Lump Load 80%
1
ETAP Project: Te Giac Trang H05 12.6.5C Date: 03-16-2015 Location: Vietnam SN: PTSCM&CJSC Contract: Revision: Manned1 Engineer: Pham Minh Cuong Study Case: TS Config.: Manned Project File: G:\1. PTSC Project\12. H5\2. DE\ETAP\TGT-H05\TGT-H05 Transient Output Report: TS TRANSIENT STABILITY ANALYSIS 0 5 10 15 20 94 96 98 100 102 104 106 Time (Sec.) % of Bus Nominal kV H05-77-SWB-001 Bus Voltage
-
Upload
hiepkhacha13 -
Category
Documents
-
view
4 -
download
2
description
Lump Load 80%
Transcript of Lump Load 80%
ETAP
Project: Te Giac Trang H05 12.6.5C Date: 03-16-2015
Location: Vietnam SN: PTSCM&CJSC
Contract: Revision: Manned1
Engineer: Pham Minh Cuong Study Case: TS Config.: Manned
Project File: G:\1. PTSC Project\12. H5\2. DE\ETAP\TGT-H05\TGT-H05 Transient
Output Report: TS
TRANSIENT STABILITY ANALYSIS
0 5 10 15 2094
96
98
100
102
104
106
Time (Sec.)
% o
f B
us N
omin
al k
V
H05-77-SWB-001
Bus Voltage