LUT Green Campus Marko Kasurinen
Transcript of LUT Green Campus Marko Kasurinen
Lappeenranta University of Technology (LUT)
Green your mind - mind your green
La
pp
een
ran
ta U
niv
ers
ity o
f Tech
no
log
y | S
trate
gia
2015 Y
hd
essä
research | education | business and industry
CampusCar: electric cars, CamBus: electricbus
CamBike: electric bicyles
Lappeenranta city and South-Karelia
SkinnWind: windmill
-30 m, 20 kW
SkinnSolar: solar panels
-200 m2 , 20 kW
”GREEN CAMPUS” Skinnarila - Campus
LUT + Saimia + Technopolis + LOAS
Busin
ess a
nd in
dustry
SAMMIO
”Joulella pisimmälle” Competition for electric vehicles
Smart Energy Grid System
i
Footer
Windmill & Schwäbisch Hall -park
• 20 kW
• 30 m tall
• 5,5 m blades
• Produces enough electricity for 3-8 domestic houses
Solar park (as originally planned)
• 20 kW
• Will be on the roofs and parking lot
• Some of it has been installed and rest are going to be on spring
• Similar power to wind mill, so the comparison is valid
Weather station
• www.saapalvelu.fi/lappeenranta
• We need weather information to compare
energy production figures
Footer
SmartGrid
Actions at the
customer gateway
Active
monitoring,
optimisation
and control of
energy use and
power flows
Generation
Solar, wind,
fuel cell, biogas
Grid
ENERGY
STORAGE
Loads; controllable, non-controllable
Information systems
Action signals based on
optimization against different
targets of system players
Market players;
TSO, DSO, supplier, aggregator
CampusCar
• Two cars being part of
SmartGrid-research
• Modified Toyota Prius hybrid ja
Fully converted to electric
vehicle VW Passat
• 3 charging stations coming, one
for public.
Footer
Electric bikes for students
Footer
Footer
Sammio
Footer
• Learning environment
• Brings different faculties together
• Students can build electric vehicles and other ”Green Campus- stuff”
Green Office
• Environmental management program made during 2012 finished in
september
• Constant improvement in sustainability issues
• Upcoming things:
• Improving metering of our buildings
• Improving control of lights
• Improving air conditioning and heating systems
• We also joined Kyyti.Net rideshare system
• Also finding out possibilities to increase working from home
LUT Green Office :
• Reducing electricity consumption by 10 % (almost 100 000 euros)
• Reducing use of paper by 10 %
• Reducing use of heat energy by 10 %
Footer
Footer
Happenings
Footer
CAMBUS - project
• One example of research :
• Packaging line of the future
Whats happening next
• Environmental manager started in February
• Goal is to get succesfully audited for ISO 14001
• Solar plans expanded; We are building the biggest solar plant in Finland
• 220 kW
• 100-150 kW during this year and the rest during 2014
Footer
Lappeenranta vs. Frankfurt solar power
capacity
0
1
2
3
4
5
6
7
kWh
/m2
/d
Kuukausi
Frankfurt, Saksa
Lappeenranta, Suomi
Conclusion
Research environment Education environment Demonstration
Renewable energy and sustainable campus
Footer