M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical...
Click here to load reader
-
Upload
pierce-franklin -
Category
Documents
-
view
216 -
download
0
Transcript of M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical...
![Page 1: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.](https://reader037.fdocuments.in/reader037/viewer/2022100421/56649f2b5503460f94c45ae3/html5/thumbnails/1.jpg)
M Bonesini 1
M. Bonesini – INFN Milano
TOF news
![Page 2: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.](https://reader037.fdocuments.in/reader037/viewer/2022100421/56649f2b5503460f94c45ae3/html5/thumbnails/2.jpg)
M Bonesini 2
Review of planned work
TOF technical designs (structure of detectors, supports, …) will be delivered to Wing in .dwg format in a few daysMore work on PMTs tests is foreseen
![Page 3: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.](https://reader037.fdocuments.in/reader037/viewer/2022100421/56649f2b5503460f94c45ae3/html5/thumbnails/3.jpg)
M Bonesini 3
Tests on R49998 PMTs
We plan to have a custom built magnet at Milano Bicocca (solenoid or Helmholtz coils with B up to 100-200 gauss) for in house tests of R4998 PMTsVME QADC+TDC system (with AGILE DAQ) readyFast home-built laser system (AVTECH fast pulser + NICHIA Laser diode at 400 nm) ordered (rate up to 1 MHz)
![Page 4: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.](https://reader037.fdocuments.in/reader037/viewer/2022100421/56649f2b5503460f94c45ae3/html5/thumbnails/4.jpg)
M Bonesini 4
Tests on Fine-mesh PMTs
Additional test at LASA (mainly for rate effects with a laser light cycle simulating ISIS) in preparation at LASA with Pavia MEG group for March/April 2005Tests with 1”,1.5”,2” fine-mesh PMTsSame equipment as in-house tests + Hamamatsu Laser PLP10 on loan (rate up to 10 MHz)
![Page 5: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.](https://reader037.fdocuments.in/reader037/viewer/2022100421/56649f2b5503460f94c45ae3/html5/thumbnails/5.jpg)
M Bonesini 5
What I need
To finalize TOF station design I need final infos on
Space available at TOF station positions laterally to MICE cooling section (to recess TOFs for calibration with cosmics) (Wing ?)
Final B field maps at TOF0… positions (Kevin, Tom ?)
Final evaluation of rates at TOF0 … positions (Tom ?)