LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information...

13
LRDR Program Overview March 8, 2017 Mr. Richard Hagy Director, Business Development

Transcript of LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information...

Page 1: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

LRDR Program Overview

March 8, 2017

Mr. Richard Hagy

Director, Business Development

Page 2: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

2

Today’s Ballistic Missile Defense System

Page 3: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

3

Long Range Discrimination Radar

Ballistic Missile Threats are Growing more Sophisticated and

Complex Requiring better Discrimination CapabilityCopyright 2017 Lockheed Martin Corporation

Page 4: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

4

Lockheed Martin LRDR Contract

LRDR Contract Awarded on October 21, 2015

LM will Design, Develop, Produce, Test, and Deliver an LRDR at Clear Air Force Station (AFS), Alaska in 2020

LRDR Contract Options

– Upgrade Initial Offering for Increased Radar Capability

– O&S Support (3 years)

– BMDS Ground and Flight Test Support

LRDR S-band Radar Mission

– Homeland Defense Against Long-range Missile Threats

– Space Situational Awareness

Radar in Alaska Ideally Suited to Defend Alaska and CONUS

Copyright 2017 Lockheed Martin Corporation

Page 5: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

5

LRDR Contract

CLIN Description

0001 LRDR

0010 CLIN 1 Spares

0030 Studies/Analysis

1000 (Option) Additional Capability for Primary Face

1010 (Option) CLIN 1000 Spares

2000 (Option) BMDS Ground Test & Integration

3000 (Option) BMDS Flight Test Support

5000 (Option) O&S Period 1

6000 (Option) O&S Period 2

Copyright 2017 Lockheed Martin Corporation

Page 6: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

6

LRDR Equipment Shelter (LES)

Mission Control Facility (MCF)

LRDR Equipment

Shelter (LES)

LRDR Equipment Shelter (LES)

• LM Construction

• LM to Populate with Array Frame / Populated Panels, Power Conditioning and LO Synthesis & Distribution Equipment

• Panels are Factory Integrated and Tested, Calibrated, and Shipped to Site

• Integrated Panels are Calibrated / Tested On-site as Complete Array

Mission Control Facility (MCF)

• MILCON Construction

• LM to Populate with Equipment Only

Notional

Copyright 2017 Lockheed Martin Corporation

Page 7: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

7

LRDR Schedule SummaryStatus as of: 6/27/2016

1TC001_Master

Baseline 1/29/2016

LRDR Team Site Deployment Begins in Early 2019

Copyright 2017 Lockheed Martin Corporation

Page 8: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

8

LRDR Contract Milestone Events

Milestone Date Status

Facilities Requirements Review (FRR) January 26, 2016

Initial Program Review (PMR) January 27, 2016

System Requirements Review (SRR) February 17-18 2016

Integrated Baseline Review April 2016

35% Facilities Design Review 4th Quarter 2016

Preliminary Design Review (PDR) 1st Quarter 2017

Critical Design Review (CDR) 3rd Quarter 2017

Final Design Review (FDR) 4th Quarter 2017

65% Facilities Design Review 2nd Quarter 2017

Factory Acceptance Test Readiness Review 2nd Quarter 2019

95% Facilities Design Review 3rd Quarter 2017

M&S Delivered 3th Quarter 2018

Radar Acceptance TRR 2nd Quarter 2020

DD-250 4th Quarter 2020

Copyright 2017 Lockheed Martin Corporation

Page 9: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

9

Potential LRDR Workforce

Opportunities in Alaska

Construction

A-frame Steel Fabrication

Material Handling Equipment

Local Transportation Services; Rail and Trucking Services

Security Services

Warehousing

Fuel Services, Septic Services, and Waste Services

Depot Repair Capabilities within Proximity to the LRDR Site;

Maintain, Repair, and Overhaul Components

Hotels, Restaurants and Car Rentals

Broad Range and Type of Potential Jobs Opportunities for Alaska

Copyright 2017 Lockheed Martin Corporation

Page 10: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

10

LRDR Alaska UpdateCeremony Tops Off LRDR Construction Milestone in Moorestown, New Jersey

Sept. 2016 – Construction Begins Oct. 2016 – Exterior Near CompletionThe LRDR Integration Site at

Lockheed Martin’s Moorestown, N.J.

Campus is a Scaled Version of

the Radar that will be Operational

in Clear, Alaska, in 2020

The Facility will be used to Test the

Hardware and Mitigate Risk. The

Team Continues to Meet all

Milestones on the Schedule

Copyright 2017 Lockheed Martin Corporation

Page 11: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

11

Summary

Radar in Alaska Ideally Suited to Defend Alaska

and CONUS

Lockheed Martin LRDR Team Excited to Leverage

and Expand upon Existing Workforce in Alaska

LRDR Team Site Deployment Begins in Early 2019

Broad Range and Type of Potential Job

Opportunities for Alaska

Copyright 2017 Lockheed Martin Corporation

Page 12: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

Copyright 2017 Lockheed Martin Corporation

Page 13: LRDR Program Overview - Alaska PTAC · Lockheed Martin Proprietary/Export Controlled Information Created Date: 2/27/2017 2:26:21 PM ...

Site Model

Copyright 2017 Lockheed Martin Corporation