M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical...

5

Click here to load reader

Transcript of M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical...

Page 1: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.

M Bonesini 1

M. Bonesini – INFN Milano

TOF news

Page 2: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.

M Bonesini 2

Review of planned work

TOF technical designs (structure of detectors, supports, …) will be delivered to Wing in .dwg format in a few daysMore work on PMTs tests is foreseen

Page 3: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.

M Bonesini 3

Tests on R49998 PMTs

We plan to have a custom built magnet at Milano Bicocca (solenoid or Helmholtz coils with B up to 100-200 gauss) for in house tests of R4998 PMTsVME QADC+TDC system (with AGILE DAQ) readyFast home-built laser system (AVTECH fast pulser + NICHIA Laser diode at 400 nm) ordered (rate up to 1 MHz)

Page 4: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.

M Bonesini 4

Tests on Fine-mesh PMTs

Additional test at LASA (mainly for rate effects with a laser light cycle simulating ISIS) in preparation at LASA with Pavia MEG group for March/April 2005Tests with 1”,1.5”,2” fine-mesh PMTsSame equipment as in-house tests + Hamamatsu Laser PLP10 on loan (rate up to 10 MHz)

Page 5: M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.

M Bonesini 5

What I need

To finalize TOF station design I need final infos on

Space available at TOF station positions laterally to MICE cooling section (to recess TOFs for calibration with cosmics) (Wing ?)

Final B field maps at TOF0… positions (Kevin, Tom ?)

Final evaluation of rates at TOF0 … positions (Tom ?)