MA5616 Addinitional.ppt
-
Upload
mostafa-asalam -
Category
Documents
-
view
242 -
download
7
Transcript of MA5616 Addinitional.ppt
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 1/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
www.huawei.com
Internal
SmartAX MA5616
Additional
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 2/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 1
With the growing demand for integrateddata, video, voice and multimedia services,
the access networks are required to providehigh data rate and good quality services.
Understanding the requirements of globalmarket, Huawei has launched its SmartAX
MA5616 Multi-service Access Module.
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 3/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 2
Upon completion of this course, you will be able to:Describe the PITP parameter
Describe the Broadband Service Power off after AC down
Describe how to shut down the power for oneboard by remote
Service Emulation
Describe the FE isolation & Rate limitation.
Environment Monitor
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 4/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 3
It is the same with MA5600:
anid atm frame/slot/subslot/port:vpi.vci
anid eth frame/slot/subslot/port: vlanid
Note:1. If there are CVLAN at service- port , the “ vlanid ” is CVLAN; and if there is none CVLAN at service -
port, the “ vlanid ” is SVLAN.
2. When we deploy the “PTM” mode of VDSL and FE service, the keyword will be “eth”, and if it is thetraditional ADSL service or “ATM” mode of VDSL, the key word will be “atm”.
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 5/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 4
broad-service power-off shutdown
undo broad-service power-off shutdown
Note:1. The broad-service power-off shutdown command is used to enable the device to stop the
broadband service when the AC power supply is cut off and the battery is used for power supply.When the battery is used for power supply, you can run this command to stop the broadbandservice so that the narrowband service works for a longer time.
2. The undo broad-service power-off shutdown command is used to cancel the configuration inwhich the device stops the broadband service when the AC power supply is cut off and the batteryis used for power supply.
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 6/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 5
board power-on frameid/slotid
board power-off frameid/slotid
Note:
1. This command “ board power-on frameid/slotid ” is used to power on a service board remotely.
2. This command “ board power-off frameid/slotid” is used to power off a service board remotely.
3. When a service board of the MA5616 is faulty, you can run the board power-off command to poweroff and then run the board power-on command to power on the service board remotely to check
whether the hardware of the service board is normal. After this command is executed successfully,the service board is powered on and is registered again.
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 7/16HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 6
PPPOE simulation
POTS emulation call
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 8/16HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 7
PPPOE simulation
Note:huawei(config)#pppoe simulate
{ start<K>|stop<K> }:start
Service-port(index<0-999>):0
User Name(length<1,65>):user-0
User Password(length<0,16>):*******
Authentication Mode: 1. Chap 2. Pap [default 1]:1
Overtime Time(5-60s)[default 5]:10
huawei#display pppoe simulate info
Service-port: 0
User name: user-0
Current phase: Discovery
Result: -Start time: 2009-05-12,08:49:23+08:00
End time: -
Session ID: -
User IP: -
Gateway IP: -
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 9/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 8
POTS emulation call
Note:pots emulational-call caller-port frameid/slotid/portid callee-port frameid/slotid/portid callee-
telno telno-vlaue
undo pots emulational
huawei(config-test)#pots emulational-call
{caller-port<K>}:caller-port
{ frameid/slotid/portid<S><Length 1-15> }:0/1/1
{callee-port<K>}:callee-port
{ frameid/slotid/portid<S><Length 1-15> }:0/1/2
{ callee-telno<K> }:callee-telno
{ telno-vlaue<S><Length 1-16> }:88880000
Command:pots emulational-call caller-port 0/1/1 callee-port 0/1/2 callee-telno 88880000
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 10/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 9
By nature, every FE port are isolated
If we want to limit the physical speed of FE port, we can usecommand “ line-rate integer port frameid/slotid/portid ”.
Note:1. line-rate integer port frameid/slotid/portid
undo line-rate port frameid/slotid/portid
integer: 64-1000000 kbit/s.
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 11/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 10
Cable One End Is Connected to The Other End Is Connected to
Environment monitoring cable
ALARM port on the control board
Temperature sensor
Door status sensor
Lightning arrester
Fan
Battery monitoring cable SENSOR port on the power board Battery temperature sensor
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 12/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 11
huawei(config)#emu add 3 H831PMU 0 7 RS485
huawei(config)#interface emu 3
huawei(config-if-h831pmu-3)#display power system parameter
EMU ID: 3 Power system information
----------------------------------------------------------------------------
Charge control state: Remote control
Equalizing voltage : 56.80V Floating voltage : 55.00V
Charge Lmt quotiety : 0.15 Equalizing time : 90 days
Battery number : 1 Battery 0 capacity : 12 AH
Battery off permit : Permit Battery off voltage : 44.00V
DC over alarm volt : 59 V DC lack alarm voltage : 48 V
Power-cut-close-Broad-service : On
----------------------------------------------------------------------------
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 13/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 12
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 14/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 13
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 15/16
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 14
huawei(config)#emu add 2 POWER4830 0 4 RS485 POWER4830
huawei(config)#interface emu 2
huawei(config-if-power4830-2)#display power system parameter
EMU ID: 2 Power system information ----------------------------------------------------------------------------Charge control state: Automatic control Equalizing voltage : 56.50V Floating voltage :53.50V Charge Lmt quotiety : 0.15 Equalizing time : 60 days Battery number : 1 Battery 0capacity : 65 AH battery temperature test upper : 80C battery temperature test lower: -20Ctemperature redeem quotiety : 80mV battery temperature alarm upper: 50C batterytemperature alarm lower: 0C Battery off permit : Permit Battery off voltage : 43.00V AC overalarm volt : 280V AC lack alarm voltage : 180V DC over alarm volt : 58 V DC lack alarmvoltage : 45 V Power module number : 2 module 0 address: 1 module 0 switch state : Onmodule 1 address: 2 module 1 switch state : On Battery high-temperature-off permit : ForbidBattery high-temperature-off temperature: 53 C ----------------------------------------------------------------
------------
8/10/2019 MA5616 Addinitional.ppt
http://slidepdf.com/reader/full/ma5616-addinitionalppt 16/16
www.huawei.com
Thank You