LWC-04 On Whimpey Creek Horizontal Plastic Belt POD Screen.
-
Upload
rodger-king -
Category
Documents
-
view
215 -
download
1
description
Transcript of LWC-04 On Whimpey Creek Horizontal Plastic Belt POD Screen.
LWC-04LWC-04On Whimpey CreekOn Whimpey Creek
Horizontal Plastic Horizontal Plastic Belt POD ScreenBelt POD Screen
Process – Start to FinishProcess – Start to Finish
• Design ideas• Contact Hydrolox and purchase materials• Overcoming problems during fabrication• Input from engineer• Changes during fabrication• Finding a site for installation• Installation• Monitoring and evaluating screen operation
• Need for other types of POD screens• Idea to build a horizontal plastic belt
screen• Fabrication crew talking about ideas and
materials• Jim Jones contacted Hydrolox and
ordered plastic belt materials after discussions with their Engineers
• Harvey Goddard assigned to take lead on project
Monitoring and EvaluationMonitoring and Evaluation
• 2.47 cfs design flow• Hydrolox Series 1800 mesh top with 37%
open area• 1.10 cfs measured flow• Water level was to low to accurately
evaluate both sweeping velocity and velocity through the screen