OWNER: PROJECT CONTRACTOR: PROJECT SUB-CONTRACTOR: PROJECT TITLE:
SABANGAN 14 MW HYDRO ELECTRIC POWER PLANT
SHEET CONTENT:
MAGAZINE ELEVATION
A-1
SHEET NO:REVISION:
10mmØ REBAR MATTING
SPACED @ .30m BOTHWAYS
1
2
" THK. PLYWOOD WALL
LINING ALL AROUND
4" CHB WALL
1
8
" THK. PLATE
w/ 1"x1" ANGLE
FRAMING
3.00
1.05 0.90 1.05
3.00
2"x4" WOODEN
PURLINS SPACED
@ .70m O.C
2"x6" WOODEN
RAFTER
10"x1" WOODEN
FASCIA BOARD
0.60 3.00 0.60
4.20
10"X1" WOODEN
FASCIA BOARD
4-4"Ø
PIPE VENT
4-4"Ø
PIPE VENT
0.10
2.55
0.65
0.45
3.75
1
8
" THK. PLATE
w/ 1"x1" ANGLE
FRAMING
FINISHED FLOOR LEVEL
GROUND LEVEL
GA #26x8' GI
ROOFING
2.55
0.65
0.45
3.75
FINISHED FLOOR LEVEL
4-4"Ø
PIPE VENT
4-4"Ø
PIPE VENT
GROUND LEVEL
0.60
5-12mmØ BAR SPACED
@ .15m BOTHWAYS
4-10mmØ VERTICAL BARS
w/ 6mmØ STIRRUP SPACED
@.15m O.C
0.20
0.60
NATURAL GRADE LINE
4-10mmØ VERTICAL BARS
w/ 6mmØ STIRRUP SPACED
@.15m O.C
5-12mmØ BAR SPACED
@ .15m BOTHWAYS
0.20
FOUNDATION PLAN
SCALE 1 : 500
ROOF FRAMING PLAN
SCALE 1 : 200
FLOOR PLAN
SCALE1 : 200
FRONT ELEVATION
SCALE 1 : 200
LEFT ELEVATION
SCALE 1 : 200
MAGAZINE FLOOR PLAN
MAGAZINE ROOF FRAMING PLAN
MAGAZINE FOUNDATION PLAN