Transcript of Lung R X Renovation (2)
Lung RXa division of
UNITED THERAPEUTICS CORPORATION.Martine Rothblatt, Ph.D. Chairman & CEO.
1077 A1ASatellite BeachFlorida 32937
Renovation of the new office building 2007
Contractors Space Coast Architects.
Indialantic. Florida. Larry Maxwell Fleis & Bennett Engineering.
Satellite Beach. Florida. Clayton Bennett.
Prime Contractor PAVCO Construction Inc. Melbourne. Florida.
Mike Fischer Vice President.
Brad Mack Project Manager. Julian Leek Job Superintendent.
John Luzier Lead Carpenter.
Out line of Scope of Work To renovate an existing
three story ocean front residential town house duplex into a single commercial office building.
Demolition of the existing office building for use as parking and landscape area.
Due to limited or nonexistence hurricane anchors the building was brought up to current standards. Threaded rod was added from the block on the first floor to the top plate
on the third floor.
Sections of walls between the two units were removed to make way for a crossover. Rebar is added before the cell is poured with concrete.
Fire wall framing on the first floor
Spray insulation foam between the roof trusses and wall cavities second and third floors.
The old garage door header is removed to make way for new front entrance and foyer.
Cabling and drywall added to new secure IT room
As the building had sat uninhabited for a few years vandals had reworked the windows.
A wide range of paint colors was used to bring out a tropical look.
Front secure reception area
Second floor relaxation room, first floor Space Shuttle conference room, connecting hallway and third floor
Murphy bed.
Storm drain had to be removed to get the equipment in place to do the wet tap for the fire hydrant.
Fire back flow installed with test gauge
After the move over to the new building the old building was stripped of usable fixtures that were
then recycled or reused.
Demolition begins
Demolition continues
Sunrise a new day begins
Site work, form work for side walks and a sub base compacted before the brick pavers are installed.
As the site work continues more old concrete sign foundations are unearthed. The contractor had to bring
back the track hoe to remove these obstacles.
Drive way prepped for pavers. Pavers installed. Fire hydrant tested and ready for use and ADA
truncated dome pavers laid in wet cement.
Looking to the East over the brick paver parking lot.
Irrigation for the landscaping is obtained by drilling a 2” deep free flowing well on the property. Water is pumped to zone valves controlled by a timer for individual precise
control of the amount of water each zone receives.
All storm water run off on the property goes into the rear retention pond.
Landscaping with only natural native salt tolerant plants
RAIN RAIN RAIN
Generator pad installed for future use under separate contract.
Beach Steps. Even before work had begun mother nature reclaimed eight feet of dunes.
Department of Environmental Protection regulations prohibit any work on the sand dunes from March 1st to November 1st of
each year due to the sea turtle nesting season. The contractors work did not involve any post penetration of the
sand as they used the preexisting posts.
Front of building looking to the East
Beach side windows
South side looking North
PAVCO Sub-Contractors
Advent Electric LLC
Universal Fire Alarm
BCI Mechanical BCI Plumbing BCI Utilities BCI Site WorkTri-State GradingMorgan Surveying Cabinets by
Booth Classic Floors Future Foam Inc
First String Fire Protection Inc.
Jim Francher Painting Inc.
Pro-Tech Roofing Snyder Steel Stone
Supermarket Atlantic Pavers Sumaj Drywall Marks
LandscapingIndian River
Irrigation Adger Smith Wells
PAVCO Sub-Contractors continued
Remar Cleaning Tuffest * Concrete Circle K Demolition Ricks Garage Doors Atlantic Testing Inc South East Staffing Riverside Glass Sunbelt Rentals RSC Rentals United Rentals
Direct contractors to Lung RX
Detect Alert Alarm Company Inc. Blinds of all Kinds Chucks Wallpaper Hanging Commercial Office Equipment Inc Romeo HDTV Computer cabling Harold Hunt Moving, Transportation, and Logistics
Elizabeth Welch, Julian Leek Repair Services.
With thanks to the staff of LUNG RX for there tolerance during inconvenient times. A special thanks
to Avi Halpert Manager Construction Facilities United Therapeutics
Corporation, Maryland. And Alice Bickford Office Manager LUNG RX Satellite Beach Office, Florida. For support, guidance and
patience.