t STATE ENVIRON-MENT IMPACT ASSESSMENT AUTHO Bay No. 55-58, Prayatan Bhawan, Sector-2, PAN No. SEIAAIHR/20161 LSS Dated:...I To M/s GLS Infratech Pvt. Ltd, 31 l, 3nr floors, JMD Pacific Square, Sector- I 5, Part-II, Gurgaon- 1 22001 Subject: Dear Sir, Environmental Clearance Housimg Colony Project at Gurga,on, Haryana. for construction Village Sohna & This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking prior Environmental Clearance for the above Notification,2006. The proposal was transferred to MoEF & CC, action was taken and the case was returned to SEIAA on 3 1.08.201 The proposal has be,sn appraised as per prescribed procedure in under the EIA Notifi,;ation,2006 on the basis of the mandatory the application viz., Form-I, Forrnl-A, Conceptual Plan and furnished in responsie to the observations of the State Expert (SEAC) constituted by MOEF, GOI vide their Notification 21.08. held on 04.03.2015. 22.12.2015 &.16.02.2016 awarded "Gold" I2l It is intrlr-alia, noted that the project involves the consrt Group Housing Colony Project at Village Sohna & Khaika, Sector- total plot area of 40468.5 sqm (10 Acre). The total built up area s The proposed Project shall comprise of 16 Towers; Tower I to I Tower 13 to 16 (GF + 08 Floors), Cornmunity Hall and Aganwadi units shall'be 1632. llhe maxirnurn heieht of the buildine shall be water requirement shall be I166 KLD. The fresh water requireme: The waste water serreration shall be 985 KLD. which will be 1200 KLD (600 KLD + 600 KLD) capacity. The total power requi KW which will be supplied by DHBVN. The Project Proponent green belt on 20.0I7'% of project area (I5o/o tree plantation + 5.01 Project Proponent proposed to constnrct 10 rain water harvesting generation will be 5Ct6l kg/day. The bio-degradable waste will be area by installation ol OWC (organic waste converter). The total are 1958 Two Wheelers and 209 ECS. t3l The State Expert Appraisal Committee, Haryana after the relevant documemts submitted by the project proponent and of' Ktr la r.tot . A. Affordable Group ika, Sector-4, Distt il dated 04.12.2014 uent letter d,rted ject under the EIA I on 27 .03.20 I 5. No after its constitution. light of provisions ments enclosed with itional clarifications isal Committee 015, in its meetings ng to the project. ion of Affordable , Distt Gurgaon on a lbe 92321.664 sqm. (GF + 13 Floors) . The total Dwelling .85 rneter. The total t shall be 146 KLD. in the 2STPs of t shall be 7960 proposed to develop landscaping). The its. The solid waste reated in the project ing spaces proposed consideration of l-- itional clarification

Transcript of LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S....

Page 1: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

t

STATE ENVIRON-MENT IMPACT ASSESSMENT AUTHOBay No. 55-58, Prayatan Bhawan, Sector-2, PAN

No. SEIAAIHR/20161 LSS Dated:...I

To

M/s GLS Infratech Pvt. Ltd,31 l, 3nr floors, JMD Pacific Square,Sector- I 5, Part-II, Gurgaon- 1 22001

Subject:

Dear Sir,

Environmental ClearanceHousimg Colony Project atGurga,on, Haryana.

for constructionVillage Sohna &

This lertter is in reference to your application no.

addressed to M.S. SllIAA, Haryana received on 04.12.2014 and

24.11.2015 seeking prior Environmental Clearance for the above

Notification,2006. The proposal was transferred to MoEF & CC,

action was taken and the case was returned to SEIAA on 3 1.08.201

The proposal has be,sn appraised as per prescribed procedure in

under the EIA Notifi,;ation,2006 on the basis of the mandatory

the application viz., Form-I, Forrnl-A, Conceptual Plan and

furnished in responsie to the observations of the State Expert

(SEAC) constituted by MOEF, GOI vide their Notification 21.08.

held on 04.03.2015. 22.12.2015 &.16.02.2016 awarded "Gold"

I2l It is intrlr-alia, noted that the project involves the consrt

Group Housing Colony Project at Village Sohna & Khaika, Sector-

total plot area of 40468.5 sqm (10 Acre). The total built up area s

The proposed Project shall comprise of 16 Towers; Tower I to I

Tower 13 to 16 (GF + 08 Floors), Cornmunity Hall and Aganwadi

units shall'be 1632. llhe maxirnurn heieht of the buildine shall be

water requirement shall be I166 KLD. The fresh water requireme:

The waste water serreration shall be 985 KLD. which will be

1200 KLD (600 KLD + 600 KLD) capacity. The total power requi

KW which will be supplied by DHBVN. The Project Proponent

green belt on 20.0I7'% of project area (I5o/o tree plantation + 5.01

Project Proponent proposed to constnrct 10 rain water harvesting

generation will be 5Ct6l kg/day. The bio-degradable waste will be

area by installation ol OWC (organic waste converter). The total

are 1958 Two Wheelers and 209 ECS.

t3l The State Expert Appraisal Committee, Haryana after

the relevant documemts submitted by the project proponent and

of'Ktr

la r.tot . A.

Affordable Groupika, Sector-4, Distt

il dated 04.12.2014

uent letter d,rted

ject under the EIA

I on 27 .03.20 I 5. No

after its constitution.

light of provisions

ments enclosed with

itional clarifications

isal Committee

015, in its meetings

ng to the project.

ion of Affordable

, Distt Gurgaon on a

lbe 92321.664 sqm.

(GF + 13 Floors)

. The total Dwelling

.85 rneter. The total

t shall be 146 KLD.

in the 2STPs of

t shall be 7960

proposed to develop

landscaping). The

its. The solid waste

reated in the project

ing spaces proposed

consideration of

l--

itional clarification

Page 2: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

furnished in response to its observations, have recommended the

clearance for the prroject rnentioned above, subject to compliz

t of environmental

with the stipulated

shall be of ultra low

(Protection) Rules

ndersround tanks and

conditions. Accordingly, the State Ilnvironment Impact Assessl ent Authority in its

meeting held on 28t'.03.2016 decided to agree with the recorn ions of SEAC to

accord necessary environmental clearance for the project under

Notification2006 su.bject to the strict compliance with the specific

ategory 8(a) of EIA

nd seneral conditions

mentioned belolv:-

PART A-SPECIFIC CONDITI9NSi-Construction Phaser-

lU "Consent for Establish" shall be obtained from Haryana

Board under Air and Water Act and a copy shall be s

Haryana before the start of any construction work at site.

A first aid room as proposed in the project report shall

construction and operational phase ofthe project.

I2l

l3l

I4l

tsl

t6l

te Pollution Control

itted to the SEIAA.

provided both during

Adequate drinking water and sanitary facilities shall be ided for construction

workers at the site. Provision should be made for mobile ilets. Open defecation

by the labour,os is strictly prohibited. The safe disposal of'so id wastes/ waste water

fforts shall be made togenerated during the construction phase should be ensured.

provide mobile STP for treatment of waste water during the on phase.

All the topsoil excavated during construction activities I be stored for use in

horticulture/landscape development within the project site.

The project proponent shall ensure that the building required during

construction phase is properly stored within the project area and disposal of

construction waste should not create anv adverse effe on the neighboring

communities and should be disposed of after taking precautions for

general safety and health aspects of people, only in approverC

of compel.ent authority.

ites with the approval

Construction spoils, including bituminous material and o r hazardous materials,

dump sites for such

the ground water and

must not be allowed to contaminate watercourses and t

material must be secured so that they should not leach int

any hazardour; waste generated during construction phase, sh

per applicabl: rules and norms with necessary approval

Pollution Control Board.

uld be disposed off as

f the Haryana State

I7l The diesel generator sets to be used during construction ph

sulphur diese,l type and should conform to Enviro

prescribed for air and noise emission standards.

I8l The diesel required for operating DG sets shall be stored

if required, clearance frorn Chief'Controller of Explosives llbe taken.

Page 3: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

tel Ambient noise levels shall conforrn to the residential standa

niqht. lnslsmernt?l pollution loads on the ambient air and

both during daY and

quality should be

should be taken to

pre-mixed concrete,

ation Building

ir conditioned sPaces

f appropriate thermal

as well as water

[10]

[11]

Ir2l

ll3l

closely monitored during construction phase. Adequate meas

reduce ambient air pollution and noise level during cons ion phase, so as to

conform to the stipulated residential standards of CPCBAyIo

Fly ash shall be used as building material in the construction as per the provisions

27th Auglst 2003.of Fly Ash Notification of Septemb et 1999 and as amended

Storm water c,ontrol and its re-use as per CGWB and BIS dards for various

applications should be ensured.

Water demand during construction shall be reduced by use

curing agents and other best practices.

ln view of the severe constrains in water supply augmentati n in the region and

NOC from CGWAsustainability of water resources, the developer will submit t

speciffing water extraction quantities and assurance from DA/ utility provider

indicating soufce of water supply and quantity of water wit details of intended

required for both

itted to the SEIAA

use of water potable and non-potable. Assurance is

construction atrd operation stages separately. It shall be su

and RO, MOE,F, Chandigarh before the start of construction'

[141

llsl

Roof must meet prescriptive requirement as per Energy

Code by ul;ing appropriate thermal insulation material.

Opaque w'all must meet prescriptive requirement as per

Building Code which is proposed to be mandatory for all

while it is desirable for non-air-conditioned spaces by use

insulation material to fulfill requirement.

ergy Conservation

The approval olithe competent authority shall be obtained for

building on account of earthquake, adequacy of fire fighting

tructural safetY of the

ipments, etc. as Per

National Building Code including protection measures frorn lightening etc. If anY

Forest Conservationforest lancl is involved in the proposed site, clearance un

Act shall be obtained frorn the competent Authority.

Overexploited groundwater and impending severe shortage water supPlY in the

conservation Plan.region requires the developer to redraw the water and

Developer shall reduce the overall footprint of the proposecl

proponent sha.ll incorporate water efficiency /savings meas

velopment. Project

reuse/recycling within 3 months and before start of cont ction to the SEIAA,

Haryana and IiO, MOEF, GOI, Chandigarh.

The Project Proponent as stated in the proposal shall con t total 10 rain water

harvesting pit;s for recharging the ground water within the ject premises. Rain

water harvesting pits shall be designed to make provisions fi silting chamber and

ntenance budget and

ll6l

l17l

I18l

removal of flctating matter before entering harvesting pit'

Page 4: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

tlel

[20]

t2rl

A+

persons responsible for maintenance must be provided' C

that contaminated water do not enter any RWH pit'

The projeot proponent shall provide for adequate fire

equipments as required by Haryana Fire Service Act, 2009

by the locsl Authority/Directorate of fire from time to time

proponent shall take necessary permission regarding fire sa

competent AuthoritY as required'

The Project Proponent shall obtain assurance from the DHB for supply of 7960

KW of po.wer supply before the start of construction. In n<l case project will be

from any externaloperational solely on generators without any power su

power utility.

shall also be taken

measures and

instructions issued

Further the Project

schemeA{OC from

the project shall be

before the start of

the natural land

flow from the

ion does not exceed

ent Haryana.

, proper sprinkling

r pollution during

the lower level of the

width and proPer

Detail calculalion of power load and ultimate power

submitted to DHBVN under intimation to SEIAA

construction. Provisions shall be rnade for electrical

atea.

load o

I22l

Harya

infrasl ture in the project

The Project J?roponent shall not raise any constructton

depression / lrtrallah/water course and shall ensure that the

Nallah/water c,ourse is not obstructed.

The Proji:ct Proponent shall keep the plinth level of he building blocks

sufficiently above the level of the approach road to the Pr<r.; . Levels of the other

ooding.areas in the Projects shall also be kept suitably so as to avoid

I23l

124]l

12sl

126l

I27l

t28l

l2el

[30]

Construction lshall be carried out so that density of popu

norms approved by Director General Town and Country De

The Project Proponent shall submit an affidavit with the laration that ground

water will not be used for construction and only treated

construction.

should be used for

The project proponent shall not cut any existing tree and pr

should be modified to include those trees in green area'

landscaping plan

The project proponent shall provide 3 meter high icade around the

project area, dust screen for every floor above the grou

and covering of stored material to restrict dust and

construction.

The project proponent shall construct a sedimentation basrn r

project site to trap pollutant and other wastes during rains.

The project proponent shall provide proper rasta of pro

strength for ttLe project before the start of construction'

The project proponent shall ensure that the U-value of the is less than3.ll7

and maxirnunr solar heat gain co-efficient is 0.25 for vertical enestratlon.

Page 5: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

[31]

I32l

The project pr,oponent shall adequately control construction

non-silica dust and wood dust. Such dusts shall not spread ott

usts like silica dust,

ide project premises'

nt to all construction

stem. Solid waste

le waste, STP,

er and one till 39

ponent shall not

ould not be sold

officer for building

iom concerned local

d sewerage sYstem

al authorities beside

Project Proponent shall provide respiratory protective equiprn

workers.

The project proponent shall develop complete civic infi ure of the Group

Housing colony including intemal roads, green belt devel sewerage line,

Rain Water rocharge arrangements, Storm water drainage

panagement r;ite and provision for treatment of bio-deg

possession of the units/flats thereafter.

l33l The project proponent shall provide one refuge atea till 24

meter each, as per National Building Code. The project

convert any refuse area in the habitable space and it

out/commercialized.

[34]

[3s]

water supply [ine, dual plumbing line' electric supply li etc. and shall offer

The project ptoponent shall provide fire control room and tfi

above 30 rneter as per National Building Code'

The projeot proponent shall obtain permission of Mines

for excavation of soil before the start of construction.

Geology Department

136l The project prroponent shall seek specific prior approval

Authority/HuDA regarding provision of storm drainage

includins their inteeration with external services of HUDA/

other required services before taking up any construction acti

t37l The project proponent shall submit the copy of fire safety

Fire Departme:nt before the start of construction.

duly approved bY

t38l The project proponent shall discharge excess oftreated water/storm water m

the public drainage system and shall seek permission of Fl A before the start of

construction.

t39l The project pr:oponent shall maintain the distance between

line.

t40l The project proponent shall ensure that the stack height is

highest tower.

t4U The proje,ot proponent shall ensure that structural stability tt

of masnitude 8.5 on Richter scale.

and water suPPlY

earthquake

Operational Phasel

tal "Consent to Operate" shall be obtained from

Board under Air and Water Act and a copy

Haryana.

The Sewage Treatment Plant (STP) shall be

sewage to thrl prescribed standards including

meter more than the

Haryana St Pollution

shall be sutr itted to the

installed for treatment of the

effluent will be

Control

SEIAA,

thelbt

odour and

Page 6: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

recycled to achieve zero exit discharge. The installation of shall be certified

treatment of vraste water is mandatory. The project propon

only Ortho-Phosphorus but total Phosphorus to the extent o less than 2mglhter.

Similarly total Nitrogen level shall be less than 2mglliter in iarv treated waste

water. Discharge of treated sewage shall conform to the s and standards of

CPCB/ HSPCB, whichever is environmentally better. Pr'c ect Proponent shall

by an independent expert and a report in this regard shall

SEIAA, Haryana before the project is commissioned fo'

implement suoh STP technology which does not require

project propo:nent shall essentially provide two numbersl

common area illumination and for domestic use should be

conform to rules made under the Environment (Protect.i

as green cover area for tree plantation especially all aroun

project and on the road sides preferably with local speci

the project shall be preferably landscaped and covered

herbs & shrubs. Only locally available plant species shall be

The project proponent shall strive to minimize water in irui

efficient irrig;ation system, scheduling irrigation only a

transpiration clata.

be submitted to the

operation. TertiarY

nt shall remove not

Iter backwash. The

as the case may

f enclosed type and

n) Act, 1986. The

the periphery of the

which can provide

open spaces inside

of STPs preferably

equivalent to !i\o/o of total capacity or as per the initial occu

be.

lcl Separation of t.he grey and black water should be done by the: e of dual plumbing

line. Treatmerrt of 1000 grey water by decentralized ent should be done

ensuring that the re-circulated water should have BOD level less than 5 mg/litre

and the recycl:d water will be used for flushing, gardening DG set coolins etc.

to achieve zero exit discharge.

For disinfection of the treated wastewater ultra-violet racl

process shoulcl be used.

on or ozofilzalron

Diesel power generating sets proposed as source of p power for lifts,

ldl

lel

IfJ

lel

location of the DG sets shall be in the open as p

proponent with appropriate stack height above the highest

by the project

level of the project

as per the CPCB norms. The diesel used for DG sets shall

diesel (35 ppnr sulphur), instead of low sulphur diesel.

ultra low sulphur

Ambient Noise level should be controlled to ensure that it

prescribed standards both within and at the boundary of tht:

Group Housing Project.

does not exceed the

Affordable

The project ploponent as stated in the proposal should main in at least 20.017%

protection against noise and suspended particulate matter.

ith vegetation/grass,

used.

ion of landscaPe bY

minimizing gr:ass area, using native variety, xeriscaping an mulching, utilizingthl

checking evapo-

Page 7: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

lil Rain water harvesting for roof run-off and surface run-off, per plan submitted

off, pre- treatmentshould be implemented. Before recharging the surface

through sedirrLentation tanks must be done to remove sus ed matter, oil and

srease. The bore well for rainwater recharging shall be kept at least 5 mts. above

the highest ground water table. Care shall be taken that con inated water do not

Water Harvesting of

material or paint which can contaminate rain water. Wire

without any toxic

and filters should

be used wherever required.

ffl The ground water level and its quality should be

consultation with Central Ground Water Authority.

regularly in

lkl A report on the energy conservation measures conforming 1: energy conservatlon

norms finalized by Bureau of Energy Efficiency should be

details about building materials & technology, R & U Facto

the SEIAA,Haryana in three months time.

ared incoqporating

ul Energy conservation measures like installation of LED onl for lighting the areas

outside the building and inside the building should be in part of the project

design and sh.ould be in place before project commissionin

must be adapted to the maximum energy conservation.

. Use of solar panels

lml The Project Proponent shall use zero ozone depleting potential material rn

insulation, refiigeration, air-conditioning and adhesive. Proj

provide Halon free fire suppression system.

Proponent shall also

The solid wa:;te generated should be properly collected segregated as per the

requirement of the MSW Rules, 2000 and as amended from ime to time. The bio-lnl

enter any RWH pit. The project proponent shall avoid Rain

first 10 minutes of rain fall. Roof top of the building shall

degradable wilste should be treated by appropriate technolo

the site ear-marked within the project area and drylinert

disposed off to the approved sites for land filling after

material.

etc and submitted to

(proposed OWC) at

lid waste should be

Ipl

recovering recyclable

lol The provision, of the solar water heating system shall be as norms specified by

HAREDA and shall be made operational in each building

The traffic plrn and the parking plan proposed by the Proj t Proponent should be

adhered to rneticulously with further scope of additi I parking for future

entry and exit pointsrequirement.'fhere should be no traffic congestion near t

from the roards adjoining the proposed project site. P

internalized arnd no public space should be used.

ing should be fully

The Project shall be operationalized only when HUDA/loca

domestic water supply systern in the area.

lql authority will provide

Page 8: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

[.] Operation and maintenance of STP, solid waste

Infrastructure, pollution control measures shall be en

completion of project.

lsl Different type of wastes should be disposed off as per provisi of municipal solid

waste, biomedical waste, hazardous waste, e-waste, batteries & plastic rules made

under Environment Protection Act, 1986. Particularly E-w and Battery waste

20Il and Batteries

a collection center

for E-waste and it shall be disposed of to only registered and rized dismarfiler /

recycler.

Itl Standards for discharge of environmental

schedules of rule 3 of Environment Protection

with.

Rule 1986 I be strictly complied

Water supply shall be metered among different users and diflfi

than the highest

lul

lvl

shall be disposed of as per existing E-waste Management Ru

Management Rules 2001. The project proponent should mai

nt and electrical

even after the

pollutants as hrined in various

nd air are within the

DG sets greater than

Variable speed drive,

ntesrated Point Load

lwl

lxl

Izl

800 KVA shall be as per CPCB latest standards for high ity DG sets.

All electric supply exceeding 100 amp, 3 phase shall mai in the power factor

between 0.98 lag to I at the point of connection.

The ;project proponent shall not use fresh water for HVAC and DG cooling. Air

ater shall be used by

t Proponent shall also

system for HVAC in

The project proponent shall ensure that the of DG sets is

tower and also ensure that the emission standards of noise

CPCB latest prescribed limits. Noise and Emission level o

based HVAC system should be adopted and only treated

project proponent for cooling, if it is at all needed. The Proj

summer and winter seasons should be kept at optimal levell.

best Co-efficient of Performance (CoP), as well as optimall

project proponent shall obtain manufacturer'S certificate alscr

The project proponent shall ensure that exit velocity fronr

sufficiently high. Stack shall be designed in such a way t

down-wash under any meteorological conditions.

use evaporative cooling technology and double stage coolinr

order to reduce water consumption. Further temperature, ive humidity during

lvl

Value and minirnum outside fresh air supply may be for conservation of

power and water. Coil type cooling DG Sets shall be used fi saving cooling water

conSurnption for water cooled DG Sets.

The project proponent shall ensure that the transformer is with high

quality grain oriented, low loss silicon steel and virgin el yte grade

that.

the stack

there

copper. The

should be

is no stack

The proiect proponent shall provide water sprinkling systenl in the project area to

suppress the dust in addition to the already suggested miti

Air Environment ChaPter of EMP.

laalion measures in the

Page 9: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

[ab] The project proponent shall ensure proper Air Ventilation light system in the

basements area for comfortable livine of hurnan being and ll ensure that number

of Air Changes per hour/(ACII) in basement never falls low 15. In case of

emergency capacity for increasing ACH to the extent of 30

project proponent.

st be provided by the

[acl The project proponent shall ensure drinking/ domestic ter supply as per

prescribed standards till treated water supply is made avai by HUDA.

lil The Project Proponent shall ensure the commitments made Form-1- Form-lA-

EIA/EMP and other documents submitted to the SEIAA br the protection of

environment and proposed environmental safeguards are plied with in letter

and spirit. In case of contradiction between two or more ments on any point,

the most environmentally friendly commitment on the pcr

commitment by project proponent.

liil The project proponent shall also submit six monthly on the status of

compliance of the stipulated EC conditions including resuL of monitored data

Regional Office of(both in hard copies as well as by e-mail) to the north

MoEF, HSPCB and SEIAA Haryana.

lii il STP outlet after stabilization and stack emission shall be monitored monthly.

Other environmental parameters and green belt shall be rrr itored on quarterly

basis. After every 3 (three) months, the project nt shall conduct

[ad] The project proponent shall install solar panel for energy

PART-B. GENERAL CONDITIONS:

environmental audit and shall take corrective measure, if reqru

The SEIAA. Harvana reserves the risht to add additional

ation.

shall be taken as

red, without delay.

safeguard measures

ncements issued

livl

lvl

lvil

subsequently, if found necessary. Environmental C sranted will be

revoked if it is found that false information has been siven fj getting approval of

this project. SEIAA reserves the right to revoke the c if conditions

stipulated are not implemented to the satisfaction of SEI

The Project proponent shall not violate any judicial orders/

by any Court/Tribunal.

All other statutory clearances such as the approvals for stora of diesel from Chief

Department, Forest

, Forest Act, 1927,

Controller of Explosives, Fire Department, Civil Aviati

Conservation Act, 1980 and Wildlife (Protection) Act, 19t

PLPA 1900, etc. shall be obtained, as applicable by proj proponents from the

respective authorities prior to construction of the project.

The Project proponent should infbrm the public that the pro.j has been accorded

Environment Clearance by the SEIAA and copies ot clearance letter are

available with the Haryana State Pollution Control Board & li AA. This should be

letter at least in twr-r

[vii]

advertised within 7 davs frorn the date of issue of the clearan

Page 10: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

L0

lviiil

lixl

lxil

local newspapers that are widely circulated in the region

should be forwarded to SEIAA Haryana' A copy of

conditions shall also be put on project proponent's web site fi

Under the provisions of Environment (Protection) Act' 19

initiated against the Project Proponent if it was found th

project has been started before obtaining prior Environmenta,l

AnyappealagainstthethisEnvironmentalClearanceshall

Green Tribunal, if preferred, within a period of 30 days

Section 16 of the National Green Tribunal Act, 2010'

the copy of the same

ent Clearance

public awareness.

legal action shall be

construction of the

learance.

ie with the National

as prescribed under

and year wise

nder rules prescribed

t, Haryana

struction/operation

ion Under Control'

lxl The project proponent shall put in place Corporate En ironment PolicY as

(I) dated 26.4.2012

should be submittedmentioned in MoEF, GoI OM No. J-l101314112006-14 l:

within 3 months period. Latest Corporate Environment Polit;

to SEIAA within 3 rnonths of issuance of this letter'

The fund ear-marked for environment protection measu should be kePt in

sepalate account and should not be diverted for other pu

expenditure shall be reported to the SEIAA/RO MOEF GOI

for Environment Audit.

[xii] The project proponent shall ensure the compliance of Forest

Notifi carion no. S. o. 121 lP A2 I 1900 I s.4 I 97 dated 28.1 | .199''l

[xiii] The Project Proponent shall ensure that no vehicle during

phase enter the project premises without valid 'Pollu

certifi cate from competent Authority.

[xiv] The project proponent is responsible for compliance

Environmental Clearance letter and project

f all

t can

ractor

conditions in

not absolve

engaged bYhimielf /herself of the responsibility by shifting it to any co:n

project proponent.

[xv] The project proponent shall seek fresh Environmental

is change in the planning of the proposed project'

ce ifat anY stage there

[xvi] Besides the developer/applicant, the responsibility to re the compliance of

Environmental Safeguards/ conditions imposed in the Envi mental Clearance

letter shall also lie on the licensee/licensees in w name/names the

license/ClU has been granted by the Town & Country lanning DePartment,

Haryana.

[xviil The proponent shall upload the status of compliance f the stipulated EC

conditions, including results of monitored data on their ite and shall uPdate

Regional Office ofthe same periodically. It shall simultaneously be sent t<l

MoEF, the respective Zonal Office of CPCB and the SPC

levels namely; PMz.s, PMto, SOx NOv, Ozone, Lead' C

The criteria Pollutant

Benzene, Ammonia,

Benzopyrine, arsenic and Nickel. (Ambient levels as well stack ernissions) or

Page 11: LSS la - Call 011-39589767This lertter is in reference to your application no. addressed to M.S. SllIAA, Haryana received on 04.12.2014 and 24.11.2015 seeking …

II

critical sectoral parameters, indicated for the project

displayed at a convenient location near the main gate of the:

domain.

[xviii] The environmental statement for each financial year endin

as is mandated to be submitted by the project proponent tcr

as prescribed under the Environment (Protection) Rut

subsequently, shall also be put on the website of the compal

of compliance of the EC conditions and shall also be

Regional Offices of MoEF by e-mail.

Ixix]

lxxl

The project proponent shall conduct environment audit

interval and thereafter corrected measures shall be tak

Details of environmental audit and corrective measures

monitoring report.

Colporate Environment and Social Responsibility (CSER.)

the project proponent (2% shall be eannarked) as per gui

Office Memorandum No. J-lI}l3l4L12006-IA.II(I) dated I

of Corporate Affairs, GoI Notification Dated 27.02.20

statement shall be submitted in the compliance. Envi

proposed to be executed under this responsibility

simultaneously. The project proponent shall select and

for implementation of CSER of its own choice and shal.

the start of construction.

Endst. No. SEIAA/HR/20L61

A copy of the above is forwarded to the following:

l. The Additional Director (lA Division), MoEF&CC,Bhavan, Zor bagh Road-New Delhi.The Regional office, Ministry of Environment, Forests &of India, Bay's no.24-25, Sector 31-A, Dakshin Marg, Cha

3. The Chairman, Haryana State Pollution Control Board, C-1.1

Assessment Authority, Haryanr

ll be monitored and

ompany in the public

31"' March in Form-V

e HSPCB Panchkula

1986, as amended

along with the status

t to the respective

every three months

without anv delav.

ll be submitted in the

all be laid down by

lines of MoEF. GoI

05.2012 and Ministry

4. A separate audit

t related work

hall be undertaken

the list of the work

bmit the same before

mpactAssessment Authority, Haryarr

Dated:

State Level Environmen

\ Indra Paryavaran

imate Change, Gor,t.

Sector-6, Pkl.

Impact. Panchkula.

\\

Member Secreta

'ember SecretaState Level Environment