LVL Roof Structure
TESTING
1. Bending test for LVL (as a structural members).2. Testing for truss connector, shearing and bending test for bamboo laminated dowels.3. Testing for LVL truss prototype.
8 cm
1,8 1,8 1,8
8 cm
1,8 cm
Single configuration
Spacious configuration
Sample Code LenghtDistance of
StiffenersPcs
G-30 30 cm NA 3
G-60 60 cm NA 3
G-90 90 cm NA 3
G-120 120 cm NA 3
G-150 150 cm NA 3
GK-10 120 cm 10 3
GK-20 120 cm 20 3
GK-30 120 cm 30 3
GK-40 120 cm 40 3
GK-60 120 cm 60 3
Shearing and bending test for bamboo laminated dowel (dia. 8 mm, 10 mm & 15 mm.)
Table : Testing variable of LVL members (Compression parallel to grain test)
Dial gauge
Loading jack
Load cell
Tested Sample
COMPRESSION TEST(parallel to grain)
LVL PROPERTIES
LVL of falcata veneers is tested for its compression behaviour. Following the engineering design codes, the LVL will
be assembled in the form of light weigh truss prototype. In order to
know the truss strenght, the prototype will be tested (following Indonesia’s building codes). Laminated bamboo dowels are used as truss connector
system.Connectors configuration
ABSTRACT
LVL TRUSS TEST
Loading Model in Truss Compression Test
Dial Gauge
Loading Model 1
Loading Model 2Support
LVL TRUSS TEST
LIGHT STEEL TRUSS TEST
0
500
1000
1500
2000
2500
3000
0 100 200 300 400 500 600 700 800
R-70
50-50
F-70
All-F
Light Steel
Load ( kg )
Deflection ( Micron )
COMPARATION OF TRUSSES STRENGHT
Certificate from Civil Engineering Dept
meet the requirements of Indonesia’s Building Codes for constuction.
Structural design of truss which is constructed of LVL ,
Certificate from Indonesian Institute Of Science
already tested and approved for housing usage.
Designing and constructing with LVL ,
T‐45
( LVL knock down house )
INTERIOR PLAN
INTERIOR PERSPECTIVE 01
INTERIOR PERSPECTIVE 02
FRONT PERSPECTIVE 01
FRONT PERSPECTIVE 02
BACK PERSPECTIVE
T‐45 MODEL (1 : 3 )
POSTS & BEAMS CONSTRUCTION
TRUSSES INSTALLATION
COMPLETED SKELETON FRAME
ROOF STRUCTURE
ROOF STRUCTURE
WALL PANEL INSTALLATION
WALL PANEL INSTALLATION
WALL PANEL INSTALLATION
COMPLETED INSTALLATION
COMPLETED INSTALLATION
T‐45 ( 20/04/2012 )
COMPLETED FITTING
DISMANTLING T‐45