MACHINERY AND EQUIPMENT OWNED MACHINERY AND EQUIPMENT OWNED HOT MIX PLANT 40/60 TPH HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED ELECTRONICALLY CONTROLLED :12 :12 Nos Nos AS PER MOST (III REVISION) AS PER MOST (III REVISION) WET MIX MACADAM PLANT WET MIX MACADAM PLANT :8 Nos :8 Nos 80-100 TPH 80-100 TPH CRUSHER (200 TPH) PUZZULONA CRUSHER (200 TPH) PUZZULONA :4 :4 Nos Nos PAVER FINISHER (SENSOR) PAVER FINISHER (SENSOR) :8 :8 Nos. Nos.

description

MACHINERY AND EQUIPMENT OWNED  LABORATORY EQUIPMENTS:3 Sets  HYDRAULIC TESTING EQUIPMENTS:3 Nos.  STEEL CENTERING PLATES:  DEWATERING PUMPS:50 Nos.  WATER TANKERS:25 Nos.

Transcript of MACHINERY AND EQUIPMENT OWNED HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos...

Page 1: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

MACHINERY AND EQUIPMENT OWNEDMACHINERY AND EQUIPMENT OWNED

HOT MIX PLANT 40/60 TPHHOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLEDELECTRONICALLY CONTROLLED :12 :12

NosNos AS PER MOST (III REVISION) AS PER MOST (III REVISION)

WET MIX MACADAM PLANT WET MIX MACADAM PLANT :8 :8 NosNos

80-100 TPH80-100 TPH

CRUSHER (200 TPH) PUZZULONA CRUSHER (200 TPH) PUZZULONA :4 :4 NosNos

PAVER FINISHER (SENSOR)PAVER FINISHER (SENSOR) :8 :8 Nos.Nos.

VIBRATORY ROLLER (Soil Compactor) VIBRATORY ROLLER (Soil Compactor) :10 :10 nos.nos.

Page 2: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

MACHINERY AND EQUIPMENT OWNEDMACHINERY AND EQUIPMENT OWNED

JCB EXCAVATORJCB EXCAVATOR : 35 Nos.: 35 Nos.

HITACHI (EX-110)HITACHI (EX-110) : 30 Nos.: 30 Nos.

MOTOR GRADER (KOMATSU GD 511) MOTOR GRADER (KOMATSU GD 511) : 10 Nos.: 10 Nos.

CONCRETE MIXERCONCRETE MIXER : 50 Nos.: 50 Nos.

TIPPERS (DOUBLE AXLE)TIPPERS (DOUBLE AXLE) : 75 Nos.: 75 Nos.

Page 3: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

MACHINERY AND EQUIPMENT OWNEDMACHINERY AND EQUIPMENT OWNED

LABORATORY EQUIPMENTSLABORATORY EQUIPMENTS :3 :3 SetsSets

HYDRAULIC TESTING EQUIPMENTSHYDRAULIC TESTING EQUIPMENTS :3 Nos.:3 Nos.

STEEL CENTERING PLATESSTEEL CENTERING PLATES ::5000050000

DEWATERING PUMPSDEWATERING PUMPS :50 :50 Nos.Nos.

WATER TANKERSWATER TANKERS :25 Nos.:25 Nos.

Page 4: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

MACHINERY AND EQUIPMENT OWNEDMACHINERY AND EQUIPMENT OWNED

BITUMAIN SPRAYER (APPOLO)BITUMAIN SPRAYER (APPOLO) :10 :10 Nos.Nos.

WELDING GENERATORSWELDING GENERATORS : 30 : 30 Nos.Nos.

POWER GENERATORS (82.5 Kw)POWER GENERATORS (82.5 Kw) : 30 : 30 Nos.Nos.

POWER GENERATORS (500 Kw)POWER GENERATORS (500 Kw) : 10 : 10 Nos.Nos.

Page 5: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

VIBRATORSVIBRATORS :10 Nos.:10 Nos.

TWO WHEELERSTWO WHEELERS :10 Nos.:10 Nos.

FOUR WHEELERS FOUR WHEELERS :35 Nos.:35 Nos.

MACHINERY AND EQUIPMENT OWNEDMACHINERY AND EQUIPMENT OWNED

Page 6: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

Apart from the above, we have established Apart from the above, we have established 1 set of Laboratory along with required 1 set of Laboratory along with required laboratory equipments at Narayanpur site. laboratory equipments at Narayanpur site. We have equipments to conduct tests for We have equipments to conduct tests for Soil, Metal, Cement and Bitumen. We have Soil, Metal, Cement and Bitumen. We have experienced Material Testing Engineers to experienced Material Testing Engineers to conduct the tests to adhere with the quality conduct the tests to adhere with the quality norms.norms.

Page 7: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

WORKS UNDER PROGRESSWORKS UNDER PROGRESS

UNDER GROUND DRAINAGE WORKS TAKEN UP BY GOVERNMENT OF KARNATKA UNDER GROUND DRAINAGE WORKS TAKEN UP BY GOVERNMENT OF KARNATKA UNDER FINANCIAL ASSISTANCE OF ASIAN DEVELOPMENT BANK. (KUIDFC)UNDER FINANCIAL ASSISTANCE OF ASIAN DEVELOPMENT BANK. (KUIDFC)

1). NAME OF THE WORK 1). NAME OF THE WORK :Supplying and laying, :Supplying and laying, gravity system, Constructing FAL gravity system, Constructing FAL

Type STP and Constructing Type STP and Constructing Secondary drainage link in Secondary drainage link in Haveri CMC. Haveri CMC.

CLIENTCLIENT :Karnataka Urban Infrastructure :Karnataka Urban Infrastructure Development Finance Corporation Development Finance Corporation

VALUE OF THE WORK VALUE OF THE WORK :Rs. 1320.00 Lakhs:Rs. 1320.00 Lakhs STATUS OF THE PROJECT STATUS OF THE PROJECT :Under Progress.:Under Progress.

Page 8: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

2). NAME OF THE WORK 2). NAME OF THE WORK :Supplying and laying Sewerage :Supplying and laying Sewerage Network and Construction of FAL Type STP of 8.00 MLD Capacity in Network and Construction of FAL Type STP of 8.00 MLD Capacity in Ilkal City Municipal Council And Improvements to Urban Drainage Ilkal City Municipal Council And Improvements to Urban Drainage System in Ilkal CMC [Contract Package No.: 02ILK-02]System in Ilkal CMC [Contract Package No.: 02ILK-02]

CLIENTCLIENT :Karnataka Urban Infrastructure :Karnataka Urban Infrastructure Development Finance Development Finance

Corporation Corporation

VALUE OF THE WORK VALUE OF THE WORK :Rs. 1290.00 Lakhs:Rs. 1290.00 Lakhs STATE OF THE PROJECT STATE OF THE PROJECT :Under Progress.:Under Progress.

Page 9: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

2). NAME OF THE WORK :2). NAME OF THE WORK :Improvements to Sewerage System in Hospet Improvements to Sewerage System in Hospet CMC- Providing & Laying 176 Km Sewer Network & Construction of Manholes CMC- Providing & Laying 176 Km Sewer Network & Construction of Manholes & Construction of Secondary Drains Linking of Length of 1.75Km. [Contract & Construction of Secondary Drains Linking of Length of 1.75Km. [Contract Package No.: 01HPT02A & 2B]Package No.: 01HPT02A & 2B]

CLIENTCLIENT :Karnataka Urban Infrastructure :Karnataka Urban Infrastructure Development Finance Corporation Development Finance Corporation

VALUE OF THE WORK VALUE OF THE WORK :Rs. 910.00 Lakhs:Rs. 910.00 Lakhs STATE OF THE PROJECT STATE OF THE PROJECT :Under Progress.:Under Progress.

Page 10: MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)

CURRENT WORKS

• Sedam – Chincholi – 38KM Road work at a cost of Rs 25.8 Crores

• Konanur to Kushalnagar – 18 KM at a cost of Rs 44.63 Crores

• UGD STP plant at Hospet, Karnataka at a cost of 19.05 Crores.