Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia...
Transcript of Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia...
![Page 1: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/1.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Luis Fernando Andrade Moreno
President - Agencia Nacional de Infraestructura
![Page 2: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/2.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
2
The National Infrastructure Agency (“ANI” or the “Agency”) clarifies that the purpose of the event “The Fourth Generation (4G) of Road Concessions in Colombia” is to introduce the conceptual framework developed by the National Government of Colombia for the structuring of new projects in road concessions. Therefore, the ideas and documents presented by the Agency at this event are for indicative purposes only and do not imply any warranties with regards to tender processes within this program. Please be advised that there is a legal framework in place for the regulation of PPPs (Law 1508), including a legal decree that regulates some of their specific aspects. However, some aspects of the PPP Law are still under review for subsequent regulation by decree. The information presented at this event is preliminary and subject to change and continued review by the Agency. In addition, this document, the ideas contained herein, and the other presentations at this event do not constitute a request or solicitation for tenders or a commitment by the Agency to accept proposals for a future tender process.
DISCLAIMER
![Page 3: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/3.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
3
1. GOVERNMENT OBJECTIVES
2. FOURTH GENERATION OF ROAD CONCESSIONS PROGRAM
3. EARLY VICTORIES
![Page 4: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/4.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
4
1. GOVERNMENT OBJECTIVES
2. FOURTH GENERATION OF ROAD CONCESSIONS PROGRAM 3. EARLY VICTORIES
![Page 5: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/5.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
5
• Lag in competitiveness due to underinvestment in transportation infrastructure
• US$3.3 billion invested in transportation infrastructure in 2011 (1% of GDP)
• 50/50 between public works and PPP.
The Lag
• Objective : Achieve 3% of GDP in 2014 (US$10 billion) •US$3.3 billion for public works (1% of GDP) •US$6.7 billion for PPP (2% of GDP)
• First step in 2012: US$4.4 billion (33% increase)
The Strategy
![Page 6: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/6.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
6 Source: The Global Commpetitiveness Report 2012-2013 © World Economic Forum
0 20 40 60 80 100 120 140
Spain
Chile
México
Ecuador
Uruguay
Argentina
Perú
Colombia
Venezuela
Brasil
13
23
50
53
81
106
100
126
128
123
Ranking in Quality of Roads
![Page 7: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/7.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Source: ANI calculations based on DNP figures
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Inversión Comunicaciones / PIB Inversión Energía / PIB
Inversión Transporte / PIB
Investment in Communications/GDP
Investment in Transportation/GDP
Investment in Energy/GDP
![Page 8: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/8.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Note: USD MM
Figures are preliminary and subject to change and further review 8
8,000 7,000 6,000 5,000 4,000 3,000 2,000
Existing road concessions New road concessions Ports Railways Airports
Investment under future programs
![Page 9: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/9.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Δ 2.4
Δ 4.6
1773*
3400*
*Figures are estimated and subject to change
743 743
101
844
273
1117
267
1384
389
1773
2517
Base 2011 2012 2013 2014 2018
Kms of Four-lane Highways to be Built
105 Km have been built as of June 2012
![Page 10: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/10.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
10
1. GOVERNMENT OBJECTIVES
2. FOURTH GENERATION OF ROAD CONCESSIONS PROGRAM
3. EARLY VICTORIES
![Page 11: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/11.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
VILLAVICENCIO
CALI
BUGA
PEREIRA
SOGAMOSO
PALO DE LETRAS CAUCASIA
MONTERIA
SINCELEJO
CARMEN DE BOLIVAR
VALLEDUPAR
BARRANQUILLA
CARTAGENA
SANTA MARTA
RIOHACHA
PARAGUACHON
SAN ROQUE
NECOCLÍ
PASTO
ZIPAQUIRA
Pamplona
Simití
Achí
San Marcos
SAN PELAYO
GIRARDOT
CUCUTA
RUMICHACA
NEIVA
VILLAVICENCIO
PUERTO GAITAN
POPAYAN
CALI
SOGAMOSO
B/MANGA
CHACHAGÛÍ
ESPINAL
ARMENIA
IBAGUE
PTO. SALGAR
Cáqueza
CALERA
Sopó
LA PAILA
BUENAVENTURA
STDER. QUILICHAO
PTO CARRENO
YOPAL
TAME
ARAUCA
Sisga
EL SECRETO
MOCOA
CARTAGO
Planeta Rica
La Yé
Toluviejo
Cruz del Viso Carreto
Ponedera La Paz
San Juan Buenavista
Cuestecitas
Barbosa
Aguaclara
MANIZALES VILLETA
MEDELLIN
BOGOTA
BARRANCAB. REMEDIOS
Pto. Arimena
El Tigre
Pto. Berrío Santa fé de Ant.
Bolombolo
La Manuela
Camilo C
Tunel de
Occidente
TUNJA
Aguachica
Granada
11
ESTIMATED KILOMETERS
UNDER CONSTRUCTION 8,170
ESTIMATED TOTAL
INVESTMENT (Billion USD) 24.4
Existing Concessions
New Concessions
![Page 12: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/12.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Santana
Pto Salgar La Dorada
Honda
Mariquita
Neiva
Girardot
Mocoa
Ibagué
BOGOTA
Girardot - Neiva (166 km)
Neiva – Mocoa- Santana (400 km)
Ibagué – Puerto Salgar – Girardot ( 313 km)
SPECIFICATIONS
P
P
P
P
P
P
Kilometers: 879 Km Existing Toll Booths: 6 New Toll Booths: 7-9 TOTAL CAPEX (Billion USD): $1.29
CORRIDORS:
P Existing Toll Booth Early Victory
Pto Bogotá
* Estimated figures, subject to change
![Page 13: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/13.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Ibagué
La Paila
Buga
Chachagüi
Stder Quilichao
B/ventura
Rumichaca
Pasto
Cali
Mulalo
Loboguerrero
Dagua
Buga – Buenaventura ( 118km)
Mulaló – Loboguerrero (90km)
Ibagué – La Paila (135km)
SPECIFICATIONS
Kilometers: 783 Km Existing Toll Booths: 8 New Toll Booths: 3 TOTAL CAPEX (Billion USD): $2.76
CORRIDORS:
Santander de Quilichao –Chachagüí/Pasto Rumichaca (440km)
P P
P
P
P
P
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 14: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/14.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
14
Pte Arimena
Guasca
La Calera
Choachí
Caqueza
Briceño
El Tablón
Chirajara
Aguaclara
Granada
Sisga
PTO CARREÑO
ARAUCA
Hato Corozal
Tame
YOPAL
Pore
Pto López
Pto Gaitán Villaviecio
Doble calzada Bogotá – Villavicencio ( 72km)
Villavicencio – Arauca (823km)
Corredor Perimetral del Oriente (154km)
CORRIDORS:
Malla Vial del Meta (340km)
SPECIFICATIONS
Kilometers: 1,389Km Existing Toll Booths: 14 New Toll Booths: 5 TOTAL CAPEX (Billion USD): $3.93
P P
P
P
P P P
P
P P
P
P
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 15: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/15.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
15
Cartagena
B/quilla
Malambo
Sta Marta
Ye de Ciénaga
Ponedera
Carreto Arjona
Cruz del Viso
Cereté
San Juan Nepomuceno
Ciénaga De Oro
El Viajando San Marcos
Sahagún
Sincelejo Yatí
Puerta De Hierro
Corozal
Cuestecitas
San Roque
La Paz
Valledupar
El Burro
Tamalameque
Distracción
La Florida
Paraguachón
Caucasia
San Juan Del Cesar
Barranquilla – Santa Marta (93km)
San Roque - Paraguachón (474 km)
Cartagena – Barranquilla - Malambo ( 152 km)
SPECIFICATIONS
Kilometers: 1,487 Km Existing Toll Booths: 11 New Toll Booths: 6 TOTAL CAPEX (Billion USD): $2.91
CORRIDORS:
Caucasia – Cruz del Viso (434 km)
Cereté - Ponedera (334 km)
P
P
P
P
P
P
P
P P
P
P P
Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 16: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/16.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Bogotá –Bucaramanga – Pamplona (543 km)
Duitama – Pamplona –Cúcuta (309 km)
Puerto Gaitán – Puerto Araujo (571 km)
SPECIFICATIONS
Kilometers: 2,266 Km Existing Toll Booths: 11 TOTAL CAPEX (Billion USD): $ 5.43
CORRIDORS:
Cúcuta –Aguaclara- Puerto Capulco (257 km)
Cúcuta – Puerto Santander (51km)
Tunja –Chiquinquirá – Puerto Boyacá (315 km)
Manizales – Honda –Villeta (220km)
Ocaña
Aguaclara
Villeta
Honda
MANIZALES
Pto Gaitán
Duitama
TUNJA
Pto Boyacá
Pto Araujo
B/MAGA
Pamplona
Pto Santander
CUCUTA
BOGOTA
P
P P
P
P P
P
P
P
P
P
P
P
Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 17: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/17.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
El Tigre
Sta. De Antioquia
MEDELLIN
Portal Occidental T. de Occidente
T. Dolores Porcesito
S.J Nus
Caucasia
Remedios
Pto. Berrio
Ancón Sur
Camilo C
Bolombolo La Pintada
La Virginia La Manuela
Irra
SPECIFICATIONS
Kilometers: 1,160 Km Existing Toll Booths: 10 New Toll Booths: 14-18 TOTAL CAPEX (Billion USD): $7.25
CORRIDORS:
Grupo 2
Grupo 3
Grupo 1
P
P
P
P
P
P P
P
P
P
P
Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 18: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/18.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
SPECIFICATIONS
Kilometers: 459 Km Existing Toll Booths: 2 TOTAL CAPEX (Billion USD): $0.87
CORRIDORS:
Cúcuta –Tibú – La Mata (331 Km)
P
Bucaramanga – Barrancabermeja – Yondó (128 Km)
La Mata
P
Convención
Tibu
CÚCUTA
B/Bermeja
P
Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 19: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/19.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
19
1. GOVERNMENT OBJECTIVES
2. FOURTH GENERATION OF ROAD CONCESSIONS PROGRAM
3. EARLY VICTORIES
![Page 20: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/20.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Pto Salgar La Dorada
Honda
Mariquita
Girardot Ibague
BOGOTA
P
Ibagué – Puerto Salgar – Girardot
Pto Bogotá
TOTAL KM 313 TOTAL CAPEX (MM USD)
$524.99
Type of Activity: Rehabilitation of existing roads Construction of bridges over Magdalena river Construction of two additional lanes Road improvement
Existing Toll Booths
1 New Toll Booths*
3
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 21: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/21.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Pto Salgar La Dorada
Honda
Mariquita
Girardot Ibague
BOGOTA
P
KM CAPEX
(MM USD) ACTIVITY TERRAIN
6 $58.83 Bridge + Construction of two additional lanes
Undulated
Flandes – Girardot
Pto Bogotá
SPECIFICATIONS
Road length 6km
Design speed 70 km/h
Maximum slope 5%
Minimum curve radius 160m
Bridge and viaduct length 399m
Length of tunnels
Traffic (2012)
Flandes
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 22: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/22.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Pto Salgar La Dorada
Honda
Mariquita
Girardot Ibague
BOGOTA
P
KM CAPEX
(MM USD) ACTIVITY TERRAIN
126 $267.57 Improvement Undulated
Girardot – Puerto Bogotá
Pto Bogotá
SPECIFICATIONS
Road length 126 km
Design speed 70km/h
Maximum slope 5%
Minimum curve radius 160m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 2,808
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 23: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/23.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Pto Salgar La Dorada
Honda
Mariquita
Girardot Ibague
BOGOTA
P
KM CAPEX
(MM USD) ACTIVITY TERRAIN
35 $130.23 Improvement Undulated
Puerto Bogotá – Puerto Salgar
Pto Bogotá
SPECIFICATIONS
Road length 35Km
Design speed 70km/h
Maximum slope 5%
Minimum curve radius 160m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 2,808
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 24: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/24.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Pto Salgar La Dorada
Honda
Mariquita
Girardot Ibague
BOGOTA
P
KM CAPEX
(MM USD) ACTIVITY TERRAIN
39 $29.18 Bridge + rehabilitation Flat
Honda – Puerto Salgar
Pto Bogotá
SPECIFICATIONS
Road length 39km
Design speed 70km/h
Maximum slope 5%
Minimum curve radius 160m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 6,679
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 25: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/25.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Pto Salgar La Dorada
Honda
Mariquita
Girardot Ibague
BOGOTA
P
KM CAPEX
(MM USD) ACTIVITY TERRAIN
107 $39.18 Rehabilitation Flat
Ibagué – Mariquita
Pto Bogotá
SPECIFICATIONS
Road length 107km
Design speed 70km/h
Maximum slope 5%
Minimum curve radius 160m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 2,874
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 26: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/26.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Mulaló – Loboguerrero - Cali
TOTAL KM 90 TOTAL CAPEX (MM USD)
$585.27
Type of Activity: Rehabilitation of existing road Construction of new two-way single lane road
Existring Toll Booths
- New Toll Booths*
2
Cali
Mulalo Dagua
Loboguerrero
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 27: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/27.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Mulaló – Loboguerrero
Cali
Mulalo Dagua
Loboguerrero KM
CAPEX (MM USD)
ACTIVITY TERRAIN
32 $573.18 New single lane road Mountainous
SPECIFICATIONS
Road length 32 km
Design speed 80 km/h
Maximum slope 9%
Minimum curve radius 235
Bridge and viaduct length 5,715 m
Length of tunnels 11,075 m
Traffic (2017) 2,694
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 28: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/28.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Cali- Dagua - Loboguerrero
Cali
Mulalo Dagua
Loboguerrero KM
CAPEX (MM USD)
ACTIVITY TERRAIN
58 $12.09 Rehabilitation Mountainous
SPECIFICATIONS
Road length 58 km
Design speed 40-60km/h
Maximum slope 9%
Minimum curve radius
Bridge and viaduct length
Length of tunnels
Traffic (2017) 4,956
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 29: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/29.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Perimetral del Oriente Corridor
TOTAL KM 154 TOTAL CAPEX (MM USD)
$339.13
Type of Activity: Rehabilitation of existing road Construction of two additional lanes Road improvement
Existing Toll Booths
2 New Toll Booths*
2
Sopo
La Calera
Choachí
Caqueza
Briceño
El Salitre Guasca
BOGOTA
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 30: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/30.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Briceño -Sopo
KM CAPEX
(MM USD) ACTIVITY TERRAIN
4 $10.44 Construction of additional two lanes, rehabilitation
Flat
SPECIFICATIONS
Road length 4 km
Design speed 60 km/h
Maximum slope 5%
Minimum curve radius 200 m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 5,080
Sopo
La Calera
Choachí
Caqueza
Briceño
El Salitre Guasca
BOGOTA
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 31: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/31.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Sopo – La Calera
KM CAPEX
(MM USD) Activities Terrain
25 $43.72 Rehabilitation + Improvement in critical areas
Undulated
SPECIFICATIONS
Road length 25 km
Design speed 60-80 km/h
Maximum slope 6%
Minimum curve radius 200 m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 3,698
Sopo
La Calera
Choachí
Caqueza
Briceño
El Salitre Guasca
BOGOTA
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 32: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/32.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Sopo
La Calera
Choachí
Caqueza
Briceño
El Salitre Guasca
BOGOTA
Salitre - Guasca
KM CAPEX
(MM USD) ACTIVITY TERRAIN
14 $10.69 Rehabilitation Mountainous
SPECIFICATIONS
Road length 14 km
Design speed 60-80 km/h
Maximum slope 8%
Minimum curve radius 200 m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 3,068
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 33: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/33.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Sopo
La Calera
Choachí
Caqueza
Briceño
El Salitre Guasca
BOGOTA
La Calera - Bogotá
KM CAPEX
(MM USD) ACTIVITY TERRAIN
16 $14.48 Rehabilitation Mountainous
SPECIFICATIONS
Road length 16 km
Design speed 60 km/h
Maximum slope 8%
Minimum curve radius 113 m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 8,636
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 34: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/34.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Sopo
La Calera
Choachí
Caqueza
Briceño
El Salitre Guasca
BOGOTA
La Calera – Choachí - Caqueza
KM CAPEX
(MM USD) ACTIVITY TERRAIN
53 $221.30 Improvement Mountainous
SPECIFICATIONS
Road length 53 Km
Design speed 60 km/h
Maximum slope 8%
Minimum curve radius 113 m
Bridge and viaduct length 700 m
Length of tunnels
Traffic (2012) 507
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 35: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/35.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Sopo
La Calera
Choachí
Caqueza
Briceño
El Salitre Guasca
BOGOTA
Bogotá -Choachí
KM CAPEX
(MM USD) ACTIVITY TERRAIN
42 $38.50 Rehabilitation Mountainous
SPECIFICATIONS
Road length 42km
Design speed 60 km/h
Maximum slope 8%
Minimum curve radius 113 m
Bridge and viaduct length
Length of tunnels
Traffic (2012) 1,544
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 36: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/36.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Cartagena – Barranquilla - Malambo
TOTAL KM 152
Type of Activity: Construction of two additional lanes Rehabilitation and maintenance Construction of new road Improvement of roads with poor technical specifications
Existing Toll Booths
2 New Toll Booths*
1
CARTAGENA
BARRANQUILLA
Malambo
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 37: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/37.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
KM CAPEX
(MM USD) ACTIVITY TERRAIN
78 $527.83
Construction of two additional lanes, rehabilitation and maintenance
Flat
Cartagena - Barranquilla
SPECIFICATIONS
Road length 78 km
Design speed 80 km/h
Maximum slope 4%
Minimum curve radius 250 m
Bridge and viaduct length 721 m
Length of tunnels
Traffic (2012) 10,797
CARTAGENA
BARRANQUILLA
Malambo
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 38: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/38.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
KM CAPEX
(MM USD) ACTIVITY TERRAIN
74 $224.33 Construction of new road
Flat
Barranquilla - Malambo
SPECIFICATIONS
Road length 74 km
Design speed 80 km/h
Maximum slope 4%
Minimum curve radius 250 m
Bridge and viaduct length 580 m
Length of tunnels
Traffic (2012) 17,200
CARTAGENA
BARRANQUILLA
Malambo
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 39: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/39.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
MEDELLIN
Alto de Dolores
Remedios
Pto. Berrio
La Pintada
La Virginia La Manuela
Irra
Conexión Ruta del
Sol
TOTAL KM 268 TOTAL CAPEX (MM USD)
$2,095.23
Type of activity: Construction of new road Improvement of existing road
Existing Toll Booths
4 New Toll Booths*
TBD
P
P
P
P
GROUP 1
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 40: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/40.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
KM CAPEX
(MM USD) ACTIVITY TERRAIN
126 $1,356.09 Construction of new road
Undulated, Mountainous
Remedios - Alto Dolores - Puerto Berrío -
Conexión Ruta del Sol
SPECIFICATIONS
Road length 126 km
Design speed 80 km/h
Maximum slope 4%
Minimum curve radius 250 m
Bridge and viaduct length
Length of tunnels 4,430 m
Traffic (2012) 1,274
MEDELLIN
Alto de Dolores
Remedios
Pto. Berrio
La Pintada
La Virginia La Manuela
Irra
Conexión Ruta del
Sol
P
P
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 41: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/41.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
KM CAPEX
(MM USD) ACTIVITY TERRAIN
142 $739.14
Improvement of existing road and construction of new road
Undulated, Mountainous
La Pintada – Irra – La Manuela , La Virginia –
Irra
SPECIFICATIONS
Road length 142 km
Design speed 80 km/h
Maximum slope 6%
Minimum curve radius 229 m
Bridge and viaduct length 680 m
Length of tunnels 3,740 m
Traffic (2012) 4,799
MEDELLIN
Alto de Dolores
Remedios
Pto. Berrio
La Pintada
La Virginia La Manuela
Irra
Conexión Ruta del
Sol
P
P
P
P
P Existing Toll Booth Early Victory
* Estimated figures, subject to change
![Page 42: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/42.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
Time Line
PROJECT STRUCTURING AND COMPLEMENTARY STUDIES
Integral structuring of the projects
Dec 2012
CONCESSION - ANI
DURATION OF THE CONCESSION PROJECT
Tender process opens
Ene 2013
Operation and maintenance –
20-25 years
Tender process
ends May 2013
Award of the concession Jun 2013
Phase III designs, environmental permits and
studies, land purchases – Jul 2013-Jul 2014
Construction –
2-5 years
42
Prequalification Dec 2012 – Jan
2013
![Page 43: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/43.jpg)
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte
43
Contractual Scheme
Insurance and Real Estate, Social, and Environmental Risks
Financing for the Fourth Generation of Road Concessions (Infrastructure Bonds)
The Vision of Multilaterals Regarding the Fourth Generations of Road Concessions
Ensuring Transparency in the Fourth Generation of Road Concessions
![Page 44: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte](https://reader030.fdocuments.in/reader030/viewer/2022040613/5f06d1a57e708231d419e46d/html5/thumbnails/44.jpg)
GRACIAS
AGENCIA NACIONAL DE INFRAESTRUCTURA
República de Colombia
www.ani.gov.co