MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th...

77
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/387 Jabalpur, dated:20.02.2019 To As per distribution list Sub: Agenda of 68 th meeting of Operation and Coordination Committee of MP. The Agenda of 68 th meeting of the Operation and Coordination Committee of MP scheduled on 27 th February 2019 at Vijan Mahal, Tilhari, Mandla Road, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Transcript of MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th...

Page 1: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/387 Jabalpur, dated:20.02.2019

To

As per distribution list

Sub: Agenda of 68th meeting of Operation and Coordination Committee of MP. …

The Agenda of 68th meeting of the Operation and Coordination Committee of MP

scheduled on 27th February 2019 at Vijan Mahal, Tilhari, Mandla Road, Jabalpur has been

uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Page 2: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-

[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-

[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,

Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-

[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –

[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-

[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-

[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,

Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,

Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,

Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near

Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,

[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –

462013., Fax No- 0755-4030130,Email – [email protected] [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical

Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected],

26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,

Email- [email protected], Indore – 452010, [email protected]

Page 3: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 67th meeting of Operation & Coordination Committee of MP held on 04th January 2019 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/146 Jabalpur dated 18.01.2019. No comments have been received.

[OCC may confirm the minutes]

ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS DECEMBER 2018 TO JANUARY 2019. 2.1. Frequency Particulars: During DECEMBER 2018 the system frequency was below 49.90 Hz for 12.68% of time against 10.69% of time during JANUARY 2019. The system frequency was above 50.05 Hz for 10.29% of time during DECEMBER 2018 against 19.05 % of time during JANUARY 2019. The system frequency was within the IEGC range of 49.90-50.05 Hz for 77.03 % of the time during December 2018 against 70.26 % of time during JANUARY 2019. The average monthly frequency was 49.97 Hz during month of DECEMBER 2018 and 49.97 Hz during month of JANUARY 2019.

The detailed frequency particulars for the month of December 2018 and JANUARY 2019 are

enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:-

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

DECEMBER 2018 49.97 Hz 49.79 Hz 50.08 Hz 49.67 Hz 50.25 Hz

JANUARY 2019 49.99 Hz 49.82 Hz 50.1 Hz 49.58 Hz 50.28 Hz

[Committee may like to note]

2.2 Operational Matters

2.2.1 Operational Discipline : System operated in terms of frequency profile for the months DECEMBER

2018 and JANUARY 2019 is as given below for discussion by the committee :

Month % of time Frequency Below 49.90 Hz

% of time Frequency above 50.05 Hz

% of time frequency within the permissible range of 49.90-50.05 Hz.

Average monthly frequency

DECEMBER 2018 12.68% 10.29% 77.03% 49.97 Hz

JANUARY 2019 10.69% 19.05% 70.26% 49.99 Hz

[Committee may like to note]

AGENDA FOR 68TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD ON 27th FEBRUARY 2019 AT 10:30 AM AT VIJAN MAHAL, TILHARI, MANDLA

ROAD, JABALPUR.

Agenda of 68th OCCM of MP 1

Page 4: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

2.2.2 Voltage Profile: During the months DECEMBER 2018 and JANUARY 2019 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:-

Sr. No.

Name of 400 KV

Substation

DECEMBER 2018 JANUARY 2019 Max. Voltage Min. Voltage Max. Voltage Min. Voltage

Observed Observed Observed Observed

Voltage KV Date Voltage

KV Date Voltage KV Date Voltage

KV Date

1 Bhopal 420.5 31.12.18 395 22.12.18 420 27.01.19 398 22.01.19

2 Bina 419.3 31.12.18 392 22.12.18 419 06.01.19 396 04.01.19

3 Gwalior 418 02.12.18 387 22.12.18 415 07.01.19 393 04.01.19

4 Indore 421 13.12.18 399 17.12.18 420 26.01.19 399 22.01.19

5 ISP 423 13.12.18 403 22.12.18 421.2 27.01.19 402 22.01.19

6 Nagda 423 13.12.18 398 22.12.18 421 26.01.19 400 24.01.19

7 Pithampur 421 13.12.18 401 17.12.18 422 21.01.19 399 22.01.19

8 Birsinghpur 426 15.12.18 408 31.12.18 426 15.01.19 407 03.01.19

9 Singhaji 423.4 24.12.18 409 17.12.18 423.1 14.01.19 409 22.01.19

10 Satpura 425 31.12.18 409 05.12.18 424 05.01.19 407 24.01.19

11 Itarsi 424.4 31.12.18 403 17.12.18 424 01.01.19 402 22.01.19

12 Ashta 426 13.12.18 398 04.12.18 425 26.01.19 398 04.01.19 [Committee may please note & discuss]

2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 31th JANUARY 2019 as submitted by DISCOMs is detailed below:

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVAR

1200 KVAR

1500 KVAR

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVAR

1200 KVAR

1500 KVAR

No of 100 KVAR Units

required

600 KVAR

1200 KVAR

600 KVAR

1200 KVAR

600 KVAR

1500 KVAR

EZ 408 142 51 08 05 01 21 07 0 25 - - - - - -

CZ 2 684 822 - - - 1 0 0 3 0 0 0 0 0 0

WZ 637 556 720 0 0 0 14 06 15 166 08 17 - - - 3

Agenda of 68th OCCM of MP 2

Page 5: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Central Discom is requested to `update their format for submission of details of Capacitor Bank as per prescribed format. The ‘Capacitor Banks healthy but not in service due to control ckt problem’ have not been included in the details submitted by Central Discom.

[Action: MPPTCL, DISCOMS]

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.01.2019 as submitted by MPPTCL is given below:-

[Action: MPPTCL]

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The various ongoing Transmission Schemes completed during the financial year 2017-2018 (up to JANUARY 2019) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

[Action: MPPTCL]

2.2.6 U/F and df/dt Relay Operation (i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during DECEMBER 2018 and

JANUARY 2019. There was no df/dt operation during the same period. [Action: MPPTCL]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt and U/F relays are in operation,

where the U/F relays are not available, the numerical relays programmed for under frequency operation. Defective df/dt relay at 220KV Sagar & 220KV S/S Chhatarpur have been replaced & at 132KV S/S Chapda the df/dt protection is provided through df/dt feature of DPR. All U/F stages are in good/ healthy & working condition. [Committee may like to note]

2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to

33 KV feeders: (i) Details of DISCOM wise Power supply given to various domestic categories during the period

DECEMBER 2018 and JANUARY 2019 is enclosed at Annexure 2.3(i).

[Committee may like to note]

Voltage Class

Capacitor bank installed as on

30.11.18(MVAR)

Capacity Added after Last OCC

Meeting (MVAR)

Capacitor banks already covered under ADB T-V

TOTAL CAPACITY AS ON 31.01.19

(MVAR)

Capacitor Bank Installed but

defective & are not repairable (No &

MVAR) 220 KV 100.00 0.00 - 100.00 All in Service

132 KV 1238.00 0.00 - 1238.00 33 KV 5212.50 67.00 - 5279.50 Total 6550.50 67.00 - 6617.50

Agenda of 68th OCCM of MP 3

Page 6: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

(ii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of 33 KV

feeders emanating from various newly commissioned/existing EHV substations for which groups have not

been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to 33 KV

feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

01

EAST

Jabalpur 13 02 Sagar 00 03 Rewa 00 04 Total 13 05

WEST Indore 05

06 Ujjain 06 07 Total 11 08

CENTRAL Bhopal 08

09 Gwalior 00 10 Total 08

TOTAL Grand Total 32

Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting. In view of the above it is requested that the order copy for which group have been allocated may

please be submitted to P&D, MPPTCL under intimation to SLDC. [ACTION: DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The annual maintenance /outages of thermal generating units of MPPGCL during February 2019 to March 2019 is NIL as intimated by ED(O&M:Gen.). Hydel Unit outage as intimated by CE (O&M:Hydel), MPPGCL in 67th OCCM is detailed as below:- S.NO. NAME OF HPS & UNIT NO. FROM DATE TO DATE REASON

1. Tons Unit # 1 15.03.2019 02.04.2019 For replacement of C&R panel 2. Tons Unit # 2 03.04.2019 21.04.2019

3. Tons Unit # 3 22.04.2019 12.05.219 The Annual Maintenance schedule for 2019 as submitted by NHDC is as follows:- S.NO. NAME OF HPS & UNIT NO. FROM DATE TO DATE REASON

1. ISP Unit # 1 01.03.2019 15.03.2019 Annual Maintenance 2. ISP Unit # 2 16.03.2019 31.03.2019 Annual Maintenance 3. ISP Unit # 3 01.04.2019 15.04.2019 Annual Maintenance 4. ISP Unit # 4 16.04.2019 30.04.2019 Annual Maintenance 5. ISP Unit # 5 01.05.2019 15.05.2019 Annual Maintenance 6. ISP Unit # 6 16.05.2019 31.05.2019 Annual Maintenance 7. ISP Unit # 7 01.06.2019 15.06.2019 Annual Maintenance

Agenda of 68th OCCM of MP 4

Page 7: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

8. ISP Unit # 8 16.06.2019 30.06.2019 Annual Maintenance [Committee May like to note]

3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period 01.03.2019 to 30.04.2019 submitted by MPPTCL is enclosed as Annexure-3.2.

[Committee May like to discuss]

3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:-

Sr. No

Line/Transformer/ etc under long Outage

Outage date Reason Response from Utility

1. 16MVA BBL make X’mer at 132KV S/S Berasiya. 10.06.2018

X’mer tripped on Differential & Buchholz

Trip Indications

MPPTCL informed that X’mer replaced by another 20MVA transformer on dt 21-01-2019.

2. UAT-7B, STPS, Sarni 30.06.2018 Differential relay & bucholz relay operated.

Order placed to M/s Shree Abirami Engineering works Chennai, Tamil Nadu on dtd-24.12.2018. Latest status may also be intimated by MPPGCL in the meeting.

3. 500 MVA, 400/220 KV X’mer at STPS. 19.04.2018

X’mer tripped at 21:55 Hrs. due to LA Burst. Emergency shutdown taken for 15 days from

21.04.18 to 05.05.18 for CPRI oil filtering and

RLA testing work.

MPPGCL informed that Owing to adverse report of RLA conducted on ICT during shutdown, proposal for permanent discontinuation of ICT from service has been submitted. In 67th OCCM, Chairman OCC stated that the matter is under dispute, as MPPTCL has shown reluctance for decommissioning of ICT looking to system constrain and proposed to commission GIS at STPS with 500 MVA ICT in service in review meeting of Energy department. Therefore MPPGCL & MPPTCL shall discuss the matter with each other and resolve the matter at the earliest & intimate to SLDC. Latest status may also be intimated by MPPGCL/MPPTCL in the meeting.

4. 50 MVAR (Make GE) Line Reactor at 400KV Sarni-Asta Ckt-I.

31.03.2018

Under outage since 31.03.18 due to concentration of

Acetylene gas. DGA test of transformer oil of

reactor was carried out by M/s CPRI, Bhopal.

MPPGCL informed that NIT has been uploaded on dtd-20.08.2018 & enquiry has been opened on 19.09.2018 and certain queries on techno commercial issues have been sought from M/s GE(T&D) India(OEM). Price bid opened on 05.12.2018 & price clarification & correspondence is going on with firm. Latest status may also be intimated by MPPGCL in the meeting.

Agenda of 68th OCCM of MP 5

Page 8: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Any transmission element/ EHV element under outage, which has not been intimated/included under aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same. The utility may submit the latest status.

[Action:MPPGCL/MPPTCL]

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF DECEMBER 2018 AND JANUARY 2019: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units. Annex. 4.2.i Power Supply Position(Energy Balance Sheet). 4.2.ii. Power Supply Position Scenario:-

POWER SUPPLY POSITION FOR THE MONTH : Dec 18 All Fig in MW

Particulars

Max Dem

Met on : 27-

Dec-18 AT :

09-00

Average 01-10 Dec

Average 11-20 Dec

Average 21-30 Dec

Average Monthly

STATE PEAK DEMAND MET 13778 10460 10183 10478 10373 BREAKUP :-

STATE THERMAL (Actual Gen) 3540 3276 3174 2965 3138

STATE THERMAL (RSD) Total MW 0 0 0 0 0

STATE HYDEL 1465 500 524 675 567

IPP (STATE) 312 228 181 308 239

CENTRAL SECTOR (Schedule) 2669 2580 2461 2649 2563

CENTRAL SECTOR (Surrender) 0 87 177 83 115

IPP (INTER STATE) 2099 2264 1937 2008 2070

RAILWAY 226 223 225 204 217

RENEWABLE ENERGY 696 553 689 515 586

OTHERS -54 -132 -114 -96 -114

BANKING / PURCHASE / SALE 2614 1033 1172 1280 1161

DEVIATION 210 -65 -66 -31 -54

DEVIATION (AVERAGE) 210 Between (-823 to 573)

Between (-862 to 548)

Between (-922 to 670)

Between (-922 to 670)

ENERGY SUPPLY STATE (LU) 2523.30

Agenda of 68th OCCM of MP 6

Page 9: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

POWER SUPPLY POSITION FOR THE MONTH : Jan 19 All Fig in MW

Particulars Max Dem Met on :

05-Jan-19 AT : 09-00

Average 01-10 Jan

Average 11-20 Jan

Average 21-30 Jan

Average Monthly

STATE PEAK DEMAND MET 14089 10492 10273 9372 10046

BREAKUP :-

STATE THERMAL (Actual Gen) 3491 3074 3230 3027 3110

STATE THERMAL (RSD) Total MW 0 0 0 0 0

STATE HYDEL 1817 596 411 312 440

IPP (STATE) 377 262 305 298 288

CENTRAL SECTOR (Schedule) 3241 2830 2610 2320 2587

CENTRAL SECTOR (Surrender) 0 149 312 544 342

IPP (INTER STATE) 2411 2164 2259 2146 2190

RAILWAY 225 223 231 217 224

RENEWABLE ENERGY 650 480 568 674 574

OTHERS -162 -125 -146 -176 -149

BANKING / PURCHASE / SALE 2081 1034 845 602 827

DEVIATION -41 -46 -41 -48 -45

DEVIATION (AVERAGE) -41 Between (-778 to 594)

Between (-828 to 594)

Between (-1259 to 802)

Between (-1259 to 802)

ENERGY SUPPLY STATE (LU) 2540.88 Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

[Committee may like to note] ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF DECEMBER 2018 AND JANUARY 2019: The Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.

[Committee May like to discuss] ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and

commissioning of reactors / transmission elements is as below:-

Agenda of 68th OCCM of MP 7

Page 10: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

S.No. 400 KV S/s Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1. Line Reactor on 400 kV Sapura–ISP line at STPS

50 MVAR MPPGCL

In 66th OCC MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by June 2019. Latest status may please be submitted by MPPGCL in the meeting.

2. Bus Reactor at SSTPS

125 MVAR MPPGCL

Work will be carried out under PSDF as intimated by MPPGCL in 62nd OCC in 66th OCC MPPGCL informed the committee that the drawing has been approved and reactor is expected to be commissioned by March 2019. Latest status may please be submitted by MPPGCL in the meeting.

The latest status may be submitted in the meeting.

[Action: MPPGCL/NHDC] 6.2 GENERATOR DATA SHEET OF SINGHAJI TPS UNIT # 1, 2, 3 & 4:- As per claus –

11, 12, 13 of Manual on Transmission Planning Criteria Of CEA the generator data is required for modeling

the generators for simulation studies. It is also to mention that due to integration of RE Generators in the grid

& its variable generation for which the precise simulation studies have to be done for proper grid management.

Further vide e-mail dtd- 12.12.2018 & 21.12.2018 Singhat TPS was requested to submit the generator data of

Singhaji TPS Unit #1,2,3&4. The requested data was submitted by MPPGCL.

In view of the above, it is to mention that the details submitted earlier was not complete and missing

details which is required to be re-submitted as conveyed vide e-mail dtd-12.02.2019 is as follows:-

1. For Stage-1 Singhaji (2x600 MW)

a. Complete Generator Technical datasheet which includes various curves like Capability, OCC, SCC etc b. PSS Tuning report of Unit-1,2

c. Turbine Governor model details with inertia of Turbine and governor system(transfer function block

diagram)

d. Turbine governor commissioning reports

e. PSS and AVR Model details (transfer function block diagram)

f. GT technical datasheet (name plate)

2. For Stage-2 Singhaji (2x660 MW) unit-3

a. Turbine Governor model details with inertia of Turbine and governor system(transfer function block

diagram).

b. Turbine governor commissioning reports

c. AVR and PSS parameters-to be downloaded from AVR and submitted.

Agenda of 68th OCCM of MP 8

Page 11: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Further it is to mention that with the commissioning of Unit-4 at Singhaji the details related to unit-4

shall also be submitted. Hence seeing to the security of the grid the modeling of generators for precise

simulation studies has to be done, therefore Singhaji TPS, MPPGCL is requested to comply with CEA

regulations and kindly furnish the required details for modeling of generators for simulatuion studies at the

earliest to this office for further submission to WRLDC.

[Action: MPPGCL]

6.3 AVAILING SHUT DOWN ON NON-ISTS ELEMENTS (ELEMENTS FOR WHICH ONLY APPROVAL OF MP-SLDC IS REQUIRED) AND OUTAGE MODULE THEREOF:- The parallel run of the ABT, OA & MIS system is in progress and the outage module has already been initiated

(link:- http://223.31.122.117:8080/EltrixPortal/login.jsp). Further it is to inform that the User ID and Password

for all the circles/generating stations/EHT-M/EHT-C along with user manual of the outage module has already

been provided vide this office e-mail dtd-14.01.2019. Also vide this office letter no. No No.07-05/174-

B/Kalki/131 dtd-15.01.2019 all the concerned entities/authorities were requested to communicate the User

ID/Password & issue necessary directives to the respective authorities to initiate the use of web based outage

module.

In view of the above all the concerned entities are again requested to submit/process the outage,

tripping, generator outage, generator start/stop, new element charging request through web based outage

module in addition to the existing practice. It is also to mention that from 01.04.2019 it will be mandatory to

process the outage request through outage module only, hence all the entities shall approach for approval of

shut down through outage module. In case of any queries/addition of element/etc the entities can write to us

on e-mail:- [email protected], [email protected] and can coordinate with Shri. Manish Tamrakar, Mob.

No. 7999535347 & Shri.G.Rakesh – 9606796709. It is also to mention that WRLDC has developed a

separate portal for WR-OCCM approval of outage of ISTS elements which shall be discussed separately.

[Action: MPPTCL/MPPGCL/DISCOM’S/NHDC/KALPTARU/JP BINA/BLA]

6.4 WEB BASED OCC OUTAGES SOFTWARE FOR REPLACING THE EXISTING GOOGLE SHEET:- WRLDC has prepared Web Based Application Software for planned outage

coordination that would replace the existing coordination through Google Sheet. The Software comprising

following features and process:-

a) The proposed outages for upcoming OCC uploaded in web based portal before 5th of every month.

b) Compiled OCC outage could be viewed and commented before the OCC meeting.

c) Outage after approval in OCC, will be used for further processing.

d) The readiness of D-3 days will be filled in Web portal by concerned utilities through their login

credentials.

e) Non-OCC outages will be updated and same is presented to WRPC for approval, before being

considered for approval.

f) Anyone could comment and give their feedback before D-3 days.

g) The necessary utility concurrence may be availed before processing any outage.

Agenda of 68th OCCM of MP 9

Page 12: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

h) The outage considered for approval could be viewed on D-2 days.

i) The outage approved by WRLDC on D-2 days could be viewed on web portal.

j) The final approved outage after NLDC concurrence is available on D-1 days in individual login

credential.

k) The re-schedule of outages is also done as per the approved guideline.

l) Everyone could view the outage approval status online.

The utilities are requested to adhere with guidelines framed regarding OCC outage procedure.

[Action: MPPTCL/MPPGCL/NHDC/JP BINA/BLA]

6.5 REVIEW OF AUFLS SETTINGS:- Review of AUFLS Scheme was being deliberated from 2nd

NPC meeting. The decision of 8th NPC in respect to AUFLS scheme is mentioned hereunder: -

AUFLS Existing frequency (Hz) Proposed frequency (Hz) Quantum of load shedding (MW)

Stage-I 49.2 49.4

Same as per existing quantum Stage-II 49.0 49.2

Stage-III 48.8 49.0

Stage-IV 48.6 48.8

It is decided that AUFLS scheme with four stages and raising the frequency by 0.2 Hz viz 49.4, 49.2,

49.0 & 48.8 Hz. The quantum of AUFLS would be reworked by NPC Secretariat based on the discussions held

in this regard. It is therefore beneficiaries are requested to change their AUFLS settings as per decision of 8th

NPC at the earliest under intimation to WRPC Secretariat. With regard to State wise quantum of load

shedding, status quo may be maintained till decision is taken by NPC subsequently.

[Action: MPPTCL /DISCOM’S]

6.6 CREATION OF GIS BASED ENERGY MAP OF INDIA BY NITI AAYOG:- Director,

CEA, New Delhi letter No. 07/02/ceA/pfam/Niti Aayog/2018 dtd. 09.02.2018 (copy enclosed), addressed to

CMDs/MDs/Chairperson of Discoms / Power Utilities, has requested to provide data pertaining to power

utilities in attached format (Annexure-6.6) for development of Geospatial Energy Map of India. Accordingly, it

has been requested to provide soft copy of these data to email Id- [email protected]. In the above

context, it is to mention that Niti Aayog is developing a user friendly GIS based Energy Map of India which

would provide true locations of energy resources in India including Power Plant, coal, and oil reserves,

transmission lines, refineries etc. The CEA is nodal agency to collect all data pertaining to the power sector of

India by collecting it from different utilities of power factor. In view of above, it is requested that consolidated

information pertaining to your Company in prescribed format may please be made available in soft copy to

CEA, New Delhi under intimation to this office. The above data may be emailed to mail Id -

[email protected]. He details has been submitted by P&D MPPTCL and NHDC. The other entities are

requested to submit the required details in prescribed format at the earliest. The Committee may discuss the matter

[Action: MPPTCL/MPPGCL/DISCOMS/NHDC/JPBINA/BLA/All State Entities]

Agenda of 68th OCCM of MP 10

Page 13: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

6.7 UPDATED 33KV NETWORK DIAGRAMS AS ON 31.01.2019 AND DETAILS OF 33KV NETWORK PLANNED FOR NEXT 10 YEARS:- It has been directed by the Board of

Directors of Transco in 93rd meeting that 4 year plan of upcoming transmission system of MPPTCL be

reviewed through independent agency after taking into consideration the capacity addition during the period of

last 5 years i.e. from 2013-2018. Accordingly RFP specification No.TR-67/2018 has been published on

03.10.2018 and final order has been placed to M/s ERDA Vadodara on 25.01.2019 for review of 5 years

transmission plan (2017-22) of MPPTCL and carrying out detailed studies for identification of new transmission

works for subsequent 5 years (2022-27). In context to above, it is to mention that the 33kV feeder wise details regarding existing 33kV network and the

plans for the next 10 years (up to 2027) shall be required for the aforesaid study by the consultant. The details

regarding existing 33kV network i.e. number and capacity of 33/11kV transformer installed in 33/11kV

substation, length of each 33kV line section with name of conductor used. 33kV HT consumers connected with

their contract demand, solar/wind/other renewable power plants connected with their capacity for each 33kV

feeder should be marked on map as per geographical location. The 33kV network planned for future should be

indicated with dotted lines and the details be provided in Annexure-6.7.i, ii & iii. The letters to each Discom

regarding submission of information have already been sent by CE(P&D), MPPTCL, however the desired

information is still awaited.

It is therefore requested that the desired details as mentioned above may be made available to CE-Planning &

Design, MPPTCL, Shakti Bhavan, Rampur, Jabalpur by each Discom along with the diagrams of 33kV network

emanating from EHV substations updated as on 31.01.2019 in respect of all the circles under East, West and

Central Discom positively by 31st March-2019. The data shall be made available to CE-Planning & Design,

MPPTCL, in prescribed format and the same may be mailed on CE(P&D) address e-mail :-

[email protected]. [Action: DISCOM’S]

6.8 MAPPING OF FEEDERS:- As earlier, it has been requested to initiate the process of mapping of

AUFLS feeders in SCADA system, however no any progress in this regard noticed so far. In 8th NPC, it has

been decided that WRPC would submit the details / progress of feeder mapping to NPC Secretariat on regular

basis (quarterly).

In view of above, it is requested quarterly details/ progress of mapping of feeders may kindly be

furnished so that same may be communicated to WRPC for onward communication.

[Action: MPPTCL/DISCOM’S] 6.9 PROTECTION AUDIT OF HYDEL POWER STATIONS OF MPPGCL:- The MPPGCL

vide letter No. 07-10/601-PSDF, dtd 21/02/2018 has conveyed that protection audit of switchyard associated

with 10 hydro power plants of MPPGCL is required to be carried out by WRPC. Further, it was decided that

work or protection audit of all switchyard carried by a team constituted by WRPC accordingly nominations

were invited from utilities for protection audit team. Vide this office email dtd 11.07.2018 the name of officers

from MPPTCL, NHDC and MPPGCL was conveyed to WRPC. MPPGCL is insisting for early completion of

Agenda of 68th OCCM of MP 11

Page 14: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

aforesaid protection audit, considering provisions of MOM of TESG meeting of PSDF regarding the

observations for PSDF grant on MPPGCL proposal in 37th meeting held on 19.01.2018.

As a sequel to above, SE (Protection), WRPC is intimated that looking to difficulties at WRPC level to

constitute a committee for aforesaid work, it has been directed that committee may be constituted MP- SLDC.

However, detailed programme for Protection Audit to be carried out be intimated to WRPC, so that WRPC may

depute one member from WRPC their end. MPPGCL is therefore requested to furnish detailed programme for

conducting Protection Audit along with data required in this regard as requested by WRPC earlier, so that

proposed Protection Audit could be carried out.

It is mentioned that the matter has been discussed in In 67th OCCM. The representative from

CE(Hydel), MPPGCL has ensured that the required details of protection audit will be submitted within a week

time, however requisite details of Hydel Power Station of MPPGCL have not been provided till date. Thus, the

Protection Audit Activities still could not initiate further. The matter may please be expedited and needed

information be provided to SLDC without further delay. [Action: MPPGCL]

6.10 LOAD DROPPING SCHEME AT 400KV & 220 KV SUBSTATIONS TO HANDLE EMERGENCY CONDITION: - This issue have been discussed during various OCC meetings and the

representative of T&C has promised that updated load dropping scheme installed at various substations will

be provided , however the requisite details has not be provided to SLDC so far. This data is urgently required

for real time system operation monitoring and to take remedial action to handle contingency condition In view of the above CE(T&C), MPPTCL is requested provide the desired details at the earliest.

[Action: MPPTCL]

6.11 INSPECTION OF RELAYS OF AUTOMATIC UNDER FREQUENCY LOAD SHEDDING AND CERTIFICATION THEREOF: - It is desired that for safe & secure operation of

integrated system, the under frequency relay should be connected in the system in healthy condition.

Accordingly, WRPC is pressing hard to provide the self-certified status of healthiness of relays of Automatic

Under Frequency Load Shedding (AUFLS) and periodic checking of the same. Vide this office various

correspondence. The CE (T&C) and also SE(T&Cs) were requested to provide status of healthiness of relays

of Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same may be communicated

to WRPC. Inspite of repeated request vide various correspondence, moreover the matter had been raised in

OCC meeting of MP in time to time, however the desired information are still awaited from utilities. It is therefore desired that the above matter may be treated as urgent and status of healthiness of

Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested

periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall

visit the sub-stations to ascertain the healthiness of under frequency relay.

Committee may please discuss the matter.

[Action: MPPTCL(T&C/P&D), Discoms]

Agenda of 68th OCCM of MP 12

Page 15: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

6.12 PROVISION OF SYNCHRONIZATION FACILITY AT EHV SUB-STATIONS OF MPPTCL

AND AT ALL POWER HOUSE: - As per Grid Code, the synchronization facility should be available at all

the Power Stations, 400 KV Sub-stations, 220 KV Sub-stations and 132 KV sub-stations in the path of black

start. In 60TH OCC meeting MPPTCL representative informed the committee that order for 69 no.

synchronization trolleys has been placed and 1 no. synchronization trolley has been delivered for checking

and testing purpose at 220KV S/S Barwaha. In subsequent meetings this issue has been discussed. However,

no any fruitful progress has been observed so far. In the above context it is indicated that at Manikheda HPS

and Rajghat HPS synchronization facility is not available. It is felt that every Hydel Power station should be

equipped with synchronization facilities invariably for system reliability and Crises Management. Also at

Manikheda HPS & Rajghat HPS single bus system exists, hence MPPGCL is requested to explore the

possibility for commissioning of Double Main Transfer Bus system. Thus, MPPGCL is requested to provide

synchronization facility at Manikheda HPS and Rajghat HPS and MPPGCL may kindly provide status of

making synchronization facility in aforesaid HPS. The MPPTCL may kindly provide the status of installation and commissioning of synchronization trolleys at different substations. Further, is also requested to indicate, whether

synchronization facility could be provided at Karera & Pichhore substation on priority basis. The

matter has been discussed with officers of T&C wing, it is conveyed that they are making arrangement

for installation of synchronizing trolley at Pichhore S/s at the earliest. T&C may please update the position.

The matter was discussed in the meeting. [Action: MPPTCL]

6.13 DELAY IN SUBMISSION OF DOCUMENTS FOR FIRST TIME CHARGING OF ELEMENTS:- As per procedure laid down by NLDC for integration of new EHV elements into the grid and

issuance of certification thereof vide letter dtd-26.05.2014, wherein it is indicated that all transmission

licensees intending to commission any transmission element belonging to them and which is a part of a

interstate transmission system shall submit FTC document for approval of RLDC. Further WRLDC vide e-mail

dtd-02.01.2019 intimated the launch of FTC Software along with the user manual. In view of the above it is to inform that, after registration the separate user id & password of MPPTCL

& MPPGCL provided by WRLDC was forwarded to respective entities so that they can upload FTC documents

through this new FTC portal (link-http://ftc.wrldc.in:8080/ftc_wrldc/). Hence all the respective entities are

requested to apply for integration of any transmission element belonging to them and which is a part of a

interstate transmission system through this FTC portal within the specified time limit (i.e., 10 days prior to

anticipated date of first time charging). It is requested that licensee / utilities shall strictly adhere with time

schedule for documentation of first time charging of new transmission elements of all interstate line and all

EHV elements 400kv and above. It may also be ensured that FTC formalities should have completed before

availing outage for integration of element. The authority submitted FTC document should ensure compliance

of protection/ metering/Telemetry issue in coordination with T&C official. It is also desired that all necessary

data should have made available to all adjacent s/s for relay coordination well before targeted date. The

authority submitted FTC document should ensure all formalities have been completed otherwise it would be

Agenda of 68th OCCM of MP 13

Page 16: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

difficult to obtain clearance from WRLDC. In general, non-attachment of requisite papers/ SLD/ document of

standing committee approval or approval of competent authority for intrastate elements /approval of Electrical

inspector /noncompliance of relay coordination of adjacent s/s / providing information incorrectly caused delay

in obtaining FTC approval. Therefore, it is desired that FTC document completed in all respect may be

provided in stipulated time schedule so that FTC formalities could be completed within targeted date of

charging.

[Action: MPPTCL/MPPGCL/ISP/OSP/JP BINA/BLA/All State Entities]

6.14 TEN DAILY RESERVOIR OPERATION TABLE OF MPPGCL HPS: - In the meeting held in

Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP

& OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation

table from WRD and NVDA for their operation of their hydro generators. In last 54th, 55th & 56th OCCM, request

has been made to MPPGCL for furnishing the same to SLDC within a week.

It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of hydel power stations in

coordination with NVDA and WRD for optimum utilization of available water in the reservoirs during the

summer season.

[Action: MPPGCL]

6.15 REGULATE VOLTAGE DURING PEAK / OFF-PEAK HOURS:- It was apprised to the

committee that Switchable Shunt Reactors are being taken in service during high voltage conditions. However,

in view of inadequate shunt reactive compensation, the generating units are advised to contribute in voltage

regulation by operating their units in under-excited mode (absorb Reactive Power) within the capability curve.

The MW, MVAR and Voltage of generating units was time to time. In various OCC meeting of MP, attention has been drawn regarding MVAR generation by Power Station

when bus voltage were deviate from nominal. It is observed that MVAR injection/absorption of generators are

not as per the system requirement. Such operation is not desirable and it is therefore desired that AVR setting

and the GT taps may be reviewed / adjusted so as to enable the unit to contribute in voltage regulation within

the capability curve. The directives in this regard may please be adhered to regulate the voltage during peak

hours as well as off peak hours.

Generators are requested to provide MVAR support as per the system requirement and absorb MVAR

when voltages are high to the extent as per their capability curve.

[Action: MPPTCL/MPPGCL/NHDC/KALPTARU/JP BINA/BLA]

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- During 2018-2019 the black start mock drill

successfully carried out at Hydel power station as mentioned below:-

S.NO. NAME OF HPS DATE OF MOCK DRILL

1 Pench & Bargi HPS Joint Mock Drill 11.04.2018

2. Gandhi Sagar HPS 06.07.2018

Agenda of 68th OCCM of MP 14

Page 17: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

3. Rajghat HPS 29.08.2018

4. Manikheda HPS 18.12.2018

The Black Start Mock Drill at Birsinghpur HPS was conducted on 20.12.2018 but the mock drill

was suspended due to abnormal sound observed from generator side during mock drill.

All the concerned generators are requested to propose a tentative date of Black Start Mock Drill in

ensuing month.

[Action : MPPGCL/NHDC]

ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 TESTING & CALLIBRATION OF METERS AND NON-RECEIPT OF TIMELY JMR DATA:

1. SLDC has already requested CE(T&C) office in previous OCCMs to issue instructions to site officials for

testing / calibration of meters installed at the Sub-Stations as per Regulations 10 and 18 of Central

Electricity Authority (Installation and operation of meter) Regulation 2010. CE(T&C) office is requested to

apprise the status of testing / calibration of interface meters to committee.

2. CE(T&C) office was repeatedly requested in previous OCCMs to issue instructions to all circle offices for furnishing the JMR data in standard format enclosed herewith as Annexure-8.1 to SLDC on email id- [email protected] before 7th of every month. However, JMR data of all TNCs are still not being received by SLDC up to 15th of every month in required format. CE(T&C) office is again repeated requested to issue instructions to all circle offices for furnishing the JMR data in standard format by 7th of every month at email [email protected].

[Action : CE(T&C) MPPTCL] 8.2 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR SYSTEM:

SLDC has already requested in 67th OCCM that ABT meter data of following TSS of Railways is not

being received through AMR system:

1. Railway TSS Bordhai.

2. Railway TSS Umreth.

3. Railway TSS Mansakra.

4. Railway TSS Khirkiya.

Railway representative has assured to coordinate with M/s Secure Meters Ltd. and SLDC for resolving

the problems related with data downloading of meter data through AMR System installed at SLDC. However,

meter data of above TSS points is still not being received by SLDC. Railways is requested to take immediate

steps for providing data to SLDC nthrough AMR.

[Action : Railway]

8.3 AMR FACILITY FOR THE ABT METERS INSTALLED AT MPPGCL :

Agenda of 68th OCCM of MP 15

Page 18: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

In compliance to state commission directives for computation of weekly transmission losses and Deviation

charges, SLDC has requested the MPPGCL for providing the AMR facility on the meters installed at the

interface points for data downloading through AMR System installed at SLDC. Accordingly MPPGCL has

provided AMR facility on 107 Nos ABT meters installed at the interface points as intimated by CE(Thermal),

O/o ED(O&M:Gen), MPPGCL vide letter No. 426 dated 01.03.2016. The status of Febraury 2018 of ABT meter

data (42 Nos) not received through AMR system of SLDC has been emailed to GCC, MPPGCL on 18rd

Febraury-2018. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. to resolve the

problems related with non-readability of meters integrated successfully and provide AMC of AMR facility

installed at Power Houses to M/s Secure Meters Ltd so that complete data of meters is received at SLDC.

MPPGCL is requested to apprise the status of AMC.

MPPGCL is requested to furnish the meter master of ABT meters installed at interface points of Hydel

power station as standy meters and provide AMR facility on standby and check meters.

MPPGCL is requested to instruct officials of SSTPS PH-I & II for furnishing the JMR data of Secure meters

where AMR is provided and whose data is downloaded by SLDC. Futher, the 15 minutes blockwise data

recorded in the meter no. XD435287 installed at GT of SSTPS PH-II unit-III do not match with midnight data i.e

monthly injection data, SLDC vide letter No.07-05/SG-11/SEM/347 on date 14.02.2019 has aleady requested

to take up the matter with M/s Secure Meters Ltd. for resolving the problem. MPPGCL may apprise status to

the Committee.

In case of Sanjay Gandhi Thermal Power Station of MPPGCL, the injection recorded by the ABT meters

installed at the outgoing feeders generally do not match with the generation recorded at Generator end.

MPPGCL is requested to advise the site officials for monthly checking / verification of feeder wise data with

Generator and Station Xmer wise data. [Action : MPPGCL ] 8.4 NON RECEIPT OF ABT METER DATA OF ISP & OSP HPS THROUGH AMR SYSTEM:

SLDC has already requested in 67th OCCM that the ABT meter data of ISP & OSP HPS is not being

received through AMR system. ISP & OSP were requested to coordinate with M/s Secure Meters Ltd. & SLDC

for resolving the problems related with downloading of meter data through AMR. OSP has integrated meters

with AMR system except meter Sr. Nos. XC560147, XC560148, XC560150, XC560152, XC560154. ISP has

replaced the SIM but details not furnished to SLDC for integrating with AMR system. ISP & OSP are requested

to expite the integrating with AMR system and apprise the status to Committee.

[Action : ISP & OSP HPS]

8.5 NON RECEIPT OF MONTHLY INJECTION DATA (JMR) OF NEWLY COMMISSIONED WIND & SOLAR POWER PROJECT FOR ISSUANCE OF MONTHLY STATE ENERGY ACCOUNT :

The concerned SE(O&M)’s do not furnish the monthly injection data of following newly commissioned

Wind & Solar Power Project connected at 33KV level. However, SLDC is incorporating the injection data

recorded in ABT meter in SEA, but, verification of data could not be done.

Agenda of 68th OCCM of MP 16

Page 19: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

i) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. having (Simcom(1MW), Eastman(4MW) , Made

Easy(10MW) connected through 33KV Ctk-I at 220KV Ganjbasoda. – SE(O&M) Vidisha.

ii) 15MW Wind Power Project of M/s Tirupati Dhar Renewable Power Pvt. Ltd. connected at 33KV Jaitpura

Dhar. – SE(O&M) Dhar.

iii) 15MW Wind Power Project of M/s Dhar Wind Power Projects Pvt. Ltd. connected at 33KV

Dashera Maidan – SE(O&M) Dhar.

DDCs, Bhopal and Indore is requested to take up the matter with their CE(Comml), office for issuance of

directives to concerned SE(O&M)’s to furnish the injection data by 3rd or 4th of every month.

Further, SLDC has repeatedly raised the issue in OCCM’s that monthly generation data of Wind

and Solar Projects is not being received from SE(O&M) Dewas till 7th of every month. DDC, Indore is

requested to take up the matter with their CE(Comml), office for issuance of directives to SE(O&M),

Dewas to furnish the JMR generation data by 3rd or 4th of every month.

The injection data of the following wind & solar generators connected at 132KV level and above is not

furnished by the concerned EE(T), MPPTCL. SLDC consider the data received through AMR or through MRI

by site official in monthy SEA, but verification of data could not be done.

i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV Badnagar

substation through 132KV Ckt.

ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation

through 132KV Ckt.

CE(T&C) office is requested to issue necessary instructions to concerned filed offices for furnishing the

injection data to SLDC by 3rd or 4th of every month.

[Action : DISCOMS & MPPTCL] 8.6 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM:- SLDC has already

requested in previous OCCMs that the ABT meters installed at the following Pooling Stations of Wind & Solar

Power Project has time drift and thus not recording the correct data. SLDC has requested to Generators with

copy to concerned licensee vide letter no. 3142 dated 29/10/2018 for time synchronization of the ABT meters

with GPS so that correct DSM account of these Wind and Solar Projects is issued by SLDC.

Sr.No. FEEDER NAME LOCATION NAME Location VOLTAGE LEVEL

Meter No

1 33 KV UJAAS 1 BERCHHA 132KV S/S BERCHHA Grid S/s End 33 XB571652 2 33 KV UJAS -2 ICHHAWAR 132KV S/S ICHHAWAR Grid S/s End 33 MPC59975

Agenda of 68th OCCM of MP 17

Page 20: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

3 GLOBUS STEEL & POWER 132KV S/s SITAMOU Generator End 33 XC562469 4 33KV BHADRESH_SUSNER 132KV S/S SUSNER Grid S/s End 33 XB593639 5 UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595 6 UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596

SLDC has already requested in previous OCCMs that the ABT meters installed at the following Solar

Generating Stations are recording the 15 minutes block wise data on slinding window principal thus blockwise

data do not match with midnight data. The concerned officials are requested to ensure that ABT meters

installed at interface points shall record load survey data in 15 minutes time block. Further concerned EE(T)’s

are requested to advice RE Generators for immediate replacement of these ABT meters.

i. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara.

ii. 2.55MW M/s Porwal Auto Component connected at 132KV S/s Makdon.

DCC, Indore & Bhopal is requested to take-up the issue with concerned officials for time synchronization

and replacement of ABT meters.

[Action : West & Central Discoms]

ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS /TRACTION FEEDERS-

The telemetry of new 400KV S/s, 220KV S/s, important 132KV S/s having injection from renewable generating Stations, Captive Power Plant & Railway Traction feeders is to be provided before charging of the sub stations. However, telemetry of Eleven Sub Stations i.e. 132 KV Raghogarh, 132 KV Isagarh, 132 KV Pratappura, 132 KV Udaipura, 132 KV Ghatabillod, 132 KV Nowgaon, 132 KV Prithvipur, 132 KV Lalbarra, 132 KV Mandsaur, 132 KV Dongrital, 132 KV Chandrawatiganj is to be provided to SLDC.

The 220KV Gudgaon & 220KV Jaora is also scheduled to be charged shortly and telemetry

is to be provided before its charging. MPPTCL may please provide the plan for arranging telemetry of these sub stations.

In last OCCM, MPPTCL informed that procurement of RTUs for 132 KV Raghogarh, 132 KV

Isagarh, 132 KV Pratappura, 132 KV Udaipura is under progress. However the integration of telemetry of above S/s is still pending & no progress in the matter has been observed. MPPTCL is requested to provide present status as well as expedite the commissioning of telemetry of these sub stations.

In addition to the above telemetry of Birsingpur HPS and Zinna HPS is also not available and same needs to be provided by MPPGCL. In last OCCM, MPPGCL informed that order for procurement of 7 RTUs will be placed by end of Jan-19 & MPPGCL was requested to finalise the data channel plan in coordination with SLDC and MPPTCL and initiate procurement of PLCC cabinet /outdoor equipments/ VFT modems so that the data channel shall be available before commissioning of RTU. MPPGCL is requested to provide the current status in the matter.

The telemetry of these identified Sub Stations is urgently required for monitoring of grid.

Hence the progress in the matter as well as further schedule of commissioning of telemetry may please be provided by MPPTCL & MPPGCL.

Agenda of 68th OCCM of MP 18

Page 21: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

[Action: - CE (T&C)/CE (Procurement), MPPTCL, ED(O&M :Gen), MPPGCL]

9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS & The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as Annexure-9.2. The list of major telemetry discrepancies is as given below :-

(a) MPPGCL Generating Substations :-

1. Satpura TPS :- Sr.No.

Description Unit Pending since

MPPGCL response in meeting dtd.30.10.18

MPPGCL response in 67th OCC

1. Gen-7 GT MVAR More than 1 year

- MPPGCL informed that the unit is to be dismantled, so procurement of transducer is not possible. SLDC requested MPPGCL to utilize the spare transducers, if any, for replacement.

2. 400 KV Astha 1 & 2

Line Reactor

Commissioning

MPPGCL informed that signals of reactor are configured in database of Satpura SCADA system but values are not being conveyed to SLDC. NIT has been issued for configuration of point & it shall be completed within one month.

MPPGCL informed that engineer of service provider will visit the site & it will be configured at the earliest.

2. Singhaji Phase II TPS :-

3. SGTPS :-

Sr.No Description Unit Pending since MPPGCL response in 67th OCC 1. Gen-3 MW/MVAR Commissioning SLDC informed that telemetered values of

Gen-3,4 & Station transformer is not available since its commissioning & no action in the matter has been taken by MPPGCL despite constant pursuance by SLDC. SLDC informed MPPGCL that commercial operation of Generator-4 shall not be permitted until telemetry of Gen-3, 4, Station Transformer & RGMO/FGMO signal status is provided by MPPGCL.

2. Gen-4 MW/MVAR Commissioning 3. Station

Transformer MW/MVAR (Data not stable)

Commissioning

Sr.No.

Description Unit Pending since

MPPGCL response in meeting dtd.30.10.18

MPPGCL response in 67th OCC

1. 400 KV STN TRANSFORMER 5A

MW More than 6 months

MPPGCL informed that order has been placed for purchasing transducers & shall be restored within one month. In

MPPGCL informed that the work is under progress & it shall be completed at

Agenda of 68th OCCM of MP 19

Page 22: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

4. Amarkantak TPS:-

5. Gandhi Sagar HPS :-

response SLDC informed that transducers may be arranged from the HPS where new RTUs are installed or from T&C where several RTUS having these type of transducers are replaced with new RTUS.

the earliest.

2. STN TR 1 (220 KV)

CB More than one year

MPPGCL informed that cabling work of breaker upto RTU panel is required to be done & shall be done within one month.

MPPGCL informed that no work has been done in response to which SLDC requested MPPGCL to expedite the work.

3. 220/33 KV Transformer

CB/MW/MVAR

More than one year

MPPGCL informed that it shall be provided within one month.

MPPGCL informed that all the discrepancies will be rectified after procurement of transducers.

4. 400 KV Bus 1 Freq More than ten months

MPPGCL informed that corrective action including testing of transducer/arrangement of new transducer shall be completed within a month.

5. 220 KV Bus 2 Voltage More than ten months

MPPGCL informed that procurement of transducer is under process & it shall be commissioned by March-19. SLDC informed that recently RTU of Rajghat & Devlond has been replaced, so transducers can be arranged from Rajghat & Devlond till procurement of new transducers.

6. 400 KV Katni-1 CB-Faulty - - -

Sr.No Description Unit Status

1. 220 KV Panagar-1 CB Faulty

2. 220 KV Bus Coupler CB Faulty

3. 220/132 KV Xmer CB Faulty

Sr.No.

Description Unit Pending since

MPPGCL response in meeting dtd.30.10.18

MPPGCL response in 67th OCC

1. Gen-4 CB More than 10 months

MPPGCL informed that it shall be rectified within 15-20 days. Further SLDC informed that it is gathered from Gandhisagar HPS that when CMR is kept ON it leads to tripping of Unit. MPPGCL informed that they will check the wiring.

MPPGCL informed that these discrepancies shall be rectified after upgradation of RTUs.

2. 33 KV Rajasthan(Kuakheda) feeder

MW/MVAR

Commissioning

SLDC informed that the telemetry of this feeder is of utmost importance as it is an inter-regional feeder. MPPGCL informed that they will arrange for the telemetry of this feeder on priority.

Agenda of 68th OCCM of MP 20

Page 23: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

6. Rajghat HPS :-

Discrepancies of Station Transformers:-

S.No. Name of TPS Station Xmer Field Value SCADA Value 1

SGTPS Station Xmer 1 6 MW 3 MW

2 Station Xmer 2 5.4 MW 3 MW 3 Station Xmer 5 A 3 MW 150 MW 4 Satpura TPS Station Xmer 3 2 MW 0 MW MPPGCL vide letter dtd.31.12.18 stated that “Upgradation of existing RTUs in TPS is not

required & suitable measures have been taken to remove discrepancies as & when required”. In last OCC, SLDC informed that large no. of discrepancies pertaining to MPPGCL generating stations are persisting since long time & thus MPPGCL was requested to arrange & expedite rectification of discrepancies /upgradation of RTUs in MPPGCL TPS. MPPGCL is requested to provide current status in the matter.

(b) Transmission/ other Generating Substations :- Sl

No. Name of Substation Name of feeders/transformers

01 400 ISP

1.Telemetry of 125 MVAR Bus Reactor not available. 2.Telemetered values of 400 KV Nagda MVAR is 10 times of actual value. 3. Telemetered values of 400 KV Indore-1 MW.

02 400 KV Kirnapur Wrong MW/MVAR value of 132 KV Dongargarh

03 220 KV Seoni 1. Wrong value of 220 KV Seoni-PG-2 2. Wrong value of 220 KV Bus II Voltage 3. Wrong CB status of 160 MVA Xmer II

(Secondary side) 4. 132 KV Bus Voltage & Frequency

(In last two OCC meeting, it was decided that telemetry of 220KV Seoni shall be shifted to Dongfeng RTU to rectify the above issues. However, action for shiting /rectification in existing RTU is still pending)

04 400 KV Bhopal 1.315 MVA Xmer-IV Main & Tie CB This discrepancy is pending since last one year & no

Sr.No.

Description Unit Pending since

MPPGCL response in meeting dtd.30.10.18

MPPGCL response in 67th OCC

1. Gen-1 CB Commissioning of new RTU

MPPGCL informed that it shall be rectified at the earliest.

Agenda of 68th OCCM of MP 21

Page 24: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

corrective actions have been taken by MPPTCL.

05 400 KV Astha 1. CB status of 220 KV Mugaliyachhap This discrepancy is pending since last one year & no corrective actions have been taken by MPPTCL. 2. Wrong CB status of 400/220 KV Xmer-1 (Sec

Side) 06 220 KV Rajgarh Biaora (i) 220 KV TBC CB status

(ii) 220 KV Voltage & Frequency 07 400 KV Indore 400 KV ISP-II line reactor CB wrong status

08 400 KV Chhegaon Wrong CB status of :- i. 132 KV IC I & II ii. 220/132 KV Xmer II (Sec side)

09 400 KV Julwaniya All 132 KV CB status showing open

10 400 KV Katni Wrong CB status of 400 KV Damoh-1

11 220 KV Kotar Wrong CB status of 220 KV Satna 1, 132 KV Rampur Baghelan, 132 KV RTS

12 220 KV Chichli CB status of 132 KV Udaipura 1

13 220 KV Mandideep CB status of 220/132 KV Xmer II & III

14 220 KV Nimrani Telemetry of 33 KV Maral

15 220 KV Indore East CB status of 220 KV Dewas

16 220 KV Nepanagar CB status of 160 MVA Xmer-3, 132 KV Bahadarpur-1 & 2, 20 MVA Xmer-3

17 220 KV Dewas CB status of 220 KV Bus Coupler & 220 KV Indore East

18 220 KV Kotar Faulty CB of 220 KV Satna-1

19 220 KV Satna 1.Wrong MW value of 220 KV Satna-PG-4

20 220 KV Maihar Wrong CB status of 220 KV Satna-PG

21 220 KV Chichli Wrong CB status of 132 KV Udaipura-1

22 220 KV Bina Wrong CB status of 220 KV Ganjbasoda

In last two OCCM, ISP informed that the case for purchasing new RTUs has been initiated by

ISP & it will be completed by 4-5 months in response to which ISP was requested to expedite the progress. The present status along with schedule for rectification of telemetry may please be provided by ISP.

In last OCC, MPPTCL informed that there is some problem in RTU at 400 KV Kirnapur.

MPPTCL (T&C) is pursuing the matter with BHEL but no significant response/action has been taken by BHEL. MPPTCL is requested to provide the current status in the matter.

Agenda of 68th OCCM of MP 22

Page 25: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

It has been observed that in substations telemetered through DFE RTUs, the transformer voltage output is used for telemetry of bus voltage. This results in wrong bus voltage in case of transformer outage. MPPTCL is requested to arrange for separate MFM for telemetry of bus voltage.

Further, It has also been observed that some times the bay no. of the charged element is changed without intimation of change in the physical address of RTU elements to SLDC. This results in the wrong telemetered values to SLDC. Recently at 220 KV Nepanagar S/s, telemetry of 132 KV Pipalpani feeder was charged though existing bay of 132 KV Bahadurpur feeder without intimation to SLDC thus resulting in wrong telemetered values of both the feeders. MPPTCL is thus requested to ensure prior intimation of any change in bay or physical address of RTU elements to SLDC.

CERC has recently implemented new DSM regulation w.e.f. 1st January, 2019 and in

this regulation change of sign of deviation by the entity is made mandatory after every six time blocks or else additional charges shall be levied for each violation. Thus the accurate computation of MP as well as Discoms’ demand is essential to avoid additional charges on daily DSM charges. Any discrepancy in real time data of Generation Station /Sub stations may lead to financial burden on Discoms’ in terms of additional DSM charges. MPPTCL, MPPGCL & NHDC are thus requested to ensure the continuity of real time data to SLDC SCADA all the time and fault if any, in the telemetry system should be attended promptly. [ACTION: T&C, MPPTCL , O&M: GEN, MPPGCL, NHDC]

9.3 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :-The RGMO signal of Pench HPS has integrated in SLDC SCADA system & extension of RGMO/FGMO signal of following generating units is still pending:-

S.No. Name of Generating Station

Unit.No. MPPGCL response in last OCC

1 Satpura TPS 6,7,8,9 MPPGCL informed that they will explore the possibility of providing FGMO signal status & will inform SLDC within one week. However no response in the matter has been observed.

2 SGTPS 1,2,3,4 MPPGCL informed in last two OCC meetings that it is under tendering process & shall be completed within 3-4 months. However no progress in the matter has been observed even after lapse of 4 month period.

3 BARGI HPS 1,2 MPPGCL informed that equipments from BHEL have been received & commissioning shall be done during AOH of Units in 2019.

4 Singhaji TPS Phase II 3,4 MPPGCL informed that as discussed with M/s L&T, RGMO/FGMO is not required. SLDC requested MPPGCL to confirm the same in written so that the matter may be placed before WRPC. The matter has been constantly pursued by SLDC vide letter dtd. 14.02.19, 17.10.18 & 21.08.18. However no response in the matter has been provided by MPPGCL.

Agenda of 68th OCCM of MP 23

Page 26: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

MPPGCL is thus requested to kindly arrange for integration of telemetry of RGMO/FGMO in RTU installed at power stations on topmost priority.

[ACTION: O&M: GEN, MPPGCL, NHDC]

9.4(A) NON AVAILABILITY/ UNRELIABLE TELEMETRY OF HYDEL POWER STATIONS :-The telemetry of Hydel Power Stations is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here under :-

Name of HPS Present

Status Availability

Oct-18 Nov-18 Dec-18 Jan-18

Pench Intermittent 60 75 72 78 Bansagar-III Intermittent 72 70 74 74 Madikheda Intermittent 65 76 71 66 Rajghat Intermittent 71 60 62 77 Gandhisagar Intermittent 72 78 71 52 Bargi Intermittent 71 76 79 72 Tons Intermittent 68 62 65 75 Birsingpur HPS Telemetry not provided to SLDC. Zinna HPS It is to mention that as per CERC communication regulation 2017, availability of telemetry is required to be

ensured more than 99.9% but as indicated above the telemetry availability of Hydel Power Stations is very low.

The telemetry of GandhiSagar HPS is out since 19-01-19 & has not yet been restored despite

constant pursuance by SLDC. Gandhisagar HPS intimated that audio signal level meter is not available & person conversant with communication & telemetry is not available in substation.

In addition to above, the telemetry of Madikheda HPS was out for 10 days from 07-01-19 to 17-01-

19. The restoration of telemetry was delayed because of non-availability of spare PLCC Modem & level meter at Madikheda HPS.

SLDC has constantly pursued the matter in last various OCC meetings regarding arrangement of

RTU/PLCC spares, measuring instruments & adequate trained manpower at MPPGCL stations. However

MPPGCL has not taken any actions regarding this matter.

MPPGCL is thus again requested to take following measures to ensure round the clock availability of real

time data to SLDC:-

1. Arrangement of essential spares at power stations and one set of all spares at centralized location

with intimation to all power stations

2. Arrangement of training to persons looking after telemetry work.

3. Arrangement of measuring instruments like level meters wherever not available.

4. Ensuring availability of RTU configuration at all power stations.

[Action :- ED(O&M:Gen),MPPGCL]

Agenda of 68th OCCM of MP 24

Page 27: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

9.4 (B) NON AVAILABILITY/ UNRELIABLE VOICE COMMUNICATION BETWEEN SLDC TO THERMAL/ HYDEL POWER STATIONS :-

It is to inform that as per CERC communication regulation 2017, availability of communication channel is required to be ensured more than 99.9%. However, despite constant pursuance, presently most of the PLCC voice communication of various power stations to SLDC is out since long time and detailed of non-availability as here under: -

Sr.No Name of

HPS/TPS

2 wire PLCC channel

MPPGCL response in meeting dtd.30.10.18

Remark

1.

Bansagar- IV

PLCC voice communication is not established

Mr.Vinay, AE, Tons HPS informed that he will visit Bansagar-IV for restoration of voice communication of Bansagar-IV at the earliest.

Restoration of PLCC channel is still pending.

2.

Madikheda

PLCC voice channel is not working since last 2 years.

Restoration of PLCC channel is still pending. In last OCCM, MPPTCL was requested to arrange for extension of voice channel utilizing Mahalgaon wideband node in coordination with Rajghat HPS.

3

Rajghat

PLCC voice channel is not working since last 2 years

SLDC suggested to extend voice facility upto Rajghat HPS while making the subscriber of 220 KV Bina in coordination with AE Bina. Therefore to commissioned above link voice channel between Rajghat HPS to 220 KV Bina shall require to be established and connect to this channel in PDH equipment at220 KV Bina to extend the voice facility of Rajghat HPS upto SLDC/Backup SLDC.

Voice facility from 220 KV Bina to SLDC Jabalpur has been established, However the voice facility from Rajghat to 220 KV Bina is still pending.

4

Gandhisagar

PLCC voice channel is not working since last 6 month

Restoration of PLCC channel is still pending.

5

Birsinghpur HPS /TPS

PLCC voice channel is not working since long time due to faulty PLCC exchange at Birsinghpur.

AE Birsinghpur informed that presently voice communication between SLDC to thermal power house is proper & the commissioning of EPAX at site is under progress. AE Birsinghpur assured that the voice channel of Birsinghpur HPS shall be restored within one month.

Restoration of voice channel is still pending.

.

Satpura TPS

PLCC voice channel is not working since last 1 years.

AE Satpura informed that faulty card shall be repaired at the earliest. Further, SLDC informed that the OPGW has already been laid between 400 KV Ashta and Satpura TPS and suggested that alternate path can be established using this path by installing end optical

Repair/replacement of Exchange & Card of PLCC equipment at Satpura TPS side is still pending.

Agenda of 68th OCCM of MP 25

Page 28: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

equipment.

The matter regarding Non Availability/ Unreliable voice communication Between SLDC to Thermal/

Hydel Power Stations was discussed in last various OCC meeting & special meeting on 30.10.18. However there is no progress in the matter & status provided by MPPGCL in meeting dtd.30.10.18 remains the same.

In last OCCM SLDC pursued the matter regarding extending 2 wire voice facility upto Singhaji 1 & 2

TPS , Madikheda HPS, Rajghat HPS, ISP & OSP HPS from nearest wide band node. Only 2 wire voice facility extension completed for ISP HPS. MPPGCL & NHDC are requested to arrange completion of 2 wire voice facility upto their Power stations.

[ Action :- ED(O&M:Gen),MPPGCL Action :- GM, NHDC]

9.5 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA :-

The proper receipt of Sequence of events (SOE) in SLDC SCADA system from field RTUs is an important feature required for analysis of grid incidents. However, on some instances, it has been observed that the SOE was not received in SCADA system and accordingly, the matter was taken up with field for verification for proper configuration /connections of SOE data in RTUs. After long pursuance, the matter was investigated and it was found that the settings “inf code 2” & “inf code 4” were not correct in Dongfeng make RTUs. These settings have now verified and changed in some of the RTUs and SOE with correct time stamping from RTUS where settings were modified is now receipt in SLDC SCADA/EMS system. However, the verification of the same in most of the RTUs is still pending. The matter regarding verification of SOE in all Dongfeng make RTUS was also discussed in last three OCCM meetings and it was confirmed to arrange the same by end of August 2018. However no significant progress in the matter has been observed. Out of 155 RTUs, SOE verification of 87 RTUs has been completed & the list of RTUs where SOE verification is pending is enclosed herewith as Annexure-9.5. MPPTCL is requested to provide schedule of SOE verification and arrange SOE verification of balance RTUs on top most priority.

9.6 UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS:- In last various OCC, SLDC informed that the W.B node at Birsinghpur TPS has already been

commissioned in 2016. However, despite constant pursuance utilization of node is still pending since last two years due to pending work of laying of cable form W.B node location to PLCC room, Exchange room and RTU. It was informed by SLDC that complete scheme to extend wideband facility upto RTU was prepared by SLDC and forwarded to SGTPS around two years back. The matter is pursued by SLDC constantly. However, required converter and laying of fiber optic cable is still pending. In last OCCM, MPPGCL informed that the procurement of optical cable & modem is still under tendering process. 9.7 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS & INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :- The long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication channel is discussed in detail:-

Sl No. Name of Sub Station Out from /Remark

Agenda of 68th OCCM of MP 26

Page 29: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

01 Gandhisagar HPS Out since last one month

02 132 KV Pichhore S/s Out since last one month

03 220 KV Nagra Out since more then one month

03 Satpura TPS Very intermittent

04 132 KV Waidhan S/s Very intermittent

05 Tons HPS Very intermittent

06 Bargi HPS Very intermittent

07 220 KV Rewa Very intermittent

08 Bansagar III HPS Very intermittent

09 220 KV Anuppur Very intermittent

101 132 KV Morwa Very intermittent

11 132 KV Chhindwara Very intermittent

12 220 KV Shahdol Very intermittent

MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs. MPPTCL, MPPGCL are requested to sort out rectification of above RTU/data channel on top most priority & arrange for alignment of PLCC Channel & identify/replace the outdoor equipments which injects the noise in the channel/system. [Action :- MPPGCL, MPPTCL] 9.8 TELEMETRY OF RAILWAY TSS SUB STATIONS:-

The telemetry of existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP.

In last two OCC Meetings, the railway representative informed that currently the telemetry of

Railway TSS is being extended to Railway Zonal office & further it will be integrated with SLDC. SLDC has constantly requested Railways in last various OCC Meetings to arrange a meeting with SLDC before initiating the integration of telemetry with SLDC .However no such meeting has been arranged by Railways so far. Further Railways has not yet submitted the architecture of telemetry scheme, details of equipments & protocol to be used. Railway is requested to provide present status of telemetry commissioning and arrange a meeting with the implementing agency in coordination with SLDC on topmost priority.

Agenda of 68th OCCM of MP 27

Page 30: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

9.9 INFORMATION REQUIRED FOR PMU ANALYTICS UNDER URTDSM PROJECT:- Under the “Unified Real Time Dynamic State Measurement” URTDSM Project, the analytics applications has been installed at SLDC MP for which the relay setting details are required for its configuration from all the sub-stations where PMU’s are installed and its adjacent sub-stations (list of S/s enclosed as Annexure-9.9.1). The format for submitting the required details is enclosed as Annexure-9.9.2.

The matter has been constantly being pursued by SLDC from last 4 OCC Meetings, however still the required information is pending to be provided by MPPTCL. The required data has been received from SGTPS, MPPGCL. MPPTCL is requested to furnish the data at the earliest.

[Action :- MPPTCL] 9.10 ENSURING AVAILABILITY OF AIR CONDITIONER AT WIDE BAND NODES:- The availability of air conditioner is essentially required in wide band communication rooms. Accordingly, SLDC is taking up the matter continuously for ensuring proper functioning of air conditioners in wideband communication rooms. However, it is reported that one no.air conditioner at 220KV Ratlam is faulty, power supply for air conditioner at 220 KV Indore(SZ) is not available, non-availability of air conditioner at 220 KV Bhopal & 220 KV Betul. MPPTCL & MPPGCL are requested to ensure availability & running condition of Air Conditioner at following wide band nodes already commissioned :-

MPPTCL Substations MPPGCL Substations 220 KV S/s Satna 220 KV S/s Katni 400 KV S/s Bhopal 400 KV S/s Bina 220 KV S/s Jabalpur 220 KV S/s Itarsi 400 KV S/s Indore 220 KV Chhindwara 220 KV Ratlam 220 KV Shivpuri 220 KV Indore (SZ) 220 KV Shujalpur 220 KV Neemuch 220 KV Gwalior 220 KV Bina 400 KV Pithampur 220 KV Barwaha 220 KV Seoni 220 KV Damoh 400 KV Nagda 400 KV Chhegaon 220 KV Bhopal 220 KV Rajgarh 220 KV Malanpur 220 KV Pithampur Indore chambal Indore SubLDC

Birsinghpur TPH Gandhi Sagar HPS Pench HPS

Agenda of 68th OCCM of MP 28

Page 31: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

132 KV Pichhore 220 KV Betul

[Action :- MPPTCL, MPPGCL] ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING :

As discussed in 66th OCCM & confirmed by entities the schedule & host of upcoming Operation and Coordination Committee meeting of MP is detailed as below:-

S.NO. OCC MEETING

OF MP HOSTING ENTITY

TENTATIVE DATE

1. 69TH MP-OCCM NHDC 26.04.2019 2. 70TH MP-OCCM MPPGCL 28.06.2019 3. 71ST MP-OCCM DISCOM(WZ) 22.08.2019

In view of the above hosting entity of 69th OCCM may confirm the same in the meeting. The venue of the 69th OCC meeting will be intimated later.

[Action :- All the concerned entities]

***********

Agenda of 68th OCCM of MP 29

Page 32: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

S. No. Particulars

1

1.1 Maximum Frequency 50.08 HzBetween 06.00 hrs & 07.00 Hrs on 16.12.18

50.1 HzBetween 13.00 hrs & 14.00 Hrs on 14.01.19

1.2 Minimum Frequency 49.79 HzBetween 07.00 hrs & 08.00 Hrs on 21.12.18

49.82 HzBetween 16.00 hrs & 17.00 Hrs on 21.01.19

1.3 Average Frequency 49.97 Hz 49.99 Hz

2

2.1 Maximum Frequency 50.25 HzAT 06.01.40 HRS ON 02.12.18

50.28 Hz AT 02.01:20 HRS ON 22.01.19

2.2 Minimum Frequency 49.67 HzAT 09.17:30 HRS ON 16.12.18

49.58 Hz AT 07.32:20. HRS ON 04.01.19

3 Percentage of time when frequency was :-

%age of time when frequency was Dec-18 Jan-19

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 12.68 10.69

3.7 Between 49.9 Hz and 50.05 Hz 77.03 70.26

3.8 Between 50.05 Hz AND 51.5 Hz 10.29 19.05

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Dec-18 Jan-19

Agenda of 68th OCCM of MP 30

Page 33: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

I S.

No. NAME OF THE TRANSMISSION LINE / (FINANCED BY)

TYPE OF CIR CUITS

ROUTE LENGTH CIRCUIT

KMS.

MONTH OF COMPLETION

DATE OF COMMI-SSIONING

A. 400 KV TRANSMISSION LINES

NIL 0 0

B. 220 KV TRANSMISSION LINES

1LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv S/s Suwasara (ADB-III Saving)

DCDS 4.382 17.528 June'2018 28.06.2018

2220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line with lilo of one ckt of line at Morena 220Kv s/s (ADB-III Saving)

DCDS 69.64 139.28 Aug'2018 19.08.2018

3220kV DCDS Khandwa(400 PGCIL) - Chhanera line(2x39.217) ADB-III (S)

DCDS 39.217 78.434 Oct'2018 30.10.2018

4LILO of both Ckt of Indore-II (jaitpura) - Ujjain 220kV line at Indore (PGCIL) 765 kV S/S (4x6.026) (UBI)

DCDS 6.03 24.104 Dec'2018charged on 10.12.2018

5220kV DCDS line from Julwaniya 400kV S/s in Sendhwa 220kV S/s (2x35.341) (GEC)

DCDS 35.34 70.682 Dec'2018

charged on 10.12.2018 (Ckt-I) & 25.12.2018 (2nd

ckt)

C. 132 KV TRANSMISSION LINES

1132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar for PS to 132kV RTS Ashoknagar (2x4.726)

DCDS 4.726 9.452 April'2018 11.04.2018

2

132kV DCSS line from 132kV Balwada - water pumping station No.2 of NVDA at village Mukhtyara (1x2.421) (Contribution Supervision Work)

DCSS 2.421 2.421 May'2018 05.05.2018

3132 kv DCDS Line Chichli - Udaypura (On 220Kv Tower) (ADB-III)

DCDS 46.860 93.720 June'2018 04.06.2018

4LILO of one ckt of Vidisha - Gairatganj line at 132kV Raisen(2x18.221) (ADB-III Saving)

DCDS 18.266 36.532 June'2018 06.06.2018

5LILO of both ckt. Of 132 kV Balaghat - Bhanegaon line at Balaghat/Kirnapur 400kV S/s.(2x0.774 + 4x1.216) (ADB-III)

DCDS 1.990 6.412 June'2018 13.06.2018

6132kV MACT (Bhopal) - Mugaliachhap line (4x20.2 + 2x10.536)

DCDS 30.736 101.872 June'201814.06.2018 (ckt-I) 22.06.2018 (ckt-II)

7132 kv DCSS Dewas-Agrod line (1x20.76) (ADB-III)

DCSS 21.600 21.600 June'2018 27.06.2018

82nd ckt of 132kV Maihar - Amarpatan 132kV line (GEC)

2nd ckt 26.000 26.000 June'2018 28.06.2018

9132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) (ADB-III Saving)

DCSS 17.200 35.800 June'2018 28.06.2018

10132Kv DCSS line from 400Kv s/s Katni - RTS Patwara (1x19.417) (CCW)

DCSS 19.414 19.414 June'2018 29.06.2018

11132kv Mugaliya Chaap - Sehore DCSS line (1x19.914 +2x1.140) (JICA)

DCSS 21.054 22.194 July'2018 20.07.2018

12132 kv DCSS Dewas-Barotha line (1x17.428) (JICA)

DCSS 17.428 17.428 July'2018 25.07.2018

13LILO of one ckt of 132kv Neemuch - Mandsore line at Budha 132KV Sub-station (2x21.503) (ADB-saving)

DCDS 43.006 43.006 July'2018 17.07.2018

14LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Suwasara 220KV S/s (4x1.423) (ADB-saving)

DCDS 1.423 5.692 July'2018 30.06.2018

15132kv DCDS Rajgarh - Khujner/Sindaota line (2x26.499+ 2x1.457) (ADB-saving)

DCDS 27.956 29.413 July'20181x26.499

30.07.2018

16132kv DCSS line Chhindwara-Saori line (1x31.23) (ADB-saving)

DCSS 31.23 31.23 July'2018 31.07.2018

ANNEXURE-2.2.5.i

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2018-19 (UP TO 31.01.2019)EHV TRANSMISSION LINES

Agenda of 68th OCCM of MP 31

Page 34: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

17132Kv DCSS 2 phase 2wire line from 132Kv s/s Shahpura(JBP) for 5MVA PS to RTS Bhitoni (1x5.968) (Contrib)

DCSS 5.968 5.968 July'2018 06.07.2018

18132Kv DCSS line PS III &IV for NVDA at Simrol (1x8.031) (Contrib only supervision)

DCSS 8.031 8.031 July'2018 19.07.2018%

19132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS to TSS Bhadanpur(1x13.06) (CCW)

DCSS 13.06 13.06 Oct'2018charged on 25.10.2018

20132 kv DCSS Badnagar - Chhayan Line (1x31) ADB-III

DCSS 20.969 20.969 Nov'2018

Part line 20.969 CktKm charged on

05.11.2018 by tapping

arrangement

21LILO of 132Kv Bhopal(220kV) - Bairagarh line at 132kV S/s Badwai (IT Park) (2x0.513) (CCW)

DCDS 1.026 1.026 Nov'2018charged on 30.11.2018

22132Kv DCDS line from 132Kv s/s Morwa for Power supply of 21.6MVA in phase manner on 132kV for RTS Singroli (1x1.809) (CCW)

DCDS 1.052 1.052 Nov'2018

1.052 CktKm charged upto

dead end tower 30.11.2018

23LILO of one ckt.(Balaghat-Katangi ckt) Of 132 kV Balaghat - Seoni/Katangi line at 132 kV S/s Waraseoni (2x4.699) (ADB-III)

DCDS 4.70 9.398 Dec'2018charged on 05.12.2018

24132kV DCSS Sagar - Rehli line (1x38.583)(ADB-III Saving)

DCSS 38.58 38.583 Dec'2018chjarged on 31.12.2018

25132kv DCSS Betul-Bisnoor/Masod line (1x35.19)(ADB-III Saving)

DCSS 35.19 35.19 Dec'2018charged on 06.12.2018

26LILO of 132 kv Satna-Maihar line at Satna-II S/s (2x11.047)(ADB-III Saving)

DCDS 0.500 0.5 Dec'2018Part line 0.50

CktKm charged on 05.12.2018

27132kV DCDS interconnector between Sailana 400kV S/s & Sailana 132kV S/s (2x18.344) (GEC)

DCDS 18.34 36.688 Dec'2018charged on 27.12.2018

282nd ckt of 132kV Alot - Sitamau 132kV line (43.136)(GEC)

2nd ckt 43.14 43.136 Dec'2018charged on 29.12.2018

29132kv Birsinghpur -Shahdol DCSS line (1x44.821) (Revised Estt. Sanc.no.0187dtd.05.09.2016) (ADB-III Saving)

DCSS ADB-saving 44.821 Jan'2019

302nd circuiting of 132kv Birsinghpur -Shahdol DCSS line (1x44.821) (Sanc.no.0204dtd.08.12.2017) (GEC)

2nd ckt GEC 44.821 Jan'2019

31

LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon (2x9.825)(132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s) (GEC)

DCDS 5.09 10.184 Jan'2019

LILO 1st ckt(2x5.092) charged on 24.01.2019

32132Kv DCSS 2 phase 2wire line from 132Kv s/s Barhi for PS to RTS Khanna Banjari(1x3.105) (CCW)

DCSS (2p2w)

3.11 3.105 Jan'2019charged on 28.01.2019

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE RATIO

(KV)

No.OF X-mer &

Cap.(MVA)

EFFECTIVE CAPACITY

MVA

MONTH OF COMPL-ETION

DATE OF COMMI-

SSIONING

A. 400 KV SUBSTATIONS

1400 KV sub-station Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer (Dist-BALAGHAT) ADB-III

400/132 1x100 100 Oct'2018

1x100 MVA charged on

29.10.2018 (132 KV side)

B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

1220/132kV S/s Suwasara (2x160MVA + 1x50) ADB-III S

220/132 kV1x1601x160

320June'2018Aug'2018

30.06.2018 20.08.2018 (2nd X-

mer)

2220 kV Indore N/Z (Upgradation) with 2x160MVA (UBI)

220/132 1x160 160 July'2018 30.07.2018 (1st

unit)

charged on 17.01.2019

EHV SUB - STATIONS

Agenda of 68th OCCM of MP 32

Page 35: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

3Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA +1x50MVA 132KV X-mer (50 MVA X-mer charged on 19.08.2018) (ADB-III S)

220/132 kV 2x160 320 Sept'2018

20.09.2018 & 30.09.2018 (from

132 KV) & 30.10.2018 (from

220KV)

4 220/132kV S/s Sendhwa (1x160MVA + 1x63) (GEC)

220/132 kV 1x160 160 Dec'2018charged on 10.12.2018

Agenda of 68th OCCM of MP 33

Page 36: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

C. 132 KV SUBSTATIONS

a. 132KV NEW SUBSTATIONS

1 Udaipura 132kv s/s with 1x40 MVA (ADB-III) 132/33 kV 1x40 40 April'201827.04.2018 (33)

04.06.2018 (132)

2Bilkishganj 132kv s/s with 1x50 MVA (ADB-III Saving)

132/33 kV 1x50 50 June'2018 29.06.2018

3Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) (ADB-III)

132/33 kV 1x40 40 July'201829.07.2018 (33kV)

& 05.12.2018 (132KV)

4Khujner/Sindaota 132kv s/s with 1x50 MVA (ADB-III Saving)

132/33 kV 1x50 50 July'2018 31.07.2018

5 Budha 132kV S/s with 1x50MVA (ADB-III Saving) 132/33 kV 1x50 50 July'2018 17.07.2018

6Bisnoor 132kv s/s with 1x50 MVA (ADB-III Saving)

132/33 kV 1x50 50 Aug'201821.08.2018 (33KV)

& 07.12.2018 (132KV)

7Patera 132kv s/s with 1x50 MVA (ADB-III Saving)

132/33 kV 1x50 50 Aug'2018 10.08.2018

8 Saori 132kV S/s with 1x50MVA (ADB-III Saving) 132/33 kV 1x50 50 Aug'2018 23.08.2018

9 Rehli 132kv s/s with 1x50 MVA (ADB-III S) 132/33 kV 1x50 50 Sept'201830.09.2018 &

31.12.2018 (132KV)

10Satna-II 132kV S/s with 2x50MVA (ADB-III Saving)

132/33 kV 2x50 100 Oct'2018

31.10.2018 (33 KV) &

05.12.2018(132KV)

11 Pipalpani 132kV S/s with 1x50 MVA (REC-II) 132/33 kV 1x50 50 Nov'2018charged on

27.11.2018 (from 33KV)

12IT Park Badwai 132kv s/s with 1x63 MVA (Bhopal) (CCW)

132/33 kV 1x63 63 Nov'2018charged on 27.11.2018

13Shahpura 132kv s/s with 1x40 MVA (Barwani) (UBI)

132/33 kV 1x40 40 Dec'2018charged on

04.12.2018 (33KV)

Agenda of 68th OCCM of MP 34

Page 37: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

S. No. NAME OF THE TRANSMISSION LINE CKT.KMS. PROGRESS IN %

A. 400 KV TRANSMISSION LINES

1400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-II) - Pithampur (2x69.968+ 2x68.626)

277.188 98%

2 400kV DCDS (Quad moose) line from Pithampur - Badnawar (2x70) 140 99%

3 LILO of 400kV Seoni - Bhilai SC line at 400kV S/s Balaghat/Kirnapur (2x3.375) 6.75 71%

4 LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s Badnawar (4x8.163) 33 70%

5 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s 137.32 36%

6400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at Sagar 400 kV S/s

56 53%

7 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s 179.474 26%

8 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s 84.528 68%

9 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s 53.2 38%

B. 220 KV TRANSMISSION LINES

1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 87%

2LILO of one ckt of 220 KV DCDS jabalpur-Amarkantak line & 132 KV Jabalpur - Maneri S/C at proposed 220 KV S/s Gorabazar JBP

76%

3 LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782) 66 11%

4 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 39%

5220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x5.6)

24.4 48%

6 220Kv DCDS Julwaniya- Kukshi (2X58) 116 18%

7 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 24%

8 LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s Daloda (2x12.2) 24.4 76%

9Part (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017)

77.728 55%

10 220kV DCDS line from Badnawar 400kV S/s - Kanwan 220kV S/s 63 77%

11 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s 62.78 63%

12 LILO of both ckt Nagda - Neemuch 220kV line at 400Kv S/s Mandsore(Sitamau) (2x22.427) 44.854 21%

13 220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV S/s 92.294 44%

14 220kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s 94 84%

15 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s 85.016 47%

16 220kV interconnector between Sailana 400kV S/s & Ratlam switching 220kV S/s 66.42 95%

17 2nd circuiting of Ratlam switching - Daloda 220kV DCSS line 72 42%

18 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) 7.02 68%

19 LILO of both ckt of Ujjain - Badod 220 kV line at Ujjain 400 Kv S/s (2x6.4+2x5.691) 24.182 50%

20 LILO of both ckt of Ujjain - Nagda 220 kV line at Ujjain 400 Kv S/s (2x2x11.766) 47.064 16%

21 220 kV Sabalgarh - Sheopur line (2x110) 220 21%

220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For interconnection of Solar PV Plant of RUMS) (2X43.426)

86.852

a) 220kV line from 220kV S/s RUMS at Gujarkhedi, Suwasara to tap point (2x8.813) 17.626 23.05.2017

b) Tap point to 400 kV S/s Sitamau (2x34.613) 69.226 90%

23 220kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X0.917) 1.834 100%(work completed)

24 220kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X2.572) 5.144 100%(work completed)

25 220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X0.917) 4.33 60%

132 KV TRANSMISSION LINES

1 132kv DCSS Gautampur -Depalpur line (1x19) 19 68%

2 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 48%

3 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209) 53.209 82%

4 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) 40 70%

5 132 kv DCSS Guna-Eshagarh line (1x72) 72 38%

6LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s Morwan (2x1)

2 0%

7 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 39%

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.01.2019

22

Annexure-2.2.5.ii

Agenda of 68th OCCM of MP 35

Page 38: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

8 LILO of 132 kv Jaora - Khachrod line at Bhesola 132 KV S/s (2x0.729) 1.458 60%

9LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

55.09 44%

10 132 KV Shyampur - Pilukhedi DCSS line (1x22.834) 22.834 33%

11 132 KV Gourjhamar - Deori DCSS line (1x27.493) 27.493 53%

122nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV S/s Sheopur. (2nd ckt- 34 cktkm+2x1+4x5)

56 40%

13 132kV DCDS line from 400 kV Ujjain to 132KV Vikram Udyogpuri (Narwar) (2x21.43) 42.86 23%

142nd circuiting of 132 kV Nepa- Dharni (MSEB line) & LILO for 132kV S/s Pipalpani (34.8 ckm 2nd ckt + 2x1.225)

37.25 93%

15 133 KV Datiya- Bhitarwar DCSS line (1x35.296) 35.296 31%

16 LILO of 132 KV Badod - Garoth line at 132KV S/s Shyamgarh 2.56 60%

17 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 38%

18 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 12%

19132 kv DCSS Badnagar - Chhayan Line (1x28.26) ADB-III (Part line 20.969 ckt charged on 05.11.2018 by tapping arrangement)

28.26 90%

20 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 52%

21 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) 14.8 17%

22 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 66%

23 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 24%

24 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 68%

25 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 42%

26 LILO of 132 kv Bhikangaon Khargone line at Biston 132 KV S/s (2x18.997) 38 27%

27 LILO of 132 kv Tikamgarh - Bijawar line at BadaMalhera132 KV S/s (2x1.675) 3.35 46%

28 LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at Chinour 27.364 cktkm charged on 04.08.2017)

0.216 97%

29 132kV DCSS line Chichli - Palohabada (1x25.606) 25.606 50%

30LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Bhanpura 220KV S/s (4x14)

56 97%

31LILO of 132 kv Satna-Maihar line at Satna-II S/s (2x11.047)(ADB-III Saving) (Part line 0.50 CktKm charged on 05.12.2018)

22.094 14%

32 132kv DCDS line Guna-Bhonra (2x21.394) 21 74%

33 132kv DCSS Damoh-Patera line (1x38) 38 97%

34LILO of 132kV Julwania-Sendhwa-Shahpura at 220 KV Sendhwa including 2nd ckt between 220 KV Sendhwa to 132 kV Sendhwa (2nd ckt-7.071+2x2.538)

12.147 59%

35 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line 95.69 54%

36132kV interconnector between Kanwan 220 kV S/s & Kanwan 132kV S/s (2x13.115+ 3.4 Cktkm 2nd ckt)

26 54%

37 132kV DCDS line from Kanwan 220 kV S/s - Teesgaon 132kV line 24 98%

38 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Jhabua 132kV line 68.8 85%

39LILO of both ckt of 132kV Neemuch - Mandsore at Mandsore(Sitamau) 400 kV S/s (2x71.464)

142.928 21%

40 LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon (2x9.825)(132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s)

19.65LILO 1st ckt(2x5.092) charged on 24.01.2019

412nd Circuiting of Sidhi 220 Mauganj 132 kV DCSS line (new line 6 km involved)(2x12+ 36 ckm 2nd ckt)

60 23%

42 LILO of both ckt of Ujjain - Tarana 132KV line at Ujjain 400 KV S/s (4x0.198) 0.792 14%

43 2nd circuiting of Mahidpur - Zarda 132KV line (23.26) 23.26 16%

44 2nd Circuiting of Susner - Jeerapur 132 kV DCSS line (30.256) 30.256 34%

45 LILO of both ckt of Ujjain 220 KV - Agar 132kV line at Makdon 132KV S/s (2x2x30.052) 120.208 8%

46 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x46.866) 74.866 97%

472nd ckt of 220 KV Mandideep to 132 KV Mandideep line & LILO for HEG (2nd ckt-6.5 + 2x2.5)

11.547%

48 132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS kaima1x26.938) 26.938 59%

49 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) 56.1 80%

50 132Kv DCSS 2 phase 2wire line from 132Kv s/s Beohari for PS to RTS Beohari (1x20.278) 20.278 20%

51 132Kv DCSS 2 phase 2wire line from 220Kv s/s Sidhi for PS to RTS Marwasgram(1x51.341) 51.341 40%

Agenda of 68th OCCM of MP 36

Page 39: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

52132Kv DCSS 2 phase 2wire line from 132Kv s/s Dongrital for PS to RTS Gajra Bahara (1x17.435)

17.435 9%

53132Kv DCSS 2 phase 2wire line from 132 Kv s/s Nowgaon for PS to RTS Harpalpur (1x49.851)

49.851 44%

54132Kv DCSS 2 phase 2wire line from 132Kv s/s Prithvipur to RTS Niwadi for p/s to RTS Niwadi (1x22.712)

22.712 36%

55 132 KV line 2 phase 2 wire Nainpur - RTS Nainpur line 4.04 30%

56 132 KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s 82.659 48%

57 132Kv DCSS 2 phase 2wire line Nainpur Ghansor line (1x34.413) 34.413 5%

58132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Linga from 220 KV S/s Chhindwara

8.989 74%

59132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Sausar from 132 KV S/s Boregaon

17.413 25%

60 2nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTS Mungaoli RVNL 38 100%

61 132Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line 12.188 15%

62132 KV 2 phase 2wire DCSS line from 132 KV S/s Malhargarh to RTS Sindpan (earliar 132 KV 2 phase 2wire DCSS Mandsore - RTS Mandsore (Sindpan) line)

14.86 22%

63 132Kv 2ph 2 wire DCSS Jaora - RTS Jaora line 1.3 95%

64 132Kv 2ph 2 wire line from 220KV S/s - Mandla - RTS Mandla Fort 8.102 12%

65132Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river Narmada (Line-II)(1x24.152)

24.152 63%

66132Kv DCSS line from 220kV s/s Rajgarh(Biora) - Birampura Pumping station Distt- Rajgarh of water Resources Department. (1x6.79+4x1.007)

10.818 100%

S.No.

NAME OF THE SUBSTATIONEFFECTIVE CAPACITY

MVA

A. 400 KV SUBSTATIONS

1 400 KV sub-station Kirnapur with 2x100MVA 400/220 KV X-mer+ 1X40 MVA X-mer 20080% 1x100 MVA charged on 29.10.2018 (132 KV side)

2 400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer 630 80%

3 400 KV sub-station Mandsore with 2x315MVA 400/220 KV X-mer + 2x160 MVA 630 9%

4 400 KV sub-station Sagar with 2x315MVA 400/220 KV X-mer 630 50%

5 400 KV sub-station Ujjain with 2x315MVA 400/220 KV X-mer+ 2x160 630 17%

B. a 220 KV SUBSTATIONS

1 Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA 160 36%

2 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA 160 49%

3 Adampur 220/33kv S/s 2x50MVA 100 29%

4 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA 160 18%

5 220/132kV S/s Sailana (2x160MVA + 1x63) 320 54%

6 220/132kV S/s Jaora (Upgradation) (2x160MVA + 1x40) 320 57%

7 220/132kV S/s Kanwan (Upgradation) (1x160MVA + 1x63) 160 58%

8 220/132kV S/s Gudgaon (1x160MVA + 1x63) 16058%

63 MVA charged on 24.01.2019

9 220/132kV S/s Ratangarh (2x160MVA + 1x63) 320 13%

10 Sheopurkala 220kv S/s with 2x160MVA+ 1x63MVA 320 2%

11 33/220 Kv Pooling Sub-station at Barsitadesh 3x100MVA 300 100% (work completed)

12 33/220kV Pooling Sub-station at Ramnagar 3x100 300 83%

13 33/220kV Pooling Sub-station at Badwar (3x100) 300 25%

C. 132 KV SUBSTATIONS

(a) NEW SUBSTATIONS

1 Biston 132kv s/s1x40 MVA 40 26%

2 Shamgarh 132kv s/s1x40 MVA 40 26%

3 Teesgaon 132kv s/s 1x40MVA 40 56%

4 Bada malehra 132kv s/s 1x40MVA 40 42%

5 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) 40 46%

6 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) 40 59%

7 Khimlasa 132kv s/s 1x40 MVA 40 26%

8 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) 40 32%

9 Narsinghgarh 132kv s/s with 1x40 MVA 40 7%

10 Silvani 132kv s/s with 1x40 MVA 40 50%

11 Palohabada 132kv s/s with 1x50 MVA 50 49%

12 Bhesola 132kV S/s with 1x50 MVA 50 16%

13 Deori 132kV S/s with 1x50 MVA 50 4%

14 Pilukhedi 132kV S/s with 1x50 MVA 50 36%

15 Vikram Udyogpuri 132kV S/s with 1x63 MVA 63 29%

16 Bhitarwar 132kV S/s with 1x50 MVA 50 45%

17 Morwan 132kV S/s with 1x40 MVA 40 20%

Agenda of 68th OCCM of MP 37

Page 40: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Dec-18 Jan-19 Dec-18 Jan-19

Commissinary HQ 23:51 23:54 23:44 23:38

District HQ 23:53 23:54 23:51 23:51

Tehsil HQ 23:48 23:49 23:36 23:42

Rural -Mixed 23:32 23:34 23:11 23:29

Rural -DLF 23:32 23:34 23:22 23:32

Rural -Irrigation 9:58 9:56 9:47 9:49

Dec-18 Jan-19 Dec-18 Jan-19

Commissinary HQ 23:49 23:57 23:48 23:49

District HQ 23:56 23:56 23:53 23:54

Tehsil HQ 23:50 23:51 23:44 23:47

Rural -3Phase 23:45 23:53 23:22 23:32

Rural -1Phase 23:45 23:52 23:33 23:39

Total Rural 9:53 9:55 9:53 9:54

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Agenda of 68th OCCM of MP 38

Page 41: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Annexure-2.3.ii

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR

(For which group to be allocated) JABALPUR REGION

Name of EHV Substation Name of 33KV feeder

Date of commission-ing of feeder

bay

Date of commission-ing of feeder

400KV

400 KV Kirnapur 33KV Hatta 33KV Kirnapur 33KV Rajegaon

11.11.2018 12.11.2018 12.11.2018

11.11.2018 12.11.2018 12.11.2018

220KV

220 KV Seoni 33KV Karirat 21.08.2007 06.01.2016

132KV

132 KV Waraseoni

33KV Dongarmali 33KV Waraseoni 33KV Kochevahi 33KV Khairlanji

10.12.2018 06.02.2018 06.12.2018 06.12.2018

10.12.2018 06.02.2018 06.12.2018 06.12.2018

132 KV Nainpur

33KV Keolari-II

22.11.2018 28.03.2018

132 KV Saori

33KV Saori 33KV Lawaghogri 33KV Mujawar 33KV Bhutai

05.10.2018 05.10.2018 06.11.2018 06.11.2018

12.11.2018 13.11.2018 12.11.2018 30.01.2019

REWA REGION

Name of EHV Substation Name of 33KV feeder

Date of commission-ing of feeder

bay

Date of commission-ing of feeder

NIL

SAGAR REGION

Name of EHV Substation Name of 33KV feeder

Date of commission-ing of feeder

bay

Date of commission-ing of feeder

NIL

E:\E-DRIVE\OCC\OCC- 68th meeting_\JBP.doc

Agenda of 68th OCCM of MP 39

Page 42: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

ANNEXURE-2.3.ii

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)

INDORE REGION

UJJAIN REGION

E:\E-DRIVE\OCC\OCC- 68th meeting_\IND-.doc

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of commissioning

of feeder 220KV

220KV Pithampur (Sec-III)

33KV Mittal Corp-2 33KV SRF

08.05.2011 03.09.2013

08.05.2011 03.09.2013

132KV

132KV Chandrawatiganj

33KV Chandrawatiganj

27.04.2015

27.04.2015

132KV Electronic

33KV AKVN (Namkeen Cluster)

31.03.2016

31.03.2016

132KV GhataBillod

33KV Kesoor-II

19.10.2014

19.10.2014

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of Charging of feeder

220KV

220KV Suwasra

33KV Kantiya feeder

01.07.2018

28.08.2018 132KV

132KV Agar

33KV Agar Town-II

03.12.2012

24.05.2018

132KV Arniyakalan

33KV Designco Manufacture & Exporter (5MW Solar Power Plant)

01.05.2018

01.05.2018

132KV Zarda

33KV Semliya 18.11.2017 20.04.2018

132KV Khachrod

33KV Kamthana 31.01.2018 21.12.2018

132KV Budha

33KV Sanjeet feeder 18.07.2018 17.08.2018

Agenda of 68th OCCM of MP 40

Page 43: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

ANNEXURE-2.3.ii

LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL (For which group to be allocated)

BHOPAL REGION

Name of EHV Substation

Name of 33KV feeder

Date of charging of feeder bay

Date of charging of feeder

132 KV 132 KV Tamot 33 KV Obedullaganj

05.05.2016

02.02.2017

132 KV Lateri 33 KV Aligarh Kotra 33 KV Madankhedi 33 KV Anantpura

28.08.2017 27.06.2017 15.06.2017

20.12.2017 05.01.2018 22.05.2018

132 KV Salamatpur 33 KV Dewanganj 33 KV Aamkheda

04.12.2017 04.12.2014

04.12.2017 04.12.2017

132 KV Udaipura 33 KV Thaladigawan 33 KV Boras

26.04.2018 04.06.2018

04.06.2018 06.06.2018

GWALIOR REGION

Name of EHV Substation

Name of 33KV feeder

Date of charging of feeder bay

Date of charging of feeder

Nil E:\E-DRIVE\OCC\OCC- 68th meeting_\BPL.doc

Agenda of 68th OCCM of MP 41

Page 44: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

1 400315MVA CGL-I Xmer at 400KV S/s Julwaniya

01-Mar-19 09:00 01-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

2 400315MVA ICT-IV at 400KV S/s Indore

05-Mar-19 09:00 08-Mar-19 18:00 ContinueFor transformer maintenance and replacement of isolator under PSDF

3 400315MVA CGL-I Xmer at 400KV S/s Chhegaon

05-Mar-19 10:00 05-Mar-19 18:00 Daily For Pre monsoon maintenance and testing work

4 400315MVA Xmer-IV at 400KV S/s Nagda

05-Mar-19 08:00 06-Mar-19 17:00 Continue For Pre monsoon maintenance and testing work

5 400315MVA CGL-I Xmer at 400KV S/s Chhegaon

06-Mar-19 10:00 06-Mar-19 18:00 Daily For Pre monsoon maintenance and testing work

6 400315MVA CGL-II Xmer at 400KV S/s Chhegaon

07-Mar-19 10:00 07-Mar-19 18:00 Daily For Pre monsoon maintenance and testing work

7 400315MVA CGL-II Xmer at 400KV S/s Chhegaon

08-Mar-19 10:00 08-Mar-19 18:00 Daily For Pre monsoon maintenance and testing work

A- 400 KV TRANSFORMERS

ANNEXURE-3.2

PROPOSED SHUTDOWN OF TRANSMISSION ELEMENTS FOR THE PERIOD FROM 01-03-19 TO 30-04-19

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

8 400315MVA CGL Xmer-III at 400KV S/s Bina

11-Mar-19 08:30 14-Mar-19 17:00 Continue For Pre-monsoon maintenance & attending Oil leakage

9 400315MVA ICT-III at 400KV S/s Indore

11-Mar-19 09:00 14-Mar-19 18:00 ContinueFor transformer maintenance and replacement of isolator under PSDF

10 400315MVA ICT-I at 400KV S/s Pithampur

25-Mar-19 10:00 26-Mar-19 17:00 Continue For Pre monsoon maintenance and testing work

11 400315MVA ICT-II at 400KV S/s Indore

26-Mar-19 09:00 29-Mar-19 18:00 ContinueFor transformer maintenance and replacement of line isolator under PSDF

12 400315MVA ICT-II at 400KV S/s Pithampur

27-Mar-19 10:00 28-Mar-19 17:00 Continue For Pre monsoon maintenance and testing work

13 400315MVA Xmer-I at 400KV S/s Bhopal

03-Apr-19 08:00 03-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

14 400315MVA Xmer-I at 400KV S/s Bhopal

04-Apr-19 08:00 04-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

15 400315MVA CGL-I Transformer at 400KV S/s Ashta

04-Apr-19 09:00 04-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

16 400315MVA BHEL Xmer at 400KV S/s Katni

04-Apr-19 09:00 05-Apr-19 17:00 Continue For Pre monsoon maintenance and testing work

17 400315MVA CGL-I Transformer at 400KV S/s Ashta

05-Apr-19 09:00 05-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

Agenda of 68th OCCM of MP 42

Page 45: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

18 400315MVA Xmer-II at 400KV S/s Bhopal

08-Apr-19 08:00 08-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

19 400315MVA CGL-II Transformer at 400KV S/s Ashta

08-Apr-19 09:00 08-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

20 400315MVA TELK Xmer at 400KV S/s Katni

08-Apr-19 09:00 09-Apr-19 17:00 Continue For Pre monsoon maintenance and testing work

21 400315MVA Xmer-II at 400KV S/s Bhopal

09-Apr-19 08:00 09-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

22 400315MVA CGL-II Transformer at 400KV S/s Ashta

09-Apr-19 09:00 09-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

23 400315MVA Xmer-III at 400KV S/s Bhopal

10-Apr-19 08:00 10-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

24 400315MVA Xmer-III at 400KV S/s Bhopal

11-Apr-19 08:00 11-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

1 40050MVAR Reactor (make-CGL) at 400KV S/s Chhegaon

02-Mar-19 10:00 02-Mar-19 18:00 Daily For Pre monsoon maintenance and testing work

B- 400 KV REACTORS

2 40050MVAR Reactor (make-CGL) at 400KV S/s Julwaniya

02-Mar-19 09:00 02-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

3 40050MVAR Line Reactor-I at 400KV S/s Bina

15-Mar-19 08:30 15-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

4 40050MVAR Line Reactor-II at 400KV S/s Bina

16-Mar-19 08:30 16-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

5 40050MVAR Bus Reactor at 400KV S/s Bina

18-Mar-19 08:30 18-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

6 40080MVAR Reactor 1 at 400KV S/s Bhopal

22-Mar-19 08:00 30-Mar-19 18:00 Continue For attending oil leakage

7 400 50 Mvar Raj-II Line Reactor at 400KV S/s Nagda27-Mar-19 08:00 27-Mar-19 17:00 Daily For attending oil leakage

8 400 50 Mvar bus reactor-I at 400KV S/s Nagda27-Mar-19 13:00 27-Mar-19 18:00 Daily For attending oil leakage

9 400 2X50 MVAR BUS REACTOR 29-Mar-19 10:00 29-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

Agenda of 68th OCCM of MP 43

Page 46: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

10 400400/220KV 125 MVAR BHEL REACTOR at 400KV S/s Katni

02-Apr-19 09:00 02-Apr-19 17:00 Daily For Pre monsoon maintenance and testing work

11 400400KV Line Reactor- I (BHEL) at 400KV S/s Ashta

11-Apr-19 09:00 11-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

12 40080MVAR Reactor 2 at 400KV S/s Bhopal

22-Apr-19 08:00 30-Apr-19 18:00 Continue For attending oil leakage

13 400400KV Line Reactor- II (BHEL) at 400KV S/s Ashta

22-Apr-19 09:00 22-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

14 400400KV Bus Reactor (CGL) at 400KV S/s Ashta

24-Apr-19 09:00 24-Apr-19 18:00 Daily For Pre monsoon maintenance and testing work

1 400 400KV Indore-Nagda 01-Mar-19 09:00 03-Mar-19 18:00 ContinueFor replacement of line isolator under isolator under PSDF scheme , 400KV Nagda line will be kept OFF

400KV Bhopal-II Tie CB at PG

C- 400 KV FEEDER & BAYS OF 400 KV- S/S-

2 400400KV Bhopal-II Tie CB at PG Itarsi

04-Mar-19 08:00 20-Mar-19 08:00 Continue Replacement of Tie CB and Tie CT under PSDF Scheme.

3 400 400KV Julwaniya-Chhegaon 11-Mar-19 09:00 11-Mar-19 17:00 Daily For bay equipment maintenance and testing work

4 400 400KV Julwaniya-SSTPS 12-Mar-19 09:00 12-Mar-19 17:00 Daily For bay equipment maintenance and testing work

5 400400KV Bhopal-II Line at PG Itarsi

20-Mar-19 08:00 20-Mar-19 18:00 DailyTesting work after replacement of CB and CT.Line will be under shutdown

6 400 400KV Indore-ISP-II 22-Mar-19 09:00 25-Mar-19 18:00 ContinueFor replacement of line isolator under isolator under PSDF scheme , 400KV ISP -II line will be kept OFF

7 400 400KV Nagda-Rajgarh-I 29-Mar-19 08:00 29-Mar-19 17:00 Daily For bay equipment maintenance and testing work

8 400400KV Bus-Transfer at 400KV S/s Julwania

01-Apr-19 09:00 01-Apr-19 17:00 Daily For bay equipment maintenance and testing work

9 400400KV Main bus -I at 400KV S/s Indore

02-Apr-19 09:00 04-Apr-19 18:00 ContinueFor replacement of bus-I P.G isolator of ISP-II. 400 KV ISP-II will be on TBC.

10 400400KV ISP -II at 400KV S/s Indore

02-Apr-19 09:00 04-Apr-19 18:00 ContinueFor replacement of bus-I P.G isolator of ISP-II. 400 KV ISP-II will be on TBC.

11 400400KV Main bus-I at 400KV S/s Bina

03-Apr-19 09:00 20-Apr-19 17:00 ContinueFor 400KV PG Isolators replacement work of 315MVA X-mer -I,II & III & 400KV Bhopal-I & II.

Agenda of 68th OCCM of MP 44

Page 47: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

12 400 400KV Pithampur-S.S.T.P.S.-I 08-Apr-19 00:00 08-Apr-19 00:00 Daily For bay equipment maintenance and testing work

13 400 400KV Chhegaon-Julwaniya 08-Apr-19 10:00 08-Apr-19 18:00 Daily For bay equipment maintenance and testing work

14 400400KV Main bus -II at 400KV S/s Indore

09-Apr-19 09:00 11-Apr-19 18:00 ContinueFor replacement of bus-II P.G isolator of ICT-III. ICT-III will be on TBC.

15 400400KV ICT -III at 400KV S/s Indore

09-Apr-19 09:00 11-Apr-19 18:00 ContinueFor replacement of bus-II P.G isolator of ICT-III. ICT-III will be on TBC.

16 400 400KV Pithampur-S.S.T.P.S.-II 09-Apr-19 00:00 09-Apr-19 00:00 Daily For bay equipment maintenance and testing work

17 400400KV Chhegaon-Malwa (SSTPH)

09-Apr-19 10:00 09-Apr-19 18:00 Daily For bay equipment maintenance and testing work

18 400 400KV Pithampur-P.G.C.I.L.-I 10-Apr-19 00:00 10-Apr-19 00:00 Daily For bay equipment maintenance and testing work

19 400 400kV Ashta- Satpura-I 11-Apr-19 09:00 11-Apr-19 18:00 Daily For bay equipment maintenance and testing work

20 400 400KV Pithampur-P.G.C.I.L.-II 11-Apr-19 00:00 11-Apr-19 00:00 Daily For bay equipment maintenance and testing work

21 400 400kv Katni- Birsingpur-I 11-Apr-19 09:00 11-Apr-19 17:00 Daily For bay equipment maintenance and testing work

22 400 400kV Ashta- Satpura-I 12-Apr-19 09:00 12-Apr-19 18:00 Daily For bay equipment maintenance and testing work

23 400 400kv Katni- Birsingpur-II 12-Apr-19 09:00 12-Apr-19 17:00 Daily For bay equipment maintenance and testing work

24 400 400KV Bhopal BDTCL-I 15-Apr-19 08:00 15-Apr-19 08:00 Daily For bay equipment maintenance and testing work

25 400 400kv Katni- Damoh 15-Apr-19 09:00 15-Apr-19 17:00 Daily For bay equipment maintenance and testing work

26 400400KV Bhopal - Power grid Itarsi-II

16-Apr-19 08:00 16-Apr-19 18:00 Daily For bay equipment maintenance and testing work

27 400400 KV Main bus -II at 400KV S/s Indore

16-Apr-19 09:00 18-Apr-19 18:00 ContinueFor replacement of bus-II P.G isolator of ISP-I.400 KV ISP-I will be on TBC.

28 400400 KV ISP -I at 400KV S/s Indore

16-Apr-19 09:00 18-Apr-19 18:00 ContinueFor replacement of bus-II P.G isolator of ISP-I.400 KV ISP-I will be on TBC.

29 400400KV Bhopal - Power grid Itarsi-I

18-Apr-19 08:00 18-Apr-19 18:00 Daily For bay equipment maintenance and testing work

Agenda of 68th OCCM of MP 45

Page 48: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

30 400400KV Main Bus No- I at 400KV S/s Katni

18-Apr-19 09:00 18-Apr-19 17:00 Daily For bay equipment maintenance and testing work

31 400 400kV Ashta- Satpura-II 22-Apr-19 09:00 22-Apr-19 18:00 Daily For bay equipment maintenance and testing work

32 400400KV Main Bus No- II at 400KV S/s Katni

22-Apr-19 09:00 22-Apr-19 17:00 Daily For bay equipment maintenance and testing work

33 400 400kV Ashta- Satpura-II 23-Apr-19 09:00 23-Apr-19 18:00 Daily For bay equipment maintenance and testing work

34 400400 KV Main bus -I at 400KV S/s Indore

23-Apr-19 09:00 25-Apr-19 18:00 ContinueFor replacement of bus-I P.G isolator of ICT-IV.ICT-IV will be on TBC.

35 400400 KV ICT -IV at 400KV S/s Indore

23-Apr-19 09:00 25-Apr-19 18:00 ContinueFor replacement of bus-I P.G isolator of ICT-IV.ICT-IV will be on TBC.

36 400400kV Bus Tie at 400KV S/s Ashta

25-Apr-19 09:00 25-Apr-19 18:00 Daily For bay equipment maintenance and testing work

37 400400kV Bus Coupler at 400KV S/s Ashta

26-Apr-19 09:00 26-Apr-19 18:00 Daily For bay equipment maintenance and testing workAshta

38 400400kV Main Bus no. 1 & CVT set No.1 at 400KV S/s Ashta

27-Apr-19 09:00 27-Apr-19 18:00 Daily For bay equipment maintenance and testing work

39 400400 kV Main Bus no. 2 & CVT Set No.2 at 400KV S/s Ashta

29-Apr-19 09:00 29-Apr-19 18:00 Daily For bay equipment maintenance and testing work

40 400400 kV Aux. Bus at 400KV S/s Ashta

30-Apr-19 09:00 30-Apr-19 18:00 Daily For bay equipment maintenance and testing work

1 220 220KV Mahalgaon-PGCIL-I 07-Mar-18 09:00 07-Mar-18 17:00 Daily For bay equipment maintenance and testing work

2 220 220KV Pandhurna-Kamleshwar 02-Mar-19 10:00 02-Mar-19 17:00 Daily For bay equipment maintenance and testing work

3 220220KV Interconnecter-I at 220KV S/S Pithampur Sect.-III 04-Mar-19 09:00 04-Mar-19 17:00 Daily For bay equipment maintenance and testing work

4 220 220KV Malanpur-PGCIL-I 05-Mar-19 10:00 05-Mar-19 17:00 Daily For bay equipment maintenance and testing work

5 220 220KV Mehgaon-Adani 05-Mar-19 09:00 05-Mar-19 17:00 Daily For bay equipment maintenance and testing work

6 220 220KV Shivpuri-Bina MPPTCL 05-Mar-19 09:00 05-Mar-19 17:00 Daily For bay equipment maintenance and testing work

D- 220 KV FEEDER & BAYS-

Agenda of 68th OCCM of MP 46

Page 49: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

7 220 220KV Ujjain-PGCIL-I 05-Mar-19 09:00 05-Mar-19 17:00 Daily For bay equipment maintenance and testing work

8 220 220KV Damoh-PGCIL-I 05-Mar-19 09:00 05-Mar-19 17:00 Daily For bay equipment maintenance and testing work

9 220 220KV Malanpur-PGCIL-II 06-Mar-19 10:00 06-Mar-19 17:00 Daily For bay equipment maintenance and testing work

10 220 220KV Mehgaon-Auraiya 06-Mar-19 09:00 06-Mar-19 17:00 Daily For bay equipment maintenance and testing work

11 220 220KV Ujjain-PGCIL-II 06-Mar-19 09:00 06-Mar-19 17:00 Daily For bay equipment maintenance and testing work

12 220 220KV ICT-I at 220KV S/s Sukha 06-Mar-19 9:00 08-Mar-19 17:00 Continue For replacement of equipment (Isolator) under PSDF scheme

13 220 220KV Damoh-PGCIL-II 06-Mar-19 09:00 06-Mar-19 17:00 Daily For bay equipment maintenance and testing work

14 220 220KV Barwaha-Omkareshwar 07-Mar-19 10:00 07-Mar-19 17:00 Daily For bay equipment maintenance and testing work14 220 220KV Barwaha-Omkareshwar 07-Mar-19 10:00 07-Mar-19 17:00 Daily For bay equipment maintenance and testing work

15 220160MVA BHEL Xmer-I at 400KV S/s Julwaniya

07-Mar-19 09:00 07-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

16 220 220KV Mahalgaon-PGCIL-II 08-Mar-19 09:00 08-Mar-19 17:00 Daily For bay equipment maintenance and testing work

17 220 220KV Shivpuri-Bina PGCIL 08-Mar-19 09:00 08-Mar-19 17:00 Daily For bay equipment maintenance and testing work

18 220220KV Interconnecter-II at 220KV S/S Pithampur Sect.-III

08-Mar-19 09:00 08-Mar-19 17:00 Daily For bay equipment maintenance and testing work

19 220100MVA Transformer at 220KV S/s Indore East (Bicholi )

08-Mar-19 09:00 08-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

20 220 220KV Nimrani-Maheshwar-II 08-Mar-19 10:00 08-Mar-19 17:00 Daily For bay equipment maintenance and testing work

21 220160MVA BHEL Xmer-II at 400KV S/s Julwaniya

08-Mar-19 09:00 08-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

22 220 220KV Damoh-Tikamgarh 08-Mar-19 09:00 08-Mar-19 17:00 Daily For bay equipment maintenance and testing work

23 220 220KV Malanpur-Auraiya 11-Mar-19 10:00 11-Mar-19 17:00 Daily For bay equipment maintenance and testing work

Agenda of 68th OCCM of MP 47

Page 50: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

24 220 220KV Shivpuri-Sabalgarh-I 11-Mar-19 09:00 11-Mar-19 17:00 Daily For bay equipment maintenance and testing work

25 220160MVA BBL Xmer-II at 400KV S/s Chhegaon

11-Mar-19 10:00 11-Mar-19 18:00 Daily For Pre monsoon maintenance and testing work

26 220 220KV Damoh-Katni 11-Mar-19 09:00 11-Mar-19 17:00 Daily For bay equipment maintenance and testing work

27 220 220KV Malanpur-Morena-I 12-Mar-19 10:00 12-Mar-19 17:00 Daily For bay equipment maintenance and testing work

28 220160MVA X-mer-I At 220KV s/s Mehgaon

12-Mar-19 09:00 12-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

29 220220KV PGCIL No-II at 220KV S/S Pithampur Sect.-III

12-Mar-19 09:00 12-Mar-19 17:00 Daily For bay equipment maintenance and testing work

30 220220KV ICT-II at 220KV S/s Sukha

12-Mar-19 9:00 14-Mar-19 17:00 ContinueFor replacement of equipment (CB & Isolator) under PSDF scheme

31 220 220KV Seoni - PGCIL -I 12-Mar-19 09:00 12-Mar-19 17:00 Daily For bay equipment maintenance and testing work31 220 220KV Seoni - PGCIL -I 12-Mar-19 09:00 12-Mar-19 17:00 Daily For bay equipment maintenance and testing work

32 220 220KV Damoh-PGCIL-III 12-Mar-19 09:00 12-Mar-19 17:00 Daily For bay equipment maintenance and testing work

33 220 220KV Malanpur-Morena-II 13-Mar-19 10:00 13-Mar-19 17:00 Daily For bay equipment maintenance and testing work

34 220160MVA X-mer-II At 220KV s/s Mehgaon

13-Mar-19 09:00 13-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

35 220160MVA BHEL Xmer-III at 400KV S/s Chhegaon

13-Mar-19 10:00 13-Mar-19 18:00 Daily For Pre monsoon maintenance and testing work

36 220 220KV Julwaniya-Omkareshwar 13-Mar-19 09:00 13-Mar-19 17:00 Daily For bay equipment maintenance and testing work

37 220 220KV Chhindwara-PGCIL-I 13-Mar-19 10:00 13-Mar-19 16:00 Daily For bay equipment maintenance and testing work

38 220 220KV Mahalgaon-Bina 14-Mar-19 09:00 14-Mar-19 17:00 Daily For bay equipment maintenance and testing work

39 220 220KV Shivpuri-Sabalgarh-II 14-Mar-19 09:00 14-Mar-19 17:00 Daily For bay equipment maintenance and testing work

Agenda of 68th OCCM of MP 48

Page 51: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

40 220 220KV Chhindwara-PGCIL-II 14-Mar-19 10:00 14-Mar-19 16:00 Daily For bay equipment maintenance and testing work

41 220 220KV Sagar-PGCIL-I 14-Mar-19 09:00 14-Mar-19 17:00 Daily For bay equipment maintenance and testing work

42 220 220KV Mahalgaon-Datia 15-Mar-19 09:00 15-Mar-19 17:00 Daily For bay equipment maintenance and testing work

43 220 220KV Datia- Gwalior 15-Mar-19 09:00 15-Mar-19 17:00 Daily For bay equipment maintenance and testing work

44 220220KV Bus transfer at 400KV S/s Indore

15-Mar-19 09:00 16-Mar-19 18:00 ContinueFor replacement of isolator under PSDF scheme, Nagda line will be kept OFF

45 2203x40MVA CGL Xmer at 220KV S/s Nepanagar

15-Mar-19 10:00 15-Mar-19 18:00 Daily For Pre monsoon maintenance and testing workS/s Nepanagar

46 220 220KV Seoni - PGCIL -II 15-Mar-19 09:00 15-Mar-19 17:00 Daily For bay equipment maintenance and testing work

47 220 220KV Sagar-PGCIL-II 15-Mar-19 09:00 15-Mar-19 17:00 Daily For bay equipment maintenance and testing work

48 220 220KV Malanpur-ADANI 16-Mar-19 10:00 16-Mar-19 17:00 Daily For bay equipment maintenance and testing work

49 220 220KV Datia- Bina 18-Mar-19 09:00 18-Mar-19 17:00 Daily For bay equipment maintenance and testing work

50 220160MVA Xmer-I EMCO at 220KV S/s Shivpuri

18-Mar-19 09:00 18-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

51 220220KV Bus I and 200KV Barwaha -I at 400KV S/s Indore

18-Mar-19 09:00 19-Mar-19 18:00 ContinueFor replacement of isolator under PSDF scheme, Barwaha-I line will be kept OFF

52 220220KV Dhar at 220KV S/S Pithampur Sect.-III

18-Mar-19 09:00 18-Mar-19 17:00 Daily For bay equipment maintenance and testing work

53 220220KV PGCIL at 220KV S/S Dhar

18-Mar-19 09:00 18-Mar-19 17:00 Daily For bay equipment maintenance and testing work

Agenda of 68th OCCM of MP 49

Page 52: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

54 220160MVA Xmer-II BHEL at 220KV S/s Shivpuri

22-Mar-19 09:00 22-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

55 220160MVA No-I at 220KV S/S Pithampur Sect.-III

23-Mar-19 09:00 23-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

56 220160MVA X-Mer-I at 220KV S/S Datia

25-Mar-19 09:00 25-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

57 220160MVA Transformer-II at 220KV S/s Jetpura

25-Mar-19 09:00 25-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

58 220160MVA X-Mer-II at 220KV S/S Datia

26-Mar-19 09:00 26-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

59 220160MVA No-II at 220KV S/S Pithampur Sect.-III

26-Mar-19 09:00 26-Mar-19 17:00 Daily For Pre monsoon maintenance and testing work

60 220220KV Bus I and 200KV Barwaha -II at 400KV S/s Indore

30-Mar-19 09:00 31-Mar-19 18:00 ContinueFor replacement of isolator under PSDF scheme, Barwaha-II line will be kept OFF

61 220220KV Interconnecter-I at 400KV S/s Pithampur

01-Apr-19 00:00 01-Apr-19 00:00 Daily For bay equipment maintenance and testing work400KV S/s Pithampur

62 220220KV Interconnecter-II at 400KV S/s Pithampur

02-Apr-19 00:00 02-Apr-19 00:00 Daily For bay equipment maintenance and testing work

63 220160MVA No-III at 220KV S/S Pithampur Sect.-III

02-Apr-19 00:00 02-Apr-19 00:00 Daily For Pre monsoon maintenance and testing work

64 220 220KV Julwaniya-Nimrani 02-Apr-19 09:00 02-Apr-19 17:00 Daily For bay equipment maintenance and testing work

65 220 220KV ICT-I at 220KV S/s Sukha 02-Apr-19 9:00 04-Apr-19 17:00 Continue For replacement of equipment (Isolator) under PSDF scheme

66 220 220KV Mehgaon-Adani 03-Apr-19 09:00 03-Apr-19 17:00 Daily For bay equipment maintenance and testing work

67 220 220KV Pithampur-Badnagar 03-Apr-19 00:00 03-Apr-19 00:00 Daily For bay equipment maintenance and testing work

68 220220KV Interconnector-I at 400KV S/s Julwania

03-Apr-19 09:00 03-Apr-19 17:00 Daily For bay equipment maintenance and testing work

69 220 220KV Mehgaon-Auraiya 04-Apr-19 09:00 04-Apr-19 17:00 Daily For bay equipment maintenance and testing work

70 220220KV Pithampur-Pithampur Sector-I

04-Apr-19 00:00 04-Apr-19 00:00 Daily For bay equipment maintenance and testing work

Agenda of 68th OCCM of MP 50

Page 53: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

71 220220KV Interconnector-II at 400KV S/s Julwania

04-Apr-19 09:00 04-Apr-19 17:00 Daily For bay equipment maintenance and testing work

72 220160MVA X-mer-I At 220KV s/s Mehgaon

08-Apr-19 09:00 08-Apr-19 17:00 Daily For Pre monsoon maintenance and testing work

73 220220KV Pithampur at 220KV S/S Pithampur Sect-I

08-Apr-19 00:00 08-Apr-19 00:00 Daily For Pre monsoon maintenance and testing work

74 220160MVA Transformer-I at 220KV Jetpura

08-Apr-19 09:00 08-Apr-19 17:00 Daily For Pre monsoon maintenance and testing work

75 220 220KV Shajapur-Ashta-I 08-Apr-19 09:00 08-Apr-19 17:00 Daily For bay equipment maintenance and testing work

76 220 220KV Sagar-Bina-I 08-Apr-19 09:00 08-Apr-19 17:00 Daily For bay equipment maintenance and testing work

77 220 220KV Gwalior II-PGCIL-I 09-Apr-19 09:00 09-Apr-19 17:00 Daily For bay equipment maintenance and testing work

160MVA X-mer-II At 220KV s/s 78 220

160MVA X-mer-II At 220KV s/s Mehgaon

09-Apr-19 09:00 09-Apr-19 17:00 Daily For Pre monsoon maintenance and testing work

79 220220KV ICT-II at 220KV S/s Sukha

09-Apr-19 9:00 11-Apr-19 17:00 Continue For replacement of equipment (Isolator) under PSDF scheme

80 220 220KV Pandhurna-Kamleshwar 09-Apr-19 10:00 09-Apr-19 16:00 Daily For DPR Testing work

81 220 220KV Gwalior II-PGCIL-II 10-Apr-19 09:00 10-Apr-19 17:00 Daily For bay equipment maintenance and testing work

82 220220KV Barwaha-Nimrani Tap Omkareshwar

10-Apr-19 10:00 10-Apr-19 17:00 Daily For bay equipment maintenance and testing work

83 220 220KV Sagar-Bina-II 10-Apr-19 09:00 10-Apr-19 17:00 Daily For bay equipment maintenance and testing work

84 220 220KV Mahalgaon-PGCIL-I 11-Apr-19 10:00 11-Apr-19 17:00 Daily For bay equipment maintenance and testing work

85 220 220KV Mahalgaon-PGCIL-II 12-Apr-19 10:00 12-Apr-19 17:00 Daily For bay equipment maintenance and testing work

86 220220KV Nimrani-Barwaha Tap Omkareshwar

12-Apr-19 10:00 12-Apr-19 17:00 Daily For bay equipment maintenance and testing work

87 220220KV Indore at 220KV S/S Pithampur Sect-I

13-Apr-19 00:00 13-Apr-19 00:00 Daily For bay equipment maintenance and testing work

Agenda of 68th OCCM of MP 51

Page 54: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Date Time Date Time

Sr- No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

88 220 220KV Datia- Bina 15-Apr-19 09:00 15-Apr-19 17:00 Daily For bay equipment maintenance and testing work

89 220 220KV Shajapur-Ashta-II 15-Apr-19 09:00 15-Apr-19 17:00 Daily For bay equipment maintenance and testing work

90 220 220KV Datia- Gwalior 16-Apr-19 09:00 16-Apr-19 17:00 Daily For bay equipment maintenance and testing work

91 220160MVA at 220KV S/S Pithampur Sect-I

16-Apr-19 00:00 16-Apr-19 00:00 Daily For Pre monsoon maintenance and testing work

92 220 220KV Mahalgaon-Bina 17-Apr-19 10:00 17-Apr-19 17:00 Daily For bay equipment maintenance and testing work

93 220 220KV Mahalgaon-Datia 18-Apr-19 10:00 18-Apr-19 17:00 Daily For bay equipment maintenance and testing work

94 220 220KV Dewas-Indore 19-Apr-19 09:00 19-Apr-19 17:00 Daily For bay equipment maintenance and testing work

95 220220KV Pithampur at 220KV S/S Dhar

22-Apr-19 00:00 22-Apr-19 00:00 Daily For bay equipment maintenance and testing workDhar

96 220160MVA Transformer at 220KV Mangliya

22-Apr-19 09:00 22-Apr-19 17:00 Daily For Pre monsoon maintenance and testing work

97 220220KV Dewas-Indore East (Bicholi)

22-Apr-19 09:00 22-Apr-19 17:00 Daily For bay equipment maintenance and testing work

98 220160MVA X-Mer-I at 220KV S/S Datia

25-Apr-19 09:00 25-Apr-19 17:00 Daily For Pre monsoon maintenance and testing work

99 220160MVA X-Mer-II at 220KV S/S Datia

26-Apr-19 09:00 26-Apr-19 17:00 Daily For Pre monsoon maintenance and testing work

Agenda of 68th OCCM of MP 52

Page 55: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

A. ThermalStn. Name UNIT No. Capacity

MW Dec-18 Jan-195 210 156.14 155.12

PH III 210 156.14 155.12TOT 210 156.14 155.12

6 200 104.09 118.997 210 72.23 103.75

PH II 410 176.31 222.748 210 99.12 70.779 210 58.09 119.61

PH III 420 157.20 190.3910 250 160.65 156.8311 250 161.90 137.38

PH IV 500 322.55 294.21TOT 1330 656.07 707.33

1 210 116.69 112.352 210 105.37 116.36

PH I 420 222.05 228.713 210 114.71 96.174 210 109.10 122.98

PH II 420 223.81 219.155 500 345.16 340.65

PH III 500 345.16 340.65TOT 1340 791.02 788.50

1 600 325.95 308.252 600 239.40 185.91

PH1 1200 565.35 494.163 660 346.82 347.194 660 1.17 0.00

PH II 1320 347.99 347.19

TOT 1860 913.34 841.35

4740 2516.57 2492.31

B. HydelCapacity

MW Dec-18 Jan-19115.0 61.12 60.82172.0 66.38 68.0099.0 44.88 45.51

386.0 172.38 174.33193.0 86.19 87.16160.0 6.51 3.22107.0 4.34 2.1490.0 25.04 22.25

315.0 48.17 38.0120.0 0.00 0.0060.0 0.00 0.0030.0 6.17 4.7045.0 6.97 11.5222.5 3.49 5.7620.0 11.72 9.7960.0 11.06 11.67

1186.0 288.01 275.48915.0 176.75 161.97917.5 196.17 181.49

CapacityMW Dec-18 Jan-19

Indira Sagar Hydel Project 1000 170.32 112.58Omkareshwar Hydel Project 520 72.51 46.35

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

Agenda of 68th OCCM of MP 53

Page 56: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

S No. Source Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Total30 31 30 31 31 30 31 30 31 31 0 0 306

A.1 Thermal 1923.24 1570.02 1869.78 1656.07 1636.40 1648.88 2031.86 2166.02 2334.44 2313.55 0.00 0.00 19150.272 Hydel 43.21 64.48 59.23 122.45 211.77 287.99 167.38 163.73 194.00 179.99 0.00 0.00 1494.233 Total 1966.45 1634.50 1929.02 1778.51 1848.17 1936.87 2199.24 2329.75 2528.45 2493.54 0.00 0.00 20644.50

B.1 Indira Sagar 26.16 66.30 41.07 15.70 64.84 233.13 181.55 129.57 165.71 109.73 0.00 0.00 1033.782 Omkareshwar 12.50 32.62 20.66 15.34 43.84 109.03 84.85 59.47 72.51 46.35 0.00 0.00 497.163 MPPMCL Schedule from Central Sector of WR 1795.68 1868.24 1627.45 1808.73 1709.00 1705.21 2014.05 1916.01 1796.98 1807.69 0.00 0.00 18049.034 MPPMCL Schedule from Central Sector ER 33.98 30.77 24.82 34.85 36.56 28.47 41.92 45.40 47.16 40.97 0.00 0.00 364.905 Total MPPMCL Schedule from Central Sector (WR+ER) 1829.66 1899.01 1652.26 1843.58 1745.56 1733.68 2055.98 1961.41 1844.13 1848.65 0.00 0.00 18413.946 Deviation Energy of (WR+ER) -25.45 -9.57 -67.85 -14.40 -10.14 25.90 -10.18 -50.19 -12.65 -21.70 0.00 0.00 -196.237 NET NR ISGS POWER SCH to MP 0.00 0.00 15.53 27.11 37.72 64.96 76.74 72.24 35.06 29.02 0.00 0.00 358.398 RUMS SOLAR REWA 0.00 0.00 0.00 0.71 3.50 16.25 27.93 30.46 32.61 48.56 0.00 0.00 160.019 Schedule From Sugen 0.54 5.08 0.43 3.96 3.24 5.27 9.73 2.53 10.33 7.52 0.00 0.00 48.64

10 LANCO Amk 162.03 186.79 171.98 171.49 115.32 111.60 177.67 168.21 187.01 155.91 0.00 0.00 1608.0111 SASAN 990.18 994.72 976.50 852.02 921.36 873.16 938.38 965.76 1001.51 977.00 0.00 0.00 9490.6112 ESSAR (STOA against LTA) 1.38 3.27 1.58 1.58 2.65 8.43 12.27 4.91 3.15 3.80 0.00 0.00 43.0113 J P Nigri 294.92 335.85 313.61 141.84 281.40 297.61 338.99 308.45 178.70 268.80 0.00 0.00 2760.1514 MB Power 192.75 208.08 108.70 201.61 142.68 135.47 199.64 237.09 156.64 207.06 0.00 0.00 1789.7115 JHABUA Power 31.73 31.77 44.22 47.39 31.21 87.76 71.27 83.27 66.57 77.63 0.00 0.00 572.8216 Other Open Access Schedule other than MPPMCL Incl. Seci -80.41 -30.49 -107.06 -49.82 -76.57 -46.99 -29.11 -62.12 -80.34 -110.11 0.00 0.00 -673.0217 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0018 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0019 Schedule from Sardar Sarovar -0.70 -0.76 -0.73 3.04 9.74 45.53 55.00 50.81 60.98 53.84 0.00 0.00 276.7520 SCH to Railway from RGPPL_ebid 160.44 165.31 162.90 166.68 166.63 160.02 161.25 156.44 168.84 172.94 0.00 0.00 1641.4521 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0022 Schedule from Rihand+Matatila 2.02 5.15 2.06 2.80 4.83 13.93 18.31 11.77 12.28 15.91 0.00 0.00 89.04

23 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

25 Additional Power Purchase 3.49 0.00 0.00 0.00 0.00 0.00 15.17 26.61 16.08 30.35 0.00 0.00 91.7026 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0027 Banking of Energy -441.88 -369.30 -404.32 -871.65 -803.51 -867.01 144.69 896.18 901.16 717.13 0.00 0.00 -1098.5028 Sale of Power -557.64 -167.20 -801.20 -140.91 -128.76 -244.79 -89.43 -46.87 -50.32 -130.34 0.00 0.00 -2357.4629 Total MP Schedule (Including Railway) 2588.52 3267.30 2136.46 2401.41 2457.02 2394.88 4184.46 4867.14 4544.40 4373.65 0.00 0.00 33215.2530 Total MP Drawal (Including Railway) 2563.07 3257.72 2068.61 2387.01 2446.88 2420.78 4174.29 4816.96 4531.75 4351.95 0.00 0.00 33019.0231 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.00 0.01 0.00 2.19 8.70 6.89 2.68 0.00 0.00 20.4832 Wheeled Energy of Wind Farm 15.18 19.45 20.05 13.88 17.63 9.48 3.98 3.46 11.50 9.20 0.00 0.00 123.8133 Wheeled Energy of Solar Plant 68.57 61.61 45.70 33.58 32.32 44.30 57.37 53.43 55.31 54.76 0.00 0.00 506.9534 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0035 Wheeled Energy of Ascent Hydro 1.46 1.41 1.39 1.11 1.31 1.01 1.24 1.26 1.21 1.18 0.00 0.00 12.5936 Export to MSEB (Nepa-Dharni) -6.08 -5.89 -3.94 -3.31 -3.34 -3.55 -6.13 -5.44 -5.94 -5.88 0.00 0.00 -49.5037 Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil -0.05 -3.52 -8.37 -11.49 51.62 40.67 254.82 43.25 -8.44 -15.80 0.00 0.00 342.7038 Energy Purchased by MP from Wind Farm 437.86 584.49 678.72 592.59 635.88 424.36 155.44 115.89 227.95 212.30 0.00 0.00 4065.4839 Energy Purchased by MP from Solar Plant 151.93 162.97 134.33 88.86 87.34 110.60 167.81 131.51 136.76 129.74 0.00 0.00 1301.86

40 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP

60.47 38.27 113.76 73.85 91.59 47.61 16.72 55.96 64.80 98.01 0.00 0.00 661.04

41Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

24.49 7.73 6.31 2.67 2.55 6.91 3.34 6.87 21.51 27.94 0.00 0.00 110.30

42 Deviation Energy of ISP 2.68 4.21 3.27 1.74 2.23 4.24 2.68 3.70 4.61 2.86 0.00 0.00 32.2043 Schedule Energy of BLA Power against LTOA 0.00 2.16 4.82 5.49 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.9844 Schedule Energy of JP BINA Power against LTOA 165.38 155.48 111.80 91.52 90.57 100.01 206.86 167.76 111.14 116.88 0.00 0.00 1317.3945 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.01 0.40 1.94 1.50 1.77 1.89 0.00 0.00 7.5346 Chambal Complex Excess / less Overshare by MP -1.15 -1.72 -2.27 -2.76 -3.05 -3.90 -21.47 -35.96 -24.62 -25.74 0.00 0.00 -122.6447 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.02 -0.07 -0.04 0.14 2.46 4.23 1.50 4.08 1.90 3.43 0.00 0.00 17.6148 State Supply (Ex-Power st. Bus) 5488.91 6017.75 5164.90 5084.43 5416.36 5486.17 7488.23 7891.70 7904.78 7615.01 0.00 0.00 63558.2449 AVERAGE DAILY (Ex-Bus) 182.96 194.12 172.16 164.01 174.72 182.87 241.56 263.06 254.99 245.65 #DIV/0! #DIV/0! 207.7150 MINIMUM DAILY (MP Periphery) 163.56 163.85 140.57 139.40 151.95 138.27 2023.45 234.71 239.60 208.98 0.00 0.00 138.2751 MAXIMUM DAILY (MP Periphery) 185.36 197.05 186.70 166.05 184.93 205.87 254.89 265.87 253.94 254.09 0.00 0.00 265.8752 State Supply (Ex-Power st. Bus):- YEAR : 2017-18 5494.33 5544.84 4725.99 4626.86 5108.56 5168.84 6313.68 7073.82 7088.70 6884.71 5491.63 5705.36 58030.3153 Year ((18-19)-(17-18))*100/Year (17-18) -0.10 8.53 9.29 9.89 6.03 6.14 18.60 11.56 11.51 10.61 -100.00 -100.00 9.5354 Unshedule L/S : Year-2018-19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0055 Frequency Correction 5.16 8.76 4.57 4.11 3.70 5.68 7.05 7.46 7.45 5.37 0.00 0.00 59.3356 Restricted Requirement : Year-2018-19 5494.07 6026.51 5169.47 5088.54 5420.06 5491.86 7495.28 7899.17 7912.23 7620.38 0.00 0.00 63617.5757 Shedule L/S : Year-2018-19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0058 Un-Restricted Requirement : Year-2018-19 5494.07 6026.51 5169.47 5088.54 5420.06 5491.86 7495.28 7899.17 7912.23 7620.38 0.00 0.00 63617.57

ENERGY BALANCE SHEETYear : 2018 - 19

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Agenda of 68th OCCM of MP 54

Page 57: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

S.NO. Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Yr 18-19

C.1 DEMAND MET 8511 8641 8232 7398 8577 9270 12268 13304 13378 14089 0 0 140892 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 7908 8306 8122 7753 8289 9481 10919 12058 11548 11422 0 0 120582 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 8621 8897 8437 7753 8577 9481 12268 13304 13778 14089 0 0 14089G. COMPUTED MAXIMUM DEMAND 8624 8916 8460 7800 8577 9515 12301 13312 13778 14089 0 0 14089H. UNRESTRICTED MAXIMUM DEMAND 8624 8916 8460 7800 8577 9515 12301 13312 13778 14089 0 0 14089I.1. Div. Head Quarters 23:47 23:44 23:43 23:43 23:44 23:44 23:46 23:50 23:48 23:49 0:00 0:00 23:462. District Head Quarters 23:49 23:48 23:45 23:50 23:50 23:47 23:46 23:52 23:53 23:54 0:00 0:00 23:493. Tahsil Head Quarters 23:42 23:40 23:34 23:36 23:39 23:37 23:43 23:47 23:44 23:47 0:00 0:00 23:414. Rural -Mixed 23:19 23:16 23:01 23:07 23:18 23:06 23:13 23:24 23:22 23:32 0:00 0:00 23:165. Rural -DLF 23:25 23:23 23:05 23:17 23:23 23:19 23:21 23:32 23:33 23:39 0:00 0:00 23:246. Rural -Irrigation 9:47 9:44 9:33 9:40 9:43 9:43 9:47 9:53 9:53 9:54 0:00 0:00 9:46J LOAD FACTOR % 88.43 90.91 84.77 87.66 84.23 79.18 80.89 81.31 76.45 71.91 #DIV/0! #DIV/0! 82.58

S.N PARTICULARS Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Yr 18-19

A. INTGRATED FREQUENCY1 MAXIMUM 50.08 50.10 50.15 50.08 50.08 50.08 50.07 50.09 50.08 50.10 0.00 0.00 50.152 MINIMUM 49.81 49.77 49.74 49.78 49.81 49.77 49.82 49.85 49.79 49.82 0.00 0.00 49.74

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.20 50.23 50.25 50.24 50.22 50.20 50.20 50.25 50.25 50.28 0.00 0.00 50.282 MINIMUM 49.62 49.57 49.60 49.62 49.62 49.57 49.69 49.70 49.67 49.58 0.00 0.00 49.57

C. AVG FREQUENCY 49.97 49.95 49.98 49.98 49.98 49.97 49.97 49.97 49.97 49.99 0.00 0.00 49.97D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 7.63 7.42 11.19 11.27 10.63 6.57 8.75 9.21 10.29 19.06 0.00 0.00 10.223 49.9 TO 50.05 Hz 79.57 70.06 76.97 78.48 80.44 80.22 79.20 79.87 77.03 70.26 0.00 0.00 77.184 49.7 TO 49.9 Hz 12.80 22.52 11.84 10.25 8.93 13.21 12.05 10.92 12.68 10.69 0.00 0.00 12.595 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Year : 2018 - 19

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2018-19

ENERGY BALANCE SHEET : Demand & Sypply Hours

Agenda of 68th OCCM of MP 55

Page 58: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs Injecti

on

Total CPPs

Injection

Total CSSNet

NR to MP

Sugen Lanco Sasan Essa

rJP

Nigri

RUMS (SOLAR)

REWA TO MPPMCL

MB Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur STOA

Rihand+Matatila-

Rajghat

Total SCH UN SCH TOTAL

1:00 49.99 3093 2865 120 4 12 227 510 3739 2237 16 0 186 1287 0 228 0 144 27 78 220 0 423 -3 0 -180 14 4677 8416 4538 -139 -5 8272 0 0 0 8276 8276

2:00 49.98 3069 2843 127 8 10 230 511 3728 2147 16 0 174 1276 0 227 0 104 12 79 221 0 423 0 0 -182 14 4510 8238 4391 -119 -5 8114 0 0 0 8119 8119

3:00 49.99 3103 2874 121 16 8 230 510 3759 2288 24 0 216 1287 0 227 0 155 35 79 222 0 423 0 6 -172 14 4803 8561 4810 7 -5 8563 0 0 0 8568 8568

4:00 49.99 3124 2894 121 4 8 231 509 3767 2301 36 0 223 1299 0 227 0 162 50 79 222 0 423 0 19 -172 14 4883 8650 4864 -18 -5 8626 0 0 0 8631 8631

5:00 49.99 3154 2922 127 20 19 231 502 3822 2329 26 0 214 1296 0 227 0 159 58 79 217 0 423 -7 69 -146 14 4956 8778 4954 -2 -5 8771 0 0 0 8777 8777

6:00 50.00 3371 3126 176 115 68 232 499 4217 2370 58 0 241 1294 0 227 0 196 78 79 217 0 423 -34 95 -137 14 5120 9337 5140 19 -6 9351 0 0 0 9355 9355

7:00 49.92 3744 3474 274 178 93 241 494 4753 2397 85 7 260 1294 4 230 4 209 95 78 218 0 1580 -30 0 0 14 6445 11198 6516 71 -7 11262 0 0 0 11290 11290

8:00 49.95 3830 3554 469 432 186 247 649 5536 2447 38 21 262 1294 8 234 40 224 117 78 218 0 1992 -7 47 -7 15 7020 12556 7003 -17 -9 12529 0 0 0 12551 12551

9:00 49.96 3837 3561 468 549 211 249 872 5909 2467 29 24 263 1294 19 235 88 225 116 77 218 0 2156 -7 98 -53 15 7264 13173 7307 43 -10 13206 0 0 0 13223 13223

10:00 49.96 3837 3560 365 517 195 247 913 5798 2459 32 26 263 1291 9 235 127 225 116 78 218 0 2156 -7 98 -79 15 7261 13059 7254 -7 -10 13043 0 0 0 13058 13058

11:00 49.98 3488 3237 251 278 116 240 1013 5135 2436 19 26 263 1291 6 234 156 225 114 79 218 0 2156 -24 73 -94 15 7191 12326 7281 90 -10 12406 0 0 0 12415 12415

12:00 49.98 3373 3129 202 229 86 235 1031 4912 2367 34 12 259 1288 4 224 167 225 102 83 218 0 2156 -137 0 -190 15 6826 11738 6611 -216 -10 11512 0 0 0 11523 11523

13:00 49.96 3379 3134 179 150 64 239 1008 4774 2456 46 26 263 1288 4 226 162 225 107 82 214 0 2156 -25 0 -144 15 7100 11874 7391 291 -9 12156 0 0 0 12171 12171

14:00 49.99 3355 3111 175 192 88 239 909 4715 2458 58 26 263 1292 4 229 137 225 111 82 213 0 2156 -7 0 -133 15 7129 11844 7192 63 -10 11897 0 0 0 11905 11905

15:00 49.97 3355 3111 170 129 76 239 736 4461 2479 90 28 263 1295 4 229 100 225 111 82 214 0 2156 -11 0 -98 15 7183 11645 7198 15 -9 11651 0 0 0 11663 11663

16:00 49.94 3386 3140 187 226 109 240 472 4374 2464 96 28 263 1295 4 231 50 226 111 83 217 0 2156 -11 0 -41 15 7188 11562 7262 74 -9 11626 0 0 0 11647 11647

17:00 49.94 3592 3332 496 643 253 240 191 5155 2468 65 7 263 1295 1 235 8 231 112 84 217 0 2073 -149 0 -9 15 6918 12073 6460 -458 -9 11606 0 0 0 11626 11626

18:00 49.95 3634 3372 553 866 352 241 175 5559 2485 92 33 263 1295 19 237 0 231 120 85 217 0 1023 -7 19 4 15 6132 11692 5666 -467 -9 11216 0 0 0 11235 11235

19:00 50.00 3378 3133 323 556 216 238 264 4729 2431 44 21 263 1297 5 236 0 231 120 85 217 0 423 -89 0 5 15 5304 10033 5226 -77 -8 9947 0 0 0 9949 9949

20:00 49.99 3327 3085 248 202 101 235 352 4223 2419 59 16 254 1293 4 236 0 229 103 85 218 0 423 -120 0 -43 15 5191 9413 5096 -95 -8 9311 0 0 0 9316 9316

21:00 49.99 3277 3038 172 53 29 233 421 3947 2351 24 9 238 1292 2 231 0 207 78 85 218 0 423 -224 0 -135 15 4814 8761 4719 -95 -7 8659 0 0 0 8663 8663

22:00 50.06 3136 2905 149 36 27 229 462 3807 2250 16 0 216 1287 0 227 0 177 54 85 217 0 423 -538 0 -193 15 4236 8044 4184 -52 -7 7985 0 0 0 7985 7985

23:00 50.00 3156 2923 145 61 33 231 493 3885 2386 30 2 238 1287 2 227 0 198 75 85 216 0 423 -43 0 -132 15 5008 8894 4971 -37 -6 8850 0 0 0 8854 8854

24:00 50.04 3107 2878 129 44 23 227 507 3808 2294 34 2 223 1287 1 227 0 188 45 83 219 0 423 -9 0 -195 15 4837 8645 4713 -125 -6 8515 0 0 0 8515 8515

Avg. 49.98 3379 3133 239 229 99 236 583 4521 2383 44 13 243 1291 4 230 43 202 86 81 218 0 1208 -62 22 -105 15 5917 10438 5864 -52 -8 10378 0 0 0 10388 10388

00 TO 06 HRS.

49.99 3152 2921 132 28 21 230 507 3839 2279 30 0 209 1290 0 227 0 153 43 79 220 0 423 -7 32 -165 14 4825 8663 4783 -42 -5 8616 0 0 0 8621 8621

06 TO 12 HRS.

49.96 3685 3419 338 364 148 243 829 5340 2429 40 19 262 1292 8 232 97 222 110 79 218 0 2032 -35 53 -71 15 7001 12342 6995 -6 -9 12327 0 0 0 12343 12343

12 TO 18 HRS.

49.96 3450 3200 293 368 157 240 582 4840 2468 75 25 263 1293 6 231 76 227 112 83 215 0 1953 -35 3 -70 15 6942 11781 6861 -80 -9 11692 0 0 0 11708 11708

06TO 18 HRS.

49.96 3568 3310 316 366 152 241 705 5090 2449 57 22 262 1293 7 232 87 225 111 81 217 0 1993 -35 28 -70 15 6971 12062 6928 -43 -9 12009 0 0 0 12026 12026

18 TO 24 HRS.

50.01 3230 2994 194 159 71 232 416 4066 2355 34 9 239 1290 2 231 0 205 79 84 218 0 423 -170 0 -116 15 4898 8965 4818 -80 -7 8878 0 0 0 8880 8880

Devia -tion

Export to MS

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- December 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Agenda of 68th OCCM of MP 56

Page 59: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs Injecti

on

Total CPPs

Injection

Total CSSNet

NR to MP

Sugen Lanco Sasan Essa

rJP

Nigri

RUMS (SOLAR)

REWA TO MPPMCL

MB Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur STOA

Rihand+Matatila-

Rajghat

Total SCH UN SCH TOTAL

1:00 50.00 2969 2746 138 0 0 275 454 3613 1974 14 0 170 1239 0 337 0 110 35 66 224 0 457 -5 0 -264 17 4374 7987 4184 -190 -4 7793 0 0 0 7798 7798

2:00 50.00 2964 2742 134 8 0 275 461 3620 1775 14 0 158 1188 0 337 0 70 17 65 224 0 457 -5 0 -264 17 4053 7673 3966 -87 -4 7582 0 0 0 7586 7586

3:00 50.00 2984 2760 129 0 0 276 452 3616 2077 14 0 172 1209 0 337 0 118 27 65 224 0 457 -5 0 -264 17 4449 8065 4329 -120 -4 7941 0 0 0 7945 7945

4:00 50.00 2992 2768 126 4 6 276 425 3605 1927 14 0 159 1247 0 337 0 106 21 65 221 0 457 -5 0 -264 17 4302 7907 4385 83 -4 7986 0 0 0 7990 7990

5:00 50.00 3056 2827 137 12 33 280 408 3697 2084 15 0 175 1251 0 337 0 129 37 65 224 0 457 -12 0 -264 17 4516 8213 4444 -71 -4 8138 0 0 0 8142 8142

6:00 49.99 3223 2983 198 64 44 281 403 3974 2246 31 0 185 1263 0 338 0 211 89 65 220 0 457 -191 0 -264 17 4667 8642 4708 40 -5 8677 0 0 0 8683 8683

7:00 49.94 3599 3335 279 161 75 286 400 4535 2449 76 9 211 1272 3 344 1 306 126 65 224 0 1151 -263 0 -43 17 5948 10483 6147 200 -7 10676 0 0 0 10699 10699

8:00 49.98 3741 3467 421 452 174 306 523 5343 2621 67 26 245 1272 11 349 48 345 137 65 225 0 1440 -61 66 -14 17 6860 12203 6921 61 -9 12255 0 0 0 12268 12268

9:00 50.00 3729 3456 435 605 241 315 778 5831 2659 58 31 253 1272 21 351 125 354 139 66 223 0 1594 -56 199 -62 17 7245 13076 7281 36 -10 13102 0 0 0 13111 13111

10:00 50.00 3722 3450 359 498 187 315 899 5707 2665 46 28 250 1271 18 353 186 354 138 68 225 0 1594 -61 199 -92 17 7259 12966 7337 78 -10 13034 0 0 0 13043 13043

11:00 50.02 3599 3334 258 284 120 301 1033 5332 2657 56 19 245 1270 11 356 217 350 140 69 224 0 1594 -105 95 -112 17 7103 12434 7067 -35 -10 12388 0 0 0 12393 12393

12:00 50.01 3455 3199 197 141 63 283 1104 4987 2518 35 11 206 1273 6 352 235 344 132 71 224 0 1594 -253 63 -121 17 6706 11693 6526 -180 -10 11504 0 0 0 11510 11510

13:00 50.01 3435 3180 180 68 44 281 1123 4876 2673 57 17 215 1276 5 351 232 349 136 71 222 0 1594 -234 63 -117 17 6928 11805 7052 124 -10 11918 0 0 0 11922 11922

14:00 50.01 3399 3146 175 45 34 282 1041 4723 2669 37 16 209 1278 5 349 208 330 133 71 216 0 1594 -126 63 -175 17 6893 11616 6792 -101 -9 11506 0 0 0 11511 11511

15:00 49.98 3371 3120 172 16 26 281 884 4499 2579 45 9 196 1278 5 350 166 319 127 70 219 0 1594 -146 63 -160 17 6731 11231 6742 10 -9 11231 0 0 0 11240 11240

16:00 49.95 3444 3188 214 105 58 287 635 4486 2543 43 9 201 1270 5 351 96 323 128 70 224 0 1594 -182 63 -102 17 6655 11141 6725 70 -9 11201 0 0 0 11221 11221

17:00 49.96 3633 3366 317 352 128 301 304 4768 2665 72 4 233 1266 0 354 26 342 134 71 225 0 1520 -293 0 -36 17 6600 11368 6400 -200 -9 11159 0 0 0 11174 11174

18:00 49.99 3670 3401 349 449 156 310 173 4839 2693 80 24 244 1266 13 357 0 361 139 73 224 0 693 -53 92 -6 17 6217 11055 5884 -332 -9 10714 0 0 0 10722 10722

19:00 49.98 3459 3204 255 201 83 303 251 4296 2566 43 16 215 1267 9 358 0 361 139 75 224 0 457 -183 0 -6 17 5560 9856 5575 15 -9 9863 0 0 0 9871 9871

20:00 50.01 3401 3150 208 108 40 293 319 4118 2501 20 7 198 1270 7 358 0 339 133 75 224 0 457 -337 0 -2 17 5268 9386 5138 -130 -8 9248 0 0 0 9252 9252

21:00 50.00 3293 3048 157 20 8 279 371 3884 2415 16 0 185 1275 4 354 0 295 112 75 225 0 457 -645 0 -21 17 4766 8649 4708 -58 -7 8584 0 0 0 8589 8589

22:00 50.05 3179 2942 156 24 4 282 421 3829 2312 13 0 178 1277 0 348 0 240 86 75 225 0 457 -872 0 -260 17 4097 7926 3995 -102 -6 7819 0 0 0 7819 7819

23:00 50.02 3066 2837 151 32 6 283 439 3749 2209 15 2 178 1269 0 347 0 197 70 74 220 0 457 -103 0 -236 17 4717 8466 4690 -28 -5 8434 0 0 0 8435 8435

24:00 50.04 3010 2784 130 4 2 279 449 3648 2002 15 0 172 1272 0 344 0 158 42 72 224 0 458 -40 0 -270 17 4465 8114 4358 -107 -5 8002 0 0 0 8002 8002

Avg. 50.00 3350 3101 220 152 64 289 573 4399 2395 37 10 202 1262 5 348 64 267 101 69 223 0 960 -176 40 -142 17 5682 10082 5640 -43 -7 10031 0 0 0 10039 10039

00 TO 06 HRS.

50.00 3031 2804 144 15 14 277 434 3688 2014 17 0 170 1233 0 337 0 124 38 65 223 0 457 -37 0 -264 17 4393 8081 4336 -58 -4 8019 0 0 0 8024 8024

06 TO 12 HRS.

49.99 3641 3374 325 357 143 301 790 5289 2595 56 21 235 1271 11 351 135 342 135 67 224 0 1495 -133 104 -74 17 6853 12143 6880 26 -9 12160 0 0 0 12171 12171

12 TO 18 HRS.

49.98 3492 3234 234 172 75 290 693 4699 2637 56 13 216 1272 5 352 121 337 133 71 222 0 1432 -172 57 -99 17 6671 11369 6599 -72 -9 11288 0 0 0 11298 11298

06TO 18 HRS.

49.99 3566 3304 280 265 109 296 741 4994 2616 56 17 226 1272 8 351 128 340 134 69 223 0 1463 -153 81 -87 17 6762 11756 6739 -23 -9 11724 0 0 0 11734 11734

18 TO 24 HRS.

50.02 3235 2994 176 65 24 287 375 3921 2334 21 4 188 1272 3 351 0 265 97 74 224 0 457 -363 0 -132 17 4812 8733 4744 -68 -6 8658 0 0 0 8661 8661

Devia -tion

Export to MS

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- January 2019

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Agenda of 68th OCCM of MP 57

Page 60: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.99 2684 2666 -18 0 0 2667 2667 2868 2864 -4 0 0 2866 2866 2711 2506 -205 0 0 2507 2507 220 236

2:00 49.98 2567 2417 -150 0 0 2419 2419 2746 2691 -55 0 0 2693 2693 2841 2765 -77 0 0 2767 2767 221 241

3:00 49.99 2520 2484 -36 0 0 2485 2485 2718 2791 73 0 0 2793 2793 3078 3052 -26 0 0 3054 3054 222 236

4:00 49.99 2504 2484 -19 0 0 2485 2485 2758 2801 43 0 0 2803 2803 3108 3116 8 0 0 3117 3117 222 225

5:00 49.99 2542 2520 -21 0 0 2522 2522 2817 2886 69 0 0 2888 2888 3157 3135 -22 0 0 3137 3137 217 230

6:00 50.00 2613 2526 -87 0 0 2527 2527 2950 3090 141 0 0 3092 3092 3469 3504 35 0 0 3505 3505 217 230

7:00 49.92 3105 3110 5 0 0 3118 3118 3442 3678 236 0 0 3687 3687 4310 4231 -79 0 0 4241 4241 218 243

8:00 49.95 3448 3375 -73 0 0 3380 3380 3949 3973 24 0 0 3980 3980 4974 4935 -38 0 0 4944 4944 218 247

9:00 49.96 3577 3482 -96 0 0 3486 3486 4208 4335 127 0 0 4340 4340 5220 5151 -68 0 0 5158 5158 218 238

10:00 49.96 3552 3481 -71 0 0 3485 3485 4207 4274 67 0 0 4279 4279 5124 5045 -79 0 0 5051 5051 218 242

11:00 49.98 3454 3412 -42 0 0 3414 3414 4050 4137 87 0 0 4140 4140 4680 4624 -57 0 0 4627 4627 218 234

12:00 49.98 3254 3015 -239 0 0 3018 3018 3788 3712 -76 0 0 3716 3716 4523 4544 21 0 0 4548 4548 218 241

13:00 49.96 3186 3163 -22 0 0 3167 3167 3654 3881 227 0 0 3886 3886 4773 4893 120 0 0 4899 4899 214 218

14:00 49.99 3090 2989 -100 0 0 2991 2991 3731 3795 64 0 0 3797 3797 4817 4898 81 0 0 4901 4901 213 215

15:00 49.97 3029 2943 -86 0 0 2946 2946 3639 3696 57 0 0 3700 3700 4729 4794 65 0 0 4800 4800 214 217

16:00 49.94 3020 2979 -42 0 0 2984 2984 3592 3680 88 0 0 3686 3686 4693 4740 46 0 0 4748 4748 217 228

17:00 49.94 3266 3116 -150 0 0 3121 3121 3816 3827 11 0 0 3833 3833 4733 4429 -304 0 0 4436 4436 217 234

18:00 49.95 3383 3261 -122 0 0 3266 3266 3834 3658 -175 0 0 3664 3664 4278 4063 -215 0 0 4070 4070 217 234

19:00 50.00 3153 3257 104 0 0 3258 3258 3064 3056 -8 0 0 3057 3057 3599 3389 -210 0 0 3390 3390 217 245

20:00 49.99 3037 3135 98 0 0 3137 3137 2890 2869 -21 0 0 2870 2870 3210 3056 -154 0 0 3058 3058 218 251

21:00 49.99 2903 2961 59 0 0 2963 2963 2702 2646 -56 0 0 2648 2648 2924 2812 -112 0 0 2813 2813 218 239

22:00 50.06 2670 2703 33 0 0 2703 2703 2479 2513 34 0 0 2513 2513 2657 2535 -121 0 0 2536 2536 217 233

23:00 50.00 2819 2870 51 0 0 2871 2871 2946 3078 132 0 0 3079 3079 2853 2679 -174 0 0 2680 2680 216 223

24:00 50.04 2738 2753 15 0 0 2753 2753 2955 2927 -28 0 0 2927 2927 2792 2588 -203 0 0 2589 2589 219 246

Avg. 49.98 3005 2963 -42 0 0 2965 2965 3325 3369 44 0 0 3372 3372 3885 3812 -74 0 0 3816 3816 218 234

00 TO 06 HRS. 49.99 2572 2516 -55 0 0 2518 2518 2810 2854 45 0 0 2856 2856 3061 3013 -48 0 0 3015 3015 220 233

06 TO 12 HRS. 49.96 3399 3313 -86 0 0 3317 3317 3941 4018 78 0 0 4024 4024 4805 4755 -50 0 0 4762 4762 218 241

12 TO 18 HRS. 49.96 3162 3075 -87 0 0 3079 3079 3711 3756 45 0 0 3761 3761 4670 4636 -34 0 0 4642 4642 215 225

06TO 18 HRS. 49.96 3280 3194 -87 0 0 3198 3198 3826 3887 61 0 0 3892 3892 4738 4696 -42 0 0 4702 4702 217 233

18 TO 24 HRS. 50.01 2886 2947 60 0 0 2948 2948 2839 2848 9 0 0 2849 2849 3006 2843 -162 0 0 2844 2844 218 240

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- December 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 68th OCCM of MP 58

Page 61: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 50.00 2590 2612 22 0 0 2614 2614 2635 2627 -8 0 0 2629 2629 2524 2317 -208 0 0 2318 2318 224 237

2:00 50.00 2453 2367 -87 0 0 2368 2368 2493 2452 -41 0 0 2454 2454 2600 2521 -79 0 0 2523 2523 224 242

3:00 50.00 2403 2426 23 0 0 2427 2427 2460 2538 78 0 0 2539 2539 2775 2741 -34 0 0 2742 2742 224 236

4:00 50.00 2363 2420 57 0 0 2421 2421 2475 2540 65 0 0 2541 2541 2796 2800 4 0 0 2801 2801 221 226

5:00 50.00 2411 2451 39 0 0 2452 2452 2536 2600 65 0 0 2602 2602 2877 2855 -22 0 0 2856 2856 224 232

6:00 49.99 2482 2459 -23 0 0 2461 2461 2670 2820 151 0 0 2822 2822 3154 3172 18 0 0 3174 3174 220 226

7:00 49.94 2974 3042 68 0 0 3048 3048 3193 3485 292 0 0 3493 3493 3992 3908 -85 0 0 3916 3916 224 241

8:00 49.98 3410 3412 3 0 0 3416 3416 3853 3913 60 0 0 3917 3917 4744 4686 -58 0 0 4691 4691 225 243

9:00 50.00 3624 3541 -83 0 0 3544 3544 4229 4333 104 0 0 4336 4336 5099 4995 -104 0 0 4999 4999 223 233

10:00 50.00 3626 3554 -72 0 0 3557 3557 4278 4363 84 0 0 4365 4365 4977 4881 -97 0 0 4884 4884 225 236

11:00 50.02 3543 3489 -55 0 0 3490 3490 4155 4227 71 0 0 4228 4228 4617 4443 -174 0 0 4444 4444 224 230

12:00 50.01 3347 3129 -218 0 0 3131 3131 3875 3834 -41 0 0 3836 3836 4354 4301 -53 0 0 4303 4303 224 240

13:00 50.01 3275 3205 -71 0 0 3206 3206 3751 3948 197 0 0 3949 3949 4536 4541 5 0 0 4543 4543 222 224

14:00 50.01 3134 2991 -143 0 0 2992 2992 3751 3813 62 0 0 3814 3814 4462 4486 24 0 0 4488 4488 216 217

15:00 49.98 3047 2941 -106 0 0 2943 2943 3651 3699 47 0 0 3701 3701 4365 4371 6 0 0 4374 4374 219 221

16:00 49.95 3052 2978 -74 0 0 2983 2983 3603 3687 83 0 0 3693 3693 4303 4310 7 0 0 4318 4318 224 227

17:00 49.96 3170 3078 -92 0 0 3082 3082 3705 3788 82 0 0 3793 3793 4221 4062 -159 0 0 4068 4068 225 231

18:00 49.99 3240 3130 -110 0 0 3132 3132 3720 3557 -163 0 0 3560 3560 3939 3792 -147 0 0 3795 3795 224 235

19:00 49.98 3153 3220 67 0 0 3223 3223 3070 3069 -1 0 0 3072 3072 3472 3334 -139 0 0 3336 3336 224 240

20:00 50.01 3080 3124 44 0 0 3125 3125 2947 2873 -74 0 0 2874 2874 3228 3015 -213 0 0 3017 3017 224 237

21:00 50.00 2911 2946 35 0 0 2947 2947 2717 2636 -81 0 0 2638 2638 2917 2768 -149 0 0 2769 2769 225 234

22:00 50.05 2689 2675 -15 0 0 2675 2675 2495 2468 -27 0 0 2468 2468 2643 2444 -199 0 0 2444 2444 225 232

23:00 50.02 2759 2804 45 0 0 2805 2805 2784 2906 122 0 0 2907 2907 2681 2499 -182 0 0 2499 2499 220 224

24:00 50.04 2664 2672 8 0 0 2672 2672 2745 2706 -39 0 0 2706 2706 2601 2378 -223 0 0 2378 2378 224 246

Avg. 50.00 2975 2944 -31 0 0 2946 2946 3241 3287 45 0 0 3289 3289 3662 3567 -94 0 0 3570 3570 223 233

00 TO 06 HRS. 50.00 2450 2456 5 0 0 2457 2457 2545 2596 52 0 0 2598 2598 2788 2734 -53 0 0 2736 2736 223 233

06 TO 12 HRS. 49.99 3421 3361 -59 0 0 3364 3364 3931 4026 95 0 0 4029 4029 4631 4535 -95 0 0 4540 4540 224 237

12 TO 18 HRS. 49.98 3153 3054 -99 0 0 3056 3056 3697 3748 52 0 0 3752 3752 4304 4260 -44 0 0 4264 4264 222 226

06TO 18 HRS. 49.99 3287 3207 -79 0 0 3210 3210 3814 3887 73 0 0 3891 3891 4467 4398 -70 0 0 4402 4402 223 232

18 TO 24 HRS. 50.02 2876 2907 31 0 0 2908 2908 2793 2776 -17 0 0 2777 2777 2924 2740 -184 0 0 2741 2741 224 236

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- January 2019

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 68th OCCM of MP 59

Page 62: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

ANNEXURE-5 System Disturbance / System Incidence

1. System Disturbance on 09.12.2018 in 220kv s/s Jabalpur: On dated 09-12-2018 at 11.15 hrs. M.P

system was normal and frequency of National Grid was 49.98 Hz, at 11:17 Hrs Monkey fault occurred on main bus No. 1 B Phase due to which feeders & xmer connected to Main Bus No.1 including bus tie & some feeders of Main bus No.2 also tripped, resulting in the tripping of following elements :

220/132 kv 160 MVA X-mers I & II at 220kv s/s Jabalpur 220/132 kv 3*40 MVA X-mer at 220kv s/s Jabalpur 220/132 kv 160 MVA X-mer at 220kv s/s Panagar 220kv Jabalpur-Birsinghpur ckt-I & II 220kv Jabalpur-Narsinghpur ckt-I 220kv Jabalpur-Sukha ckt-I 220kv Jabalpur-Amarkantak ckt-I & II 220kv BUS tie 132kv Tejgarh-Damoh ckt 132kv Bargi-Lakhnadaun ckt 132kv Panagar-Mansakra ckt 132kv Katni-Panagar ckt

Large area affected by the tripping. Total interruption occurred at 220kv s/s Jabalpur , 220kv s/s Panagar, 132kv s/s Tejgarh , 132kv s/s Katangi , 132kv s/s Patan , 132kv s/s Maneri, 132kv s/s Vinoba bhave , 132kv s/s VFJ, 132kv s/s Madhotal. There was load loss of around 430 MW and no generation loss. Supply restored by charging 160 MVA x-mer BHEL at 11.45 Hrs. As per the received information suspected mal-operation of Bus Bar Protection Scheme at 220KV S/s Nayagaon Jabalpur.

2. System Disturbance on 27.12.2018 in 220kv s/s Malanpur: On dated 27-12-2018 at 09:50 hrs.

M.P system was normal and frequency of National Grid was 50.08 Hz, at 09:55 hrs, 160 MVA X-mer II at 220kv s/s Malanpur tripped on PRV indication with cable fault, resulting in the tripping of following elements : 220/132 kv 160 MVA X-mer- I at 220kv s/s Malanpur 220/132 kv 160 MVA X-mers -I & II at 220kv s/s Mehgaon 220/132 kv 160 MVA X-mer -I at 220kv s/s Morena 132kv Banmore-Motijheel ckt- I & II

Large area affected by the tripping. This caused total supply interruption at 220kv s/s Malanpur,

220 KV S/s Mehgaon, 220KV S/s Morena, 132KV S/s Bhind, 132KV S/s Seondha, 132kv s/s Lahar, 132kv s/s Ron, 132KV S/s Porsa, 132kv s/s Pratappura, 132kv s/s Morar, 132kv s/s Gohad, 132kv S/s Morena, 132KV S/s Ambah, 132KV S/s Badgaon Dimini. There was load loss of 550 MW and no generation loss. Supply normalisation started by charging 132KV Motijheel-Banmore Ckt I&II. Later the supply extended to nearby s/s.

3. System Disturbance on 24.01.2019 in 400kv S/s Bhopal: On dated 24.01.2019 at around 06:15

Hrs. M.P system was normal and frequency of National Grid was 49.90 Hz. At 06:17 Hrs, 220 KV

Agenda of 68th OCCM of MP 60

Page 63: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Bhopal Interconnector – II tripped due top conductor disc failure at Loc. No.-22, causing single phase to ground fault. Simultaneously LBB protection of 220 KV Bhopal Interconnector – II mal-operated at 400 KV S/s Bhopal, resulting in operation of Bus bar protection of 220 KV Main Bus – II and tripping of following feeders/transformers at 400 KV S/s Bhopal:- 315 MVA, 400/220 KV X’mer – 2 & 4. 220 KV Bhopal – Vidisha Ckt. 220 KV Bhopal – Bairagarh Ckt – II. 220 KV Bus Tie. No any system and areas affected as load managed by other transformers and feeders at 400 KV S/s Bhopal. There was no load loss and no generation loss. System Normalized by charging 220 KV Bhopal – Bairagarh Ckt – II at 07:23 Hrs. It was intimated by site that as a precautionary measure, the LBB initiation contact of the 1-Ø tripping relay has been changed, to avoid repetition of any false operation.

*********

Agenda of 68th OCCM of MP 61

Page 64: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Agenda of 68th OCCM of MP 62

Page 65: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

NAME OF CIRCLE : NAME OF REGION :

NAME CAPACITY (MVA) NAME OF 33KV FEEDERWHETHEREXISTING

OR NEW FEEDER

ANNEXURE-6.7.i

REMARK

YEAR WISE DETAILS OF PRPOSED NEW 33/11KV SUBSTATIONS (UP TO 2027)

33KV FEEDERPROPOSED 33/11KV SUBSTATIONS.No.

NAME OF FEEDING EHV SUBSTATION

PLANNED YEAR OF

COMPLETION

Agenda of 68th OCCM of MP 63

Page 66: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

NAME OF REGION :

NAME OF 33/11KV SUBSTATION

EXISTING CAPACITY AS ON 31.01.2019

PROPOSED ADDN./AUGMENTATION

CAPACITY AFTER ADDN./AUGMENTATION

ANNEXURE-6.7.ii

NAME OF CIRCLE :

NAME OF 33KV FEEDERPLANNED YEAR OF

COMPLETION

YEAR WISE DETAILS OF ADDITION/AUGMENTATION OF CAPACITY AT 33/11KV SUBSTATIONS (UP TO 2027)

S. No.

NAME OF FEEDING EHV SUBSTATION

33/11KV SUBSTATION (ALL CAPACITIES IN MVA)

REMARKS

Agenda of 68th OCCM of MP 64

Page 67: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

NAME OF REGION :

FROM (NAME OF S/S OR TAP POINT )

TO (NAME OF S/S OR TAP POINT )

LENGTH IN Km

CONDUTOR USED(DOG / RACCOON)

ANNEXURE-6.7.iii

YEAR WISE DETAILS OF PRPOSED NEW 33KV LINES (UP TO 2027)

S.No.NAME OF FEEDING EHV SUBSTATION

REMARKS

PROPOSED 33KV LINE

PURPOSE(FOR NEW 33/11KV S/S

OR SYSTEM STRENGTHENING)

PLANNED YEAR OF

COMPLETION

NAME OF 33KV FEEDER

NAME OF CIRCLE :

Agenda of 68th OCCM of MP 65

Page 68: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Annexure-8.1

132KV33KV132KV33KV132KV33KV132KV33KV132KV33KV

NOTE:- New Transformer add in substation please marke Below

REMARKS

2

PREVIOUS READING

WITH TIME & DATE

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS

1

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

EXPORT

ASSESEMENTMETER SERIAL NO.

MF

1

2

PREVIOUS READING WITH TIME & DATE

M.P. POWER TRANSMISSION COMPANY LTDNAME OF T & C CIRCLE :-

CONSU- MPTION (MWH)

MFSl. No.

132KV/33KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) MONTH:-

NAME OF SUBSTATION

ASSESEMENT

IMPORT

4 2

1

3

3

5

Agenda of 68th OCCM of MP 66

Page 69: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

1 132KV BUS VOLTAGE 113 1332 132KV RTS MW/MVAR.CB N/A Process connection required

1 220 KV SATNA 1 CB FAULTY CLOSE

1 132KV 63 MVA XMER (PRI) CB FAULTY CLOSE2 132 KV KYMORE CB FAULTY CLOSE3 220 KV PGCIL 4 MW /MVAR 14/5 28/10

1 132KV BUS COUPLER CB FAULTY

1 220 KV PGCIL CB FAULTY

1 220 KV G BASODA CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY

1 132 KV UDYAPUR 1 CB N/A CLOSE

Sr. DESCRIPTION Status Telemetry value at SLD Actual value at site1 132 KV BUS VOLTAGE/ FREQUENCY N/A 132/502 220 KV BUS 2 VOLTAGE 191 2253 220 KV SEONI PGCIL MW /MVAR 58/15 99/30

Sr. DESCRIPTION Status Telemetry value at SLD Actual value at site1 132 KV BUS DONGARGRAHMW/MVAR 26/16 ;-40/20

1 400 KV AASTHA 1 & 2 LINE REACTOR N/A2 400 KV ISP MW N/C 300

1 GENERATOR 3 & 4 MW/MVAR N/A2 GEN NO 3 & 4 RGMO N/A

1 400 KV STN TRANSFORMER 5A MW 150 32 220 /33 KV TR MW/MVAR NA3 GEN 1 CB FAULTY CLOSE4 400 KV BUS 1 FREQ 49.79 49.985 220 KV BUS 2 VOLTAGE 264 2306 400 KV KATNI 1 CB FAULTY CLOSE8 GEN NO.1,2,3,4 RGMO N/A

1 GEN 1 CB FAULTY OPEN

1 GEN NO 1 ,2 RGMO N/A

1 GEN 4 CB FAULTY CLOSE

MAIHAR 220 KV S/S

Annexure-9.2

SATNA CIRCLEAMARPATAN 132 KV S/S

KOTAR 220 KV S/S

SATNA 220

WAIDHAN 132 KV S/S

BINA CIRCLEBINA 220 KV S/S

ASHOKNAGAR 220 KV S/S

SATNA CIRCLECHICHLI 20 KV S/S

SEONI 220 KV S/S

KIRNAPUR 132 KV S/S

GANDHI SAGAR H P S

BARGI

SATPURA T P S

SINGHA JI phase 2 S T P S

S G T P S

RAJGHAT H P S

Agenda of 68th OCCM of MP 67

Page 70: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

2 33 KV Rajisthan feeder MW/MVAR N/A3 Gen 5 MVAR 7 24 132 Manasa MW 56 525 132 KV BUS 1 KV 127 1316 132 KV BUS 2 FREQUENCY 50.12 50.047 132 KV BUS 2 KV 120 131

1 220 KV sidhi MW/MVAR 104/16 85/122 220 KV BUS COUPLER CB FAULTY CLOSE3 220 KV sidhi CB TRANSIT CLOSE

GANDHI SAGAR HPS TELEMETRY OUT SINCE 19 JAN 2019

1 400/220KV X-MER-1(LV) CB FAULTY CLOSE2 GEN-6 CB FAULTY

1 GENERATOR-1 CB FAULTY OPEN

Sr. Parameter Field value Scada value /status1 ISP –INDORE 400 KV Feede 40 4022 ISP –NAGDA 400 KV Feeder 50 5043 GENERATOR 5 & 6 MAVR 5 N /A4 ALL CB N/C5 GENERATOR (OFF CONDITION) N/C6 400 KV BUS 1& 2 VOLTAGE , FREEQUENCY N/C

1 Ind ISP Reactor CB Open Close

1 132 Kv RLY Traction-I CB open close

1 220kv dewas CB OPEN CLOSE

1 132 Kv PRASRAM PURIYA CB FAULTY close2 132 KV SEZ CKT CB FAULTY open3 132 KV INTC-I CB FAULTY CLOSE4 132 KV SRF Ckt CB FAULTY CLOSE

2 220/132kV 160MVA TRF-1(SEC SCB FAULTY CLOSE

1 220/132 TR1, TR2,TR3 & TR4 OLTC N/C2 132KV CAT-2 CB NOT CLOSED CLOSED3 132KV BUS COUPLER CB NOT CLOSED CLOSE

1 220/132 160 MVA XMER-3 CB FAULTY CIOSE3 132KV BAHADURPUR 1&2 CB FOULTY CLOSE4 132/33KV 20MVA TRF-3 CB OPEN CLOSE

SATPURA 400T P S

RAJGHAT H P S

ATPS

ISP

INDORE SZ 220KV S/S

NEPANAGAR 220 KV S/S

INDORE EAST 220 KV S/S

PITAMPUR 220 KV S/S Sector-III

PITAMPUR 220 KV S/S-II

INDORE 400 KV S/S

INDORE NZ (JETPURA) 220KV S/S

MANGLIYA220KV S/SNote :- All CB's are suspected

Note :- All CB's are suspected

Agenda of 68th OCCM of MP 68

Page 71: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

1 132/33KV 40MVA TRF-3 CB NOT CLOSAD CLOSED

1 All X-mer OLTC Not Coming2 220/132 160MVA TRF-3 CB Open CLOSE3 220/132 160MVA TRF-2 LV CB FOULTY5 132/33 Kv 40 MVA X-mer-I CB OPEN CLOSE6 132KV INTCC-1 CB FOULTY CLOSE7 132KV INTCC-2 CB FOULTY CLOSE

1 132/33KV40MVA TRF-1 CB OPEN CLOSED2 132KV NIMRANI -1 CB OPEN CLOSED3 132KV NIMRANI -2 CB OPEN CLOSED4 132KV INTCC-2 CB OPEN CLOSED5 INTCC-2 CB OPEN CLOSED6 132KV ANJAD CB OPEN CLOSED7 132KV SENDHAVA CB OPEN CLOSED

1 132/33KV 40MVA TRF-1 CB FOULTY CLOSED

1 132 KV CAP BANK-1 CB FOULTY OPEN

1 132KV SARJAN CB OPEN CLOSE

1 132kV Buscoupler CB Faulty Close

1 220KV BUS COUPLER CB FOULTY CLOSED2 220KV INDORE EAST CB FOULTY CLOSED

1 132/33KV 40 MVA TRF-1 CB FOULTY CLOSED2

3 132/33KV 40MVA TRF-2 CB NOT CLOSED CLOSED

1 400KV SHUJALPUR-1& DEHGAMTIE CB Open CLOSE

3 400/220KV 315MVA TRF-4 CB Open CLOSE

1 132/33K 40 TRF -1 CB Open close2 132KV INTCC CB Not coming

1 220KV KSHMA-2 CB Faulty Close2 220 Kv Nagda Ckt -II CB Faulty Close

JULWANIA 400 KV S/S

NIMRANI 220 KV S/S

NEEMUCH 220 KV S/S

DEPALPUR 132 KV S/S

CHHEGAON 400 KV S/S

132 KV S/S AGAR

DEWAS 220 KV S/S

132KV ALOT

132 KV S/S KUKSHI

NAGDA 400 KV S/S

NAGDA 220 KV S/S

220 Kv S/S NAGRA

Agenda of 68th OCCM of MP 69

Page 72: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

1 220KV MUGALIACHAAP CB FAULTY CLOSE

1 2/33 KV 50 MVA XMER (HV SID CB OPEN CLOSE

1 132 KV KHIRKIYA CB NON CURRENT CLOSE2 132 KV CHANNERA CB FAULTY CLOSE3 132 KV KHIRKIYA RLY TRCTN-1 CB FAULTY CLOSE

1 132 KV WANEEP CB OPEN CLOSE

1 132 KV BUS COUPLER MW/MVAR NON CURRENT2 132 KV BUS COUPLER CB FAULTY

1 132/33 KV 40 MVA XMER-1 CB FAULTY CLOSE

1 20 315 MVA XMER-4(HV & LV CB OPEN CLOSE

10/132 160 MVA XMER-2(HV SI CB FAULTY CLOSE2 0/132 160 MVA XMER-1(LV SI CB FAULTY CLOSE

1 132 KV BUS VOLTAGE WRONG VALUES2 132/33 KV 20 MVA XMER -1 CB FAULTY CLOSE3 132 KV BUS COUPLER CB FAULTY

1 132 KV SABALGARH-2 CB FAULTY CLOSE2 132 KV SABALGARH-1 & 2 MW,MVAR3 132 KV BARODA MW,MVAR4 132/33KV 63MVAX-MER-2(HV) MW,MVAR

1 132 KV MOTIJHEEL CB FAULTY

1 132/33 KV 50 MVA XMER MW/MVAR/CB PROCESS CONNECTION REQUIRED

PACHORE 132 KV S/S

ASHTA 400 KV S/S

ITARSI 220 KV S/S

HARDA 132 KV S/S

ICHAWAR 132 KV S/S

KURAWAR 132 KV S/S

BHOPAL 400 KV S/S

MANDIDEEP 220 KV S/S

BERASIYA 132 KV S/S

GWALIOR-2 220 KV S/S

SHOEPURKALAN 132 KV S/S

WRONG DIRECTIONWRONG DIRECTION

WRONG VALUES

SABALGARH 220 KV S/S

Agenda of 68th OCCM of MP 70

Page 73: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Sub Station name RTU MAKE SOE verified ANUPPUR 220 DFE yesBALAGHAT 132 DFEBHANEGAON 132 DFEBOREGAON 132 DFEBINA 220 DFE yesBINA 400 DFE yesBIRSINGPR 220 DFE yesBIJAWAR 132 KV S/S DFE yesCHHATARPR 220 DFE yesCHHINDWRA 132 DFECHHINDWRA 220 DFECHICHLI 220 DFECHAURAI 132 DFEGADARWARA 132 DFEJABALPUR 220 DFEKATNI 220 DFEKATNI 400 DFEKOTAR 220 DFEKHAPA SWAMI DFEKYMORE 132 DFEMAJGAWAN DFEMADHOTAL 132 DFEMANSAKRA 132 DFENAINPUR DFENARSINGPR 220 DFEPANDURNA 220 DFEPONDAR DFEPANAGAR 220 DFEREWA 132 DFESAGAR 220 DFE YESSATNA 132 DFESATNA 220 DFESHAHDOL 220 DFE yesSEONI 132 DFESIRMOR DFESIDHI 220 DFESUKHA 220 DFETIKAMGRAH 220 DFE yesUMARIYA 132 DFE YESUMRETH 132 DFESHAHPURA DFEBAIRAGARH DFEBETUL 220 DFEBHOPAL 220 DFEGUNA DFEGWALIOR DFE yesHANDIA DFEHOSHANGABAD DFEITARSI 220 DFEMEHGAON DFE yesMALANPUR DFE yesPIPARIYA 220 DFERAJGARH BEORA DFESARNI DFESABALGARH DFE yes

Annexure-9.5

Agenda of 68th OCCM of MP 71

Page 74: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

SHIVPURI DFE yesVIDISHA DFEGWALIOR 2 DFE yesDATIYA 220 DFE YESASHOK NAGAR DFEGANJBASODA DFEMUNGALIYA CHHAP DFEMORENA DFE yesBHOPAL 400 DFE yesASTHA 400 DFEASTHA 132 DFEAMLA DFEKHILCHIPUR DFEGUDGAON DFEICHHAWAR DFEVIJAYPUR 132 DFE yesMANDIDEEP 132 DFEMUNGAWALI DFECHANDERI 132 DFERAISEN 132 DFE

SEHORE 132 DFE

AYODHYANAGAR132 DFE

BERASIA 132 DFE

PACHORE 132 DFE

SIRONJ 132 DFE

BETUL 132 DFE

MULTAI 132 DFE

DATIA 132 DFE yes

SEMRIHARCHAND 132 DFE

BANKHEDI 132 DFE

KOTHIYA 132 DFE

KURAWAR DFE

BIAORA 132 KV DFE400 KV Indore DFE YES400 Kv Chhegaon DFE yes400 KV Julwaniya DFE YES220 kv South zone Indore DFE yes220 Kv Chhanera DFE yes200 Kv Indore North Zone DFE yes220 kv Jetpura Indore DFE yes220 Kv Mangliya DFE yes220 kv Pithampur Sec-I DFE yes220 kv Dhar DFE yes220 kv Rajgar DFE YES220 kv Barwaha DFE yes220 kv Nepa DFE YES132 kv Petlawad DFE yes

Agenda of 68th OCCM of MP 72

Page 75: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

132 kv kukshi DFE YES132 pansemal DFE yes132 kv Bahadarpur DFE YES132 Kv Chambal DFE yes132 kV Chhegaon DFE YES400 Kv Nagda DFE YES220 kv Nagda DFE YES220 KB Bhanpura DFE yes200 Kv Daloda DFE YES220 Kv Ratlam DFE YES220 Kv Badnagar DFE yes220 Kv neemauchh DFE YES220 Kv Ujjain DFE YES220 Kv Badod DFE YES220 Kv Dewas DFE YES220 Kv Shujalpur DFE YES220 kV Shajapur DFE YES220 Kv Suwasra DFE yes132 KV Sailana DFE YES132 Kv Khachrod DFE YES132 Meghnagar DFE yes132 KV Jaora DFE yes132 Kv Khachrod DFE YES132 KV Sanwer DFE yes132 Ratangar DFE YES132 Kv Sitamau DFE yes132 KV Ingoriya DFE yes132 Kv Bherugar DFE YES132 kv Alot DFE yes132 kv Depalpur DFE yes132 Kv Agar DFE yes132 KV Susner DFE yes132 KV Ghosla DFE YES132 Kv Ratadiya DFE YES132 Kv Dews BNP DFE YES132 Kv Polikalan DFE YES132 KV Arnikalan DFE yes132 Sonkatchh DFE YES132 KV Shankargar DFE yes132 KV Kannod DFE yes132 kv Chapda DFE YES132 Kv Shujalpur DFE YES 132 kv Berchha DFE YES132 kv makshi DFE yes132 Kv Mominbadodiya DFE YES132 Kv Makdone DFE YES132 KV Suwasra DFE YES220 kv DAMOH DFE YES132 kv KOTMA DFE YES132 KV SARANGPUR DFE YES132 KV PICHORE DFE132 KV MORWA DFE YES132 KV WAIDHAN DFE YES

Agenda of 68th OCCM of MP 73

Page 76: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

ANNEXURE-9.9.iS.NO. NAME OF SUB-STATION VOLTAGE LEVEL

1 BINA 4002 BHOPAL 4003 KATNI 4004 INDORE 4005 NAGDA 4006 SGTPS 400 & 2207 ISP 4008 JP BINA 4009 BINA-PG 400

10 ITARSI-PG 40011 DAMOH-PG 40012 KSTPS 40013 SHUJALPUR-PG 40014 DEHGAM 40015 ASOJ 40016 RAJGARH-PG 40017 INDORE-PG 40018 BHOPAL-BDTCL 400

Agenda of 68th OCCM of MP 74

Page 77: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED …sldcmpindia.com/uploads/meeting/Agenda of 68th OCCM of MP.pdf · Corporate office: Madhya Pradesh Power Transmission Co. Ltd.,

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Forward(ZF) Reverse(ZR)

Positive sequence

impedance

Substation Name

Line Name / X'mer

CT/CVT Ratio

PT Ratioline length in

Km

Zone-I

Zone-2

Zone-3

Zone-4 Power Swing Blocking

Annexure-9.9.II

Negative sequence

impedance

Zero sequence

impedance Relay Type

Voltage Level

Agenda of 68th OCCM of MP 75