Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying...

34
This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. CESBA tool and Protocollo Itaca Building assessment experiences in Italy

description

Presentation at the CEC5 International Conference in Ljubljana, Slovenia

Transcript of Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying...

Page 1: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF.

CESBA tool and Protocollo Itaca

Building assessment experiences in Italy

Page 2: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

ENVIRONMENTAL ASSESSMENTS FOR BUILDINGS

Page 3: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

MESURING BUILDING SUSTAINABILITY

MATERIALSWATER

ENERGY

MATERIALS

QUALITY OFSERVICE

COMFORT

Page 4: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

BUILDING ASSESSMENT SYSTEMS

Performance analysis with regards to a group of criteria

and indicators.

Rating of a building on the base of its performance

Procedure

Score and ratingResults

Objective

Score and ratingResults

Page 5: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

BUILDING ASSESSMENT SYSTEMS

Page 6: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

BUILDING ASSESSMENT SYSTEMS

Page 7: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

BUILDING ASSESSMENT SYSTEMS

Page 8: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

MORE THAN 80 BUILDING ASSESSMENT SYSTEMS USED IN EUROPE…

2010

1990

1995

2000

2005 NATURE

Page 9: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

Harmonization of building assessment in Europe

A Collective Initiative for a New Culture of Built Environment in Europe

Harmonization of building assessment in Europe

Initiative supported by: CEC5, CABEE and Visible Projects

www.cesba.eu

Page 10: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

AIMS AND PRINCIPLES OF CESBA

• Sustainability

• Regional Contextualization

• Comparability

• Mass-oriented• Mass-oriented

• Simple to Use

• Open Source

• Co-creation

• Transparent

Page 11: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

STRUCTURE OF CESBA

Page 12: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

CESBA TOOL

Page 13: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

PROTOCOLLO ITACA

Rating system for sustainable biuildings based on the international

tool SBTool developed by iiSBE (international intiative for

Saustainable Built Environment) – www.iisbe.org.

In 2004 it has been approved by the Conference of the Italian In 2004 it has been approved by the Conference of the Italian

Regions Presidents.

Oficially adopted by 14 Italian Regions.

Since 2011 availble also in a national version.

Page 14: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

PROTOCOLLO ITACA

5 issues

19 categories

34 criteria

A Quality of site– A1 Site selection

– A3 Site development

Page 15: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

PROTOCOLLO ITACA

B Resources consumption– B1 Primary energy

– B3 Renewables energy

– B4 Materials

– B5 Potable water

– B6 Energy need– B6 Energy need

C Environmental Loads– C1 CO2 Emissions

– C3 Solid Waste

– C4 Effluents

– C5 Local impact

Page 16: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

PROTOCOLLO ITACA

D Indoor Environmental Quality

– D2 Ventilation

– D3 Thermal comfort

– D4 Visual comfort

– D5 Acoustic comfort– D5 Acoustic comfort

– D6 Magnetic Fields (ELF) pollution

E Quality of service– E3 Efficiency (BACS)

– E6 Operation

Page 17: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

CESBA TOOL -

PROTOCOLLO ITACA

Page 18: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

PERFORMANCE SCALE - BENCHMARK

Regulation

Standards

Statistical data

Simulations

Page 19: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

AGGREGATION

Page 20: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

RATING

Page 21: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

PUBLIC ORGANIZATIONS

POLICIES AND

INCENTIVES

BUILDING CODES

GREEN PROCUREMENTGREEN PROCUREMENT

URBAN PLANS

Page 22: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

INCENTIVE BASED POLICY

10.000 Apartments by 2012

Social Housing funding program launched in 2007

Available funds: 700.000.000 euro

Incentives: 50.000.000 euro

Requested a minimum mandatory level of performance

assessed by means of a building rating system

(Protocollo ITACA)

Page 23: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

INCENTIVE BASED POLICY

10.000 Apartments y 2012

Level of performance – Incentives

New constructions

Score 2 = + 5.000 euro per apartment

Score 2.5 = + 10.000 euro per apartment

Existing buildings

Score 1 = + 5.000 euro per apartment

Score 1.5 = + 10.000 euro per apartment

Page 24: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

BUILDING REGULATIONS

Additional voluntary based requirements beside the base

requirements.

Possible incentives:

-Tax reduction (construction phase)-Tax reduction (construction phase)

-Tax reduction in use

-Additional volume

Page 25: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

GREEN PUBLIC PROCUREMENT

Science and Technology pole on energy

R&D, knowledge transfer, incubator, services

New construction: 20.000 sqm

Offices + Laboratories

ENERGY CENTER – CITY OF TORINO

Offices + Laboratories

Page 26: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

GREEN PUBLIC PROCUREMENT

ENERGY CENTER – CITY OF TORINO

Requested a minimum performance with regards to

Protocollo ITACA (2.8).

If not achieved: 5% reduction of the tender value.

Requested an improvement of specific performances: energy,

BACS, etc..

Requested the specific qualifications “Expert Protocollo

ITACA” for designers and construction companies.

Page 27: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

PIEDMONT REGION

Neighborhood contracts

Social Housing Program 10.000 apartments by 2012

Hosing Plan

Retail buildings

Schools retrofitting

New Skyscraper

Green Public Procurement

Page 28: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

DESIGNERS

INTEGRATED DESIGN

TARGET DEFINITION

DECISION SUPPORT TOOLDECISION SUPPORT TOOL

DESIGN QUALITY MONITORING

Page 29: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

DESIGNERS

ReviewFunctionalProgram,establish

Assemble thedesign team;

identifymissing

specialties

Develop a

conventionalreference

design

Assessconditions ofsite and any

existingstructures

Develop

ConceptDesign

Hold akick-offDesign

Workshop

DesignWorkshop

DesignWorkshop

Consider sitedevelopment

issues

Selectbuildingstructure

type

Developbuildingestablish

preliminary

targets

Monitor actual

performance;optimize

performance

Performance targets for:

¥ Non-renewable resources,¥ Environmental Loadings,

¥ indoor env. quality,

¥ Long-term performance¥ Functionality,

¥ Social & economic issues

Preliminary

ventilation,heating and

coolingdesign

DesignWorkshop

Design

Workshop

JobmeetingsJob

meetings

Jobmeetings

Jobmeetings

buildingenvelope

design

Developpreliminarydaylighting,lighting and

power design

Preliminaryventilation,

heatingand cooling

design

Screenmaterials for

environmentalperformance

Complete

detaileddesign and

contractdocuments

Develop QAstrategy forconstruction

andoperation

Completeconstructionabove grade;

Commissioning

Site take-over,existing building

decontamination &

deconstruction,excavation and

Foundations

Decide ondesign option

for finaldevelopment

Integrated

Design

Process

Larsson 2005

Note: Sequence of steps is

approximate and may vary

according to project needs

Use GBTool

Page 30: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

REAL ESTATE MARKET

Investors

Developers

Construction Companies

Owners

Page 31: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

REAL ESTATE MARKET

If well designed, it is possible to reduce the cost of green buildings.

Green Buildings are more attractive on the market:

Reduced operation cost

Higher productivity

Value stability

Page 32: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

REAL ESTATE MARKET

Page 33: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

REAL ESTATE MARKET

US Market

By 2015 more than 40% of

non residential buildings will

be green

Green building market: 2% in

2005, 12% in 2008, 35% in

2010

Page 34: Luca Degiorgis: Presentation of CESBA tool usage study, in comparison with Protocol Itaca certifying system and its use in Italy

THANK YOU!

Contacts:

[email protected]@iisbeitalia.org

www.iisbeitalia.org