ŁúÖ´Ö Łú¸üŗÖê ¿ÖŒμÖ ¾ÖÖ™üŸÖ -ÖÖÆüß. ×-Ö×¾Ö¤êüŸÖ -Ö´Öã¤ü Łêú»μÖÖ-ÖãÃÖÖ¸ü ‹Łæ úŗÖ 16 ńÖÖÓ¾ÖÖ´Ö¬Öᯙ 16 ‡Ô.‹ÃÖ.†Ö¸ü. “Öê ²ÖÖÓ¬ÖŁúÖ´Ö ŸÖÖê›üÖ¾ÖμÖÖ“Öê †ÖÆêü, ¾Ö ‹ŁæúŗÖ 17 ‡Ô.‹ÃÖ.†Ö¸ü.¾Ö 2 •Öß.‹ÃÖ. †Ö¸ü. -Ö¾μÖÖ-Öê ×-Ö×¾Ö¤êüŸÖᯙ ¿Öê›üμÖã»Ö ²Öß ´Ö¬μÖê -Ö´Öã¤ü Łêú»μÖÖ¯ÖÏ´ÖÖŗÖê ²ÖÖÓ¬ÖÖ¾ÖμÖÖ“Öê †ÖÆêüŸÖ. -Ö¾μÖÖ-Öê ²ÖÖÓ¬ÖÖ¾ÖμÖÖ“Öê ‡Ô.‹ÃÖ.†Ö¸ü. ¾Ö ¯ÖÖ›üÖ¾ÖμÖÖ“Öê ‡Ô.‹ÃÖ.†Ö¸ü. ÆüμÖÖ •ÖÖńÖÖ Ã¾ÖŸÖÓ¡Ö †ÖÆêüŸÖ. ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›üŗμÖÖ ×¾ÖÂÖμÖß“Öß ŁúÖμÖÔ¾ÖÖÆüß ¾Ö ŸμÖÖ“Öê ¤ü¸ü Æêü ×-Ö×¾Ö¤êüŸÖᯙ †™üß ¾Ö ¿ÖŸÖá-ÖãÃÖÖ¸ü †ÖÆêüŸÖ. ŸμÖÖŸÖ ²Ö¤ü»Ö -ÖÖÆüß. ‡Ô.‹ÃÖ. †Ö¸ü. “Öê ²ÖÖÓ¬ÖŁúÖ´Ö ŸÖÖê›üŗμÖÖ“Öß ²ÖÖ²Ö Ã¾ÖŸÖÓ¡Ö¯ÖŗÖê ¿Öê›üμÖæ»Ö ²Öß ´Ö¬μÖê -Ö´Öæ¤ü Łêú»Öê»Öß -ÖÃÖæ-Ö ÃÖ²Ö ¾ÖŁÔú -ÖÓ.6 ´Ö¬μÖê ŸμÖÖ“Öß ŸÖôû ×™ü¯Ö ¤ê üŗμÖÖŸÖ †Ö»Öê»Öß †ÖÆêü. ×›üÃÖ´Öë™ü»ÖàńÖ Łú¸üŗμÖÖÃÖÖšüß ŁúÖêŗÖŸÖßÆüß †¤üÖμÖńÖß Ã¾ÖŸÖÓ¡Ö¯ÖŗÖê †-Öã–ÖêμÖ -ÖÖÆüß. ‡Ô.‹ÃÖ. †Ö¸ü. “Öê ²ÖÖÓ¬ÖŁúÖ´Ö ŸÖÖê›üŸÖÖ-ÖÖ ×•Ö×¾ÖŸÖ †£Ö¾ÖÖ ‡ŸÖ¸ü ´ÖÖ»Ö´Ö¢Öê“Öß ŁúÖêŗÖŸÖßÆüß ÆüÖ-Öß ÆüÖêŗÖÖ¸ü -ÖÖÆüß μÖÖ“Öß ÃÖÓ¯ÖæŗÖÔ ¤üĩÖŸÖÖ ŁÓú¡ÖÖ™ü¤üÖ¸üÖ-Öê ‘μÖÖ¾ÖμÖÖ“Öß †ÖÆêü. Chief. Engineer (Water management) New Administrative Bldg., Gr.Floor, Kanhaiya Nagar, Kopari, Thane (East) – 400 603 web www.mahamjp.com Tel. No. : 022/25322335 022/25320860 022/25320203 022/25326020 Fax : 022/25320207 e-mail : [email protected]

Transcript of MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf ·...

Page 1: MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf · ICTPN 4 Pole SFU ICTP 3 Pole SFU ICDP 2 Pole SFU 3) ... for 12)A)--Starter for

MAHARASHTRA JEEVAN PRADHIKARAN

Name of work :- Malmatha 25 Villages R.R. Water Supply Scheme . Tal. Malegaon

Repairs to Dam, Designing, Providing, Constructing of

Unconventional Water Treatment Plant of 5 MLD capacity, Pure

water Pumping Machinery, L/L & Jointing Connecting Main,

L/Main, Designing Const of RCC ESR, RCC GSR’S, P/L/L &

jointing Distribution System, Miscellenous Work & Trial Run of

scheme for 1 year.

Tender Notice No:- 2 for 2012-2013

Estimated cost :- Rs 9,26,82,960/-

MINUTES OF PRE- BID MEETING HELD ON 6/7/2012

Sr.No. Point raised by Contractor Clarification given by M.J.P.

M/s. R.A. Ghule, Palghar

1 ÃÖ² Ö¾ Ö�Ôú �Î ú. 6 - †Ö¸ü.ÃÖß.ÃÖß. ‹´Ö.²Öß.†Ö¸ü/‡Ô.‹ÃÖ.†Ö¸ü. ²ÖÖÓ¬Ö�Öê (−ÖÖê™ü´Ö¬µÖê) ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›ü�Öê²ÖÖ²ÖŸÖ ¿Öê›üµÖã»Ö ²Öß ´Ö¬µÖê 16 ÖÖÓ¾Öê פü»Öê»Öß †ÃÖæ−Ö †Öò²»Öß Öê™ü¸üß ›üÖ™üÖ ´Ö¬µÖê ‹&æú�Ö 18 ÖÖÓ¾Öê ¤üÖ)Ö×¾Ö»Öê»Öß †ÖÆêüŸÖ ¾Ö ¯ÖÏŸµÖ-ÖÖŸÖ 3 ÖÖÓ¾Öê ˆ¤üÖ. ×™ü‘Ö¸üß, ÖÖ»Ö�Öê, ´ÖÖ−Ö&êú µÖê£Öê ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›ü�Öê ¤üÖ)Ö×¾Ö»Öê †ÖÆêü. ¯Ö�Ö −Ö¾µÖÖ−Öê ²ÖÖÓ¬Ö�Öê ¤üÖ)Ö×¾Ö»Öê»Öê −ÖÖÆüߟÖ. ‡Ô.‹ÃÖ. †Ö¸ü. ŸÖÖê›ü�µÖÖÃÖ ×−Ö×¾Ö¤êü“µÖÖ †™üß−Öê ¾Ö “ÖÖ»Öæ ¤ü ü ÃÖãדÖ−Öê ¤ü¸ü ‘Öê‰ú−Ö ŸµÖÖ“Öß Ø&ú´ÖŸÖ ŸµÖÖŸÖ ¬Ö¹ý−Ö •Ö¸ü Æêü &úÖ´Ö &ú¸ü�ÖÖ¸ü †ÃÖÖ»Ö ŸÖ¸ü“Ö Æêü &úÖ´Ö &ú¸ü�Öê ¿ÖŒµÖ ¾ÖÖ™üŸÖê. †−µÖ£ÖÖ ×−Ö×¾Ö¤êü−ÖãÃÖÖ ü Æêü &úÖ´Ö &ú¸ü�Öê ¿ÖŒµÖ ¾ÖÖ™üŸÖ −ÖÖÆüß.

×−Ö×¾Ö¤êüŸÖ −Ö´Öã¤ü &êú»µÖÖ−ÖãÃÖÖ ü ‹&æú�Ö 16 ÖÖÓ¾ÖÖ´Ö¬Öᯙ 16 ‡Ô.‹ÃÖ.†Ö¸ü. “Öê ²ÖÖÓ¬Ö&úÖ´Ö ŸÖÖê›üÖ¾ÖµÖÖ“Öê †ÖÆêü, ¾Ö ‹&æú�Ö 17 ‡Ô.‹ÃÖ.†Ö¸ü.¾Ö 2 •Öß.‹ÃÖ. †Ö¸ü. −Ö¾µÖÖ−Öê ×−Ö×¾Ö¤êüŸÖᯙ ¿Öê›üµÖã»Ö ²Öß ´Ö¬µÖê −Ö´Öã¤ü &êú»µÖÖ¯ÖÏ´ÖÖ�Öê ²ÖÖÓ¬ÖÖ¾ÖµÖÖ“Öê †ÖÆêüŸÖ. −Ö¾µÖÖ−Öê ²ÖÖÓ¬ÖÖ¾ÖµÖÖ“Öê ‡Ô.‹ÃÖ.†Ö¸ü. ¾Ö ¯ÖÖ›üÖ¾ÖµÖÖ“Öê ‡Ô.‹ÃÖ.†Ö¸ü. ÆüµÖÖ •ÖÖ ÖÖ Ã¾ÖŸÖÓ¡Ö †ÖÆêüŸÖ. ‡Ô.‹ÃÖ.†Ö¸ü. ŸÖÖê›ü�µÖÖ ×¾ÖÂÖµÖß“Öß &úÖµÖÔ¾ÖÖÆüß ¾Ö ŸµÖÖ“Öê ¤ü¸ü Æêü ×−Ö×¾Ö¤êüŸÖᯙ †™üß ¾Ö ¿ÖŸÖá−ÖãÃÖÖ¸ü †ÖÆêüŸÖ. ŸµÖÖŸÖ ²Ö¤ü»Ö −ÖÖÆüß. ‡Ô.‹ÃÖ. †Ö¸ü. “Öê ²ÖÖÓ¬Ö&úÖ´Ö ŸÖÖê›ü�µÖÖ“Öß ²ÖÖ²Ö Ã¾ÖŸÖÓ¡Ö¯Ö�Öê ¿Öê›üµÖæ»Ö ²Öß ´Ö¬µÖê −Ö´Öæ¤ü &êú»Öê»Öß −ÖÃÖæ−Ö ÃÖ²Ö ¾Ö&Ôú −ÖÓ.6 ´Ö¬µÖê ŸµÖÖ“Öß ŸÖôû ×™ü¯Ö ¤êü�µÖÖŸÖ †Ö»Öê»Öß †ÖÆêü. ×›üÃÖ´Öë™ü»Öà Ö &ú¸ü�µÖÖÃÖÖšüß &úÖê�ÖŸÖßÆüß †¤üÖµÖ Öß Ã¾ÖŸÖÓ¡Ö¯Ö�Öê †−Öã–ÖêµÖ −ÖÖÆüß. ‡Ô.‹ÃÖ. †Ö¸ü. “Öê ²ÖÖÓ¬Ö&úÖ´Ö ŸÖÖê›üŸÖÖ−ÖÖ ×•Ö×¾ÖŸÖ †£Ö¾ÖÖ ‡ŸÖ¸ü ´ÖÖ»Ö´Ö¢Öê“Öß &úÖê�ÖŸÖßÆüß ÆüÖ−Öß ÆüÖê�ÖÖ¸ü −ÖÖÆüß µÖÖ“Öß ÃÖÓ¯Öæ�ÖÔ ¤ü-ÖŸÖÖ &Óú¡ÖÖ™ü¤üÖ¸üÖ−Öê ‘µÖÖ¾ÖµÖÖ“Öß †ÖÆêü.

Chief. Engineer (Water management)

New Administrative Bldg., Gr.Floor,

Kanhaiya Nagar, Kopari,

Thane (East) – 400 603

web www.mahamjp.com

Tel. No. : 022/25322335

022/25320860

022/25320203

022/25326020

Fax : 022/25320207

e-mail : [email protected]

Page 2: MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf · ICTPN 4 Pole SFU ICTP 3 Pole SFU ICDP 2 Pole SFU 3) ... for 12)A)--Starter for

ŸÖÃÖë“Ö ÃÖÓ²ÖÓ¬ÖßŸÖ ²ÖÖÓ¬Ö&úÖ´Ö ŸÖÖê›üŸÖÖ−ÖÖ ŸÖê ŸÖÖê›ü�µÖÖŸÖ µÖêŸÖ †ÃÖ»µÖÖ²ÖÖ²ÖŸÖê ±ú»Ö&ú šüôû&ú¯Ö�Öê פüÃÖŸÖᯙ †¿µÖÖ¯ÖÏ&úÖ¸êü &úÖµÖÔãÖôûÖ¾Ö¸ü »ÖÖ¾Ö�µÖÖŸÖ µÖÖ¾ÖêŸÖ. µÖÖ -Öê¡ÖÖ»ÖÖ ÃÖÓ¸ü-Ö�Ö &ãú¯Ö�Ö (Barricading) †Ö¾Ö¿µÖ&úŸÖê−ÖãÃÖÖ¸ü ¾Ö †Ö¾Ö¿µÖ&ú ŸµÖÖ &úÖ»ÖÖ¾Ö¬Öֵ߯ÖÔŸÖ ‘ÖÖ»Ö�µÖÖŸÖ µÖÖ¾Öê.

2 ÃÖ² Ö¾ Ö�Ôú �Î ú. 7 - ×¾ ÖŸÖ¸ü �Ö ¾ µ Ö¾ Ö Ã£Ö Ö »Öê ²Ö¸ü ¯ ÖÖ™ Ôü- ²ÖÖ²Ö &Îú.1 ¯ÖÖ‡Ô¯Ö )ÖÖê¤üÖ‡Ô :- ÃÖ¸üÖÃÖ¸üß ¤ü¸ü ¯Ö&ú›ü»Öê»ÖÖ †ÖÆêü ŸÖÖê &ú´Öß ¾ÖÖ™üŸÖÖê ÃÖ²Ö¾Ö&Ôú 4 ´Ö¬Öᯙ ¤ü¸ü ¾Ö ÃÖ²Ö¾Ö&Ôú 2 ´Ö¬Öᯙ ¤ü¸üÖŸÖ ±ú¸ü&ú ¾ÖÖ™üŸÖÖê. ¤ü¸üÖ²ÖÖ²ÖŸÖ Ã™ÒüüÖ™üÖ &úÃÖÖ ¯Ö&ú›ü»ÖÖ µÖÖ“Öß &ãúšêüÆüß −ÖÖë¤ü −ÖÖÆüß.

ÃÖ²Ö¾Ö&Ôú 4 ´Ö¬Öᯙ &úÖ´Ö Æêü ´Öã)µÖ Öã¹ýŸ¾Ö¾ÖÖ×Æü−Öß“Öê †ÖÆêü ¾Ö ÃÖ²Ö¾Ö&Ôú 7 ´Ö¬Öᯙ &úÖ´Öê ×¾ÖŸÖ¸ü�Ö ¾µÖ¾ÖãÖê“Öê †ÖÆêü. ¤üÖê−Æüß &úÖ´Öê •µÖÖ ×šü&úÖ�Öß &ú¸üÖ¾ÖµÖÖ“Öß †ÖÆêüŸÖ ŸµÖÖ ×šü&úÖ�Öß •Ö×´Ö−Öß“µÖÖ ÃŸÖ¸üÖ´Ö¬µÖê ±ú¸ü&ú †ÃÖ»µÖÖ´Öãôêû ÃÖ¸üÖÃÖ¸üß ¤ü¸üÖŸÖ ±ú¸ü&ú †ÖÆêü. ¤üÖê−Æüß ×šü&úÖ�Öß ÃÖ¸üÖÃÖ¸üß ¤ü¸ü &úÖœüŸÖÖÓ−ÖÖ ÖéÆüßŸÖ ¬Ö¸ü�µÖÖŸÖ †Ö»Ö껵ÖÖ Ã™ÒüÖ™üÖ“Öê ¯ÖÏ´ÖÖ�Ö )ÖÖ»Ö߻֯ÖÏ´ÖÖ�Öê †ÖÆêü. ÃÖ²Ö¾Ö&Ôú-4 ( Öã¹ýŸ¾Ö¾ÖÖ×Æü−Öß ) ¾Ö 7 (×¾ÖŸÖ¸ü�Ö ¾µÖ¾ÖãÖÖ) Strata

classification

For

Gravity

main

For

Distribution

Soil,soft

murum

11% 24%

Hard murum 11% 13%

Soft rock 25% 18%

Hard rock by

blasting

37% 5%

Hard rock by

mechanical

means

16% 40%

Total 100% 100%

3 ´Öê�ò ú×− Ö�ú »Ö ¯ÖÖ™ Ôü - ²ÖÖ²Ö &Îú. 1 - ±»ÖÖê ×´Ö™ü¸ü²ÖÖ²ÖŸÖ :- ×›ü™êü»Ö ïÖê×ÃÖ×±ú&êú¿Ö−Ö´Ö¬µÖê ±»ÖÖê ×´Ö™ü¸ü“Öê ïÖê×ÃÖ×±ú&êú¿Ö−Ö ×¤ü»Öê»Öê −ÖÖÆüß. ŸÖÃÖê“Ö ²ÖÖ•ÖÖ¸üÖŸÖᯙ ¤ü¸ü Æêü •ÖÖÃŸÖ †ÃÖ»µÖÖ−Öê ŸÖê ¤ü¸ü ÖÏÖÆüµÖ ¬Ö¸üÖ¾ÖêŸÖ Æüß ×¾Ö−ÖÓŸÖß.úú

±»ÖÖê ×´Ö™ü¸ü²ÖÖ²ÖŸÖ ×›ü™êü»Ö ïÖê×ÃÖ×±ú&êú¿Ö−Ö ÃÖÖê²ÖŸÖ •ÖÖê›ü�µÖÖŸÖ †Ö»Öê»Öê †ÖÆêüŸÖ. ¤ü¸ Æêü ×−Ö×¾Ö¤êüŸÖ −Ö´Öã¤ü &êú»µÖÖ¯ÖÏ´ÖÖ�Öê ¸üÖÆüŸÖß»Ö.

4 ²ÖÖ ²Ö �Î ú. 4 :- ÆüÖ‰úÃÖ &ú−ÖꌿÖ−Ö :- ×›ü™êü»Ö ïÖê×ÃÖ×±ú&êú¿Ö−Ö´Ö¬µÖê ÆüÖ‰úÃÖ &ú−Öꌿ֓Öê ïÖê×ÃÖ×±ú&êú¿Ö−Ö ×¤ü»Öê»Öê −ÖÖÆüß. ŸÖÃÖê“Ö ¯ÖÖ‡Ô¯Ö &ãúšü»ÖÖ ¾ÖÖ¯Ö¸üÖµÖ“ÖÖ, ŸµÖÖ“Öê ïÖê¿Ö»Ö, ±êú¸üÖê»Ö ¾Ö ¾ÖÖò™ü¸ü ×´Ö™ü¸ü ‡ŸµÖÖ¤üß“Öß ´ÖÖ×ÆüŸÖß ×¤ü»Öê»Öß −ÖÖÆüß. ²ÖÖ•ÖÖ¸üÖŸÖᯙ ¤ü¸üÖ¯Öê-ÖÖ ×−Ö×¾Ö¤êüŸÖᯙ ¤ü¸ü &ú´Öß †ÖÆêüŸÖ ²ÖÖ•ÖÖ¸üÖŸÖ ×´Ö™ü¸ü“Öß Ø&ú´ÖŸÖ †Ó¤üÖ•Öê ¹ý. 1000 ŸÖê 1500 †ÃÖ»µÖÖ−Öê ×−Ö×¾Ö¤êüŸÖᯙ ¤ü¸üÖ−Öê

ÆüÖ‰úÃÖ &ú−ÖꌿÖ−Ö²ÖÖ²ÖŸÖ“Öß ×›ü™êü»Ö ïÖê×ÃÖ×±ú&êú¿Ö−Ö ÃÖÖê²ÖŸÖ •ÖÖê›ü»Öê»Öê †ÖÆêüŸÖ. ÆüÖ‰úÃÖ &ú−ÖꌿÖ−Ö´Ö¬µÖê †Ûß֟¾ÖÖŸÖ †ÃÖ»Ö껵ÖÖ −Öôû •ÖÖê›ü�µÖÖÓ−ÖÖ ±úŒŸÖ •Ö»Ö´ÖÖ¯Ö&êú ²ÖÃÖ×¾Ö�µÖÖ“Öß ²ÖÖ²Ö ‹¾Öœüß“Ö µÖÖ ²ÖÖ²Öà´Ö¬µÖê †ÓŸÖ³ÖæÔŸÖ †ÖÆêü. •Ö»Ö´ÖÖ¯Ö&úÖ“ÖÖ ¯Öã¸ü¾ÖšüÖ Ã¯Öê×ÃÖ×±ú&êú¿Ö−Ö¯ÖÏ´ÖÖ�Öê &Óú¡ÖÖ™ü¤üÖ¸üÖ−Öê &ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ¤ü¸ Æêü ×−Ö×¾Ö¤êüŸÖ −Ö´Öã¤ü &êú»µÖÖ¯ÖÏ´ÖÖ�Öê ¸üÖÆüŸÖß»Ö.

Page 3: MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf · ICTPN 4 Pole SFU ICTP 3 Pole SFU ICDP 2 Pole SFU 3) ... for 12)A)--Starter for

&úÖ´Ö ÆüÖê�Öê ¿ÖŒµÖ ¾ÖÖ™üŸÖ −ÖÖÆüß. ×−Ö×¾Ö¤êüŸÖ ¤ü¸ü ¹ý. 825 &úÃÖÖ ¯Ö&ú›ü»ÖÖ †ÖÆêü ŸÖê ¤üÖ)Ö¾ÖÖ¾Öê †−µÖ£ÖÖ ¯ÖÏŸµÖ-Ö &úÖ´ÖÖ“Öê ¸êü™ü †ò−µÖÖ»ÖêÃÖêÃÖ &ú¹ý−Ö ¤ü¸ü ¬Ö¸üÖ¾ÖÖ.

5 ¯ÖÖ‡Ô Ö ¾ÖÖÆüŸÖã&ú )Ö›üß, êüŸÖß, ×ÃÖ´Öë™ü, Ùüᯙ ¾Ö ‡ŸÖ¸ü ´Ö™êü׸üµÖ»Ö“Öê ¤ü¸ü 5 ×&ú.´Öß. ¯Öê-ÖÖ •ÖÖ¤üÖ“Öê ¤ü ü ÖÏÖÆüµÖ ¬Ö¸üÖ¾ÖêŸÖ.

Öã¹ýŸ¾Ö¾ÖÖ×Æü−Öß“Öê ¯ÖÖ‡Ô¯Ö Æêü ´Ö•Ö߯ÖÏÖ &ú›æü−Ö ¯Öã¸ü¾Ö�µÖÖŸÖ µÖê�ÖÖ¸ü †ÃÖã−Ö ŸÖê ¯ÖÏŸµÖ-Ö &úÖµÖÔãÖôûÖ¾Ö¸ü •µÖÖ ×šü&úÖ�Öß ¿ÖŒµÖ †ÖÆêü ŸµÖÖךü&úÖ�Ö“µÖÖ •ÖÖ Öê¾Ö¸ü ˆ¯Ö»Ö²¬Ö &ú¹ý−Ö ¤êü�µÖÖŸÖ µÖê�ÖÖ¸ü †ÖÆêüŸÖ, ¾Ö Æêü †ÓŸÖ¸ü 5 ×&ú.´Öß ¯Ö׸üÃÖ¸üÖ“µÖÖ †ÖŸÖ“Ö ¸üÖÆüÖ�ÖÖ¸ü †ÖÆêü. )Ö›üß, ×ÃÖ´Öë™ü,Ùüᯙ Æêü 5.×&ú.´Öß “µÖÖ ¯Ö׸ü‘ÖÖŸÖ ˆ¯Ö»Ö²¬Ö †ÖÆêüŸÖ. ¸êüŸÖß²ÖÖ²ÖŸÖ 5 ×&ú.´Öß “µÖÖ ¾Ö¸üᯙ †ÓŸÖ¸ü Æêü ´Ö㻵ÖÖÓ&ú−ÖÖŸÖ ÖéÆüßŸÖ ¬Ö¸ü�µÖÖŸÖ µÖê�ÖÖ¸ü †ÖÆêü.

6 ³ÖÖ¾Ö¾ÖÖœü ¤ü ü Æêü ×−Ö×¾Ö¤êüŸÖ ÃÖ´ÖÖ×¾Ö™ü −ÖÃÖ»µÖÖ−Öê, ¯Ö׸ü¯Ö¡Ö&úÖ−ÖãÃÖÖ¸ü ³ÖÖ¾Ö¾ÖÖœüß“Öê ¤ü¸ü &úÃÖê ŸÖß−Ö ™ü¯µÖÖŸÖ &ú¸üÖ¾ÖµÖÖ“Öê ¾Ö ŸµÖÖ−ÖãÃÖÖ¸ü ³ÖÖ¾Ö¾ÖÖœüß“Öê ¤ü ü &úÃÖê ¯Ö&ú›ü�ÖÖ¸ü µÖÖ“Öê ´ÖÖ ÖÔ¤ü¿ÖÔ−Ö &ú¸üÖ¾Öê Æüß ×¾Ö−ÖÓŸÖß.

&úÖ´ÖÖ“Öß ‹&æú�Ö ´Öã¤üŸÖ 30 ´Ö×Æü−Öê †ÖÆêü ŸµÖÖŸÖᯙ ¯ÖÏŸµÖ-Ö &úÖ´Ö Æêü 18 ´Ö×Æü−µÖÖŸÖ ¯Öæ�ÖÔ &ú¸üÖ¾ÖµÖÖ“Öê †ÖÆêü ¾Ö ¯Öãœüᯙ 12 ´Ö×Æü−µÖÖŸÖ µÖÖê•Ö−ÖÖ “ÖÖ»Ö¾ÖÖ¾ÖµÖÖ“Öß †ÖÆêü. 18 ´Ö×Æü−µÖÖŸÖ ¯Öæ�ÖÔ &ú¸üÖ¾ÖµÖÖ“µÖÖ &úÖ´ÖÖ“ÖÖ ²ÖÖ¸ü“ÖÖ™Ôü ×−Ö×¾Ö¤êüŸÖ ü¤êü�µÖÖŸÖ †Ö»Öê»ÖÖ †ÖÆêü. ŸµÖÖ“ÖÖ †³µÖÖÃÖ &ú¹ý−Ö &Óú¡ÖÖ™ü¤üÖ¸üÖ−Öê ¤êü&úÖ¸ü ³Ö¸ü�Öê †¯Öê×-ÖŸÖ †ÖÆêü.

ERRATA

Sr.no Page no Printed as Read as

1 Schedule ‘A’ Place of Delivery at Malmatha

Dam store at Village Virane

Tal malegaon

Place of Delivery @ Work

site.

2 Sub Work No :- 1 -

Repairs to dam

Item no 1 :- Dry stone

pitching

Unit of Item – per Rm Unit of Item – Per Sqm

3 Sub Work No :- 1-

Repairs to dam

Item no 3:- Royalty

charges

Royalty charges Item No.3 of sub work

No.1 will not be executed .

Instead of this Royalty

charges will be

reimburssed to contractor

only after submission of

receipt from revenue

department in original .

4 Specification inrespect

of Sub Work 6- Item

No.1

Design condition – “The

contractor can alternatively

quote with is on design with

following ”

The contractor should

design ESR’s with

following condition

Page 4: MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf · ICTPN 4 Pole SFU ICTP 3 Pole SFU ICDP 2 Pole SFU 3) ... for 12)A)--Starter for

5 Specification inrespect

of Sub Work 6- Item

No.1- General

GENERAL – c) For ESR the

horizontal piping for

inlet,outlet, overflow & bypass

shall be provided up to

d) 5 m from outer, brace.

c) For ESR the horizontal

piping for inlet,outlet,

overflow & bypass shall

be provided up to 5 m

from outer, brace.

6 NOTES OF

SCHEDULE B

20) In case of supply of pipes

valves etc.

20) In case of supply of

pipes & valves etc.

The pump shall be confirming

to IS 9079/17979 & suitable

for + 10% to – 25% variations.

The pump shall be

confirming to IS

9079/17979 & suitable for

head variation with + 10%

to – 25% variations.

7 SUB WORK NO:-3

PURE WATER

PUMPING

MACHINERY

Item No.1

Motor shall be totally enclosed

type fan cooled mounted on

same shaft on common base

plate.

Motor shall be totally

enclosed type fan cooled

mounted on same shaft on

common base plate, and

not less than 7.5 HP. The

motor shall have sufficient

reserve marging while

running on specified head

range.

8 SUB WORK NO:-3

PURE WATER

PUMPING

MACHINERY

Item No.3

The sluice valve shall confirm

IS 780PN1

The sluice valve shall

confirm IS 14846 /

780PN1.

1) (A) ------ 50 Kg 1 (A) ------ Suitable Qty.

ICTPN 4 Pole SFU

ICTP 3 Pole SFU

ICDP 2 Pole SFU

3) Change over switch 3) Rotary Change over

switch

12)A)-- Starter & DOL starter

for

12)A)--Starter for pumps &

DOL starter for Vaccum

pumps

9 SUB WORK NO:-3

PURE WATER

PUMPING

MACHINERY

Item No.6

17) Self----- 2 No. 17) Self----- As required

Item No.8 (A) : CABLE Item No.7 (A) : CABLE

Item No.8 (B) : CABLE Item No.7 (B) : CABLE

Item No.8 (C) : CABLE Item No.7 (C) : CABLE

Item No.9 : TOOLS Item No.8 : TOOLS

10 SUB WORK NO:- 3

PURE WATER

PUMPING

MACHINERY

Item No.10 : EARTHING Item No.9 : EARTHING

Page 5: MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf · ICTPN 4 Pole SFU ICTP 3 Pole SFU ICDP 2 Pole SFU 3) ... for 12)A)--Starter for
Page 6: MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf · ICTPN 4 Pole SFU ICTP 3 Pole SFU ICDP 2 Pole SFU 3) ... for 12)A)--Starter for

´Ö.•Öß. ¯ÖÏÖ. •Ö »Ö¾ µÖ¾ Öã ÖÖ¯Ö −Ö š üÖ�Öê. ×¾ ÖÂÖµ Ö :- ×−Ö ×¾ Ö¤ üÖ ¯Öæ¾ ÖÔ ²Öî šü�úß“ Öê ‡×Ÿ Ö¾ Öé¢ Ö

�úÖ´Ö Ö“ Öê −Ö ÖÓ¾ Ö :- ´Ö Öôû´ ÖÖ £ÖÖ ¾ Ö 2 5 / ÖÖÓ¾ Öê ¯ÖÏ Ö¤ êü׿ Ö� ú ¯ÖÖ� Ö߯ Öã ü¾ Ö šüÖ µ ÖÖê• Ö −ÖÖ, ŸÖ Ö. ´ÖÖ »Ö ê/ ÖÖÓ¾ Ö, ו Ö. −Ö Ö׿ Ö�ú

¬Ö¸ü�ÖÖ“Öß ¤ãü¹ýßÖß, 5 ¤ü.»Ö.×»Ö. -Ö´ÖŸÖê“Öê •Ö»Ö¿Ö㬤üß&ú¸ü�Ö &ëú¦ü ÃÖÓ&ú»¯Ö−Ö &ú¸ü�Öê, ²ÖÖÓ¬Ö�Öê ¾Ö “ÖÖ“Ö�Öß ¤êü�Öê, ¿Ö㬤ü ¯ÖÖ�µÖÖ“Öß ¯ÖÓ¯Öß Ö ´Ö׿Ö−Ö¸üß ¯Öã¸ü¾Ö�Öê,&ú−Öꌙüà Ö ´Öê−Ö ¾Ö ÖÏò¾Æüß™üß ´Öê−Ö ™üÖ&ú�Öê •ÖÖê›ü�Öê ¾Ö “ÖÖ“Ö�Öß ‘Öê�Öê, ×¾Ö×¾Ö¬Ö -Ö´ÖŸÖꓵÖÖ ÃÖ»ÖÖêÆü Ó“Ö ¾Ö ³Öæßָü ™üÖŒµÖÖÓ“Öê ÃÖÓ&ú»¯Ö−Ö &ú¸ü�Öê ²ÖÖÓ¬Ö�Öê ¾Ö “ÖÖ“Ö�Öß ¤êü�Öê, ×¾Ö×¾Ö¬Ö ¾µÖÖÃÖÖ“Öß ¯Öß¾ÆüßÃÖß ¯ÖÖ‡Ô Ö ×¾ÖŸÖ¸ü�Ö ¾µÖ¾ÖãÖÖ ¯Öã¸ü¾Ö�Öê ™üÖ&ú�Öê ¾Ö •ÖÖê›ü�Öê ¾Ö µÖÖê•Ö−ÖÖ ‹&ú ¾ÖÂÖÔ “ÖÖ»Ö×¾Ö�Öê ‡. †Ó¤üÖ×•ÖŸÖ Ø&ú´ÖŸÖ ¹ý.9,26,82,960/- ÃÖÓ¤ ü³Ö Ô :- ×−Ö×¾Ö¤üÖ ÃÖã“Ö−ÖÖ &Îú. 2 ÃÖ−Ö 2012-13

´ÖÖôû´ÖÖ£ÖÖ ¾Ö 25 ÖÖÓ¾Öê ¯ÖÏÖ¤êü׿Ö&ú ¯ÖÖ�Ö߯Öã¸ü¾ÖšüÖ µÖÖê•Ö−ÖêÓŸÖ ÖÔŸÖ ¬Ö¸ü�ÖÖ“Öß ¤ãü¹ýßÖß, 5 ¤ü.»Ö.×»Ö. -Ö´ÖŸÖê“Öê •Ö»Ö¿Ö㬤üß&ú¸ü�Ö &ëú¦ü ÃÖÓ&ú»¯Ö−Ö &ú¸ü�Öê, ²ÖÖÓ¬Ö�Öê ¾Ö “ÖÖ“Ö�Öß ¤êü�Öê, ¿Ö㬤ü ¯ÖÖ�µÖÖ“Öß ¯ÖÓ¯Öß Ö ´Ö׿Ö−Ö¸üß ¯Öã¸ü¾Ö�Öê,&ú−Öꌙüà Ö ´Öê−Ö ¾Ö ÖÏò¾Æüß™üß ´Öê−Ö ™üÖ&ú�Öê •ÖÖê›ü�Öê ¾Ö “ÖÖ“Ö�Öß ‘Öê�Öê, ×¾Ö×¾Ö¬Ö -Ö´ÖŸÖꓵÖÖ ÃÖ»ÖÖêÆü Ó“Ö ¾Ö ³Öæßָü ™üÖŒµÖÖÓ“Öê ÃÖÓ&ú»¯Ö−Ö &ú¸ü�Öê ²ÖÖÓ¬Ö�Öê ¾Ö “ÖÖ“Ö�Öß ¤êü�Öê, ×¾Ö×¾Ö¬Ö ¾µÖÖÃÖÖ“Öß ¯Öß¾ÆüßÃÖß ¯ÖÖ‡Ô Ö ×¾ÖŸÖ¸ü�Ö ¾µÖ¾ÖãÖÖ ¯Öã¸ü¾Ö�Öê ™üÖ&ú�Öê ¾Ö •ÖÖê›ü�Öê ¾Ö µÖÖê•Ö−ÖÖ ‹&ú ¾ÖÂÖÔ “ÖÖ»Ö×¾Ö�Öê ‡. &úÖ´ÖÖ&ú׸üŸÖÖ ×¤ü−ÖÖÓ&ú 6/07/2012 ¸üÖê•Öß ¤ãü. 12.00 ¾ÖÖ•ÖŸÖÖ ×−Ö×¾Ö¤üÖ ¯Öæ¾ÖÔ ²Öîšü&ú ‘Öê�µÖÖŸÖ †Ö»Öß ÃÖ¤ü¸ü ²Öîšü&úßÃÖ )ÖÖ»Öᯙ †×¬Ö&úÖ¸üß ¾Ö šêü&êú¤üÖ¸ü ˆ¯ÖÛÃ£ÖŸÖ ÆüÖêŸÖê.

†. �Î ú. †×¬ Ö�ú Ö- µ ÖÖÓ“ Ö ê −ÖÖ Ó¾ Ö ¯Ö¤ ü−ÖÖ´ Ö

1 ÁÖß. −Ö¸ëü¦ü &êú¸ü&ú¸ü ´Öã)µÖ †×³ÖµÖÓŸÖÖ(•Ö¾µÖ)

2 ÁÖß. ‹ÃÖ. •Öß. &úÖ×»Ö&êú, †¬Öß-Ö&ú †×³ÖµÖÓŸÖÖ ,´ÖÓ›üôû †Öî¸Óü ÖÖ²ÖÖ¤ü

3 ÁÖß. ÃÖß.•Öß. ÃÖÖê−ÖÖ¾Ö�Öêü, ¯ÖϳÖÖ¸üß &úÖµÖÔ&úÖ¸üß †×³ÖµÖÓŸÖÖ,×¾Ö.−ÖÖ׿Ö&ú

4 ÁÖß. ›üß.²Öß. ¯ÖÖ™üᯙ ¾Ö׸üšü »Öê)ÖÖ †×¬Ö&úÖ¸üß

5 ÁÖß. ‹ÃÖ.‹»Ö.¸üÖê&ú›êü ˆ¯Ö †×³ÖµÖÓŸÖÖ (•Ö¾µÖ)

6 ÁÖß. ¾Æüß.¾ÖÖµÖ.»ÖÖê™ü�Ö&ú¸ü ×¾Ö³ÖÖ ÖßµÖ »Öê)ÖÖ¯ÖÖ»Ö(•Ö¾µÖ)

7 ÁÖß. •Öê.‹´Ö. )Ö¸êü ˆ¯Ö †×³ÖµÖÓŸÖÖ (•Ö¾µÖ) ´ÖÖ»Öê ÖÖÓ¾Ö

�Óú¡ ÖÖ™ü¤ üÖ ¸ü Ø�ú¾ Ö Ö Ÿµ ÖÖ“ Öê ¯ÖÏ ×Ÿ Ö×− Ö ¬ Öß

1 ¯ÖÏןÖ×−Ö¬Öß, ´Öê. †Ö¸ü.‹. ‘Öã»Öê, ¯ÖÖ»Ö‘Ö¸ü

2 ¯ÖÏןÖ×−Ö¬Öß, ´Öê. ´ÖÓ Ö»Ö¤üÖÃÖ ‡−±ÏúÖ™êü&ú ¯ÖÏ.×»Ö.¯Öã�Öê

ÃÖ¤ü¸ü ²Öîšü&úßŸÖ ¾Ö üᯙ &úÖ´ÖÖ“µÖÖ ×−Ö×¾Ö¤üÖ²ÖÖ²ÖŸÖ &Óú¡ÖÖ™ü¤üÖ¸üÖ&ú›æü−Ö ˆ¯ÖÛÃ£ÖŸÖ &ú¸ü�µÖÖŸÖ †Ö»Öê»Öê ´Öã§êü ¾Ö µÖÖÓ−ÖÖ

´Ö•Ö߯ÖÏÖŸÖ±ìú ¤êü�µÖÖŸÖ †Ö»Öê»ÖÖ )Öã»ÖÖÃÖÖ ŸÖÃÖê“Ö ´Ö.•Öß.¯ÖÏÖ. ´ÖÖ±ÔúŸÖ &úÖÆüß ´ÖãªÖ²ÖÖ²ÖŸÖ(Errata) ¿Ö㬤üß¯Ö¡Ö &ú¸ü�µÖÖŸÖ †Ö»Öê †ÃÖæ−Ö ¯ÖÏ¯Ö¡Ö ÃÖÖê²ÖŸÖ •ÖÖê›ü»Öê †ÖÆêü. ÃÖ¤ü¸ü ¿Ö㬤üß¯Ö¡Ö (Errata) ÃÖ¾ÖÖÔ−Öã´ÖŸÖê ´ÖÖ−µÖ &ú¸ü�µÖÖŸÖ †Ö»Öê. ²Öîšü&úßŸÖ ˆ¯ÖÛã֟ÖÖÓ“Öê †Ö³ÖÖ¸ü ´ÖÖ−Öæ−Ö ²Öîšü&ú ÃÖÓ¯Ö®Ö &ú¸ü�µÖÖŸÖ †Ö»Öß.

Page 7: MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf · ICTPN 4 Pole SFU ICTP 3 Pole SFU ICDP 2 Pole SFU 3) ... for 12)A)--Starter for
Page 8: MAHARASHTRA JEEVAN PRADHIKARANmjp.maharashtra.etenders.in/tnduploads/mjp/pressnotices/PRSN67.pdf · ICTPN 4 Pole SFU ICTP 3 Pole SFU ICDP 2 Pole SFU 3) ... for 12)A)--Starter for

Sub work No.7 :- Mechanical part Item No.1 :-EEC Mark Bulk water meter ( As per shedule B)

Providing, installing and giving satisfactory field testing of various mm dia. Flanged ends

bulk water meter EEC mark without remote reading facility with FGI 250 cast iron body or

suitable moc class B conforming to ISO 4064 marked to read in metric system, alongwith

manufactureres test and guarantee certificate including cost of materials and labour etc

complete.

One Bulk water meter of each size shall be got calibrated from a) FCRI Palakkad, b) IDEMI

Mumbai c )CWPRS Pune d) Any other instiute approved by MJP and calibration certificate

shall be produced. The manufacturer test certificate guaranty card for all meters.

Item No.2 :- C.I. Stainers :- C.I. strainers T Basket type with flanged end and stainless steel

or brass mesh with opening of 2.50 MM to 3.00MM and suitable for operating pressure of

6kg/cm2

Item No. :- M.S. specials – Providing and supplying ISI standard MS specials of required

thickness with 3 coats of approved make epoxy paint from outside & inside including all

taxes, octroi, inspection charges, transportation to site etc. complete.

Item No.3 :- Mechanical Joints –

Manufacturing supplying of C.I. Mechanical compression flanged/ socket tail pieces suitable

for making flanged connection with the plain barrel of C.I. spun pipes ( As per IS 1538/2001)

and D.I pipes as per IS 8329/2000) . The tail pieces to be supplied complete with sealing

rubber gasket of SBR cast iron follower glands and mild steel nut bolts. The whole assembly

should be mechanically and hydraulically tested to the provision as laid down in IS

1538/1993. The rates are inclusive of cost of material of warding charges sales tax, loading,

transportation and unloading at departmental store etc. complete as directed.

Item No.4 :- House connection with domestic meter –

For the existing house connections only, water meter is to be supplied and to be fixed at the

appropriate location preferebly near / in the premises, house or as directed by engineer-in-

charge.

Providing, installing & giving satisfactory field testing of domestic water meter horizontal

inferential multi jet type with magnetic type with magnetic drive and dry dial suitable for

ambient 50 degree calicoes temp. to be sealed against tempering complete with coupling at

both end confirming to class B along with manufacture test certificate and guaranty

certificate including cost of all material and labour. The rate includes providing and

supplying 15MM dia water meter on existing consumer connection, with required labour

charges etc complete. The water meter shall be ISI mark confirming to IS 779/1994. The

works shall be carried out as directed by engineer-in-charge. 10% of meter quantity shall be

got calibrated / tested from approved agencies like CWPRS/FCRI/IDEMI.