LT Success Story Presentation r2

download LT Success Story Presentation r2

of 17

Transcript of LT Success Story Presentation r2

  • 8/8/2019 LT Success Story Presentation r2

    1/17

    SUCCESS STORY OF WRENCH IMPLEMENTATIONAT

    Larsen & Toubro LimitedMachinery & Industrial Products Division

    LTM Business Unit, Chennai .

  • 8/8/2019 LT Success Story Presentation r2

    2/17

    LTM Chronology

    1972 Established as a JV between L & T Limited and McNeil Akron Inc, USA under the name L&T-McNeil Limited

    1974 Commenced Production of Tyre Curing Presses

    1988 Technical Collaboration with Mitsubishi for Tyre Building Machines & Bias Cutters and with Demag for Plastics injection moulding machines

    1995 L&T buys the complete shares of McNeil Akron Inc in L&T- McNeilLimited and forms a wholly owned business unit of L&T for Rubber & Plastics machineries

    2001 JV with Demag for Plastics machinery

    2003 Collaboration with Kobe for manufacture of latest range of Curex S1

    series Hydraulic Tyre Curing Presses

  • 8/8/2019 LT Success Story Presentation r2

    3/17

    Growth

    Rs. Million

  • 8/8/2019 LT Success Story Presentation r2

    4/17

    Mechanical Tyre Curing P ressesFrom 24" to 104"

  • 8/8/2019 LT Success Story Presentation r2

    5/17

    Some of our major CustomersSome of our major Customers

  • 8/8/2019 LT Success Story Presentation r2

    6/17

    LTM presenc e in t he Wor ld ...

    CHINA

    EGYPT

    U.K

    FINLAND

    ITALY

    KENYA MALAYSIA

    MOROCCO

    NEPAL

    SRILANKA

    SYRIA

    TANZANIA

    THAILANDTURKEY

    VIETNAM

    ARGENTINA

    BRAZIL

    CHILE

    CUBA

    ECUADOR

    VENEZUELA

    INDIA

    SPAIN

    INDONAESIA

    PHILIPPINES

    ISRAEL

    SOUTH AFRICA

    USA

  • 8/8/2019 LT Success Story Presentation r2

    7/17

    PRODUCT DEVELOPMENT PROCESSPRODUCT DEVELOPMENT PROCESS

    NEW PRODUCTS

    PRODUCTS VARIANTS TO CUSTOMER NEEDSRESULTING IN

    MAJOR DESIGN MODIFICATIONS TO EXISTINGPRODUCTS

    MINOR MODIFICATIONS

    PRODUCT CONFIGURATION TO MEET CUSTOMER

    REQUIREMENTS

  • 8/8/2019 LT Success Story Presentation r2

    8/17

    PEOCESS FLOW FOR PRODUCT DEVELOPMENT

    procedure thru PLM

    engg team on review

    Design Department

    Sales Dept.

    StartReceive

    Request forChange

    Evaluate andAnalyseChange

    Initiate ECOWorkflow in

    Wrench

    ECOApproved?

    Rework

    Release of Changed BOM/ Drawings/Specs to Other

    departmentsEND

    ECO PROCESS FLOW

    Yes

    No

    ReceiveCustomerEnquiryDetails

    from Sales

    Follow1. Enquiry to Quote2. Quote to Sales

    Order

    Prepare TentativeBOM of Critical Sub-

    Assemblies andProvide details for

    Estimation &Quotation purpose to

    Sales Dept.

    Start

    Design Department

    Receive SalesOrder with

    detailed Specs

    Start designDesgin Activityas per ISO

    CreateDrawings &

    BOMs

    Design Outputreview withconcurrent

    Release ofBOM to ERPthru PLM

    FinalDrawings &BOMs based

    Layout DrawingApproval toCustomer ?

    TechnicalReview

    meeting Toconfirm Tech

    Specs andcompatibility

    Modify

    Release ofDrawings formanufacturingthru PLM

    END

    PrepareEquipmentSafety (CE)file wherever

    required

    No

    Yes

    Design Department

    Design Department Sales/Design Dept.

  • 8/8/2019 LT Success Story Presentation r2

    9/17

    Problems Faced before WRENCH implementation

    Total dependency on individuals.

    25 to 30% time spent for searching for data.

    Mismatch of revision numbers between ERP data and actual drawings

    No system to prevent usage of drawings to old revisions.

    Delay in issue of drawing prints due to manual processs and uncontrolled

    No link between drawings and BOMs and manual entry of BOM for MRP

    No control over multiple copies of the same drawing.

    Lack of security on intellectual data being copied out.

  • 8/8/2019 LT Success Story Presentation r2

    10/17

    Problems Faced before WRENCH implementation

    Errors in product configuration due to manual process and time consuming.

    No collaboration among cross functional departments.

    No sharing of massive volume of digital product data available with differentdepartments like Engg,Marketing,Purchase,Manufacturing,Service,etc.

    Poor visualization for the users as there was no tools to access the3D solid models created by design department.

    Product history not captured and maintained systematically.

    Most of the learnings /design calculations during product development lost.

    Change management was manual , slow and not communicated to endusers well in time

  • 8/8/2019 LT Success Story Presentation r2

    11/17

    Problems Faced before WRENCH implementation

    To overcome these problems many adhoc procedures/

    systems were adopted likePrint request program.

    Centralised storage of drawings with defined File namingprocedure.

    View access for cross functional departments for drawingsstored in R&D server.

  • 8/8/2019 LT Success Story Presentation r2

    12/17

    VISION for an Ideal Design Environment

    A l l d o

    c u m e n t s

    i n e l e c

    t r o n i c

    f o r m

    3 D s o l i d

    m o d e l i n g

    c o n c e p t

    Asse m b l y based

    o n co ns t ra i n ts

    As s o c i a t i o n o f D e s i g n d a t a / F E A w i t h p a r t s

    C a l c u l a t i o n s /

    Ideal

    Design EnvironmentHow we design in future?

    3 D s o l i d d i r e c t l y a s s o c i a t e d w i t h 2 D

    V ie w i ng a nd

    P r i n t i ng fac i l i t ies

    a t use r e nd

    C a l c u l a t i o n s a s s o c i a t e d w i t h As s e m b l i e s

    Q ua l i t y P la nassoc ia ted w i t h

    Asse m b l ies

    C ha nges

    assoc ia ted w i t h

    3 D Asse m b l iesAut o c o st i ng a t c o nc e p t st a g e

    C o n c u r r e n t E n g i n e e r i n g i n

    t h e m a i n s t r e a m S c h e d u l e f o r p r o t o t y p e a t c o n c e p t

    BO Msassoc ia ted w i t h

    Asse m b l ies

    Online costing of new tools

    S i n g l e w i n d o w a c c e s s

  • 8/8/2019 LT Success Story Presentation r2

    13/17

    Challenges faced

    Brain storming to list out the requirements for anideal single window access system for design.

    Evaluation of available softwares to short listbased on the following priorities

    Meeting the requirements as per the vision statement Seamless interface with the existing MRP-II system Customisation skills to follow good practices being followed Cost of implementation and maintenance Possibility for future upgrades / addition of new modules

    Conversion of Legacy data built over many years to digital data.

    Understanding the existing MRP-II system and interfacing.

    Training and smooth change over to the new system.

  • 8/8/2019 LT Success Story Presentation r2

    14/17

    Benefits after implementation of WRENCH

    50% Faster product development due to on-line availability ofdesign data, re-use of existing variants& flexible search capabilities

    15 times faster product configuration due to BOM variant concept Single window access for design engineers & Immediate access toJDEdwards ERP without consuming the license of ERP package

    No manual keying-in and duplication of engineering data into ERP

    On-line access to the latest drawings with defined security

    Concurrent engineering during design stage.

    40% Reduction in number of drawing prints

    Automatic work flow management for Draw/Check and Approval

  • 8/8/2019 LT Success Story Presentation r2

    15/17

    Benefits after implementation of WRENCH

    Automatic print management

    Complete security for design data in server

    Faster change management.

    Linking of Design calculations,FEA, Moms,check sheets, test

    data & customer feed back to part master/work orders. Possibility to view and mark 200+ file formats

    Sharing of information between departments

    Better visualisation of the part by users by viewing the solidmodels

    Quick review of project status with color codings of status

  • 8/8/2019 LT Success Story Presentation r2

    16/17

    WHAT NEXT

    1. Extend access to Sales and branch offices.

    2. Non conformance management.3. Provide online spare part catalogue.

    4. Extend product data to vendors with restrictedaccess.

    5. Online capture of customer feedback on products.

    6. Extract knowledge from real time ECO & NC data.

  • 8/8/2019 LT Success Story Presentation r2

    17/17