Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag)...

25
Machine-Status Outline: Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23- E.Huttel 1 Erhard Huttel in Behalf of the SESAME-Tea

Transcript of Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag)...

Page 1: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

1

Machine-StatusOutline: Organization

Financial aspectsRadiation SafetyCoolingSR Magnets (CESSAMag)SR VacuumSR RF

TAC-SAC-2013/11/23-E.Huttel

Erhard Huttel in Behalf of the SESAME-Team

Page 2: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Organization

Design/MechanicsMaher ShehabThaer Abu-HaniehAkrum Al-Homoud

Ahmad AteiehOpen position

Machine-Physics (+2)Maher Attal Mohammad Ebeni (2013)Koryun Maunkyan (2013).

Cooling/VacuumFiras MahahlehOsama Nour (C)Mohammad Al-Nadjdawi (V)Adel Amro (V)Saed Budair (V)

Beamlines (+1)XABS:Messaoud HarfoucheIR: Ibraheem YousefPD: Rabia Kaneez (2013)

Computing Salman MAtalgahMustafa Zoubi

Radiation-SafetyAdli HamadMorteza Mansouri

Power-Supplies / Electric (+1)Sofian JavarIfikhar AbidOsama Khader (2013)

Yazeed Momani Farouq Al-Omari

RF/DiagnosticsDarweesh FoudehNashat (RF)Alaa Alkurdi (RF)Hussain Al-Mohammad (D)

Administration (+4)Sonia Al-FaquesMajeda Salama ( 2013)Ayman Al-Zoubi Ibrahim RadwanAbd Al Mawla GnaimatAmeyreh Basheer(2013)Khaled Al-Zoubi (2013)Rawan Ramadan (2013)

TAC-SAC-2013/11/23-E.Huttel 2

Control (+1,-1)(Ziaulhaque Qazi) left 2013Ibrahim SalehAbdallah Ismail (2013)Open Positions

Administrative SectorTechnical SectorScientific SectorGroups working for both Sectors

(more efficient for a small facility)

Page 3: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Financial Aspects till 2016

Income

EU-CERN: 5.00 M€Jordan: 4 x 1.25 M$Turkey: 4 x 1.25 M$Israel: 4 x 1.25 M$Iran: 4 x 1.25 M$ ?

Sum: 26 M $ ?

Injector-upgrade 0.9 M€Magnets and PS:5.0 M€Girder: 0.8 M€Vacuum: 3.0 M€RF: 3.0 M€Diagnostics: 1.5 M€SR-Cooling: 0.5 M€Cabling: 0.5 M€Commissioning: 1.5 M€Control-System 1.1 M€Safety P+A 0.8 M€Front-Ends: 0.5 M€

Sum [€] 19.0 M€Sum [$] 23.3 M$10% 25.6 M$

Machine: 25.6 M$4 Beamlines upgrade: 8.7 M$Guesthouse+ 1.3 M$

Sum 35.6 M$

TAC-SAC-2013/11/23-E.Huttel 3

Page 4: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Cost Planning / Schedule Plan A

Nov 2013 till Nov 2014:Committed money 12.5 M$> provided money 7.5 M$< less spend money 6.0 M$

Date Provided [M$] 1)

Contract(cost [M$])

Committed[M$]

Spend[M$] 2)

Nov 12 3.75 Jordan+IR (0.6)SR.Vac. (2.0)Rad.Saf. (0.4)AOB. (0.3) 3.2 1.6

Nov 13 7.50 RF.Cav. (2.0)Girder (1.2)Vac.Pumps (1.2)Vac.Valves (1.2)RF-Ampl. (3.2)AOB. (0.5) 12.5 6.0

Nov 14 11.25 RF LL etc (0.5)Diagnostics (2.0)Rad.Saf. (0.5)Frontends (0.7)AOB (0.5) 16.7 11.8

Nov 15 15.00 16.7

Jan 16 Start Operation

1) Contribution Israel, Jordan, Turkey 2) due to partial payment over two years spend is less than committed money

If committed money must be less provided money Schedule must be revised! Plan B.Start of operation delayed!

The contribution of Iran is needed for the built up of the beam-lines!

TAC-SAC-2013/11/23-E.Huttel 4

Page 5: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Cost Planning / Schedule Plan BProvided Money (blue)> committed money (red)> spend money (green)

Date Provided [M$] 1)

Contract(cost [M$])

Committed[M$]

Spend[M$] 2)

Nov 12 3.75 Jordan+IR (0.6)SR.Vac. (2.0)Rad.Saf. (0.4)AOB. (0.3) 3.2 1.6

Nov 13 7.50 RF.Cav. (2.0)Girder (1.2)AOB. (0.5) 6.9 4.3

Nov 14 11.25 Vac.Pumps (1.2)Vac.Valves (1.2)2 RF-Ampl. (3.2)AOB (0.5) 11.4 7.1

Nov 15 15.00 2 RF Ampl. (3.2)RF LL etc (0.5)Diagnostics (2.0)Rad.Saf. (0.5)Frontends (0.7) 16.7

12.7

Nov 16 Delivery 16.7

Nov 17 Start Operation

1) Contribution Israel, Jordan, Turkey 2) due to partial payment over two y ears spend is less than committed money

The contribution of Iran is needed for the built up of the beam-lines !

TAC-SAC-2013/11/23-E.Huttel 5

Commissioning delayed to 2017!

Page 6: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Project-Development

TAC-SAC-2013/11/23-E.Huttel 6Still in the expected range for commissioning in 2016

Page 7: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

No-In-kind Contribution Pakistan

TAC-SAC-2013/11/23-E.Huttel 7

Visit of SESAME Director, Scientific- and Administrative Director Jan. 2013

Visit of SESAME-Technical Director and Mechanical Group-Leader March 2013

In preparation of contracts: Our mails have not been replied

Kick off meeting at HMC3

Page 8: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Cooling System

TAC-SAC-2013/11/23-E.Huttel 8

Air conditioningHall (600 kW), Tunnel (30 kW)

Heat-exchanger (2x 0.9 MW)Pumps

Chillers, Cooling towers (2 x 1.1 MW)

Design by SESAME : Firas

Makahleh

Done by local provider: Alpha-Amman

Volume: 2.2 M $,

Built up: 2011-2013

Financed by: EuropAid

Page 9: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

New Commissioning Permit for Microtron-Operation

SESAME dose calculation confirmed by JNRC:Expected dose less 1mSv/yLimit for general public access

Microtron

Dos

e [m

Sv]

TAC-SAC-2013/11/23-E.Huttel 9

Page 10: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Radiation Safety

Two bids (Thermo/Eberlein, Berthold (178 k$, 275 k$)On-line-Radiation Monitors (Thermo/Eberlein) delivered: Aug. 13

Radiation Monitor installed on top of the SESAME Booster

X-ray and Neutron Personal (Luxel) Dosimeter ordered from Landauer

Luxel Dosimeter

TAC-SAC-2013/11/23-E.Huttel 10

Page 11: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

11

Personal Safety System

TAC-SAC-2013/11/23-E.Huttel

Personal-Safety System Invitation to bid: May 133 Bids received: Jul. 13 (SAM, PROCON, SELMER)

(73 k$, 163 k$, 743 k$)

Page 12: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Booster InstallationDone:Vacuum Installed and pumpedMagnets alignedRF InstalledSeptum, Kicker PS built upCabling doneControl system built upRadiation-Monitors installed

Commissioning Jan.2014

QuadrupoleCorrectorCavityCurrent-MonitorDipole

TAC-SAC-2013/11/23-E.Huttel 12

Page 13: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Control-SystemDevelopment of Virtual Servers (EPICS) and Graphical User-Interface (CSS) for: Booster -Vacuum, -RF, -Power-Supplies and -Timing

Booster fully in Control

TAC-SAC-2013/11/23-E.Huttel 13

Page 14: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

CESSAMag-Project

TAC-SAC-2013/11/23-E.Huttel 14

Invitation to Bid (Jun. 2013)Opening of Bids (Aug.2013)Dipole: (TESLA, DANFYSIK)Quadrupole: (ELYTT, SIGMA-PHI, SCANDITRONIX, DANFYSIK,TESLA)

Cost allow Power-Supplies to be fully paid within CESSMag Project

CERNJean-Pierre KoutchoukDavide TommasiniAttilio MilaneseLouis WalckiersTheodor Tortschanoff

SESAMEErhard HuttelMaher AttalMaher ShehabFiras MakahlehMohammad Ebeni

ALBAMontse Pont

CERN SESAME agreement: 15.05.2012EU CERN agreement FP7: 11.04.2013

Paul ProudlockJean-Paul BurnetMiguel Cerqueira Bastos

Page 15: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Storagering Magnets

Dipole:B: 1.46 TB’:2.79 T/mL: 2.25 m

Quadrupole:B’: 17 (-9) T/mL: 0.28 (0.1) m

Sextupole:M: 90 (-140) T/m2

l.: 0.1 m First punched laminations

TAC-SAC-2013/11/23-E.Huttel 15

Page 16: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Measuring Bench

TAC-SAC-2013/11/23-E.Huttel 16

Measurement Radius 29 mm

Measurement Length 1200 mm

Max allowed weight 1100 Kg

Power supply 50 V, 300 A

Compensation scheme Dipole, Quadrupole

Absolute field measurement error ± 5 10-4 peak-peak

Relative harmonics resolution ± 0.1 10-4

Main field angle measurement error ± 0.5 mRad

Magnetic axis measurement ± 50 µm peak-peak

Page 17: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

SR-Girder

Design ready (ALBA Design)6 feeds3 struts used for transverse and longitudinal adjustment3 jacks used for vertical adjustment and clampingMagnet Position defined by pins

TAC-SAC-2013/11/23-E.Huttel 17

Tender Request next week

Page 18: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

SR-Vacuum-Chamber-Design

Electron beam chamber70 x 28 mm2

Syn.Rad. is passing into ante chamber

Syn.Rad. is absorbed on

lumped absorber,Pumps beneath

Installed Ion-Pumps:16 x ( 2x 300 l/s + 7 150 l/s)

Pressure < 2 10-9 mbar for lifetime > 10 h

TAC-SAC-2013/11/23-E.Huttel 18

Page 19: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Vacuum-System-Purchasing

TAC-SAC-2013/11/23-E.Huttel 19

Invitation to Bid: Jun. 133 bids received : Aug. 13 (FMB, CECOM, RCJ)

(2.0 M$, 2.2 M$, 3.9 M$)

Next:Purchasing Pumps (Varian, Gamma-Vac)Purchasing Valves, Bellows (VAT)

Page 20: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

SR-RF Cavities

TAC-SAC-2013/11/23-E.Huttel 20

Two old ELETTRA cavities (reduced performance) available.

Disconnected and leaking cooling pipes.

Purchasing of 4 new cavities ( ELETTRA, BESSY, KEKII/PF)Invitation to bid: Sep. 2013Opening of Bids: Nov. 2013 (2.2 M$, 2.1 M$, 4.3 M$)

Two half performing cavities: 2.0 GeV (250 kV) 200 mAThree cavities: 2.5 GeV (615 kV) 100 mAFour cavities: 2.5 GeV (615 kV) 300 mA

Page 21: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

21

Cavities

TAC-SAC-2013/11/23-E.Huttel

Invitation to Bid: Sep. 133 bids received : Nov. 13 (RI, ELETTRA, TOSHIBA)

Specification:Number: 4Frequency: 499.65 MHzShunt Impedance: > 3.3 MΩMax Cavity Voltage: > 650 kVMax Window Power: > 120 kW

HOM-Damping Properties: Wave guide (BESSY) ++Beam-Pipe (KEK/PF) +Temperature (ELETTRA) 0

Page 22: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

RF Amplifier

TAC-SAC-2013/11/23-E.Huttel 22

Intended : Use 500 MHz solid state amplifier (0.6 kW Module) developed at SOLEIL

Needed: 4 x 80 kW from 4 x 10 x 16 x 0.5 kW

Status: 16 Modules combined and tested by SOLEIL.40 kW tower will be built up by SOLEIL for THOMX (Beginning 2014).

Export of Technology from SOLEIL to SESAME on halt (May 2013)Export approval received (Aug.2013)

Intended: Built up of one 80 kW tower (Demonstrator) by SOLEIL, sold to SESAME.Participation of SESAME.Licensing of 500 MHz technology from SOLEIL to SIGAM-PHI-Electronics?Purchasing of further 3 towers from SIGMA-PHI-Electronics? Cost?

Page 23: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

500 MHz 80 kW Solid-State-Amplifier

X 16 X 10 4 x

Syn.Rad. Losses: (200 mA 600 kV) / 4 = 30 kWCavity Losses: (500 kV)2 / (6 MΩ)= 40 kW4 Cavities: 280 kW

0.65 kW 10 kW 80 kW

TAC-SAC-2013/11/23-E.Huttel 23

Page 24: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Summery

TAC-SAC-2013/11/23-E.Huttel 24

Done in 2013:Cooling plant/Air-conditioning: Installation done.Microtron: Commissioned.Booster: Installation done.Radiation Monitoring System: Installation done.SR Magnet System (CESSAMag): Design, Tendering, Contracting done.SR Vacuum Chamber: Design, Tendering, (Contracting) done. Girder System: Design, (Tendering) done.SR-RF-Cavities: Tendering done.

Thank you for your attention!

Foreseen in 2014:Booster: CommissioningSR Magnets: Testing of Prototype, Start ProductionSR Vacuum Chamber: Testing of Prototype, Start ProductionSR Girder: Testing of Prototype, Start ProductionRF amplifier: Tendering.SR Pumps: Tendering.SR valves, bellows: Tendering.

Page 25: Machine-Status Outline:Organization Financial aspects Radiation Safety Cooling SR Magnets (CESSAMag) SR Vacuum SR RF TAC-SAC-2013/11/23-E.Huttel1 Erhard.

Power and Cooling

TAC-SAC-2013/11/23-E.Huttel 25

Electric Power Cooling CapacityCooling Tower Compressor 400 kW 2x 1 115 kWChilling water tankPumps 100 kWHeat Exchanger 2 x 870 kWPumps 120 kWAir-Conditioning 300 kW 600 kWDe Ionized Water Circuits:

SR Magnet 500 kWRF Amplifier 250 kWRF-Cavities 200 mA 125 kWSR Absorber (200 mA) 125 kWBooster (PS) 100 kW

Sum 2 000 kW