LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 PLAN TECHNICAL ADVISORY COMMITTEE (TAC) MEETING #4 FEBRUARY 7, 2017

Transcript of LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated...

Page 1: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 PLAN TECHNICAL ADVISORY COMMITTEE (TAC) MEETING #4

FEBRUARY 7, 2017

Page 2: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Agenda

• WMYA 2040 Status Update

• Updated Needs, Revenues & Gap

• MetroQuest Survey Results

• Alternative Investment Choices (AICs)

• Next Steps

WMYA TAC MEETING #4February 7, 2017 2

Page 3: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Plan Development Status

Task 1: Preparations & Research

Task 2: Goals & Objectives

Task 3: Needs & Revenues Forecast

Task 4: Scenario Analysis

Final Plan & Implementation – Targeting May Transportation Board Study Session

May 2017

WMYA TAC MEETING #4February 7, 2017 3

Page 4: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Highway Needs by Investment Type: $53 BCategory / Mode Estimated 25 Year Need Annual Need

Preservation

Pavement $7.9 B $316 M

Bridge $1.3 B $54 M

Subtotal $9.2 B $370 M

Modernization

Highways $4.3 B $172 M

Bridge $0.4 B $16 M

Safety $1.9 B $76 M

ITS/Technology $3.3 B $132 M

Subtotal $9.9 B $396 M

Expansion

Expansion (HERS-ST) $12.6 B $504 M

New Roads $8.7 B $351 M

Bridges $0.4 B $17 M

Interchanges $2.3 B $92 M

Key Commerce Corridors $10 B $400 M

Subtotal $34 B $1,360 M

TOTAL $53 Billion $2.1 Billion

WMYA TAC MEETING #4February 7, 2017 4

Page 5: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Non-Highway Needs: $36 B• Public Transit ($14.8 Billion)o Rural transit ($1.7B) extrapolated from 2008 ADOT study

o Urban transit ($13.1B) from ADOT staff and MPO plans

• Non-Motorized ($913 Million )o Derived from MPO plans

o Rural SHS needs (e.g., shoulders) in highway modernization needs

o Does not include data from all jurisdictions

• Passenger Rail ($6.2B Million )o Derived from State Rail Plan/ ADOT & MPO staff

o Rural SHS needs (e.g., shoulders) in highway modernization needs

• Aviation ($14.4 Billion )o Extrapolated from 2008 State Airport System Plan

WMYA TAC MEETING #4February 7, 2017 5

Page 6: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Revenue Forecast: $31.1B (2016 $)

$0

$500

$1,000

$1,500

$2,000

$2,500

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040

Mil

lio

ns

$38.7 billion in current yeardollars equates to....

...$31.1 billion in inflation adjusted dollars to base year 2016(a 20 percent loss in purchasing power)

WMYA TAC MEETING #4February 7, 2017 6

Page 7: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

State Highway Funding Gap

$30 Billion Gap

WMYA TAC MEETING #4

$53B

$23B

$4.8B

$3.5B

$0

$10

$20

$30

$40

$50

$60

Highway Needs HighwayRevenues

O&M andTransit

Bill

ion

s (2

01

6 $

s)

February 7, 2017 7

Page 8: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Operations & Maintenances• Activities: routine pavement maintenance,

guardrail replacement, barriers, etc.• Funded by annual State Budget Appropriation• Current funding level is $138M/year• ADOT estimates current level is $50M/year too low• New facilities in MAG & PAG plans, and increased

ITS deployment, will increase needs

WMYA TAC MEETING #4February 7, 2017 8

Page 9: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Allocation by Investment Area

Annualized Allocation Based on Current Plans*

MAG PAG ADOT - Greater AZ Total

Expansion $343 32% $93 9% $45 4% $482 52%

Modernization $43 4% $27 2% $107 10% $176 19%

Preservation $6 1% $0 0% $258 24% $264 29%

TOTAL $393 38% $120 11% $410 51% $922 100%

*MAG 2035 Regional Transportation Plan*PAG 2045 Regional Transportation Plan*ADOT Five Year Construction Program FY 14-21

WMYA TAC MEETING #4February 7, 2017 9

Page 10: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Public Outreach Results

WMYA TAC MEETING #4February 7, 2017 10

Page 11: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

WMYA TAC MEETING #4

Public Engagement: RIC Development

• Use of Metroquest online tool

• Content – Five screenso Welcome – provides basic facts and

info on WMYA 2040 initiative

o Priority Ranking – asked respondents to rank investment areas

o Budget Allocation – respondents said how they would spend $100

o Trade-offs – five pairwise comparisons

o Wrap-up – participant info and link to Project Website

February 7, 2017 11

Page 12: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

WMYA TAC MEETING #4

Participation and Publicity

o Strong e-mail and media campaign

o 14,000+ visited survey website, nearly 6,000 completed survey

February 7, 2017 12

Page 13: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

WMYA TAC MEETING #4

Who Participated

February 7, 2017 13

Page 14: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

WMYA TAC MEETING #4

Who Participated

February 7, 2017 14

Page 15: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

WMYA TAC MEETING #4February 7, 2017 15

Page 16: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

WMYA TAC MEETING #4February 7, 2017 16

Page 17: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

WMYA TAC MEETING #4

• Smooth Roads: Preserve and maintain the existing pavement and bridges

• New Smart Roads: Expand the system with new roads, interchanges, and technology

• Smart Roads: Enhance system with advanced technology and support connected vehicles

• More Roads: Expand the system constructing new roads and widening existing roads

• Connected Roads: Improve access to the system by constructing new interchanges

Investment Trade-Offs: Categories

February 7, 2017 17

Page 18: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Trade-off #1

WMYA TAC MEETING #4February 7, 2017 18

Page 19: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Trade-off #2

WMYA TAC MEETING #4February 7, 2017 19

Page 20: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Trade-off #3

WMYA TAC MEETING #4February 7, 2017 20

Page 21: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Trade-off #4

WMYA TAC MEETING #4February 7, 2017 21

Page 22: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Trade-off #5

WMYA TAC MEETING #4February 7, 2017 22

Page 23: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Alternative Investment Choices (AICs)

WMYA TAC MEETING #4February 7, 2017 23

Page 24: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

AIC Side-by Side Comparison(Dollars in Millions 2016 $s)

WMYA TAC MEETING #4

Total Annual Budget % Share

%

Needs

Met Budget

%

Share

%

Needs

Met Budget

%

Share

%

Needs

Met Budget

%

Share

%

Needs

Met

Preservation $9,236 $369 $264 29% 72% $337 37% 91% $313 34% 85% $305 33% 82%

Modernization $9,962 $398 $175 19% 44% $220 24% 55% $248 27% 62% $214 23% 54%

Expansion $34,050 $1,362 $482 52% 35% $364 40% 27% $360 39% 26% $402 44% 30%

TOTAL $53,248 $2,130 $921 100% 43% $921 100% 43% $921 100% 43% $921 100% 43%

Blended AIC25-year Needs Current Plans AIC Agency AIC Public AIC

AIC Side-by Side Comparison

February 7, 2017 24

Page 25: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Alternative Investment Choices (AICs)

Preservation29%

Modernization19%

Expansion52%

Current Plans AIC

WMYA TAC MEETING #4February 7, 2017 25

Preservation37%

Modernization24%

Expansion40%

Agency AIC

Preservation34%

Modernization27%

Expansion39%

Public AIC

Page 26: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

RIC Discussion: Preservation Focus

Description: Builds from ADOT STIPs and budgets and MPO plans to estimated AIC based on Current Plans

Investment TypeGreater

Arizona MAG PAG

Annual

Total

25-Year

Total

% of Need

Met AIC % Investment Area

Modernization $55 $13 $2 $69 $1,736 28% 8% Modernization

Bridge $50 $0 $0 $50 $1,250 58% 5% Preservation

Pavement $270 $6 $0 $276 $6,912 87% 30% Preservation

Expansion $25 $343 $93 $462 $11,541 37% 50% Expansion

Technology $3 $7 $2 $12 $299 9% 1% Modernization

Accessibility $8 $23 $23 $54 $1,350 58% 6% Modernization

TOTAL $411 $393 $120 $923 $23,087 43% 100%

Detailed AIC

AIC Roll-up

Investment Area 25-Yr Needs

25-Year Revenue

% of Needs Met

Annual Spending

% of Total

Revenue

Preservation $9,236 $8,162 88% $326 35%

Modernization $9,962 $3,385 34% $135 15%

Expansion $34,050 $11,541 34% $462 50%

TOTAL $53,248 $23,087 43% $923 100%

WMYA TAC MEETING #4February 7, 2017 26

Page 27: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Baseline vs. Enhanced Preservation Spending: SHS Pavement

0

5

10

15

20

25

2016 2020 2025 2030 2035 2040

% L

ane

Mile

s at

DL

for

IRI

% Lane Miles at Deficiency Level for IRI

Baseline Scenario 1

• Assumes annual spending increases from $218M to $270M from 2023 to 2028, stays $270M/year through 2040

• Baseline developed using HERS-ST

• Scenario 1 developed assuming average resurfacing cost of $300K/lane mile

WMYA TAC MEETING #4February 7, 2017 27

Page 28: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Baseline vs. Enhanced Preservation Spending: NHS Bridges

4

5

6

7

8

9

10

2016 2020 2025 2030 2035 2040

% o

F D

eck

Are

a St

ruct

ual

ly D

efi

cie

nt

% of NHS Deck Area Structually Deficient

Baseline Scenario 1

• Assumes annual spending increases from $40M to $50M from 2023 to 2028, stays $50M/Year though 2040

• Number of deficient NHS bridges declines from 72 in 2016 to 48 in 2040

Max Federal Performance Threshold

WMYA TAC MEETING #4February 7, 2017 28

Page 29: LONG RANGE TRANSPORTATION PLAN UPDATE: 2040 ......Agenda •WMYA 2040 Status Update •Updated Needs, Revenues & Gap •MetroQuest Survey Results •Alternative Investment Choices

Next Steps• Work with PPAC to finalize RIC• Stakeholder coordination• Board approval of Draft Plan• Public review period• Final Plan

WMYA TAC MEETING #4February 7, 2017 29