Loops

download Loops

of 1

description

aaaa

Transcript of Loops

MAHINDRA & MAHINDRA LTD. SWARAJ DIVISION DESIGNED BY: GAURAV SINGLA

Gear Box Assembly Loop No. 4

Idle GearSub-AssemblyGear ShiftingTesting RigShifter Rods&Forks fitmentGear & Shaft FitmentUnloading of Gearbox Housing Bearing PressingInternal gear & Planet gear carrier Sub Assembly

To Rear cover Fitment in Differential LOOPHYDRAULIC TESTING RIG( for testing)Control Sector, C/valve, Coupler Sub-Assembly Fitment Rear/cover CastingLoading and Cylinder FitmentSensor tube / Response Valve Assembly FitmentGap Setting54mm+_0.02Rock-Shaft , Ram arm FitmentSensor TubeSub-AssemblyResponse/Relief Valve Sub- Assembly & TestingControl ValveSub- AssemblyRockshaft -Bush Sub AssemblyCoupler Sub-AssemblyC- Sector Sub AssemblyRAM cylinder Sub AssemblyREAR COVER FITMENT***************Gearbox Coupling Station In Differential Loop NO. 1King Pin Stub AxlefitmentFRONT AXLE BEAMSub-Assembly & FitmentHydraulic pump Sub AssemblyENGINE RACK(FROM ENGINE PLANT)4 cylinder-843XM,978FE3 cylinder-735FE,735XM,855FE,744FE2 cylinder- 724XM(1 cylinder- 725 upcoming)Engine Assembly Loop No. 5******************LOOP NO. 2Fit over engineDelivery adapter suction pipe fitmentInsert O rings in delivery pipe & suction pipeHydraulic pump RackEngine oil fillingClutch FitmentStarter Fitment