LUC Phase 2 Masterplan · 2010-04-11 · Community Garden Project Children’s Toilet New...

1
LIDO BRIXTON WATER LANE ENTRANCE WEST MEADOW BOWLING PAVILION ONE O’CLOCK CLUB LEGEND: Long meadow grassland with mown paths to create ‘green’ corridors through site. Hedges planted to help screen, enclose and soften some areas of the park. New area of vibrant seasonal planting in front of the Hall (Phase 2). New perennial and shrub planting to help create new setting for Hall. Area of marginal / wetland planting beside the lakes Decked walkway / bridge over ponds. Area of marginal planting / meadow grasses, creating a transition between the south meadow and the ponds areas. Mown grassland. BROCKWELL HALL STABLES & YARD CLOCK TOWER POND 1. WALLED GARDEN COMMUNITY GREENHOUSE PROJECT TEMPLE POND 2. POND 3. CAR PARK HERNE HILL ENTRANCE NORWOOD LODGE ENTRANCE IMPROVED VEHICLE ENTRANCE ROSENDALE ROAD GATE BROCKWELL GARDENS GATE CRESSINGHAM GATE 1 CRESSINGHAM GATE 2 BROCKWELL GATE TULSE HILL ENTRANCE Toilets Re-instate shelter; moved from beside Hall. Lodge POND 4. Improve entrances from Brixton Water Lane, to make safer and more attractive, adding new gate posts, gates and tree planting. NORTH PARKLAND Add new paths Community Garden Project Children’s Toilet New attenuation pond constructed Stream restored Stream restored Island area increased & replanted. New bridge installed. Historic cascade restored New areas of ornamental marginal planting added New stream created to pond 1 Footpaths relaid & timber structures replaced/ restored. Paths & railing to Greenhouse Project improved & greenhouse re-glazed. Provision for new unisex toilet and kitchen facilities Wildflower meadow area increased to create green link through site. Improved drainage to grass football pitch Land drains installed to collect water to feed wetland & top-up pond system. Selected paths reconstructed to higher specification to take events traffic. Norwood Gate External facade of Norwood Lodge restored & lodge refurbished Possible location for Yard/ Maintenance Compound as part of phase 2 Bid Basic refurbishment to shelter Selected paths reconstructed to higher specification to take events traffic. Wildflower meadow area increased to create green link through site. Land drains installed to collect water to help reduce flooding of Dulwich Road. Water collected in new land drains. EAST PARKLAND Wildflower meadow area increased to create green link through site. Avenue checked for potential for tree inter- planting. Restore ornamental shrub planting enclosed within parkland railing Herne Hill Gate to allow occasional larger scale events traffic. Gates and railings refurbished. Internal walls / flower beds demolished changing room block Planting thinned to improve safety, and area under planted with spring bulbs New Railing added along Dulwich Road boundary to match historic vehicle entrance Tree canopies thinned to open views to Lido Frontage Selected paths reconstructed to higher specification to take events traffic. New native hedgerow planted along historic field boundary Hoarding replaced with Park railing and new native hedgerow BROCKWELL TERRACE FIELD Water’s edge to Pond 1. opened up and new bridge installed between pond 1 and 2 Basic refurbishment to shelter Restore Arlingford Road entrance Undertake specimen tree planting in selected area Localised improvements to rear garden boundaries Localised improvements to rear garden boundaries Restore temple NEW WET PLAY AREA. Phase 1: break out old basket ball pitch and re-instate with grass. All other works to be in Phase 2. Toilet block to be demolished & relocated in the case of Herne Hill Junction improvements Land drains installed New turf football pitches NEW CHILDREN’S PLAY AREA Land drains installed to top-up pond system

Transcript of LUC Phase 2 Masterplan · 2010-04-11 · Community Garden Project Children’s Toilet New...

Page 1: LUC Phase 2 Masterplan · 2010-04-11 · Community Garden Project Children’s Toilet New attenuation pond constructed Stream restored Stream restored Island area increased & replanted.

LIDO

BRIXTON WATER LANE ENTRANCE

WEST MEADOW

BOWLINGPAVILION

ONE O’CLOCKCLUB

LEGEND:Long meadow grassland with mown paths to create ‘green’ corridors through site.

Hedges planted to help screen, enclose and soften some areas of the park.

New area of vibrant seasonal planting in front of the Hall (Phase 2).

New perennial and shrub planting to help create new setting for Hall.

Area of marginal / wetland planting beside the lakes

Decked walkway / bridge over ponds.

Area of marginal planting / meadow grasses, creating a transition between the south meadow and the ponds areas.

Mown grassland.

BROCKWELL HALL

STABLES & YARD

CLOCK TOWER

POND 1.

WALLEDGARDEN

COMMUNITY GREENHOUSE PROJECT

TEMPLE

POND 2.

POND 3.

CAR PARK

HERNE HILLENTRANCE

NORWOOD LODGE ENTRANCE

IMPROVED VEHICLE ENTRANCE

ROSENDALE ROAD GATE

BROCKWELL GARDENS GATE

CRESSINGHAM GATE 1

CRESSINGHAM GATE 2

BROCKWELL GATE

TULSE HILLENTRANCE

Toilets

Re-instate shelter; moved from beside Hall.

Lodge

POND 4.

Improve entrances from Brixton Water Lane, to make safer and more attractive, adding new gate posts, gates and tree planting.

NORTH PARKLAND

Add new paths

Community Garden Project

Children’s Toilet

New attenuation pond constructed

Stream restored

Stream restored

Island area increased & replanted. New bridge installed.

Historic cascade restored

New areas of ornamental marginal planting added

New stream created to pond 1 Footpaths relaid &

timber structures replaced/ restored.

Paths & railing to Greenhouse Project improved & greenhouse re-glazed. Provision for new unisex toilet and kitchen facilities

Wildflower meadow area increased to create green link through site.

Improved drainage to grass football pitch

Land drains installed to collect water to feed wetland & top-up pond system.

Selected paths reconstructed to higher specification to take events traffic.

Norwood Gate

External facade of Norwood Lodge restored & lodge refurbished

Possible location for Yard/Maintenance Compound as part of phase 2 Bid

Basic refurbishment to shelter

Selected paths reconstructed to higher specification to take events traffic.

Wildflower meadow area increased to create green link through site.

Land drains installed to collect water to help reduce flooding of Dulwich Road. Water collected in new land drains.

EASTPARKLAND

Wildflower meadow area increased to create green link through site.

Avenue checked for potential for tree inter-planting.

Restore ornamental shrub planting enclosed within parkland railing

Herne Hill Gate to allow occasional larger scale events traffic. Gates and railings refurbished. Internal walls / flower beds demolished

changing room block

Planting thinned to improve safety, and area under planted with spring bulbs

New Railing added along Dulwich Road boundary to match historic

vehicle entrance

Tree canopies thinned to open views to Lido Frontage

Selected paths reconstructed to higher specification to take events traffic.

New native hedgerow planted along historic field boundary

Hoarding replaced with Park railing and new native hedgerow

BROCKWELL TERRACE FIELD

Water’s edge to Pond 1. opened up and new bridge installed between pond 1 and 2

Basic refurbishment to shelter

Restore Arlingford Road entrance

Undertake specimentree planting inselected area

Localised improvements to rear garden boundaries

Localised improvements to rear garden boundaries

Restore temple

NEW WET PLAY AREA.

Phase 1: break out old basket ballpitch and re-instate with grass. All other works to be in Phase 2.

Toilet block to be demolished & relocated in the case of Herne Hill Junction improvements

Land drains installed

New turf football pitches

NEW CHILDREN’S PLAY AREA

Land drains installed to top-up pond system