LS of Highway-Model (2)

download LS of Highway-Model (2)

of 1

Transcript of LS of Highway-Model (2)

  • 7/21/2019 LS of Highway-Model (2)

    1/1

    CHAINAGE

    RL OF GROUND

    RL OF FORMATION

    HEIGHT OF FILLINGDEPTHOF CUTTING

    0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000

    99.755 99.670 99.57 99.35 99.295 99.110 98.925 98.95 98.38 100.2 100.185 99.715 99.475 99.115 98.605 98.710 98.575 98.705 99.80 98.69 99.065 100.075 100.455 101.010 101.65 102.225 103.365 103 .695 104.565 10 5.38 105 .87 0 1 06.3 1 1 06.4 25 106.685 107.100 106.84 105.995 105.600 104.855 10 4.15 5 103.665

    DATUM=95.000

    VS= 1:100

    :

    RAISING GRADIENT = 1 in 1000