LOUDOUN COUNTYTOWN OF LEESBURG LOUDOUN COUNTY …

8
CROSSTRAIL BLVD (UNDER CONSTRUCTION) SYCOLIN RD RT. 643 E 11,748,000 N 7,070,000 GOURLEY TRANSIT DR GANT LN RT. 652 COCHRAN MILL RD RT. 653 CLAUDIA DR KINCAID BLVD SE MILLER DR SE DULLES GREENWAY (TOLL ROAD) RT. 267 LOUDOUN CENTER PL E 11,749,000 E 11,750,000 E 11,751,000 E 11,752,000 E 11,753,000 E 11,754,000 E 11,755,000 E 11,756,000 E 11,757,000 E 11,758,000 E 11,748,500 E 11,749,500 E 11,750,500 E 11,751,500 E 11,752,500 E 11,753,500 E 11,754,500 E 11,755,500 E 11,756,500 E 11,757,500 E 11,758,500 N 7,071,000 N 7,072,000 N 7,073,000 N 7,074,000 N 7,075,000 N 7,076,000 N 7,077,000 N 7,078,000 N 7,079,000 N 7,070,500 N 7,071,500 N 7,072,500 N 7,073,500 N 7,074,500 N 7,075,500 N 7,076,500 N 7,077,500 N 7,078,500 N 7,079,500 LOUDOUN COUNTY TOWN OF LEESBURG PHILIP A BOLEN MEMORIAL PARK LEESBURG EXECUTIVE AIRPORT LEESBURG PARK AND RIDE LOT GOVERNMENT SUPPORT CENTER JUVENILE DETENTION CENTER SITE PROJECT SITE STAKEOUT NOTE PROPOSED ENTRANCES FROM STATE MAINTAINED ROADS WILL BE STAKED BY A LICENSED SURVEYOR REGISTERED IN THE COMMON WEALTH OF VIRGINIA. THE DIRECTOR MAY REQUEST FIELD ASSISTANCE TO IDENTIFY SPECIFIC AREAS OF PROPOSED DEVELOPMENT AS RELATED TO EXISTING SITE CONDITIONS. PLEASE CONTACT TIMMONS GROUP AT 20110 ASHBROOK PLACE SUITE 100, ASHBURN, VA 20147. PHONE (703) 554 -6700 PROJECT NO: DATE: 11/6/2020 3:19:04 PM LOUDOUN COUNTY JUVENILE DETENTION CENTER STPL-2017-0010, TLPF-2017-0005 (TLCR-2017-0001) GOURLEY TRANSIT DRIVE, LEESBURG, VA (PARID#: 191169866000) CATOCTIN DISTRICT, LOUDOUN COUNTY, VIRGINIA 481000 03/27/2020 REVISIONS DATE DESCRIPTION 10/30/20 REVISIONS FOR VERIZON 20110 Ashbrook Place, Suite 100 Ashburn, VA 20147 TEL 703.726.1342 FAX 703.726.1345 www.timmons.com THIS DRAWING PREPARED AT THE NORTHERN VIRGINIA OFFICE 11/06/20 ADDENDUM 3 C/O PETE CLOUTIER, P.E. 20110 ASHBROOK PLACE, SUITE 100 ASHBURN, VIRGINIA 20147 PHONE: (703) 554-6709 C/O JOE KROBOTH LC DEPARTMENT OF TRANSPORTATION AND CAPITAL INFRASTRUCTURE 101 BLUE SEAL DR, SUITE 102 LEESBURG, VA 20177 PHONE: (703) 777-0396 FAX: (703) 777-0263 SCALE: 1" = 1,000' VICINITY MAP OWNER / APPLICANT: LOUDOUN COUNTY 3200 NORFOLK STREET RICHMOND, VA 23230 PHONE: (804) 794-7555 FAX: (804) 355-5690 ARCHITECT: MOSELEY ARCHITECTS Sheet List Table Sheet Number Sheet Title DU0.0 COVER SHEET DU1.0 LEGEND DU1.1 GENERAL NOTES AND DETAILS DU2.0 OVERALL PLAN DU3.0 EXISTING CONDITIONS, EROSION AND SEDIMENT CONTROL PH I DU3.1 EXISTING CONDITIONS, EROSION AND SEDIMENT CONTROL PH II DU3.2 EROSION AND SEDITMENT CONTROL NOTES AND DETAILS DU3.3 EROSION AND SEDITMENT CONTROL NOTES AND DETAILS LOUDOUN COUNTY JUVENILE DETENTION CENTER - DRY UTILITY PLAN GRADING PERMIT PLAN CATOCTIN ELECTION DISTRICT LOUDOUN COUNTY, VIRGINIA ENGINEER: TIMMONS GROUP NOTICE REQUIRED CONTRACTORS SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AND OR BLASTING AT LEAST TWO (2) WORKING DAYS, BUT NOT MORE THAN TEN (10) WORKING DAYS PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. NAMES AND TELEPHONE NUMBERS OF POSSIBLE OPERATORS OF UNDERGROUND UTILITY LINES APPEAR BELOW. THESE NUMBERS SHALL ALSO BE USED TO SERVE IN AN EMERGENCY CONDITION. NON-EMERGENCY FIRE AND RESCUE / POLICE: (703) 777-0637 (FOR EMERGENCY CALL: 911) MISS UTILITY DIAL 811, OR 1-800-552-7001 BEFORE DIGGING GAS CABLE ELECTRIC TELEPHONE CNG TRANSMISSION CORP. COLUMBIA GAS TRANSMISSION CORP. NOVEC VERIZON COMCAST AT&T WASHINGTON GAS DOMINION VIRGINIA POWER (814) 583-5171 (703) 327-6331 (800) 752-7520 (888) 335-0500 (888) 667-3000 (800) 256-4646 (800) 288-2747 (888) 375-4888 OTHER CENTURY LINK (800) 366-8201 UTILITY CONTACTS DU0.0 COVER SHEET SITE NARRATIVE THE SITE PROPOSES 1.30 ACRES OF LAND DISTURBANCE FOR THE INSTALLATION OF DRY UTILITIES AS REQUIRED FOR THE NEW LOUDOUN COUNTY JUVENILE DETENTION CENTER (JDC). THE SITE IS CURRENTLY UNDEVELOPED VACANT LAND WITH LOUDOUN COUNTY PROPERTY TO THE NORTH SOUTH AND EAST. SYCOLIN ROAD BORDERS THE PROPERTY TO THE WEST AND GOURLEY TRANSIT DRIVE (PRIVATE) TO THE SOUTH. SITE NOTES ALL INFORMATION SHOWN WITHIN THE LIMITS OF DISTURBANCE IS BASED UPON LOUDOUN COUNTY GIS DATA AND FUTURE DEVELOPMENT SITE PLAN (STPL-2017-0010)

Transcript of LOUDOUN COUNTYTOWN OF LEESBURG LOUDOUN COUNTY …

CR

O

SS

TR

AIL B

LV

D

(U

ND

ER

C

O

NS

TR

UC

TIO

N)

SY

CO

LIN

R

D

RT

. 6

43

E 1

1,7

48

,0

00

N 7,070,000

G

O

U

R

L

E

Y

T

R

A

N

S

IT

D

R

G

A

N

T

L

N

R

T

.

6

5

2

C

O

C

H

R

A

N

M

I

L

L

R

D

R

T

.

6

5

3

CLAUDIA D

R

K

I

N

C

A

I

D

B

L

V

D

S

E

M

I

L

L

E

R

D

R

S

E

D

U

L

L

E

S

G

R

E

E

N

W

A

Y

(

T

O

L

L

R

O

A

D

)

R

T

.

2

6

7

L

O

U

D

O

U

N

C

E

N

T

E

R

P

L

E 1

1,7

49

,0

00

E 1

1,7

50

,0

00

E 1

1,7

51

,0

00

E 1

1,7

52

,0

00

E 1

1,7

53

,0

00

E 1

1,7

54

,0

00

E 1

1,7

55

,0

00

E 1

1,7

56

,0

00

E 1

1,7

57

,0

00

E 1

1,7

58

,0

00

E 1

1,7

48

,5

00

E 1

1,7

49

,5

00

E 1

1,7

50

,5

00

E 1

1,7

51

,5

00

E 1

1,7

52

,5

00

E 1

1,7

53

,5

00

E 1

1,7

54

,5

00

E 1

1,7

55

,5

00

E 1

1,7

56

,5

00

E 1

1,7

57

,5

00

E 1

1,7

58

,5

00

N 7,071,000

N 7,072,000

N 7,073,000

N 7,074,000

N 7,075,000

N 7,076,000

N 7,077,000

N 7,078,000

N 7,079,000

N 7,070,500

N 7,071,500

N 7,072,500

N 7,073,500

N 7,074,500

N 7,075,500

N 7,076,500

N 7,077,500

N 7,078,500

N 7,079,500

L

O

U

D

O

U

N

C

O

U

N

T

Y

T

O

W

N

O

F

L

E

E

S

B

U

R

G

PHILIP A BOLEN

MEMORIAL

PARK

LEESBURG

EXECUTIVE

AIRPORT

LEESBURG

PARK AND

RIDE LOT

GOVERNMENT

SUPPORT

CENTER

JUVENILE

DETENTION

CENTER SITE

PROJECT

SITE

STAKEOUT NOTE

PROPOSED ENTRANCES FROM STATE MAINTAINED ROADS WILL BE STAKED BY A

LICENSED SURVEYOR REGISTERED IN THE COMMON WEALTH OF VIRGINIA. THE

DIRECTOR MAY REQUEST FIELD ASSISTANCE TO IDENTIFY SPECIFIC AREAS OF

PROPOSED DEVELOPMENT AS RELATED TO EXISTING SITE CONDITIONS. PLEASE

CONTACT TIMMONS GROUP AT 20110 ASHBROOK PLACE SUITE 100, ASHBURN, VA

20147. PHONE (703) 554 -6700

PROJECT NO: DATE:

11/6/2020 3:19:04 P

M

LOUD

OUN C

OUNT

Y JUV

ENILE

DETE

NTIO

N CEN

TER

ST

PL

-2

01

7-0

01

0, T

LP

F-2

01

7-0

00

5 (T

LC

R-2

01

7-0

00

1)

GO

UR

LE

Y T

RA

NS

IT

D

RIV

E, L

EE

SB

UR

G, V

A (P

AR

ID

#: 1

91

16

98

66

00

0)

CA

TO

CT

IN

D

IS

TR

IC

T, L

OU

DO

UN

C

OU

NT

Y, V

IR

GIN

IA

481000 03/27/2020

REVISIONS

DATE DESCRIPTION

10/30/20 REVISIONS FOR

VERIZON

20110 Ashbrook Place, Suite 100

Ashburn, VA 20147

TEL 703.726.1342

FAX 703.726.1345

www.timmons.com

THIS DRAWING PREPARED AT THE

NORTHERN VIRGINIA OFFICE

11/06/20 ADDENDUM 3

C/O PETE CLOUTIER, P.E.

20110 ASHBROOK PLACE, SUITE 100

ASHBURN, VIRGINIA 20147

PHONE: (703) 554-6709

C/O JOE KROBOTH

LC DEPARTMENT OF TRANSPORTATION AND CAPITAL INFRASTRUCTURE

101 BLUE SEAL DR, SUITE 102

LEESBURG, VA 20177

PHONE: (703) 777-0396

FAX: (703) 777-0263

SCALE: 1" = 1,000'

VICINITY MAP

OWNER / APPLICANT: LOUDOUN COUNTY

3200 NORFOLK STREET

RICHMOND, VA 23230

PHONE: (804) 794-7555

FAX: (804) 355-5690

ARCHITECT: MOSELEY ARCHITECTS

Sheet List Table

Sheet Number Sheet Title

DU0.0 COVER SHEET

DU1.0 LEGEND

DU1.1 GENERAL NOTES AND DETAILS

DU2.0 OVERALL PLAN

DU3.0 EXISTING CONDITIONS, EROSION AND SEDIMENT CONTROL PH I

DU3.1 EXISTING CONDITIONS, EROSION AND SEDIMENT CONTROL PH II

DU3.2 EROSION AND SEDITMENT CONTROL NOTES AND DETAILS

DU3.3 EROSION AND SEDITMENT CONTROL NOTES AND DETAILS

LOUDOUN COUNTY JUVENILE

DETENTION CENTER - DRY UTILITY PLAN

GRADING PERMIT PLAN

CATOCTIN ELECTION DISTRICT LOUDOUN COUNTY, VIRGINIA

ENGINEER: TIMMONS GROUP

NOTICE REQUIRED

CONTRACTORS SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND

UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AND OR BLASTING AT

LEAST TWO (2) WORKING DAYS, BUT NOT MORE THAN TEN (10) WORKING DAYS

PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. NAMES AND

TELEPHONE NUMBERS OF POSSIBLE OPERATORS OF UNDERGROUND UTILITY

LINES APPEAR BELOW. THESE NUMBERS SHALL ALSO BE USED TO SERVE IN AN

EMERGENCY CONDITION.

NON-EMERGENCY

FIRE AND RESCUE / POLICE: (703) 777-0637

(FOR EMERGENCY CALL: 911)

MISS UTILITY

DIAL 811, OR 1-800-552-7001

BEFORE DIGGING

GAS

CABLE

ELECTRIC

TELEPHONE

CNG TRANSMISSION CORP.

COLUMBIA GAS TRANSMISSION CORP.

NOVEC

VERIZON

COMCAST

AT&T

WASHINGTON GAS

DOMINION VIRGINIA POWER

(814) 583-5171

(703) 327-6331

(800) 752-7520

(888) 335-0500

(888) 667-3000

(800) 256-4646

(800) 288-2747

(888) 375-4888

OTHER CENTURY LINK (800) 366-8201

UTILITY CONTACTS

DU0.0

COVER SHEET

SITE NARRATIVE

THE SITE PROPOSES 1.30 ACRES OF LAND DISTURBANCE FOR THE INSTALLATION

OF DRY UTILITIES AS REQUIRED FOR THE NEW LOUDOUN COUNTY JUVENILE

DETENTION CENTER (JDC). THE SITE IS CURRENTLY UNDEVELOPED VACANT LAND

WITH LOUDOUN COUNTY PROPERTY TO THE NORTH SOUTH AND EAST. SYCOLIN

ROAD BORDERS THE PROPERTY TO THE WEST AND GOURLEY TRANSIT DRIVE

(PRIVATE) TO THE SOUTH.

SITE NOTES

ALL INFORMATION SHOWN WITHIN THE LIMITS OF DISTURBANCE IS BASED UPON

LOUDOUN COUNTY GIS DATA AND FUTURE DEVELOPMENT SITE PLAN

(STPL-2017-0010)

#

DETAIL SECTION BUBBLE

#.##

x.xx

A

DRAINAGE AREA LABEL

XXKEYNOTES

# REVISION TRIANGLE

XX

NAD 83

NORTH ARROW

0

SCALE 1"=10'

20'10'

PLAN VIEW GRAPHIC SCALE

PROFILE SCALE

0

0

10

1

PROFILE VIEW GRAPHIC SCALE

#

ADA PARKING SPACE

PARKING SPACE COUNT

CONCRETE WHEELSTOP

SIGN

DOUBLE POST SIGN

BOLLARD

AERIAL UTILITY POLE

TV

C

CABLE TELEVISION MANHOLE

CABLE TELEVISION PEDESTAL

SATELLITE DISH

T

T

TELECOMM MANHOLE

TELECOMM PEDESTAL

LIGHT POLE

E

E

ELECTRIC METER

ELECTRIC MANHOLE

GUY POLE

ELECTRIC PEDESTAL

GUY ANCHOR

S SANITARY SEWER MANHOLE

XX

SANITARY SEWER CLEANOUT

SANITARY MANHOLE IDENTIFICATION

WATERLINE PLUG

DOUBLE DETECTOR CHECK ASSEMBLY

FITTING

FIRE HYDRANT ASSEMBLY

W WATER MANHOLE

WATER METER

POST INDICATOR VALVE

REDUCER

FIRE DEPARTMENT CONNECTION

W

SPIGOT

WATER VALVE

WELL

NATURAL GAS VALVE

STORM SEWER CLEANOUT

D STORM SEWER MANHOLE

1-1

STORM SEWER IDENTIFICATION

STORM SEWER ENDWALL

STORM SEWER WINGWALL

STORM SEWER END SECTION

DOWNSPOUT

SURVEY BENCHMARK LOCATION

SURVEY CONTROL POINT

SOIL BORING IDENTIFICATION

XX

EXISTING ADA PARKING

AC

D

EXISTING SIGN

EXISTING DOUBLE POST SIGN

EXISTING AIR CONDITIONING UNIT

EXISTING BOLLARD

EXISTING DUMPSTER

EXISTING FLAG POLE

EXISTING HEADSTONE

EXISTING MAILBOX

EXISTING LIGHTED BOLLARD

U

EXISTING AERIAL UTILITY POLE

EXISTING UTILITY MANHOLE

EXISTING UTILITY VAULT

TV

C

EXISTING CABLE TELEVISION MANHOLE

EXISTING CABLE TELEVISION PEDESTAL

EXISTING SATELLITE DISH

T

T

EXISTING TELECOMM MANHOLE

EXISTING TELECOMM PEDESTAL

EXISTING YARD LIGHT

EXISTING GROUND LIGHT

E

EXISTING LIGHT POLE

EXISTING ELECTRIC METER

EXISTING ELECTRIC MANHOLE

EXISTING GUY POLE

EXISTING GUY ANCHOR

EXISTING ELECTRIC BOX

S EXISTING SANITARY MANHOLE

EXISTING SANITARY CLEANOUT

EXISTING SANITARY FLOW DIRECTION

W

W

EXISTING FIRE HYDRANT

EXISTING FIRE DEPARTMENT

CONNECTION

EXISTING SPIGOT

EXISTING WATER METER

EXISTING WATER MANHOLE

EXISTING WATER VALVE

EXISTING POST INDICATOR VALVE

EXISTING WELL

EXISTING GAS METER

EXISTING DRIP VALVE

EXISTING GAS VALVE

D EXISTING STORM MANHOLE

EXISTING STORM CATCH BASIN

EXISTING DOWNSPOUT

EXISTING STORM FLOW DIRECTION

EXISTING TRAFFIC SIGNAL POLE

TC EXISTING TRAFFIC SIGNAL BOX

SV

EXISTING SPRINKLER BOX

EXISTING SPRINKLER VALVE

EXISTING SPRINKLER HEAD

CURB INLET

REVISION CLOUD

CREEK/STREAM CENTERLINE

CREAK/STREAM EDGE OF WATER

RCARESOURCE CONSERVATION AREA

RPARESOURCE PROTECTION AREA

DITCH CENTERLINE

MAJOR DRAINAGE AREA BOUNDARY

MINOR DRAINAGE AREA BOUNDARY

TIME OF CONCENTRATION

FLOODPLAIN

XFENCE

POND EDGE OF WATER

PROPERTY LINE

PROPERTY SETBACKS

PROPERTY ZONE

RAILWAY

ROAD CENTERLINE

GUARDRAIL

EDGE OF GRAVEL

SIGHT DISTANCE

EDGE OF UNPAVED SURFACE

EDGE OF SHRUB

EDGE OF TREES

MAJOR CONTOUR

MINOR CONTOUR

150

149

UDSTORM SEWER UNDERDRAIN

WETLANDS BOUNDARY

OCATVOVERHEAD CABLE TV

UCATVUNDERGROUND CABLE TV

OFOOVERHEAD FIBER OPTIC

UFOUNDERGROUND FIBER OPTIC

OHTOVERHEAD TELECOMM

UGTUNDERGROUND TELECOMM

BASBUILDING AUTOMATION SYSTEM

GNATURAL GAS SERVICE

OHPOVERHEAD POWER

UGPUNDERGROUND POWER

OH P/COVERHEAD POWER + CABLE

OH P/T/COVERHEAD POWER + TELECOMM + CABLE

OH P/TOVERHEAD POWER + TELECOMM

OH T/COVERHEAD TELECOMM + CABLE

UG P/CUNDERGROUND POWER + CABLE

UG P/T/CUNDERGROUND POWER + TELECOMM + CABLE

UG P/TUNDERGROUND POWER + TELECOMM

UG T/CUNDERGROUND TELECOMM + CABLE

FMSANITARY SEWER FORCE MAIN

SANSANITARY SEWER PIPE

6''SANSANITARY SEWER PIPE WITH SIZE

WWATER SERVICE

FFIRE PROTECTION SERVICE

6''WWATER SERVICE WITH SIZE

6''FFIRE PROTECTION SERVICE WITH SIZE

CHWRCHILLED/HOT WATER RETURN

CHWSCHILLED/HOT WATER SERVICE

CWRCHILLED WATER RETURN

CWSCHILLED WATER SERVICE

HWRHOT WATER RETURN

HWSHOT WATER SERVICE

EXISTING CREEK/STREAM CENTERLINE

EXISTING DITCH CENTERLINE

EXISTING FLOODPLAIN

EXISTING INUNDATION ZONE

EXISTING POND EDGE OF WATER

EXISTING STORM SEWER PIPE

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

150

149

X X EXISTING FENCE

EXISTING EDGE OF SHRUB

EXISTING EDGE OF TREES

EXISTING ADJOINING PROPERTY LINE

EXISTING PROPERTY LINE

EXISTING PROPERTY LOTS

EXISTING PROPERTY SETBACKS

EXISTING RAILWAY

EXISTING RIGHT-OF-WAY

EXISTING EDGE OF ASPHALT

EXISTING ROAD CENTERLINE

EXISTING GUARDRAIL

EXISTING EDGE OF GRAVEL

EXISTING EDGE OF UNPAVED SURFACE

UFO FIBER OPTIC PAINT MARKING

OFO EXISTING OVERHEAD FIBER OPTIC

UGT TELECOMM PAINT MARKING

OHT EXISTING OVERHEAD TELECOMM

G NATURAL GAS SERVICE PAINT MARKING

UGP POWER PAINT MARKING

OHP EXISTING OVERHEAD POWER

SANITARY SEWER PAINT MARKINGSAN

EXISTING SANITARY SEWER PIPE WITH SIZE6'' SAN

UNKNOWN UTILITY PAINT MARKINGUTL

WATER SERVICE PAINT MARKINGW

EXISTING WATER SERVICE WITH SIZE6'' W

CIVIL SYMBOL LEGEND CIVIL LINETYPE LEGEND

A

AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND

TRANSPORTATION OFFICIALS

A/C UNIT AIR CONDITIONING UNIT

ACP ASBESTOS CONCRETE PIPE

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJACENT

ADV ADVANCE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APPR APPROXIMATE

APPROX APPROXIMATE

ARCH ARCHITECT or ARCHITECTURAL

ASSY ASSEMBLY

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AT/FP ANTI-TERRORISM / FORCE PROTECTION

AWWA AMERICAN WATER WORKS ASSOCIATION

B

BC BACK OF CURB

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTOR

BL BASE LINE

BLDG BUILDING

BM BENCHMARK

BMP BEST MANAGEMENT PRACTICE

BOV BLOW OFF VALVE

BV BUTTERFLY VALVE

BW BOTTOM OF WALL

C

CATV CABLE TELEVISION

CBR CALIFORNIA BEARING RATIO

CG CURB AND GUTTER

CHH COMMUNICATION HANDHOLE

CI CAST IRON

CL CLASS

CLF CHAINLINK FENCE

CMP CORRUGATED METAL PIPE

CO CLEAN OUT

COE CORPS OF ENGINEERS

COMM COMMUNICATIONS

CONC CONCRETE

CONN CONNECTION

CY CUBIC YARD

D

DEPT DEPARTMENT

DET DETAIL

DEQ VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY

DI DROP INLET

DIA DIAMETER

DIP DUCTILE IRON PIPE

DIR DIRECTION

DMH DOGHOUSE MANHOLE

DNE DO NOT ENTER

DOM DOMINION VIRGINIA POWER

DR DRIVE

DS DOWNSPOUT

DVP DOMINION VIRGINIA POWER

DWG DRAWING

E

E ELECTRIC

EA EACH

EG EXISTING GRADE

EHH ELECTRIC HANDHOLE

EL ELEVATION

ELEC ELECTRIC

ELEV ELEVATION

EMH ELECTRIC MANHOLE

EOI END OF INFORMATION

EP EDGE OF PAVEMENT

EPA UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

EQ EQUAL

ESMT EASEMENT

EUE EXISTING UNDERGROUND ELECTRIC

EUT EXISTING UNDERGROUND TELEPHONE

EW EXISTING WATER

EX EXISTING

E&SC EROSION AND SEDIMENT CONTROL

F

FC FACE OF CURB

FDC FIRE DEPARTMENT CONNECTION

FEV FUEL EFFICIENT VEHICLES

FFE FINISHED FLOOR ELEVATION

FG FINISHED GRADE

FH FIRE HYDRANT

FL FIRE LANE

FL FLOW LINE

FT FOOT

FVO FIRE VEHICLES ONLY

G

G GAS

GIS GEOGRAPHIC INFORMATION SYSTEM

GM GAS METER

GND GROUND

GPIN GEOGRAPHIC PARCEL IDENTIFICATION NUMBER

GPS GLOBAL POSITION SYSTEM

GRVL GRAVEL

GTI GRATE TOP INLET

GTS GAS TEST STATION

GV GATE VALVE

H

HD HEAVY DUTY

HDPE HIGH DENSITY POLYETHYLENE

HH HANDHOLE

HORIZ HORIZONTAL

HOV HIGH OCCUPANCY VEHICLES

HP HIGH POINT

I

IBC INTERNATIONAL BUILDING CODE

ID INTERNAL DIAMETER

IFC INTERNATIONAL FIRE CODE

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

ISO INSURANCE SERVICES OFFICE, INC

L

LD LIGHT DUTY

LF LINEAR FEET

LOC LOCATION

LOC LIMITS OF CONSTRUCTION

LOD LIMITS OF DISTURBANCE

LOW LIMITS OF WORK

LP LOW POINT

M

MAX MAXIMUM

MDE MARYLAND DEPARTMENT OF THE ENVIRONMENT

MECH MECHANICAL

MG MATCH GRADE

MH MANHOLE

MIN MINIMUM

MJ MECHANICAL JOINT

MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES

N

NAD NORTH AMERICAN DATUM

NAVD NORTH AMERICAN VERTICAL DATUM

N/F NOW OR FORMERLY

NFF NEEDED FIRE FLOW

NIC NOT IN CONTRACT

NO NUMBER

NPZ NO PARKING ZONE

NTS NOT TO SCALE

NWI NATIONAL WETLANDS INVENTORY

O

OC ON CENTER

OD OUTSIDE DIAMETER

OHE OVERHEAD ELECTRIC

OHP OVERHEAD POWER

OHT OVERHEAD TELEPHONE

OS&Y OUTSIDE STEM AND YOKE

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

OVHD OVERHEAD

P

PB PLAT BOOK

PC POINT OF CURVATURE

PCC POINT OF COMPOUND CURVATURE

PCC PORTLAND CEMENT CONCRETE

PED PEDESTAL

PG PAGE

PH PHASE

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

PL PROPERTY LINE

POA POINT OF ANALYSIS

POI POINT OF INTEREST

PP POWER POLE

PRC POINT OF REVERSE CURVATURE

PRV PRESSURE REDUCING VALVE

PT POINT OF TANGENT

PVC POLYVINYL CHLORIDE PIPE

PVMT PAVEMENT

PWR POWER

Q

QLx QUALITY LEVEL [A, B, C, D]

R

RCA RESOURCE CONSERVATION AREA

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

REQ REQUIRED

RJ RESTRAINED JOINT

RMA RESOURCE MANAGEMENT AREA

ROW RIGHT-OF-WAY

RPA RESOURCE PROTECTION AREA

RPZ REDUCED PRESSURE ZONE

S

S SLOPE

SAN SANITARY SEWER

SCH SCHEDULE

SDR STANDARD DIMENSION RATIO

SF SILT FENCE

SF SQUARE FEET

SMH STANDARD MANHOLE

SPT SPOT GRADE

STA STATION

STD STANDARD

STM STORM

STMH STORM SEWER MANHOLE

SUE SUBSURFACE UTILITY EXPLORATION

SWK SIDEWALK

SWL SWALE

SY SQUARE YARDS

T

T TELEPHONE / TELECOMM

TB TOP OF BOX

TBD TO BE DETERMINED

TBM TELEPHONE BENCHMARK

TBR TO BE REMOVED

TBRL TO BE RELOCATED

TC TOP OF CURB

TCM TELECOMMUNICATIONS MANHOLE

TCP TERRACOTTA CLAY PIPE

TEL TELEPHONE

THH TELEPHONE HANDHOLE

TMH TELEPHONE MANHOLE

TP TREE PROTECTION

TRANS TRANSFORMER

TW TOP OF WALL

TYP TYPICAL

U

UG UNDERGROUND

UGE UNDERGROUND ELECTRIC

UGP UNDERGROUND POWER

UNK UNKNOWN

UNO UNLESS NOTED (INDICATED) OTHERWISE

UTL UTILITY

V

VAR VARIABLE

VCP VITRIFIED CLAY PIPE

VDH VIRGINIA DEPARTMENT OF HEALTH

VDOT VIRGINIA DEPARTMENT OF TRANSPORTATION

VEPCO VIRGINIA ELECTRIC POWER COMPANY

VERT VERTICAL

VESCH VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK

W

W WATER

W/ WITH

W/L WATERLINE

WAT WATER

WLK WALKWAY

WM WATER METER

WUS WATERS OF THE US

WV WATER VALVE

X

X-ING CROSSING

SYMBOLS

Ø DIAMETER

≈ APPROXIMATELY EQUAL

≠ NOT EQUAL

± PLUS/MINUS

℄ CENTERLINE

⅊ PROPERTY LINE

Δ DELTA ANGLE

@ AT

CIVIL ABBREVIATIONS

DROP INLET / GRATE TOP INLET

TREE (SYMBOL VARIES)

STORM PIPE

COLUMN GRID AND IDENTIFICATION

[REFER TO ARCHITECTURAL DRAWINGS]

33

SECURITY FENCE

SLOPE % TAG

GRADE TAG

-5.00%

2.5:1

SPOT DESCRIPTION

SPOT ELEVATION

EXISTING GRADE SPOT ELEVATIONSWK

389.84'

EX

+/- 389.84'

EXISTING TREE

EXISTING SHRUB

PROJECT NO: DATE:

11/6/2020 3:13:02 P

M

LOUD

OUN C

OUNT

Y JUV

ENILE

DETE

NTIO

N CEN

TER

ST

PL

-2

01

7-0

01

0, T

LP

F-2

01

7-0

00

5 (T

LC

R-2

01

7-0

00

1)

GO

UR

LE

Y T

RA

NS

IT

D

RIV

E, L

EE

SB

UR

G, V

A (P

AR

ID

#: 1

91

16

98

66

00

0)

CA

TO

CT

IN

D

IS

TR

IC

T, L

OU

DO

UN

C

OU

NT

Y, V

IR

GIN

IA

481000 03/27/2020

REVISIONS

DATE DESCRIPTION

10/30/20 REVISIONS FOR

VERIZON

20110 Ashbrook Place, Suite 100

Ashburn, VA 20147

TEL 703.726.1342

FAX 703.726.1345

www.timmons.com

THIS DRAWING PREPARED AT THE

NORTHERN VIRGINIA OFFICE

11/06/20 ADDENDUM 3

DU1.0

LEGEND

ASSOCIATED PROJECT NAME ASSOCIATED PROJECT NUMBER

LEESBURG PARK AND RIDE FACILITY

STPL-2007-0078 (APPROVED 6/12/08)

CROSSTRAIL BOULEVARD AND KINCAID BLVD

CPAP-2011-0015 (APPROVED 4/8/13)

CROSSTRAIL BOULEVARD - SEGMENT B

CPAP-2012-0046 (APPROVED 8/26/16)

LOUDOUN COUNTY GOVERNMENT SUPPORT CENTER

SPEX-2013-0005 (APPROVED 12/2/15)

LOUDOUN COUNTY GOVERNMENT SUPPORT CENTER

CMPT-2013-0007 (APPROVED 12/2/15)

LOUDOUN COUNTY JUVENILE DETENTION CENTER

STPL-2017-0010 (APPROVED 11/14/18)

60"

RESTORE TO EXISTING

CONDITION

NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL FINAL CONSTRUCTION PERMITS.

2. ALL CONDUIT SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE NOTED.

3. MINIMUM COVER OVER ALL DUCTBANKS SHALL BE 30 INCH UNLESS OTHERWISE NOTED

4. FOR ASPHALT PAVEMENT REPAIR, REFER TO ASPHALT PAVEMENT RESTORATION

DETAIL ON THIS SHEET, AND PROVIDE FULL DEPTH ASPHALT TO MATCH THE EXISTING

PAVEMENT THICKNESS.

5. CONTRACTOR TO CONTACT MISS UTILITY TO PROVIDE LOCATIONS OF UNDERGROUND

UTILITIES

6. TEST PITS ARE REQUIRED AT CROSSING LOCATIONS INDICATED FROM MISS UTILITY

MARKINGS AND ANY ADDITIONAL LOCATIONS WHERE PROPOSED FACILITIES COULD

POTENTIALLY BE IMPACTED BY EXISTING CONDITIONS, SHOULD A TEST PIT REVEAL A

CONFLICT, THE CONTRACTOR SHALL NOTIFY THE ENGINEER FOR RESOLUTION, UNDER

NO CIRCUMSTANCES SHALL EXISTING FACILITIES BE DISTURBED AND/OR INTERRUPTED

UNLESS SPECIFICALLY SHOWN HEREON.

7. ALL UTILITY CROSSINGS SHALL HAVE AT LEAST 1' VERTICAL CLEARANCE AND 5'

HORIZONTAL CLEARANCE

8. FINAL LOCATIONS OF HANDHOLDS TO BE DETERMINED IN FIELD.

9. ONCE WORK IS COMPLETED, WORK AREA SHALL BE RESTORED TO ORIGINAL

CONDITIONS.

10. THE CONTRACTOR SHALL REQUEST THE HANDHOLES FROM VERIZON AND OTHER

SERVICE PROVIDERS PRIOR TO COMMENCING WITH CONSTRUCTION.

11. THE CONTRACTOR SHALL PROVIDE THE PULL STRINGS FOR THE CONDUITS.

6"

4"

6"

6"

6"

28"

30"

RESTORE TO EXISTING

CONDITION

NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL FINAL CONSTRUCTION

PERMITS.

2. ALL CONDUIT SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE NOTED.

3. MINIMUM COVER OVER ALL DUCTBANKS SHALL BE 30 INCH UNLESS

OTHERWISE NOTED

4. FOR ASPHALT PAVEMENT REPAIR, REFER TO ASPHALT PAVEMENT

RESTORATION DETAIL ON THIS SHEET, AND PROVIDE FULL DEPTH ASPHALT

TO MATCH THE EXISTING PAVEMENT THICKNESS.

5. CONTRACTOR TO CONTACT MISS UTILITY TO PROVIDE LOCATIONS OF

UNDERGROUND UTILITIES

6. TEST PITS ARE REQUIRED AT CROSSING LOCATIONS INDICATED FROM MISS

UTILITY MARKINGS AND ANY ADDITIONAL LOCATIONS WHERE PROPOSED

FACILITIES COULD POTENTIALLY BE IMPACTED BY EXISTING CONDITIONS,

SHOULD A TEST PIT REVEAL A CONFLICT, THE CONTRACTOR SHALL NOTIFY

THE ENGINEER FOR RESOLUTION, UNDER NO CIRCUMSTANCES SHALL

EXISTING FACILITIES BE DISTURBED AND/OR INTERRUPTED UNLESS

SPECIFICALLY SHOWN HEREON.

7. ALL UTILITY CROSSINGS SHALL HAVE AT LEAST 1' VERTICAL CLEARANCE AND

5' HORIZONTAL CLEARANCE

8. FINAL LOCATIONS OF HANDHOLDS TO BE DETERMINED IN FIELD.

9. ONCE WORK IS COMPLETED, WORK AREA SHALL BE RESTORED TO ORIGINAL

CONDITIONS.

4"

6"

6"

16"

30"

RESTORE TO EXISTING

CONDITION

NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL FINAL CONSTRUCTION

PERMITS.

2. ALL CONDUIT SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE NOTED.

3. MINIMUM COVER OVER ALL DUCTBANKS SHALL BE 30 INCH UNLESS

OTHERWISE NOTED

4. FOR ASPHALT PAVEMENT REPAIR, REFER TO ASPHALT PAVEMENT

RESTORATION DETAIL ON THIS SHEET, AND PROVIDE FULL DEPTH ASPHALT

TO MATCH THE EXISTING PAVEMENT THICKNESS.

5. CONTRACTOR TO CONTACT MISS UTILITY TO PROVIDE LOCATIONS OF

UNDERGROUND UTILITIES

6. TEST PITS ARE REQUIRED AT CROSSING LOCATIONS INDICATED FROM MISS

UTILITY MARKINGS AND ANY ADDITIONAL LOCATIONS WHERE PROPOSED

FACILITIES COULD POTENTIALLY BE IMPACTED BY EXISTING CONDITIONS,

SHOULD A TEST PIT REVEAL A CONFLICT, THE CONTRACTOR SHALL NOTIFY

THE ENGINEER FOR RESOLUTION, UNDER NO CIRCUMSTANCES SHALL

EXISTING FACILITIES BE DISTURBED AND/OR INTERRUPTED UNLESS

SPECIFICALLY SHOWN HEREON.

7. ALL UTILITY CROSSINGS SHALL HAVE AT LEAST 1' VERTICAL CLEARANCE AND

5' HORIZONTAL CLEARANCE

8. FINAL LOCATIONS OF HANDHOLDS TO BE DETERMINED IN FIELD.

9. ONCE WORK IS COMPLETED, WORK AREA SHALL BE RESTORED TO ORIGINAL

CONDITIONS.

6"

6"

0.5'

0.5'

TYPICAL COMMUNICATIONS

CONDUIT TRENCH DETAIL

NTS

TYPICAL POWER CONDUIT

TRENCH DETAIL

NTS

TYPICAL GAS CONDUIT

TRENCH DETAIL

NTS

UB-1 PER VDOT

ROAD AND BRIDGE

SPECIFICATIONS OR

SERVICE PROVIDER

STDS

SUITABLE

BACKFILL

MATERIAL TYPE I

MINIMUM CBR =30

PER VDOT ROAD

AND BRIDGE

SPECIFICATIONSSUITABLE

BACKFILL

MATERIAL TYPE I

MINIMUM CBR =30

PER VDOT ROAD

AND BRIDGE

SPECIFICATIONS

UB-1 PER VDOT

ROAD AND BRIDGE

SPECIFICATIONS OR

SERVICE PROVIDER

STDS

UB-1 PER VDOT

ROAD AND BRIDGE

SPECIFICATIONS OR

SERVICE PROVIDER

STDS

4" 4" 4" 4"

6"

4"

6" 6"

4"

6"

12"

6"

6"

6"

6"

30"

SUITABLE

BACKFILL

MATERIAL TYPE I

MINIMUM CBR =30

PER VDOT ROAD

AND BRIDGE

SPECIFICATIONS

DUCT BANK FOR

UTILITY APPROVED

BY OWNER

VERIZON DUCT BANK

GENERAL NOTES:

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARDS SET FORTH IN THE LATEST VERSION OF THE

VIRGINIA STORM WATER MANAGEMENT HANDBOOK, VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE

STANDARDS, LOUDOUN COUNTY FACILITIES STANDARDS MANUAL, AND TOWN OF LEESBURG UTILITY.

1. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF

REQUIRED BY ALL. IN THE CASE OF A CONFLICT, DISAGREEMENT, OR AMBIGUITY, PROVIDE THE BETTER QUALITY.

IN THE CASE OF A CONFLICT, DISAGREEMENT, OR AMBIGUITY, PROVIDE THE GREATER QUANTITY OF WORK

2. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING (ON-SITE) AND REFERENCING DETAIL MANUALS FOR THE

ABOVE-LISTED AGENCIES FOR ALL CONTRACT WORK. THE CONTRACTOR SHALL NOTIFY THE CIVIL ENGINEER

PRIOR TO CONSTRUCTION IF CONFLICTS OR DISCREPANCIES ARISE BETWEEN THE APPROVED PLANS, AGENCY

DETAILS, AND MANUALS.

3. ALL CONSTRUCTION SHALL CONFORM TO CURRENT LOUDOUN COUNTY AND VIRGINIA DEPARTMENT OF

TRANSPORTATION STANDARDS AND SPECIFICATIONS.

4. PROPERTY LINES SHOWN ARE BASED ON INFORMATION FOUND AND DOES NOT IN ANY WAY, REPRESENT A FIELD

BOUNDARY SURVEY BY TIMMONS.

5. TOPOGRAPHIC INFORMATION SHOWN WAS BASED LOUDOUN COUNTY GIS DATA.

6. THE APPROVAL OF THESE PLANS SHALL IN NO WAY RELIEVE THE DEVELOPER OR HIS AGENT OF ANY LEGAL

RESPONSIBILITY WHICH MAY BE REQUIRED BY THE CODE OF VIRGINIA OR ANY OTHER ORDINANCE ENACTED BY

THE COUNTY OF LOUDOUN.

7. CONTROLLED FILLS MUST BE COMPACTED TO 95% AS DETERMINED PER STANDARD PROCTOR T-99 OR ASTM B698.

8. ALL UNDERGROUND UTILITIES WITHIN STREET RIGHTS-OF-WAY SHALL BE INSTALLED TO THE REQUIRED DISTANCE

BEYOND THE RIGHT-OF-WAY LINE PRIOR TO THE INSTALLATION OF ANY SUBBASE MATERIAL, CURB AND GUTTER

OR SIDEWALK.

9. AT LEAST 10 DAYS PRIOR TO CONSTRUCTION ACTIVITY, THE CONTRACTOR MUST OBTAIN ITS TEST PIT DATA AS

INDICATED ON THE PLAN SET AND COORDINATE WITH THE INSPECTOR. IF THE TEST RESULTS SHOW A POTENTIAL

CONFLICT OR NON-COMPLIANCE WITH THE APPROVED PLAN, REVISIONS TO THE PLANS MUST BE SUBMITTED FOR

APPROVAL. IN SUCH INSTANCES, NO WORK SHALL COMMENCE UNTIL CONFLICTS ARE RESOLVED AND REVISIONS

APPROVED.

10. ALL CONTROLLED FILL, BASE, SUBBASE AND SUBGRADE MATERIALS SHALL BE COMPACTED TO 95% OF

THEORETICAL MAXIMUM DENSITY AS DETERMINED BY AASHTO T-99 A, WITHIN +/- 2% OF OPTIMUM MOISTURE FOR

THE FILL OF ANY DEDICATED RIGHT-OF-WAY AND ALL TOWNHOUSE, COMMERCIAL AND INDUSTRIAL PARKING

LOTS; PRIVATE STREETS; PARKING BAYS; CURB AND GUTTER; AND SIDEWALKS ADJACENT TO STREETS AND

PARKING LOTS (NOT INTENDED TO INCLUDE LEADWALKS). DENSITY MUST BE VERIFIED BY A QUALIFIED SOILS

ENGINEER. CONTROLLED FILLS SHALL BE COMPACTED IN NO GREATER THAN EIGHT-INCH LIFTS (LOOSE

THICKNESS) TO THE SPECIFIED BEGINNING FROM THE EXISTING GROUND SURFACE, UNLESS OTHERWISE

APPROVED IN WRITING BY A QUALIFIED SOILS ENGINEER AND THE DIRECTOR OF PUBLIC WORKS. CONTROLLED

FILL MATERIAL TO BE SPECIFIED BY GEOTECHNICAL ENGINEER.

11. ALL EXISTING UNDERGROUND UTILTIES, UNLESS OTHERWISE NOTED ON PLAN SET, SHALL BE PHYSICALLY

LOCATED BY THE CONTRACTOR PRIOR TO THE BEGINNING OF ANY CONSTRUCTION IN THE VICINITY OF SAID

UTLITIES. WHEN DURING THE COURSE OF CONSTRUCTION ANY OBSTACLE OF A DUBIOUS NATURE IS

ENCOUNTERED, THE CONTRACTOR SHALL CEASE IN THAT AREA AND IMMEDIATELY NOTIFY THE PROPER

AUTHORITY, LOUDOUN COUNTY, AND/OR THE ENGINEER.

12. ALL SIGNAGE WILL CONFORM TO REGULATIONS NOTED IN SECTION 5-1200 OF THE REVISED 1993 LOUDOUN

COUNTY ZONING ORDINANCE.

13. NO BLASTING IS PERMITTED WITHIN 25' OF EXISTING WATER AND SEWER UTILITIES.

14. A SMOOTH GRADE SHALL BE MAINTAINED FROM THE CENTERLINE OF THE EXISTING ROAD TO THE PROPOSED

EDGE OF PAVEMENT TO PRECLUDE THE FORMING OF FALSE GUTTERS AND/OR PONDING OF WATER IN THE

ROADWAY.

15. EMERGENCY VEHICLE ACCESS SHALL BE PROVIDED DURING CONSTRUCTION.

16. ALL EXISTING STRUCTURES, TANKS, FARM DUMPS, ETC., SHALL BE CAREFULLY REMOVED AND DISPOSED OF AT A

LOUDOUN COUNTY APPROVED WASTE DISPOSAL SITE.

17. THE APPLICANT AND/OR CONTRACTOR SHALL HAVE A CLEARLY READABLE COPY OF THE APPROVED PLANS AND

SPECIFICATIONS AVAILABLE ON THE PROPERTY AT ALL TIMES.

18. ALL DAMAGE RESULTING FROM CONSTRUCTION OPERATIONS TO STREETS, ROADS, HIGHWAYS, SHOULDERS,

DITCHES, EMBANKMENTS, CULVERTS, BRIDGES, SANITARY SEWER, WATER MAINS OR OTHER PUBLIC OR PRIVATE

PROPERTY OR FACILITY, REGARDLESS OF LOCATION OR CHARACTER, WHICH MAY BE CAUSED BY CONSTRUCTION

AND.OR MOVING, HAULING OR OTHERWISE TRANSPORTING EQUIPMENT, MATERIALS OR MEN TO OR FROM THE

WORK OR ANY PART OF THE SITE THEREOF, SHALL BE THE RESPONSIBILITY OF THE APPLICANT, HIS CONTRACTOR

OR SUBCONTRACTOR.

19. APPROVAL OF THIS PLAN SHALL IN NO WAY GRANT PERMISSION BY THE COUNTY FOR THE DEVELOPER TO

TRESPASS ON OFFSITE PROPERTIES.

20. THE SUBJECT DEVELOPMENT SITE DOES CONTAIN CLASS III AND/OR CLASS IV, PER THE LATEST LOUDOUN

COUNTY SOILS MAP AND AS IDENTIFIED BY THE INTERPRETATIVE GUIDE TO SOILS MAPS, LOUDOUN COUNTY,

VIRGINIA.

21. NO BUILDING OR OTHER STRUCTURE SHALL BE LOCATED IN A MANNER OR BUILT TO A HEIGHT WHICH

CONSTITUTES A HAZARD TO AIR TRAFFIC WITHOUT CERTIFICATION FROM THE FEDERAL AVIATION

ADMINISTRATION.

22. THE SUBJECT PROPERTY IS NOT WITHIN THE MAJOR AND MINOR FLOODPLAIN OVERLAY DISTRICT ACCORDING TO

LOUDOUN COUNTY GIS DATA.

23. THE SUBJECT PROPERTY DOES NOT CONTAIN NATURAL MODERATELY STEEP AND VERY STEEP SLOPES

ACCORDING TO LOUDOUN COUNTY GIS DATA.

24. THE SUBJECT PROPERTY IS WITHIN THE LDN60 - 1 MILE BUFFER AIRPORT IMPACT OVERLAY DISTRICT ACCORDING

TO LOUDOUN COUNTY GIS DATA.

25. PLANTING AND MAINTENANCE OF MATERIALS SHALL BE DONE ACCORDING TO GUIDELINES SET FORTH IN THE

VIRGINIA EROSION & SEDIMENTATION CONTROL HANDBOOK.

26. ALL SIDEWALKS WITHIN VDOT RIGHT-OF-WAY SHALL BE CONSTRUCTED TO THE STANDARDS OF VDOT AND

SECTION 4.600.B OF THE LOUDOUN COUNTY FACILITIES STANDARDS MANUAL.

27. EVIDENCE THAT VPDES PERMITS HAVE BEEN OBTAINED MUST BE PRESENTED TO LOUDOUN COUNTY PRIOR TO

LAND DISTURBANCE AND SHALL BE PROVIDED.

28. THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTENANCE OF ALL SIDEWALKS AND TRAILS OUTSIDE OF THE

VDOT RIGHT-OF-WAY. THIS INCLUDES ANY TRAIL WITHIN A PUBLIC ACCESS EASEMENT.

29. BURNING OF CONSTRUCTION MATERIALS IS NOT PERMITTED ON SITE.

30. DRAIN ALL DISTURBED AREAS TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND

DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.

31. CALL "MISS UTILITY" 48 HOURS PRIOR TO THE START OF EXCAVATION. VERIFY LOCATION AND ELEVATION OF ALL

UNDERGROUND UTILITIES IN AREA OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT THE ENGINEER

IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT INDICATED. IF THERE APPEARS TO BE A

CONFLICT, AND UPON DISCOVERY OF ANY UTILITY NOT INDICATED, CALL "MISS UTILITY" AT 811 OR 1-800-552-7001

(TOLL FREE).

32. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL NECESSARY FINAL CONSTRUCTION PERMITS REQUIRED TO

COMPLETE THE SITE WORK AND FURNISH COPIES TO THE OWNER. ANY WORK DONE WITHIN THE VDOT

RIGHT-OF-WAY REQUIRES A VDOT PERMIT.

33. ALL WORK SHALL BE SUBJECT TO INSPECTION BY DESIGNATED LOUDOUN COUNTY, TOWN OF LEESBURG, AND

VDOT STAFF. NOTIFY THE CHIEF INSPECTOR 48 HOURS PRIOR TO START OF WORK.

PROJECT NO: DATE:

11/6/2020 3:13:08 P

M

LOUD

OUN C

OUNT

Y JUV

ENILE

DETE

NTIO

N CEN

TER

ST

PL

-2

01

7-0

01

0, T

LP

F-2

01

7-0

00

5 (T

LC

R-2

01

7-0

00

1)

GO

UR

LE

Y T

RA

NS

IT

D

RIV

E, L

EE

SB

UR

G, V

A (P

AR

ID

#: 1

91

16

98

66

00

0)

CA

TO

CT

IN

D

IS

TR

IC

T, L

OU

DO

UN

C

OU

NT

Y, V

IR

GIN

IA

481000 03/27/2020

REVISIONS

DATE DESCRIPTION

10/30/20 REVISIONS FOR

VERIZON

20110 Ashbrook Place, Suite 100

Ashburn, VA 20147

TEL 703.726.1342

FAX 703.726.1345

www.timmons.com

THIS DRAWING PREPARED AT THE

NORTHERN VIRGINIA OFFICE

11/06/20 ADDENDUM 3

DU1.1

GENERAL NOTES

AND DETAILS

X

S

A

N

S

N: 7075355.45

E: 11753176.88 N: 7075359.02

E: 11753849.69

N: 7074823.30

E: 11753849.13

N: 7074819.74

E: 11753176.88

S

S

X

X

X

21

20

22

N: 7075953.85

E: 11753664.67

N: 7075953.85

E: 11753535.85

N: 7075655.45

E: 11753664.67

R

=

1

5

0

9

.

0

0

'

L

=

2

7

8

1

.

7

7

'

R

=

2

5

.0

0

'

L

=

2

7

8

1

.7

7

'

N5°26'54"E

28.79'

N

5

9

°

1

5

'

3

8

"

E

1

4

7

.

1

2

'

R

=

1

8

5

.

0

0

'

L

=

2

7

8

1

.

7

7

'

S

8

0

°5

5

'3

5

"W

4

5

2

.3

4

'

R

=

1

8

3

.

0

0

'

L

=

2

7

8

1

.

7

7

'

S

1

2

°1

7

'5

8

"W

2

2

2

.8

5

'

N

3

0

°

4

4

'

2

2

"

W

8

9

.

1

5

'

W

W

W

W

X

X

S

S

www.contechES.com

D

S

S

STOP

STOP

STOP D

D

www.ContechES.com

S

D

STOP

X

X

O

H

P

O

H

P

O

H

P

O

H

P

G

G

G

G

G

G

G

G

G

G

G

G

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

G

G

C

R

O

S

S

T

R

A

I

L

B

O

U

L

E

V

A

R

D

TP

TP

TP

MATCHLINE SEE SHEET DU3.0

MATCHLINE SEE SHEET DU3.1

G

O

U

R

LE

Y

T

R

A

N

S

IT

D

R

IV

E

FUTURE JDC

NA

D 8

3

0

SCALE 1"=100'

200'100'

PROJECT NO: DATE:

11/6/2020 3:13:53 P

M

LOUD

OUN C

OUNT

Y JUV

ENILE

DETE

NTIO

N CEN

TER

ST

PL

-2

01

7-0

01

0, T

LP

F-2

01

7-0

00

5 (T

LC

R-2

01

7-0

00

1)

GO

UR

LE

Y T

RA

NS

IT

D

RIV

E, L

EE

SB

UR

G, V

A (P

AR

ID

#: 1

91

16

98

66

00

0)

CA

TO

CT

IN

D

IS

TR

IC

T, L

OU

DO

UN

C

OU

NT

Y, V

IR

GIN

IA

481000 03/27/2020

REVISIONS

DATE DESCRIPTION

10/30/20 REVISIONS FOR

VERIZON

20110 Ashbrook Place, Suite 100

Ashburn, VA 20147

TEL 703.726.1342

FAX 703.726.1345

www.timmons.com

THIS DRAWING PREPARED AT THE

NORTHERN VIRGINIA OFFICE

11/06/20 ADDENDUM 3

DU2.0

OVERALL PLAN

LEGEND

SOIL BOUNDARY

SOIL IDENTIFICATION

66A

SOIL DRAIN

LIMITS OF CONSTRUCTION

3

6

5

3

7

0

3

7

5

3

8

0

3

7

1

3

7

2

3

7

3

3

7

4

3

7

6

3

7

7

3

7

8

3

7

9

3

5

0

3

5

0

3

5

5

3

5

5

3

6

0

3

6

0

3

6

5

3

7

0

3

6

6

3

6

7

3

6

8

3

6

9

3

7

1

3

7

1

3

5

9

362

X

X

X

X

N: 7074819.74

E: 11753176.88

396

3

9

6

4

0

0

3

9

6

3

9

2

3

8

8

3

8

4

3

8

4

3

7

6

3

8

0

384

3

8

8

3

9

2

3

9

6

380

376

3

8

8

3

8

0

3

8

4

3

8

4

3

8

0

380

376

37

2

368

3

8

4

3

6

4

3

6

0

3

5

6

66A

62B

6

2

B

6

2

B

6

0

C

6

9

A

60C

62B

62B

60C

6

0

C

7

9

A

7

9

A

6

3

A

6

3

A

6

2

B

6

2

B

6

3

A

LIMITS OF DISTURBANCE

AREA = 1.30 AC

LIMITS OF DISTURBANCE

AREA = 1.30 AC

FUTURE JDC

MATCHLINE SEE SHEET C3.1

376

INLET PROTECTION

IP

SILT FENCE

SF

CE

CONSTRUCTION ENTRANCE

3

6

5

3

7

0

3

7

5

3

8

0

3

7

1

3

7

2

3

7

3

3

7

4

3

7

6

3

7

7

3

7

8

3

7

9

3

5

0

3

5

0

3

5

5

3

5

5

3

6

0

3

6

0

3

6

5

3

7

0

3

6

6

3

6

7

3

6

8

3

6

9

3

7

1

3

7

1

3

5

9

362

X

X

X

X

2

3

4

5

6

7

21

1

5

"

R

C

P

1

5

"

R

C

P

1

5

"

R

C

P

1

5

"

R

C

P

1

5

"

R

C

P

N: 7074819.74

E: 11753176.88

S

1

2

°

1

7

'5

8

"W

2

2

2

.8

5

'

396

3

9

6

4

0

0

3

9

6

3

9

2

3

8

8

3

8

4

3

8

4

3

7

6

3

8

0

384

3

8

8

3

9

2

3

9

6

380

376

3

8

8

3

8

0

3

8

4

3

8

4

3

8

0

380

376

37

2

368

3

8

4

3

6

4

3

6

0

3

5

6

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

UCATV

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

PROP.

STORM PIPE

PROP. GEOTHERMAL

PIPES (TYP.)

PROP. COMM LINE

(4) - 4 INCH CONDUITS

SF

SF

SF

IP

HANDHOLE

(2) (TYP.)

HANDHOLE

(TYP.)

HANDHOLE

(2) (TYP.)

PS

PS

PS

HANDHOLE

(2) (TYP.)

HANDHOLE

(2) (TYP.)

HANDHOLE

(2) (TYP.)

20'

20'

2

0

'

2

0

'

2

0

'

LIMITS OF DISTURBANCE

AREA = 1.30 AC

LIMITS OF DISTURBANCE

AREA = 1.30 AC

10' ASPHALT

TRAIL

FUTURE JDC

POND

23'

11'

12'

9

'

9

'

EX. LIGHT

POLE (TYP.)

UTILITY BOX

PED XING

SIGN

MATCHLINE SEE SHEET C3.1

376

NA

D 8

3

SCALE 1"=50'

100'50'0

SOILS INFORMATION

MAPPING UNIT NUMBER, NAME,

SLOPE, AND HYDROLOGIC

GROUP

SOILS CHARACTERISTICS MAPPING UNIT POTENTIAL FOR

GENERAL DEVELOPMENT

CENTRAL WATER AND SEWER

60C, SYCOLINE-CATLETT

COMPLEX, (7-15%) (C/D)

COMPLEX OF MODERATELY DEEP, MODERATELY WELL

DRAINED YELLOWISH-BROWN SILTY (SYCOLINE) AND

SHALLOW, WELL DRAINED GRAYISH-BORWN SKELETAL

(CATLETT) SOILS WITH PERCHED SEASONAL WATER

TABLES ON CONVEX SIDE SLOPES; DEVELOPED FROM

HORNFEL AND GRANULITES

II R - FAIR POTENTIAL; SHALLOW

SOILS OVER ROCK

62B, KELLY-SYCOLINE COMPLEX,

(3-8%) (D/C)

COMPLEX OF MODERATELY DEEP, MODERATELY WELL

TO SOMEWHAT POORLY DRAINED, YELLOWISH-BROWN

SILTY (SYCOLINE) SOILS; AND DEEP, SOMEWHAT

POORLY DRAINED GRAY AND GREYISH-BROWN

CLAYEY (KELLY) SOILS WITH SEASONAL PERCHED

WATER TABLE ON GENTLY SLOPING TO NEARLY LEVEL

RIDGE CRESTS; DEVELOPED FROM HORNFEL AND

GRANULITES

III WP - POOR POTENTIAL; HIGH

SHRINK-SWELL CLAYS AND

MODERATE DURATION PERCHED

WATER TABLE

63A, KELLY SILT LOAM, (0-3%) (D)

DEEP SOMEWHAT POORLY DRAINED GRAY AND

GRAYISH-BROWN CLAYPAN SOILS WITH SEASONAL

WATER TABLES ON GENTLY SLOPING TO NEARLY

LEVEL UPLANDS WITH LOW RELIEF; DEVELOPED FROM

HORNFEL AND GRANULITES

IV PW - VERY POOR POTENTIAL;

HIGH SHRINK-SWELL CLAYS AND

PROLONGED PERCHED WATER

TABLE

66A, WAXPOOL SILT LOAM, (0-3%)

PONDING (D) HYDRIC SOIL

VERY DEEP SOMEWHAT POORLY TO POORLY DRAINED

GRAY AND BROWN CLAYEY SOILS WITH SEASONAL

PERCHED WATER TABLES ON NEARLY LEVEL UPLAND

FLATS; DEVELOPED FROM DIABASE

IV PW - VERY POOR POTENTIAL;

HIGH SHRINK-SWELL CLAYS AND

PROLONGED PERCHED WATER

TABLE

67B, HAYMARKET AND JACKLAND

SOILS, (3-8%) (D)

COMPLEX OF VERY DEEP MODERATELY WELL DRAINED

YELLOWISH-BROWN TO OLIVE BROWN (JACKLAND) AND

WELL DRAINED STRONG BROWN (HAYMARKET) SOILS

WITH PERCHED WATER TABLES ON CONVEX

RIDGETOPS AND SIDE SLOPES OVER DIABASE AND

SOME BASALT

IV P - VERY POOR POTENTIAL;

HIGH SHRINK-SWELL CLAYS AND

SEASONAL PERCHED WATER

TABLES

69A, ELBERT SILTY CLAY LOAM,

(0-3%) PONDING (D) HYDRIC SOIL

VERY DEEP POORLY DRAINED SOIL IN DRAINAGEWAYS;

DEVELOPED FROM DIABASE AND BASALT

IV PW - VERY POOR POTENTIAL;

WETNESS AND HIGH

SHRINK-SWELL CLAYS

79A ALBANO SILT LOAM, (0-3%)

BRIEF PONDING (D) HYDRIC SOIL

DEEP POORLY DRAINED MOTTLED YELLOWISH-BROWN

AND GRAY CLAYEY SOILS WITH SEASONAL PERCHED

WATER TABLES IN CONCAVE LANDSCAPES (SWALES);

DEVELOPED IN COLLUVIUM AND LOCAL ALLUVIUM OF

SOILS DERIVED FROM TRIASSIC SILTSTONES AND

SHALES

IV W - VERY POOR POTENTIAL;

SEASONAL PERCHED WATER

TABLES. DEPTH TO HARD

BEDROCK GENERALLY RANGES 40

TO 60"

SOILS MAP CERTIFICATION

THE SUBJECT DEVELOPMENT SITE DOES CONTAIN CLASS III AND CLASS IV SOILS, PER THE

LATEST COUNTY SOILS MAP AS IDENTIFIED BY THE INTERPRETIVE GUIDE TO SOILS MAPS,

LOUDOUN COUNTY, VIRGINIA, OR PER THE APPROVED PRELIMINARY SOILS REVIEW

INVESTIGATION AND REPORT. LOUDOUN COUNTY RECOMMENDS NO CONSTRUCTION OF

STRUCTURES WITH SUBGRADE LEVELS WITHIN NATURAL DRAINAGE SWALES OR WITHIN

SOILS OR SPOTS SPECIFICALLY INDICATED AS WET PER THE LATEST COUNTY SOILS MAP AS

IDENTIFIED BY THE INTERPRETIVE GUIDE TO SOILS MAPS, LOUDOUN COUNTY, VIRGINIA.

SOILS MAP NOTES:

1. THIS PLAN WAS PREPARED BASED ON A GEOTECHNICAL

REPORT ENTITLED "REPORT OF SUBSURFACE EXPLORATION

AND GEOTECHNICAL ENGINEERING ANALYSIS, LOUDOUN

COUNTY JUVENILE DETENTION CENTER, LOUDOUN COUNTY,

VIRGINIA" PREPARED BY ECS MID-ATLANTIC, LLC. PROJECT NO.

01: 22205-E, DATED FEBRUARY 13, 2017. REFER TO THIS REPORT

FOR DETAILED INFORMATION CONCERNING INDIVIDUAL

BORINGS AND GENERAL RECOMMENDATIONS.

PROJECT NO: DATE:

11/6/2020 3:15:29 P

M

LOUD

OUN C

OUNT

Y JUV

ENILE

DETE

NTIO

N CEN

TER

ST

PL

-2

01

7-0

01

0, T

LP

F-2

01

7-0

00

5 (T

LC

R-2

01

7-0

00

1)

GO

UR

LE

Y T

RA

NS

IT

D

RIV

E, L

EE

SB

UR

G, V

A (P

AR

ID

#: 1

91

16

98

66

00

0)

CA

TO

CT

IN

D

IS

TR

IC

T, L

OU

DO

UN

C

OU

NT

Y, V

IR

GIN

IA

481000 03/27/2020

REVISIONS

DATE DESCRIPTION

10/30/20 REVISIONS FOR

VERIZON

20110 Ashbrook Place, Suite 100

Ashburn, VA 20147

TEL 703.726.1342

FAX 703.726.1345

www.timmons.com

THIS DRAWING PREPARED AT THE

NORTHERN VIRGINIA OFFICE

11/06/20 ADDENDUM 3

1. NO EXCAVATION IN THE AREAS OF EXISTING UTILITIES IS PERMITTED UNLESS THEIR LOCATION HAS BEEN DETERMINED.

CALL "MISS UTILITY" AT 1-800-552-7001, 48 HOURS PRIOR TO WORK.

2. THE CONTRACTOR SHALL DISPOSE OF EXCESS SOIL OR MATERIALS AT AN APPROVED LOCATION IN ACCORDANCE WITH

LOCAL, STATE, AND FEDERAL REQUIREMENTS.

3. BENCH MARKS TO BE PROVIDED BY THE CONTRACTOR ON SITE.

4. NONE OF THE INFORMATION PROVIDED ON THIS PLAN HAS BEEN FIELD SURVEYED AND A TITLE REPORT WAS NOT

PROVIDED.

5. THERE IS NO GEOTECHNICAL REPORT ASSOCIATED WITH THIS PROJECT.

6. THE CONTRACTOR SHALL REMOVE AND REPLACE IN KIND ANY FENCE OR OBSTRUCTIONS WHICH MAY IMPEDE

INSTALLATION OF LINEAR UTILITIES. COORDINATE WORK WITH LOUDOUN COUNTY DEPARTMENT OF TRANSPORTATION

AND CAPITAL INFRASTRUCTURE (DTCI) AND THE LOUDOUN COUNTY ADULT DETENTION CENTER (ADC) PRIOR TO

REMOVING ANY FENCE.

7. CONTRACTOR SHALL COORDINATE WATER AND SANITARY UTILITY WORK WITH TOWN OF LEESBURG UTILITIES INSPECTOR

TO ENSURE ALL WATER UTILITIES ARE PROTECTED AND MAINTAINED IN THEIR ORIGINAL STATE.

8. ALL PROPOSED UTILITY SHALL BE DIRECTIONALLY BORED WHERE FEASIBLE. IN THE AREAS WHERE THE CONTRACTOR

MUST DISTURB AND REPLACE THE EXISTING CONDITIONS THEY SHALL BE REPLACED IN KIND.

DEMOLITION NOTES:

DU3.0

EXISTING

CONDITIONS,

EROSION AND

SEDIMENT

CONTROL PH I

3

4

5

3

5

0

3

5

5

3

6

0

3

6

5

3

5

5

360

365

370

3

5

4

3

5

6

3

5

7

3

5

8

3

5

9

361

362

363

364

366

367

368

369

371

371

3

3

5

3

3

5

336

3

3

6

337

337

3

3

8

3

3

9

3

3

8

3

7

0

3

6

9

3

6

9

3

4

5

3

5

0

3

5

5

342

3

4

3

3

4

4

3

4

6

3

4

7

3

4

83

4

9

3

5

1

3

5

2

3

5

3

3

5

4

3

5

6

3

5

7

3

5

8

3

5

9

3

4

5

3

4

2

3

4

3

3

4

4

346

3

4

1

S

S

STOP

STOP

STOP D

D

www.ContechES.com

S

STOP

N: 7075355.45

E: 11753176.88

N: 7075359.02

E: 11753849.69

W

W

W

W

W

W

W

W

N: 7075655.45

E: 11753664.67

U

G

T

U

G

T

W

W

W

W

3

4

8

3

4

4

3

4

4

3

4

0

360

356

352

3

4

8

364

368

372

376

380

384

3

8

8

3

9

2

396

3

9

6

4

0

0

392

388

384

388

6

6

A

6

2

B

6

2

B

6

2

B

6

2

B

6

6

A

6

6

A

6

9

A

6

9

A

6

9

A

6

9

A

6

0

C

6

6

A

6

9

A

60C

62B

6

2

B

6

0

C

62B

63A

S

A

N

S

A

N

TP

TP

G

S

A

N

W

W

W

W

W

W

W

LIMITS OF DISTURBANCE

AREA= 1.30 AC

FUTURE JDC

FUTURE SAN.

SEWER

FUTURE JDC

MATCHLINE SEE SHEET C3.1MATCHLINE SEE SHEET C3.0

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

G

G

G

G

G

G

G

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

3

4

5

3

5

0

3

5

5

3

6

0

3

6

5

3

5

5

360

365

370

3

5

4

3

5

6

3

5

7

3

5

8

3

5

9

361

362

363

364

366

367

368

369

371

371

3

3

5

3

3

5

336

3

3

6

337

337

3

3

8

3

3

9

3

3

8

3

7

0

3

6

9

3

6

9

3

4

5

3

5

0

3

5

5

342

3

4

3

3

4

4

3

4

6

3

4

7

3

4

83

4

9

3

5

1

3

5

2

3

5

3

3

5

4

3

5

6

3

5

7

3

5

8

3

5

9

3

4

5

3

4

2

3

4

3

3

4

4

346

3

4

1

S

S

STOP

STOP

STOP D

D

www.ContechES.com

S

STOP

N: 7075355.45

E: 11753176.88

N: 7075359.02

E: 11753849.69

W

W

W

W

W

W

W

W

N: 7075655.45

E: 11753664.67

U

G

T

U

G

T

W

W

W

W

3

4

8

3

4

4

3

4

4

3

4

0

360

356

352

3

4

8

364

368

372

376

380

384

3

8

8

3

9

2

396

3

9

6

4

0

0

392

388

384

388

S

A

N

S

A

N

TP

TP

G

S

A

N

W

W

W

W

W

W

W

G

G

G

G

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

U

C

A

T

V

U

G

P

U

G

P

U

G

P

U

G

P

EX. DUCT BANK (8) - 4" CONDUIT

ENCASED IN CONCRETE

EX. 4" CONDUIT W/

FIBER RUN 24" DEEP

PROP.

WL

PROP.

SAN. LINE

PROP.

GAS LINE

PROP.

ELEC. LINE

PROP. GEOTHERMAL

PIPES (TYP.)

EX. OVERHEAD

POWER

PROP. NOVEC POWER

CONN. APPROX

LENGTH = 382'

(2) - 6" CONDUITS

EXTEND TO

WASH GAS CONN.

SINGLE CONDUIT

PROP. COMM LINE

(4) - 4" CONDUITS

PROP. COMM LINE

(4) - 4" CONDUITS

EXTEND EX.

POWER TO JDC

IP

SF

SF

SF

SF

SF

SF SFSF

CE

HANDHOLE

(2) (TYP.)

HANDHOLE

(2) (TYP.)

PS

PS

PS

PS

HANDHOLE

(2) (TYP.)

2

0

'

2

0

'

2

0

'

2

0

'

2

0

'

2

0

'

HANDHOLE

(TYP.)

LIMITS OF DISTURBANCE

AREA = 1.30 AC

LIMITS OF DISTURBANCE

AREA= 1.30 AC

STORM DRAIN

EASEMENT

OPTIONAL CONSTRUCTION

ENTRANCE IF SITE IS

BEING USED FOR STAGING

AND LAYDOWN AREA

8' ASPHALT

TRAIL

FUTURE JDC

24.32'

10' ASPHALT

TRAIL

11.81'

1

2

.4

5

'

9

'

9

'

FUTURE SAN.

SEWER

FUTURE JDC

MATCHLINE SEE SHEET C3.1MATCHLINE SEE SHEET C3.0

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

G

G

G

G

G

G

G

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

U

G

T

LEGEND

SOIL BOUNDARY

SOIL IDENTIFICATION

66A

SOIL DRAIN

LIMITS OF CONSTRUCTION

INLET PROTECTION

IP

SILT FENCE

SF

LEGEND

CE

CONSTRUCTION ENTRANCE

NA

D 8

3

0

SCALE 1"=60'

120'60'

SOILS INFORMATION

MAPPING UNIT NUMBER, NAME,

SLOPE, AND HYDROLOGIC

GROUP

SOILS CHARACTERISTICS MAPPING UNIT POTENTIAL FOR

GENERAL DEVELOPMENT

CENTRAL WATER AND SEWER

60C, SYCOLINE-CATLETT

COMPLEX, (7-15%) (C/D)

COMPLEX OF MODERATELY DEEP, MODERATELY WELL

DRAINED YELLOWISH-BROWN SILTY (SYCOLINE) AND

SHALLOW, WELL DRAINED GRAYISH-BORWN SKELETAL

(CATLETT) SOILS WITH PERCHED SEASONAL WATER

TABLES ON CONVEX SIDE SLOPES; DEVELOPED FROM

HORNFEL AND GRANULITES

II R - FAIR POTENTIAL; SHALLOW

SOILS OVER ROCK

62B, KELLY-SYCOLINE COMPLEX,

(3-8%) (D/C)

COMPLEX OF MODERATELY DEEP, MODERATELY WELL

TO SOMEWHAT POORLY DRAINED, YELLOWISH-BROWN

SILTY (SYCOLINE) SOILS; AND DEEP, SOMEWHAT

POORLY DRAINED GRAY AND GREYISH-BROWN

CLAYEY (KELLY) SOILS WITH SEASONAL PERCHED

WATER TABLE ON GENTLY SLOPING TO NEARLY LEVEL

RIDGE CRESTS; DEVELOPED FROM HORNFEL AND

GRANULITES

III WP - POOR POTENTIAL; HIGH

SHRINK-SWELL CLAYS AND

MODERATE DURATION PERCHED

WATER TABLE

63A, KELLY SILT LOAM, (0-3%) (D)

DEEP SOMEWHAT POORLY DRAINED GRAY AND

GRAYISH-BROWN CLAYPAN SOILS WITH SEASONAL

WATER TABLES ON GENTLY SLOPING TO NEARLY

LEVEL UPLANDS WITH LOW RELIEF; DEVELOPED FROM

HORNFEL AND GRANULITES

IV PW - VERY POOR POTENTIAL;

HIGH SHRINK-SWELL CLAYS AND

PROLONGED PERCHED WATER

TABLE

66A, WAXPOOL SILT LOAM, (0-3%)

PONDING (D) HYDRIC SOIL

VERY DEEP SOMEWHAT POORLY TO POORLY DRAINED

GRAY AND BROWN CLAYEY SOILS WITH SEASONAL

PERCHED WATER TABLES ON NEARLY LEVEL UPLAND

FLATS; DEVELOPED FROM DIABASE

IV PW - VERY POOR POTENTIAL;

HIGH SHRINK-SWELL CLAYS AND

PROLONGED PERCHED WATER

TABLE

67B, HAYMARKET AND JACKLAND

SOILS, (3-8%) (D)

COMPLEX OF VERY DEEP MODERATELY WELL DRAINED

YELLOWISH-BROWN TO OLIVE BROWN (JACKLAND) AND

WELL DRAINED STRONG BROWN (HAYMARKET) SOILS

WITH PERCHED WATER TABLES ON CONVEX

RIDGETOPS AND SIDE SLOPES OVER DIABASE AND

SOME BASALT

IV P - VERY POOR POTENTIAL;

HIGH SHRINK-SWELL CLAYS AND

SEASONAL PERCHED WATER

TABLES

69A, ELBERT SILTY CLAY LOAM,

(0-3%) PONDING (D) HYDRIC SOIL

VERY DEEP POORLY DRAINED SOIL IN DRAINAGEWAYS;

DEVELOPED FROM DIABASE AND BASALT

IV PW - VERY POOR POTENTIAL;

WETNESS AND HIGH

SHRINK-SWELL CLAYS

79A ALBANO SILT LOAM, (0-3%)

BRIEF PONDING (D) HYDRIC SOIL

DEEP POORLY DRAINED MOTTLED YELLOWISH-BROWN

AND GRAY CLAYEY SOILS WITH SEASONAL PERCHED

WATER TABLES IN CONCAVE LANDSCAPES (SWALES);

DEVELOPED IN COLLUVIUM AND LOCAL ALLUVIUM OF

SOILS DERIVED FROM TRIASSIC SILTSTONES AND

SHALES

IV W - VERY POOR POTENTIAL;

SEASONAL PERCHED WATER

TABLES. DEPTH TO HARD

BEDROCK GENERALLY RANGES 40

TO 60"

SOILS MAP CERTIFICATION

THE SUBJECT DEVELOPMENT SITE DOES CONTAIN CLASS III AND CLASS IV SOILS, PER THE

LATEST COUNTY SOILS MAP AS IDENTIFIED BY THE INTERPRETIVE GUIDE TO SOILS MAPS,

LOUDOUN COUNTY, VIRGINIA, OR PER THE APPROVED PRELIMINARY SOILS REVIEW

INVESTIGATION AND REPORT. LOUDOUN COUNTY RECOMMENDS NO CONSTRUCTION OF

STRUCTURES WITH SUBGRADE LEVELS WITHIN NATURAL DRAINAGE SWALES OR WITHIN

SOILS OR SPOTS SPECIFICALLY INDICATED AS WET PER THE LATEST COUNTY SOILS MAP AS

IDENTIFIED BY THE INTERPRETIVE GUIDE TO SOILS MAPS, LOUDOUN COUNTY, VIRGINIA.

SOILS MAP NOTES:

1. THIS PLAN WAS PREPARED BASED ON A GEOTECHNICAL

REPORT ENTITLED "REPORT OF SUBSURFACE EXPLORATION

AND GEOTECHNICAL ENGINEERING ANALYSIS, LOUDOUN

COUNTY JUVENILE DETENTION CENTER, LOUDOUN COUNTY,

VIRGINIA" PREPARED BY ECS MID-ATLANTIC, LLC. PROJECT NO.

01: 22205-E, DATED FEBRUARY 13, 2017. REFER TO THIS REPORT

FOR DETAILED INFORMATION CONCERNING INDIVIDUAL

BORINGS AND GENERAL RECOMMENDATIONS.

PROJECT NO: DATE:

11/6/2020 3:15:53 P

M

LOUD

OUN C

OUNT

Y JUV

ENILE

DETE

NTIO

N CEN

TER

ST

PL

-2

01

7-0

01

0, T

LP

F-2

01

7-0

00

5 (T

LC

R-2

01

7-0

00

1)

GO

UR

LE

Y T

RA

NS

IT

D

RIV

E, L

EE

SB

UR

G, V

A (P

AR

ID

#: 1

91

16

98

66

00

0)

CA

TO

CT

IN

D

IS

TR

IC

T, L

OU

DO

UN

C

OU

NT

Y, V

IR

GIN

IA

481000 03/27/2020

REVISIONS

DATE DESCRIPTION

10/30/20 REVISIONS FOR

VERIZON

20110 Ashbrook Place, Suite 100

Ashburn, VA 20147

TEL 703.726.1342

FAX 703.726.1345

www.timmons.com

THIS DRAWING PREPARED AT THE

NORTHERN VIRGINIA OFFICE

11/06/20 ADDENDUM 3

1. NO EXCAVATION IN THE AREAS OF EXISTING UTILITIES IS PERMITTED UNLESS THEIR LOCATION HAS BEEN DETERMINED.

CALL "MISS UTILITY" AT 1-800-552-7001, 48 HOURS PRIOR TO WORK.

2. THE CONTRACTOR SHALL DISPOSE OF EXCESS SOIL OR MATERIALS AT AN APPROVED LOCATION IN ACCORDANCE WITH

LOCAL, STATE, AND FEDERAL REQUIREMENTS.

3. BENCH MARKS TO BE PROVIDED BY THE CONTRACTOR ON SITE.

4. NONE OF THE INFORMATION PROVIDED ON THIS PLAN HAS BEEN FIELD SURVEYED AND A TITLE REPORT WAS NOT

PROVIDED.

5. THERE IS NO GEOTECHNICAL REPORT ASSOCIATED WITH THIS PROJECT.

6. THE CONTRACTOR SHALL REMOVE AND REPLACE IN KIND ANY FENCE OR OBSTRUCTIONS WHICH MAY IMPEDE

INSTALLATION OF LINEAR UTILITIES. COORDINATE WORK WITH LOUDOUN COUNTY DEPARTMENT OF TRANSPORTATION

AND CAPITAL INFRASTRUCTURE (DTCI) AND THE LOUDOUN COUNTY ADULT DETENTION CENTER (ADC) PRIOR TO

REMOVING ANY FENCE.

7. CONTRACTOR SHALL COORDINATE WATER AND SANITARY UTILITY WORK WITH TOWN OF LEESBURG UTILITIES INSPECTOR

TO ENSURE ALL WATER UTILITIES ARE PROTECTED AND MAINTAINED IN THEIR ORIGINAL STATE.

8. ALL PROPOSED UTILITY SHALL BE DIRECTIONALLY BORED WHERE FEASIBLE. IN THE AREAS WHERE THE CONTRACTOR

MUST DISTURB AND REPLACE THE EXISTING CONDITIONS THEY SHALL BE REPLACED IN KIND.

DEMOLITION NOTES:

DU3.1

EXISTING

CONDITIONS,

EROSION AND

SEDIMENT

CONTROL PH II

MS-1: APPLY PERMANENT SOIL STABILIZATION TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED

ON ANY PORTION OF THE SITE. APPLY TEMPORARY SOIL STABILIZATION WITHIN SEVEN DAYS TO DENUDED AREAS

THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 14 DAYS.

APPLY PERMANENT STABILIZATION TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.

MS-2: STABILIZE OR PROTECT TEMPORARY SOIL STOCKPILES WITH SEDIMENT TRAPPING MEASURES (SUCH AS SILT

FENCE). PROVIDE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS

WELL AS SOIL TRANSPORTED FROM THE PROJECT SITE.

MS-3: ESTABLISH A PERMANENT VEGETATIVE COVER ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED.

PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IN

THE OPINION OF THE SITE INSPECTOR, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.

MS-4: CONSTRUCT CONSTRUCTION ENTRANCE, STREAM CONVEYANCE CHANNEL, TREE PROTECTION, SUPER SILT FENCE,

CHECK DAMS, CULVERT INLET PROTECTION, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER MEASURES

INTENDED TO TRAP SEDIMENT AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND MAKE THESE MEASURES

FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE OR TIMBERING TAKES PLACE.

MS-5: APPLY STABILIZATION MEASURES TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY

AFTER INSTALLATION.

MS-6: CONTROL SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW MS-6: FROM DRAINAGE

AREAS GREATER THAN OR EQUAL TO THREE ACRES TO ACCOMMODATE THE ANTICIPATED SEDIMENT LOADING

FROM THE LAND- DISTURBING ACTIVITY. THE OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCOUNT

THE TOTAL DRAINAGE AREA FLOWING THROUGH THE DISTURBED AREA TO BE SERVED BY THE BASIN.

MS-7: CONSTRUCT CUT AND FILL SLOPES IN A MANNER THAT WILL MINIMIZE EROSION. PROVIDE SLOPES THAT ARE FOUND

TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION WITH ADDITIONAL SLOPE

STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.

MS-8: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE

TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.

MS-9: WHENEVER WATER SEEPS FROM A SLOPE FACE, PROVIDE ADEQUATE DRAINAGE OR OTHER PROTECTION.

MS-9A: NO E&S PHASE I CONTROLS SHALL BE REMOVED WITHOUT THE PRIOR APPROVAL OF THE SITE INSPECTOR.

MS-10: PROTECT ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SO THAT

SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR

OTHERWISE TREATED TO REMOVE SEDIMENT.

MS-11: BEFORE STORMWATER CONVEYANCE CHANNELS ARE MADE OPERATIONAL, PROVIDE ADEQUATE OUTLET

PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING IN BOTH THE CONVEYANCE

CHANNEL AND THE RECEIVING CHANNEL.

MS-12: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, TAKE PRECAUTIONS TO MINIMIZE ENCROACHMENT,

CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING

CONSTRUCTION. PROVIDE NONERODIBLE MATERIAL FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS.

EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS.

MS-13: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY

SIX-MONTH PERIOD, PROVIDE A TEMPORARY STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL.

MS-14: MEET ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE

WATERCOURSES.

MS-15: STABILIZE THE BED AND BANKS OF A WATERCOURSE IMMEDIATELY FOLLOWING AFTER WORK IN THE

WATERCOURSE IS COMPLETED.

MS-16: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THESE STANDARDS IN ADDITION TO

OTHER APPLICABLE CRITERIA:

A. OPEN NO MORE THAN 500 LINEAR FEET OF TRENCH AT ONE TIME.

B. PLACE EXCAVATED MATERIAL ON THE UPHILL SIDE OF TRENCHES

C. FILTER EFFLUENT FROM DEWATERING OPERATIONS OR PASS THROUGH AN APPROVED SEDIMENT TRAPPING

DEVICE, OR BOTH, AND DISCHARGE IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS

OR OFFSITE PROPERTY.

D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE

EROSION AND PROMOTE STABILIZATION.

E. ACCOMPLISH RESTABILIZATION IN ACCORDANCE WITH THESE REGULATIONS.

F. COMPLY WITH ALL APPLICABLE SAFETY REGULATIONS.

MS-17: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, MAKE PROVISIONS TO

MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE

SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, CLEAN THE ROAD THOROUGHLY AT THE END OF

EACH DAY. REMOVE SEDIMENT FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORT TO A SEDIMENT

CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS

MANNER.

MS-18: REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WITHIN 30 DAYS AFTER FINAL SITE

STABILIZATION BUT ONLY AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, AND ONLY AFTER

AUTHORIZED BY THE SITE INSPECTOR. PERMANENTLY STABILIZE TRAPPED SEDIMENT AND THE DISTURBED SOIL

AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES TO PREVENT FURTHER EROSION AND

SEDIMENTATION.

MS-19: PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT

DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF

STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE

FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE

NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW

RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:

A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY

INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR

THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY

ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED.

B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:

1. THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS

WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF

THE PROJECT IN QUESTION.

2.

a. NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO YEAR STORM TO VERIFY THAT

STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR

BANKS.

b. ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A

TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF

A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL

BED OR BANKS.

c. PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO

VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM.

C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES

ARE NOT ADEQUATE, THE APPLICANT SHALL:

1. IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR FREQUENCY STORM WILL NOT OVERTOP

THE BANKS AND A TWO-YEAR FREQUENCY STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR

BANKS; OR

2. IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR FREQUENCY STORM IS

CONTAINED WITHIN THE APPURTENANCES; OR

3. DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A

TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT

CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN

RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL.

4. PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION/RETENTION OR OTHER

MEASURES WHICH IS SATISFACTORY TO THE PLAN APPROVING AUTHORITY TO PREVENT DOWNSTREAM

EROSION.

D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.

E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE

ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.

F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN

APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL

SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR

PERFORMING THE MAINTENANCE.

G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL AND ENERGY

DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE

A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL.

H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.

I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT

PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR A

DETENTION FACILITY.

J. IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL,

COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT

PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE

DEVELOPMENT PROJECT. HYDRAULIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION

SHALL BE USED IN ALL ENGINEERING CALCULATIONS.

K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH

MINIMIZED IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND

OTHER WATERS OF THE STATE.

L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT

ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE

CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR

MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO

RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL

RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE

RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO

THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED

THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO

THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE

RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW

RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY

REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1- 44.15:65 OF THE ACT.

M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY

REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE

WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§62.1-44.15:24 ET SEQ. OF

THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES ARE IN

ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) PERMIT

REGULATIONS.

N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA

STORMWATER MANAGEMENT PROGRAM (VSMP) PERMIT REGULATIONS SHALL BE DEEMED TO SATISFY THE

REQUIREMENTS OF MINIMUM STANDARD 19.

NOTE:

THE CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ANY AND ALL EROSION CONTROL (EC) REQUIREMENTS FOR

ANY LAND DISTURBING ACTIVITIES, INCLUDING BUT NOT LIMITED TO, ONSITE OR OFFSITE BORROW, ONSITE OR OFFSITE

STOCKPILING OR DISPOSAL OF WASTE MATERIALS. BEFORE UNDERTAKING ANY LAND DISTURBING ACTIVITY FOR WHICH

THE PLANS DO NOT SPECIFICALLY ADDRESS EROSION CONTROL, THE CONTRACTOR SHALL CONTACT THE

ARCHITECHT/ENGINEER TO DETERMINE WHAT EC MEASURES ARE NECESSARY. THE CONTRACTOR SHALL PROVIDE A PWC

CERTIFIED, "RESPONSIBLE LAND DISTURBER" IN ACCORDANCE WITH SECTION 10.1-563, CODE OF VIRGINIA, AS REVISED.

EROSION AND SEDIMENT CONTROL NARRATIVE

PROJECT DESCRIPTION

THIS PROJECT INCLUDES THE INSTALLATION OF DRY UTILITIES AS REQUIRED FOR THE NEW LOUDOUN COUNTY JUVENILE

DETENTION CENTER (JDC). THE TOTAL DISTURBED AREA IS 1.30 AC (56,628 SF) FOR THIS UTILITY PLAN.

EXISTING SITE CONDITIONS

THE SITE IS ADJACENT TO GOURLEY TRANSIT DR, NORTH OF THE JDC SITE. THE EXISTING GRADE WITHIN THE PROJECT AREA IS

FLAT TO MODERATELY SLOPED (0-5%). THE SITE IS CURRENTLY UNDEVELOPED, WITH THE ONLY IMPROVEMENTS BEING AN

ASPHALT TRAIL AND EXISTING GOURLEY TRANSIT DR.

ADJACENT PROPERTY

THE PROJECT AREA IS A PART OF THE OVERALL PARCEL (APPROX. 672 ACRES) IDENTIFIED AS TAX MAP NUMBER 60////////12/, AND IS

PART OF THE LOUDOUN COUNTY GOVERNMENT SUPPORT CENTER. THIS PROJECT AREA IS BORDERED TO THE NORTH BY

LOUDOUN COUNTY FIRE AND RESCUE TRAINING CENTER AND THE LOUDOUN COUNTY ADULT DETENTION CENTER TO THE NORTH

AND WEST, TO THE SOUTH BY THE GOURLEY TRANSIT DRIVE, AND TO THE EAST BY A SYCOLIN ROAD.

OFF-SITE AREAS

THERE ARE NO OFF-SITE AREAS BEING DISTURBED WITH THIS PLAN. SHOULD THE NEED ARISE TO GRADE OFF-SITE, OR OBTAIN

MATERIAL FROM A BORROW AREA, THE AREA MUST BE COVERED BY A VALID GRADING PERMIT.

SEE SHEET DU3.0 & DU3.1 FOR THE COUNTY SOILS MAPPING & THE COUNTY SOILS SUMMARY.

CRITICAL EROSION AREAS

THE DISTURBED AREA WAS PREVIOUSLY GRADED WITH THE REALIGNMENT OF GOURLEY TRANSIT DRIVE.

THERE ARE NO CRITICAL AREAS WITHIN PROJECT LIMITS.

STORM WATER RUNOFF CONSIDERATION

THIS IS A LINEAR PROJECT WITH NO ADDITIONAL IMPERVIOUS AREA PROPOSED. SITE TO BE FULLY STABILIZED AT END OF EACH

WORKING DAY.

EROSION CONTROL PROGRAM

EROSION CONTROL SHALL BE MAXIMIZED THROUGH RAPID STABILIZATION OF THE DISTURBED AREAS AND BY DIVERTING CLEAN

WATER AND EROSIVE FLOWS AROUND OR THROUGH DISTURBED AREAS IN A NON-EROSIVE MANNER NOT MORE THAN 7 CALENDAR

DAYS ARE TO ELAPSE WITH ANY DISTURBED AREA REMAINING DENUDED. TEMPORARY COVER, BY SEEDING AND/OR MULCHING,

SHALL BE APPLIED TO AREAS THAT WILL BE EXPOSED FOR A PERIOD OF GREATER THAN 7 DAYS, BEFORE PERMANENT

STABILIZATION PERMANENT COVER SHOULD BE PROVIDED OVER ALL DISTURBED AREAS AS SOON AS POSSIBLE UPON ACHIEVING

FINAL GRADE, BY MEANS OF SEEDING AND MULCHING. SODDING AND PEGGING, PAVING. OR AS OTHERWISE DIRECTED BY THE

PLAN. LIKEWISE, ALL STOCKPILES SHALL BE STABILIZED WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. UTILITY TRENCHES SHALL

BE SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILLING TO THE FINISHED GRADE. ALL TEMPORARY DIVERSION DIKES SHALL

BE SEEDED AND MULCHED IMMEDIATELY AFTER CONSTRUCTION.

SEDIMENT CONTROL PROGRAM

SEDIMENT CONTROL SHALL BE ACCOMPLISHED THROUGH RAPID STABILIZATION AND BY THE INSTALLATION OF MECHANICAL

DEVICES, AS SHOWN ON THE PHASE I PLAN.

UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE

CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION &

SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED

OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION.

ALL NON-PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY

FOLLOWING FINISH GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. & SPEC. 3.32, PERMANENT SEEDING. SEED TYPE

SHALL BE AS SPECIFIED FOR "MINIMUM CARE LAWNS" AND "GENERAL SLOPES" IN THE HANDBOOK. MULCH (STRAW OR FIBER)

SHALL BE USED ON ALL SEEDED SURFACES. IN ALL SEEDING OPERATIONS SEED, FERTILIZER AND LIME SHALL BE APPLIED PRIOR

TO MULCHING.

ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH RUN-OFF PRODUCING RAINFALL.

THE FOLLOWING ITEMS SHALL BE CHECKED IN PARTICULAR:

A. CHECK THE SILT FENCE AFTER EVERY STORM EVENT TO ENSURE EFFECTIVE OPERATION AND REMOVE SEDIMENT WHEN

THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF WAY TO THE TOP OF THE BARRIER.

B. CHECK THE SILT FENCE BARRIER FOR UNDERMINING OR DETERIORATION OF THE FABRIC. REMOVE SEDIMENT WHEN THE

LEVEL OF SEDIMENT DEPOSITION REACHES HALF WAY TO THE TOP OF THE BARRIER.

C. CHECK THE GRAVEL INLET PROTECTION FOR SEDIMENT BUILDUP WHICH WILL PREVENT DRAINAGE. IF THE GRAVEL IS

CLOGGED BY SEDIMENT; REMOVE AND CLEAN, OR REPLACE.

D. CHECK THE SEEDING AREAS TO ENSURE THAT A STAND OF GRASS IS MAINTAINED. FERTILIZE AND RESEED AS NEEDED.

E. SEE MINIMUM STANDARDS FOR ADDITIONAL INFORMATION.

STRUCTURAL PRACTICES

1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02

A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS

IMPERATIVE THAT THIS MEASURE BE MAINTAINED THROUGHOUT CONSTRUCTION.

2. SILT FENCE BARRIER - 3.05

A TEMPORARY SEDIMENT BARRIER CONSTRUCTED OF POSTS AND FILTER FABRIC AND PLACED AT THE TOE OF A SLOPE

TO INTERCEPT AND DETAIN SEDIMENT AND DECREASE FLOW VELOCITIES FROM DRAINAGE AREAS OF LIMITED SIZE.

3. STORM DRAIN INLET PROTECTION - 3.07

STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL DRAINAGE STRUCTURES AS INDICATED.

4. DUST CONTROL - 3.39

DUST CONTROL MEASURES SHALL BE PROVIDED TO REDUCE THE SPREAD OF AIR MOVEMENT FROM THE ACTIVE

CONSTRUCTION SITE.

VEGETATIVE PRACTICES

1. TOPSOILING (TEMPORARY STOCKPILE) - 3.30

TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER SPREADING. STOCKPILE

LOCATIONS SHALL BE LOCATED ONSITE AND SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION.

2. TEMPORARY SEEDING - 3.31

ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH FAST

GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED

MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT IS APPLIED.

3. PERMANENT SEEDING - 3.32

ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING SEED.

4. SURFACE ROUGHENING

AREAS TO BE SEEDED SHALL BE LIGHTLY ROUGHENED AND LOOSE TO A DEPTH OF T TO 4" PRIOR TO SEEDING AREAS

WHICH HAVE BEEN GRADED AND WILL NOT BE STABILIZED IMMEDIATELY MAY BE ROUGHENED TO REDUCE VELOCITY

UNTIL SEEDING TAKES PLACE.

5. EROSION CONTROL BLANKETS OR MULCH

EROSION CONTROL BLANKETS WILL BE INSTALLED OVER FILL SLOPES WHICH HAVE BEEN BROUGHT TO FINAL GRADE AND

SEEDED TO PROTECT THE SLOPES FROM RILL AND GULLY EROSION AND ALLOW THE SEED TO GERMINATE PROPERLY.

MULCH (STRAW OR FIBER) WILL BE USED ON RELATIVELY FLAT AREAS AND WILL BE APPLIED AS A SECOND STEP IN THE

SEEDING OPERATION.

EROSION AND SEDIMENT CONTROL MANAGEMENT STRATEGIES

1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING AND SEED AND MULCH IMMEDIATELY FOLLOWING

INSTALLATION.

2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING.

3. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE

PERIMETER CONTROLS.

4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO

COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW.

PHASING OF LAND DISTURBING ACTIVITIES

THIS IS A LINEAR PROJECT WITH A SINGLE PHASE PLAN APPROVAL. THE SITE TO BE FULLY STABILIZED AT THE END OF EACH DAY.

THE LOUDOUN COUNTY INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE EROSION AND SEDIMENT TRAPS OR SEDIMENT

BASINS. EROSION AND SEDIMENT CONTROL MEASURES MAY NOT BE REMOVED OR ALTERED IN ANY WAY WITHOUT PRIOR

APPROVAL OF THE INSPECTOR.

GENERAL EROSION AND SEDIMENT CONTROL NOTES

1. UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION

AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE

VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS 9VAC25-840-10 EROSION

AND SEDIMENT CONTROL REGULATIONS.

2. PLAN-APPROVING AUTHORITY HAVING JURISDICTION WILL MAKE A CONTINUING REVIEW AND EVALUATION OF

THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN.

3. PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING,

GRADING, OR LAND DISTURBANCE.

4. MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES.

5. PRIOR TO COMMENCING LAND-DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS

(INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY EROSION

CONTROL PLAN TO THE SITE INSPECTOR FOR REVIEW AND ACCEPTANCE.

6. PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND

SEDIMENTATION AS DETERMINED BY THE SITE INSPECTOR.

7. ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING

LAND-DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT.

8. DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE.

9. INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT.

MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL

DEVICES IMMEDIATELY.

MINIMUM STANDARDS

SEQUENCE OF CONSTRUCTION:

CONSTRUCTION OPERATIONS INCLUDE THE CONSTRUCTION NEEDED TO DIVERT MAJOR OFF-SITE CLEAN WATER AND ON-SITE

DRAINAGE FLOWS AROUND THE WORK AREA AND CONTROL EROSION AND SEDIMENT ASSOCIATED WITH THE INITIAL

CLEARING AND GRADING OPERATIONS AS REQUIRED. CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS.

1. A PRE-CONSTRUCTION MEETING IS MANDATORY BEFORE ANY WORK IS DONE AT THE SITE. AFTER RECEIPT OF THE LAND

DISTURBING PERMIT ARRANGE A MEETING WITH OWNER, ENGINEER AND LOUDOUN COUNTY E&S INSPECTOR. 72 HOURS

NOTICE IS REQUIRED, ONE WEEK IS PREFERRED. ONCE THIS PLAN HAS BEEN APPROVED, A PRE CONSTRUCTION

CONFERENCE MUST BE COORDINATED BY THE CONTRACTOR WITH THE APPLICANT AND ENGINEER THROUGH LOUDOUN

COUNTY E&S INSPECTOR.

2. THE LIMITS OF DISTURBANCE MUST BE FIELD MARKED PRIOR TO CLEARING OF TREES, INSTALLATION OF SEDIMENT

CONTROL MEASURES, CONSTRUCTION, OR OTHER LAND DISTURBING ACTIVITIES.

3. CLEAR AND GRADE FOR INSTALLATION OF PERIMETER SEDIMENT CONTROL DEVICES. PERIMETER SEDIMENT TRAPPING

MEASURES MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES. CONTRACTOR SHALL NOT REMOVE

EXISTING TEMPORARY SLOPE DRAINS UNTIL SUCH TIME THAT PROPOSED DIVERSION DIKES ARE REMOVED.

4. INSTALL NECESSARY PERIMETER E&S CONTROLS TO PERFORM GRADING REQUIRED TO CONSTRUCT ACCESS ONTO SITE.

5. INSTALL STABILIZED CONSTRUCTION ENTRANCE (SCE) AS INDICATED ON THE PLANS. CONSTRUCTION ENTRANCE WASH

RACK SHALL DRAIN TO AN APPROVED SETTLING AREA.

6. CLEAR AND GRUB IN ORDER TO INSTALL THE PHASE I E&S CONTROLS (TP, SF, AND ALL OTHER PERIMETER CONTROLS).

7. CLEAR AND STRIP SITE. TEMPORARILY STOCK PILE TOPSOIL (IF ANY) ON SITE. STABILIZE STOCK PILE WITH TEMPORARY

SEEDING AND PROVIDE SILT FENCE.

8. ONCE THE COUNTY INSPECTOR APPROVES THE PHASE I EROSION CONTROL MEASURES, GRADING OPERATIONS MAY

BEGIN.

9. CONTRACTOR TO COMMENCE WITH ROUGH GRADING AND DEMOLITION ACTIVITIES. INITIALLY, THE WATER QUALITY

SWALE SHOULD BE EXCAVATED TO WITHIN ONE FOOT OF ITS FINAL ELEVATION. EXCAVATION TO THE FINISHED GRADE

SHOULD BE DEFERRED UNTIL ALL DISTURBED AREAS IN THE WATERSHED HAVE BEEN STABILIZED OR PROTECTED.

10. CONTRACTOR TO ESTABLISH A PROTECTED STAGING AREA FOR EQUIPMENT AND PARKING.

11. ONCE FINAL GRADE IS REACHED, TEMPORARILY SEED, MULCH, AND STABILIZE ALL DISTURBED AREAS PER VIRGINIA

EROSION AND SEDIMENT CONTROL STANDARDS. BEGIN TO TRANSITION TO PHASE II EROSION AND SEDIMENT CONTROL.

12. CONTRACTOR TO OBTAIN APPROVAL FROM THE LOUDOUN COUNTY INSPECTOR PRIOR TO COMMENCING WITH PHASE II

EROSION AND SEDIMENT CONTROL.

PROJECT NO: DATE:

11/6/2020 3:16:48 P

M

LOUD

OUN C

OUNT

Y JUV

ENILE

DETE

NTIO

N CEN

TER

ST

PL

-2

01

7-0

01

0, T

LP

F-2

01

7-0

00

5 (T

LC

R-2

01

7-0

00

1)

GO

UR

LE

Y T

RA

NS

IT

D

RIV

E, L

EE

SB

UR

G, V

A (P

AR

ID

#: 1

91

16

98

66

00

0)

CA

TO

CT

IN

D

IS

TR

IC

T, L

OU

DO

UN

C

OU

NT

Y, V

IR

GIN

IA

481000 03/27/2020

REVISIONS

DATE DESCRIPTION

10/30/20 REVISIONS FOR

VERIZON

20110 Ashbrook Place, Suite 100

Ashburn, VA 20147

TEL 703.726.1342

FAX 703.726.1345

www.timmons.com

THIS DRAWING PREPARED AT THE

NORTHERN VIRGINIA OFFICE

11/06/20 ADDENDUM 3

EROSION AND

SEDITMENT

CONTROL NOTES

AND DETAILS

DU3.2

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

PROJECT NO: DATE:

11/6/2020 3:17:05 P

M

LOUD

OUN C

OUNT

Y JUV

ENILE

DETE

NTIO

N CEN

TER

ST

PL

-2

01

7-0

01

0, T

LP

F-2

01

7-0

00

5 (T

LC

R-2

01

7-0

00

1)

GO

UR

LE

Y T

RA

NS

IT

D

RIV

E, L

EE

SB

UR

G, V

A (P

AR

ID

#: 1

91

16

98

66

00

0)

CA

TO

CT

IN

D

IS

TR

IC

T, L

OU

DO

UN

C

OU

NT

Y, V

IR

GIN

IA

481000 03/27/2020

REVISIONS

DATE DESCRIPTION

10/30/20 REVISIONS FOR

VERIZON

20110 Ashbrook Place, Suite 100

Ashburn, VA 20147

TEL 703.726.1342

FAX 703.726.1345

www.timmons.com

THIS DRAWING PREPARED AT THE

NORTHERN VIRGINIA OFFICE

11/06/20 ADDENDUM 3

DU3.3

EROSION AND

SEDITMENT

CONTROL NOTES

AND DETAILS