LUSI Status Update
description
Transcript of LUSI Status Update
Tom Fornek
LUSI Update [email protected]
12 November 20081
SLAC National Accelerator Laboratory
LUSI Status Update
Tom FornekProject Manager
Tom Fornek
LUSI Update [email protected]
12 November 20082
SLAC National Accelerator Laboratory
Project description (1)LUSI will deliver:
Three X-ray scattering instruments that have been funded by DOE-BES as a “Major Item of Equipment (MIE)” project:
XPP X-ray Pump Probe CXI Coherent X-ray ImagingXCS X-ray Correlation Spectroscopy
Tom Fornek
LUSI Update [email protected]
12 November 20083
SLAC National Accelerator Laboratory
61 2 3
4 5
LCLSLUSI
Offset MonochromatorExp. ChamberDetector
Beam Transport
Project description (2)
Near Experimental Hall Far Experimental Hall
XPPXCS CXI
Tom Fornek
LUSI Update [email protected]
12 November 20084
SLAC National Accelerator Laboratory
LUSI Status Changes June-November
LCLS Directorate Organization Developed
LUSI Project Execution Plan Approved
CD-2 Approved Oct. 22, 2008
LUSI Team Leader Meetings Held
Tom Fornek
LUSI Update [email protected]
12 November 20085
SLAC National Accelerator Laboratory
LCLS Directorate Organization LCLS Directorate
Dale KnutsonMark Reichanadter, Deputy
Business Office
Cindy LoweTBD, Deputy
Accelerator Systems Division
John SeemanTBD, Deputy
Engineering Physics Division
Dave SchultzJames Krebs, Deputy
Experimental Facilities Division
Jochen SchneiderJerome Hastings, Deputy
Strategic Projects Division
John Galayda
LUSI Incorporated into LCLS Directorate
Tom Fornek
LUSI Update [email protected]
12 November 20086
SLAC National Accelerator Laboratory
LCLS STRATEGIC PROJECTS DIVISIONLCLS Strategic Projects DivisionJohn Galayda – Division Director
Michael Scharfenstein – ES&HDarren Marsh – QA
Helen O’Donnell – Administrative Support
LCLS Construction ProjectJohn Galayda – Project Director
Mark Reichanadter – Deputy Project DirectorJess Albino – Associate Project Director for Civil Cinstruction
LUSI MIE ProjectTom Fornek – Project ManagerTBD – Deputy Project Manager
LUSI uses LCLS Directorate Services (ES&H, QA, PMCS, Finance)
Tom Fornek
LUSI Update [email protected]
12 November 20087
SLAC National Accelerator Laboratory
LUSI INTEGRATED PROJECT TEAMDOE-HQ
Harriet Kung, Acquisition ExecutiveT.E. Kiess, Program Manager
DOE-SSOH. Joma
DOE Federal Project Director
SLACT. Fornek
LUSI Project ManagerTBD - Deputy
WBS 1.2 XPP IIT
D. Fritz(Instr. Scientist)
J. Langton( Lead Eng)
J. DelorJ. Defever
WBS 1.3 CXI IIT
S. Boutet(Instr. Scientist)
P. Montanez( Lead Eng)
A. BusseK. Fox
WBS 1.4 XCS IIT
A. Robert(Instr. Scientist)
E. Bong(Lead Eng)
T. Osier
WBS 1.5 DCOY. Feng
(Lead Scientist)E. Ortiz
(Lead Eng )T. MontagneM. CampellR. JacksonB. Bigornia
Instrument TeamLeaders
DOE-SSO Support
WBS 1.6
Data Acquisition & Controls
G. Haller(Lead)
LCLSDirectorate Support
EngineeringTechnical Configuration Control Committee
Tom Fornek
LUSI Update [email protected]
12 November 20088
SLAC National Accelerator Laboratory
LUSI ScopeThere are six level 2 WBS elements in WBS 1.0
WBS 1.1 – Project Management
WBS 1.2 – X-ray Pump Probe (XPP)
WBS 1.3 – Coherent X-ray Imaging (CXI)
WBS 1.4 – X-ray Correlation Spectroscopy (XCS)
WBS 1.5 – Diagnostics and Common Optics
Includes XPP, CXI and XCS diagnostics and optics
WBS 1.6 – Controls and Data Acquisition
Includes XPP, CXI and XCS controls and DAQ
Tom Fornek
LUSI Update [email protected]
12 November 20089
SLAC National Accelerator Laboratory
LUSI Cost BaselineWBS Description CD-2 Est.
($M)
1.1 Project Management 5.5
1.2 X-ray Pump Probe (w/BNL) 5.9
1.3 Coherent X-ray Imaging 9.5
1.4 X-ray Correlation Spectroscopy (w/BNL) 7.7
1.5 Diagnostics & Common Optics 6.4
1.6 Controls & Data Acquisition 7.1
Contingency 13.0
2.0 Other Project Costs 4.9
LUSI Total Project Costs 60.0
Tom Fornek
LUSI Update [email protected]
12 November 200810
SLAC National Accelerator Laboratory
LUSI Funding Profile ($M)
PriorYrs
FY07 FY08 FY09 FY10 FY11 FY12 Total
TEC 0.50 6.00 15.00 15.00 13.50 5.10 55.10
OPC 3.40 1.50 4.90
Total 3.40 2.00 6.00 15.00 15.00 13.50 5.10 60.00
Tom Fornek
LUSI Update [email protected]
12 November 200811
SLAC National Accelerator Laboratory
LUSI ADVANCE PROCUREMENT REQUEST AT CD-2
DESCRIPTION PROCUREMENT REQUEST
BUDGETED COST
BUDGETED COST + CONTINGENCY WBS TOTAL
X-ray Pump/Probe Diffractometer
Sample tilt Platform 245,321 380,247
Sample Kappa Platform 130,552 228,466
Parts 186,650 281,842
XPP Detector Mover Detector Mover 183,831 292,291 1,182,846
Coherent X-ray Imaging
1.0 micron KB Mirror system (Note 1) 986,450 1,775,610 1,775,610
X-ray Coherent Scattering
Diffractometer System 531,294 929,765
XCS Detector Mover 688,800 1,350,048 2,279,813
Diagnostics & Common Optics
Large Offset Monochromator 1,173,831 1,855,888 1,855,888
TOTAL 4,126,729 7,094,157 7,094,157
Tom Fornek
LUSI Update [email protected]
12 November 200812
SLAC National Accelerator Laboratory
LUSI Schedule Changes CD-2 Review Recommendation to plan for one CD-3 and one CD-4 incorporated into baseline plan
CD-3 – April, 2010
CD-4 – August, 2012
Early science milestones for XPP and CXI established as Level 2 milestones
XPP – October, 2010
Commissioning readiness in July, 2010
CXI – August, 2011
Commissioning readiness in April, 2011
Tom Fornek
LUSI Update [email protected]
12 November 200813
SLAC National Accelerator Laboratory
CALENDAR YEARS
2008 2009 2010 2011 2012
CD-3 CD-4
XPP Early Science
XPP Procurement Approval
CXI Early Science
LUSI Schedule Baseline
CD-2
Tom Fornek
LUSI Update [email protected]
12 November 200814
SLAC National Accelerator Laboratory
BA Plan & BCWS to Fit BA Profile
$-
$3,000,000
$6,000,000
$9,000,000
$12,000,000
$15,000,000
$18,000,000
$21,000,000
$24,000,000
$27,000,000
$30,000,000
$33,000,000
$36,000,000
$39,000,000
$42,000,000
$45,000,000
$48,000,000
$51,000,000
$54,000,000
$57,000,000
Contingency1.6 - Controls1.5 - DCO1.4 - XCS 1.3 - CXI1.2 - XPP1.1 - Program MgmtFunding
Tom Fornek
LUSI Update [email protected]
12 November 200815
SLAC National Accelerator Laboratory
XPP Instrument Design
X-ray Optics & Diagnostics
Sample Goniometer
Diagnostics
Ultrafast Laser
Detector Mover
Detector
XPPD. Fritz
Tom Fornek
LUSI Update [email protected]
12 November 200816
SLAC National Accelerator LaboratoryCXI Instrument Design
1 micron focusKB system (not shown)
0.1 micronKB system
Sample Chamber with raster stageDetector Stage
(Utilizing the LCLS Detector)Diagnostics &Wavefront Monitor
Particle injector
LCLS Beam
CXIS. Boutet
Tom Fornek
LUSI Update [email protected]
12 November 200817
SLAC National Accelerator Laboratory
XCS Instrument Design
Optical raft (1.4.2)Optics and Diagnostics (1.5)
Diffractometer(1.4.4.1)
Large Angle Detector Stage(1.4.4.3)
XCSA. Robert
Tom Fornek
LUSI Update [email protected]
12 November 200818
SLAC National Accelerator Laboratory
Instrument Team LeadersXPP
K. Gaffney, Photon Science-SLAC (leader)D. Reis, University of MichiganT. Tschentscher, DESYJ. Larsson, Lund Institute of TechnologyA. Nilsson, Photon Science-SLAC
XCSB. Stephenson, ANL (leader)K. Ludwig, Boston UniversityG. Grübel, DESY
CXIJ. Hajdu, Photon Science-SLAC, Uppsala University (leader)H. Chapman, LLNLJ. Miao, UCLA
Tom Fornek
LUSI Update [email protected]
12 November 200819
SLAC National Accelerator Laboratory
Instrument Update
XPPWBS 1.2
Hutch 2
XCS Offset MonochromatorWBS 1.5
X-ray transport tunnel
XCSWBS 1.4
Hutch 6
CXIWBS 1.3
Hutch 1
Tom Fornek
LUSI Update [email protected]
12 November 200820
SLAC National Accelerator Laboratory
Near Experimental HallAMO
Control Room
AMO(LCLS)
XPP EndstationHutch 3
XPPControl Room
Future XPPSAXS Area
Tom Fornek
LUSI Update [email protected]
12 November 200821
SLAC National Accelerator Laboratory
XPP Instrument @ LCLSPhoton Shutter
Photon Shutter
Intensity Monitor
Intensity Monitor
Intensity Monitor
Intensity Monitor
Slits
Slits
Slits
Focusing Lenses
Attenuators
Pulse Picker
Mirrors
Sample Goniometer
Detector Mover
Profile Monitor
Profile Monitor
Profile Monitor
Tom Fornek
LUSI Update [email protected]
12 November 200822
SLAC National Accelerator Laboratory
XPP Schedule
Components Available in Mid-2010 Components Available in 2012 (or before)
Sample Goniometer (Kappa & Tilt Platform) X-ray Focusing Lenses
Detector Mover Harmonic Rejection Mirrors
X-ray Detector System Attenuators
Laser System Optics and Diagnostics Laser Power Amplifier
X-ray Slits Optical Parametric Amplifier
X-ray Pulse Picker
X-ray Diagnostics
Controls & DAQ
Tom Fornek
LUSI Update [email protected]
12 November 200823
SLAC National Accelerator Laboratory
Far Experimental Hall
Coherent X-ray Imaging Instrument(Hutch 5)
Control RoomLab Area
X-ray Correlation SpectroscopyInstrument (Hutch 4)
Hutch 6
Tom Fornek
LUSI Update [email protected]
12 November 200824
SLAC National Accelerator Laboratory
CXI Physics RequirementsRequirement Device
Remove X-ray beam halo X-ray Guard Slits/AperturesTailor X-ray intensity AttenuatorsTailor X-ray repetition rate Pulse PickerCharacterize X-ray pulse intensity Intensity MonitorCharacterize X-ray spatial profile Profile MonitorCharacterize X-ray pulse intensity
before the sample on every shot Non-destructive Intensity Monitor
Characterize X-ray focus Wavefront MonitorAlign experiment without X-ray beam Reference Laser
Maximize X-ray flux on sampleTailor focal spot size to the sample
Focusing optics1 micron Kirkpatrick-Baez Mirrors0.1 micron Kirkpatrick-Baez Mirrors
Minimize air scatter and backgroundPosition sample and final apertures Sample environment
Position sample environment Instrument StandDeliver single particles to the X-ray
beam in the gas phase Particle Injector
Measure X-ray scattering pattern 2D X-ray Detector (Utilizing the LCLS Detector)
Position X-ray area detector Detector StageAnalysis of sample fragments after
Coulomb explosion Ion Time-of-Flight
Photon Shutter
Guard Slits
Attenuators
Pulse Picker
Sample EnvironmentParticle InjectorIon TOF-MS
KB Mirrors
FEH H
utch 5
Wavefront Monitor
Detector Stage
Beam Dump
Guard Slits
Guard Slits
KB Mirrors
Aperture
Aperture
X-ray Transport Tunnel
Diagnostics
Diagnostics
Diagnostics
Guard Slits
Diagnostics
Reference Laser
Tom Fornek
LUSI Update [email protected]
12 November 200825
SLAC National Accelerator Laboratory
Instrument AvailabilityComponents Available in Early
2011“CXI Early Science”
Components Available in 2012(or before)
Alignment Laser 0.1 micron KB System1 micron KB System Sample Chamber for 0.1 micron KBSample Chamber for 1 micron KB Particle Injector2D Detector Ion Time-of-FlightDetector StageDiagnostics & Common Optics
Controls & DAQ
Tom Fornek
LUSI Update [email protected]
12 November 200826
SLAC National Accelerator Laboratory
CXI Major AccomplishmentsAdded 1 micron sample chamber to reduce project risk
Conducted LUSI’s first advance procurement technical reviewCXI 1 micron mirror system - October 8
Developed one micron K-B mirror system mechanical support system concept
Provided hutch 5 specification input to LCLS Conventional Facilities for FEH hutch design
Cornell detector system progressing wellSupport system design developed
Satellite Workshop held Friday, October 17 “ Application of Coherent X-rays at the LCLS”
Tom Fornek
LUSI Update [email protected]
12 November 200827
SLAC National Accelerator Laboratory
Far Experimental Hall
Coherent X-ray Imaging Instrument(Hutch 5)
Control RoomLab Area
X-ray Correlation SpectroscopyInstrument (Hutch 4)
Hutch 6Future XCS
SAXS Area
Tom Fornek
LUSI Update [email protected]
12 November 200828
SLAC National Accelerator Laboratory
XCS Instrument @ LCLS Photon ShutterPrimary Slits
Diagnostics
Secondary SlitsDiagnostics
Split and Delay
Focusing Lenses
Attenuators
Diagnostics
Photon Shutter
Defining Slits
DiffractometerLarge AngleDetector Stage
MonochromatorTransport TunnelFEH
Hutch 4
Harm. Rej. Mirrors
Pulse Picker
Secondary SlitsDiagnostics
Goal Time-resolved observation of coherent diffraction patterns using LCLS coherent hard x-rays (6-25keV)
Tailor and characterize X-ray beam parametersSpatial profileIntensityRepetition RateSpectral Bandwidth
X-ray Photon Correlation Spectroscopy Requirements
Versatility of the instrumentation (SAXS, WAXS, GI)Coherence preservation of x-ray optics (to the extent possible)
Detector with small pixel size/Large sample-detector distance
Key Performance Parameters4-20 keV energy range
Using the fundamental and third harmonic
0.1-0.01% energy resolution
Tom Fornek
LUSI Update [email protected]
12 November 200829
SLAC National Accelerator Laboratory
Device Ready Date4-circle Diffractometer (Horiz. Scattering ) CD-4 (8/2012)Large Angle Detector Mover CD-4 (8/2012)Large Offset Monochromator CD-4 (8/2012)Harmonic Rejection Mirrors CD-4 (8/2012) X-ray Focusing Lens CD-4 (8/2012)Pop-In Profile Monitor (5) CD-4 (8/2012)Pop-In Intensity Monitor (5) CD-4 (8/2012)Intensity-Position Monitors (5) CD-4 (8/2012)Attenuators CD-4 (8/2012)Guard Slits (6) CD-4 (8/2012)Pulse Picker CD-4 (8/2012)
XCS CD-4 Deliverables
Tom Fornek
LUSI Update [email protected]
12 November 200830
SLAC National Accelerator Laboratory
XCS Major Accomplishments
Developed detailed cost and schedule baseline
Provided hutch 4 specification input to LCLS Conventional Facilities for FEH hutch design
Added XCS large offset monochromator back into diagnostics and common optics scope
Satellite Workshop held Friday, October 17 “ Application of Coherent X-rays at the LCLS”
Tom Fornek
LUSI Update [email protected]
12 November 200831
SLAC National Accelerator Laboratory
Thank You