Madera Subbasin Coordination Committee – March 21, 2019 March 21, 2019 Frank Bergon Senior Center Madera, CA Sustainable Groundwater Management Act Madera Subbasin Coordination Committee Meeting 1

Transcript of Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin...

Page 1: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

March 21, 2019Frank Bergon Senior Center

Madera, CA

Sustainable GroundwaterManagement Act

Madera SubbasinCoordination Committee Meeting

1

Page 2: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT OF CHAIR AND VICE CHAIR3. GSA / GSP OVERVIEW4. PRESENTATION FROM STATE WATER RESOURCES CONTROL BOARD5. GROUNDWATER SUSTAINABILITY PLAN GSA PROJECTS6. PRESENTATION ON GROUNDWATER MODELING7. JOINT MADERA SUBBASIN GSP TIMELINE AND SCHEDULE8. DISCUSSION AND PUBLIC INPUT 9. OTHER PUBLIC COMMENT10. RECAP AND OUTLINE NEXT STEPS

Meeting Agenda

Page 3: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 2: Appointment of Chair and Vice Chair

Page 4: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 3: GSA/GSP Overview

Page 5: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

• Seven (7) GSAs• Madera County GSA• Madera Irrigation District GSA• City of Madera GSA• Madera Water District GSA• Gravelly Ford Water District GSA• Root Creek Water District GSA• New Stone Water District GSA

• Four (4) GSPs

Madera Subbasin GSA and GSP OverviewGroundwater Sustainability

Plan (GSP)Groundwater

Sustainability Agency (GSA)

Joint Madera Subbasin GSP

Madera County GSAMadera Irrigation District GSA

City of Madera GSAMadera Water District GSA

Gravelly Ford GSP Gravelly Ford Water District GSA

Root Creek GSP Root Creek Water District GSA

New Stone GSP New Stone Water District GSA

Page 6: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

• Total area~ 348,000 ac

• Irrigated (2015)~ 216,000 ac

Page 7: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 4: SWRCB Presentation

Page 8: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 5: GSA Projects

Page 9: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 6: Presentation on Groundwater Modeling

Page 10: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

March 21, 2019

Groundwater Modeling:Supporting Decisions During the

Madera SubbasinGSP Development

Presentation to:

Madera Subbasin Coordination Committee

10

Nick Watterson, PGSupervising Hydrogeologist

Page 11: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

• Guidance from DWR on Use of Groundwater Modeling in GSP • Overview of Groundwater Modeling Process • Groundwater Model Development in the Madera Subbasin• Model Applications During the GSP Development

Outline

11

Page 12: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

• GSP analyses must employ methods sufficient to evaluate historic/projected future water budgets and undesirable results

• Numerical modeling is a tool that can be used for these analyses through simulation of many interrelated factors and processes

12

Groundwater Modeling for GSP

Page 13: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 201913

Ongoing Data

Collection and

Stakeholder Outreach

1. Establish the model purpose and objectives

2. Collect and organize hydrogeologic data

3. Develop or Update Conceptual Model

4. Select appropriate model code or existing

model (see Figure 4)

5. Design and Construct or Revise the Model

6. Calibrate the model to historical data

7. Conduct sensitivityanalysis of model

8. Run predictive scenarios

9. Conduct uncertaintyanalysis of scenarios

Is the modeladequate forthe intendedpurpose(s)?

10. Model Output, Document Model Development, Package Model Files

11. Periodic Refinement of Models

Collect additional hydrogeologic data

NO

YES

General Modeling Process

MAKEDECISIONS

Page 14: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

• Evaluate existing available regional models• Develop local model through refinement of existing regional

model (as needed/appropriate)• DWR’s Central Valley model (C2VSim-Fine Grid) as basis for local

model refinement• Integrated Water Flow Model (IWFM) simulates GW, SW, and interactions

between SW and GW• Develop and calibrate local model over historical base period

(1989-2015)• Use calibrated model to evaluate future scenarios

14

Numerical Modeling Approach in the Madera Subbasin

Page 15: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 201915

Single Local Model (MCSim) for Madera and Chowchilla Subbasins

Total model area:~1,350 sq mi (~850,000 ac)

Average element area:0.5 sq mi (~320 acres)

Number model layers:7 aquifer lyrs, 3 aquitard lyrs

Calibration:1989-2015; WLs, Streamflow

• Carved/refined from C2VSim-FG• Single model for more

accurate/efficient simulation of interactions between the two subbasins

Page 16: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

•Evaluate future conditions (50 years):Demand and Supply SW and GW

Response to Plan Implementation Sust. Indicators (e.g., WLs, SW depletion, subsidence)

Climate ChangeUncertainty

Regs: Projected Water Budgets

16

Page 17: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

• Develop and run predictive model scenarios: Estimate future conditions under varying

oClimatic/hydrologic conditions, and oProjects and management action implementation.

Designed to assess the effects of GSP’s projects and management actions ono achieving sustainability goal, ando conditions at five-year interim milestones.

Demonstrate sustainability goal maintained over 50-year planning and implementation horizon.

• Evaluate uncertainty associated with scenarios.

Modeling BMP -- Groundwater Modeling Process (p. 29)

17

Page 18: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Evaluation of Different Scenarios

18

1955

1960

1965

1970

1975

1980

1985

1990

1995

2000

2005

2010

2015

2020

2025

2030

2035

2040

2045

2050

2055

2060

2065

2070

Rel

ativ

e G

roun

dwat

er E

leva

tion

Example Simulated Water LevelsHigher

LowerHistorical Conditions Future Conditions Scenarios

2020

2040

2070

Page 19: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

• Groundwater Models are Tools• Help Understand Potential Outcomes of

Situations/Decisions/Actions• Can Inform Decisions – Relative Effects; Relies on

Specified Input Parameters• Limitations in Capabilities

• Representation of complexity/heterogeneity• Limited calibration data/conditions/variables• Regional vs local – local variability not captured• Relative vs absolute – differences btwn scenarios

Role of Groundwater Modeling in GSP Development

19

Page 20: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Demonstrating Path to Sustainability

20

2040+ Maintenance

Projects Implemented Maintained Sustainability

Chan

ge in

Gro

undw

ater

Sto

rage

2020

2020-2040 Plan Implementation

2040

2070

Page 21: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

TestSolutionsw/Model

Model Decision Support Interactions

21

QuantifySituation

IdentifyPotentialSolutions Review/

RefineSolutions

GSAs Outline Path to

Sustainability

Page 22: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Questions?

22

Page 23: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 7: Joint Madera Subbasin GSP Timeline and Schedule

Page 24: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

• Chapters will live on www.MaderaCountyWater.comas they are released

• A complete draft will have a 90 day comment period

• Comments will be taken through a comment form available in August

• Comments will be able to be emailed, mailed or dropped off

Madera Timeline

Joint GSP Chapters Public Release Date

Chapter 1 March 2019

Chapter 2 April 2019

Chapter 3 July 2019

Chapter 4 July 2019

Chapter 5 July 2019

Page 25: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 8: Discussion of Public Input

Page 26: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 9: Other Public Input

Page 27: Madera Subbasin Coordination Committee Meeting · Coordination Committee Meeting 1 Madera Subbasin Coordination Committee –March 21, 2019 1. WELCOME AND INTRODUCTIONS 2. APPOINTMENT

Madera Subbasin Coordination Committee – March 21, 2019

Item 10: Recap and outline next steps