Engineer: Study Case: LF
12.6.0HPage: 1
SN:
Filename: Project OJT Section 1
Project: ETAP
Contract:
Date: 28-04-2015
Revision: Base
Config.: Normal
Branch Losses Summary Report
ID MW Mvar MW Mvar kW kvar From To
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage % Drop Vd
in Vmag
0.1 2.8 100.0 99.8 0.17TD 1 0.778 0.486 -0.778 -0.483
3.5 -7.8 99.8 99.1 0.75Line2 0.778 0.483 -0.774 -0.491
0.1 -0.5 99.1 99.0 0.03Line4 0.696 0.441 -0.696 -0.441
0.7 2.1 99.1 97.3 1.80PS 0.078 0.050 -0.078 -0.048
0.7 2.1 97.2 99.0 1.80MN 0001 -0.078 -0.048 0.078 0.050
0.1 -0.6 99.0 99.0 0.03Line6 0.617 0.391 -0.617 -0.392
0.7 2.1 97.2 99.0 1.80MN 0024- -0.078 -0.048 0.078 0.050
0.1 -0.3 99.0 99.0 0.02Line8 0.539 0.341 -0.539 -0.342
0.7 2.1 97.2 99.0 1.80MN 0048 -0.078 -0.048 0.078 0.050
0.0 -0.4 99.0 99.0 0.01Line10 0.461 0.292 -0.461 -0.292
0.7 2.1 97.2 99.0 1.80MN 0047 -0.078 -0.048 0.078 0.050
0.0 -0.1 99.0 99.0 0.00Line12 0.079 0.050 -0.079 -0.050
0.0 -0.1 99.0 99.0 0.00Line16 0.304 0.192 -0.304 -0.192
0.5 1.7 97.5 99.0 1.44MN 0007 -0.078 -0.048 0.079 0.050
0.0 -0.1 99.0 99.0 0.00Line14 0.000 0.000 0.000 0.000
0.0 -0.6 99.0 99.0 0.01Line18 0.226 0.142 -0.226 -0.143
0.7 2.1 99.0 97.2 1.80MN 0050 0.078 0.050 -0.078 -0.048
0.7 2.1 97.2 99.0 1.80MN 0002 -0.078 -0.048 0.078 0.050
0.0 -0.3 99.0 99.0 0.00Line20 0.147 0.093 -0.147 -0.093
0.0 -0.5 99.0 99.0 0.00Line22 0.099 0.062 -0.099 -0.062
0.4 1.3 99.0 97.2 1.80MN 0045 0.049 0.031 -0.048 -0.030
0.0 -0.5 99.0 99.0 0.00Line24 0.049 0.031 -0.049 -0.031
0.3 0.8 99.0 97.8 1.13MN 0013 0.049 0.031 -0.049 -0.030
0.3 0.8 97.8 99.0 1.13MN 00051 -0.049 -0.030 0.049 0.031
10.2 10.4
-
Location:
Engineer: Study Case: LF
12.6.0HPage: 2
SN:
Filename: Project OJT Section 1
Project: ETAP
Contract:
Date: 28-04-2015
Revision: Base
Config.: Normal