ETAP Project: Te Giac Trang H05 12.6.5C Date: 03-16-2015 Location: Vietnam SN: PTSCM&CJSC Contract: Revision: Manned1 Engineer: Pham Minh Cuong Study Case: TS Config.: Manned Project File: G:\1. PTSC Project\12. H5\2. DE\ETAP\TGT-H05\TGT-H05 Transient Output Report: TS TRANSIENT STABILITY ANALYSIS 0 5 10 15 20 94 96 98 100 102 104 106 Time (Sec.) % of Bus Nominal kV H05-77-SWB-001 Bus Voltage

description

Lump Load 80%

Transcript of Lump Load 80%

Page 1: Lump Load 80%

ETAP

Project: Te Giac Trang H05 12.6.5C Date: 03-16-2015

Location: Vietnam SN: PTSCM&CJSC

Contract: Revision: Manned1

Engineer: Pham Minh Cuong Study Case: TS Config.: Manned

Project File: G:\1. PTSC Project\12. H5\2. DE\ETAP\TGT-H05\TGT-H05 Transient

Output Report: TS

TRANSIENT STABILITY ANALYSIS

0 5 10 15 2094

96

98

100

102

104

106

Time (Sec.)

% o

f B

us N

omin

al k

V

H05-77-SWB-001

Bus Voltage